Laserfiche WebLink
NOTE: <br />EXI5TIN6 GMU WALL 15 TO BE SHORED PRIOR TO GMU REMOVAL TO INSTALL NEW BEAM/COLUMN 5YSTEM. <br />6.G. 15 TO BE RESPONSIBLE FOR PROVIDING AND GOORDINATING ALL WALL 5HORING REQUIRED. <br />M, ON NEW H554x4 COLUMN UP T16HT TO <br />EXI5TIN6 GMU WALL. INSTALL 50 ANGLES <br />1 AND COLUMN ARE IN PLACE. <br />CONT. 5x3 ANGLE ON BEAM <br />BOLTED THRU WALL <br />B.O. NEW WALL OPENING = <br />> T.O. NEW BEAM @ +10'-0" <br />NFW MArnwy nPPNINr, - t,Fr- PI AN <br />NEW H554x4x1/4" COLUMN W1/2" x 6" x 6" GAP PLATE <br />AND 1/2" x 6" x 10" BASE PLATE W13/16" dia. HOLES <br />FOR (4) 112" dia. HILTI KWIK-BOLT III EXPANSION <br />ANGHORS. EMBED 4 5/4" INTO TOP OF EXISTING <br />FOOTIN6. PROVIDE OVERSIZED, HARDENED WA5HER5. <br />T.O. EXIST. FT6. <br />6.G. TO F.V. <br />EXISTING CONCRETE FOOTING, G.G. TO F.V. <br />WALL FRAMING ELEVATION <br />GENTERLINE BEAM = - <br />GENTERLINE EXISTING <br />GMU WALL <br />EXISTING 8" GMU WALL TO <br />BE REMOVED UP TO LEVEL <br />5HOWN HERE. <br />W8x21 STEEL BEAM w/(2) - <br />GONT. 5 x 3 x 1/4" STEEL <br />ANGLES, L.L.V. PROVIDE <br />13/16" dia. HOLES, SPACED <br />AT 2-6" O.G., FOR BOLTS <br />AS REOV. <br />nw <br />F-------------------------- <br />II <br />II <br />II <br />II <br />II <br />II <br />II <br />II <br />II <br />II <br />II <br />II <br />-------------------------------------------------------t-r--1� <br />Il <br />II <br />II <br />II <br />F---I <br />1 L_ <br />L--J 1 <br />3/4" dia A301 THREADED THRU��---' <br />`---I�------ - - - - - - - - - - - <br />- - - - - - - - - - - - - - - - - - - - - - - - <br />- - - - - - - - - - - - <br />RODS, SPACED @ 1'49" O.G. <br />PROVIDE NUT � WASHER ON BOTH <br />ENDS. DRILL 13/I6" dia. MAX. <br />HOLE THRU EXI5TIN6 GMU WALL. <br />II <br />II <br />T16HTEN NUTS SNUG TIGHT. DO <br />NOT OVER TOURQUE. <br />� <br />II <br />II <br />= <br />8.0. NEW WALL OPENINGOL <br />I <br />T.O. NEW BEAM @ +10'-0" <br />- - - - <br />- - - - - - - - - - - - - - - - - - - - - <br />TYP. ANGLE <br />1 II <br />1 II <br />`�--+�----------------- <br />II 1 <br />II 1 <br />3/16 3912 TO BEAM <br />II <br />------------------- ----------------+-�--�' <br />II <br />II <br />EXI5TIN6 DRIVE -THROUGH CANOPY, <br />II <br />GOLUMNS, GURB5 i LANES TO BE <br />I <br />REMOVED; REFER TO EXTERIOR <br />ELEVATIONS 4 SITE PLAN FOR <br />II <br />II <br />MORE INFORMATION <br />II <br />II <br />WALL SUPPORT SECTION A -A ,---;-;------------------------------------------------------ <br />Existing CMU Wall Removal & Resu <br />DEMOLITION 5PEGIFIGRTION5 <br />DEMOLITION DEFINITIONS AND REQUIREMENTS <br />I. REMOVE, DETACH ITEMS FROM EXISTING CONSTRUCTION AND LEGALLY DISPOSE OF THEM OFF -SITE, UNLESS INDICATED TO BE REMOVED AND SALVAGED OR <br />REMOVED AND REINSTALLED. <br />2. VERIFY NOTIFICATION RE6U ATION5 BEFORE EGINNIN L B 6 SELECTIVE DEMOLITION. COMPLY WITH HAULING AND DISPOSAL REGULATIONS OF AUTHORITIES <br />HAVING JURI5DIGTION. <br />GENERAL DEMOLITION NOTE5 <br />I. 6.G. TO VISIT SITE AND VERIFY THAT THERE ARE NO DISGREPANGIE5 BETWEEN EXISTIN6 CONDITIONS AND DRAWINGS PRIOR TO START OF DEMOLITION. <br />NOTIFY ARCHITECT AND TENANT OF DISCREPANCIES IMMEDIATELY FOR COORDINATION. <br />2. DEMOLITION 15 NOT NECESSARILY LIMITED TO WHAT 15 51 ON DRAWIN65. THE INTENT 15 TO INDICATE THE GENERAL SCOPE OF DEMOLITION REQUIRED TO <br />COMPLETE THE WORK IN AGGORDANGE WITH THE GONTRAGT DRAWIN65. <br />3. OBTAIN DEMOLITION PERMITS PRIOR TO START OF DEMOLITION. <br />4. FURNI5H ALL LABOR AND MATERIAL5/EQUIPMENT AS REQUIRED TO GOMPLETE DEMOLITION AND REMOVAL OF ALL ITEMS A5 INDICATED. <br />5. IF ANY QUESTIONS AR15E A5 TO THE REMOVAL OF A MATERIAL, CLARIFY THE POINT IN QUESTION WITH THE ARGHITEGT AND TENANT BEFORE PROGEEDIN6. <br />6. MEANS OF E6RE55 MUST REMAIN AGGE5518LE AT ALL TIMES DURING DEMOLITION. <br />7. REMOVE EXI5TIN6 FINISHES IN AREAS OF MODIFICATION, UNLE55 NOTED OTHERWISE. PATGH AND REPAIR EXI5TIN6 WALL5 IN PREPARATION FOR NEW WALL <br />FINISHES. <br />8. PATCH AND REPAIR EXISTING SLAB WHERE REQUIRED WITH POLYMER MODIFIED GROUT MANUFACTURED BY MASTER BUILDERS EMAGO OR EQUAL FOR NEW <br />FLOOR FINISHES. <br />9. CONTRACTOR SHALL BE RE5PON51BLE FOR PATCHING AND/OR REPAIRIN6 ANY DAMAGE CAUSED BY HIM OR HI5 5UBGONTRAGTOR5 TO EXI5TIN6 <br />GON5TRUGTION IN 5PAGE5 EXI5TIN6 TO REMAIN. REFINISH TO MATGH EXISTING ADJACENT FINISH OR A5 NOTED HEREIN. <br />DEMOLITION EXECUTION NOTES <br />I. DEMOL15H AND REMOVE EXI5TIN6 GON5TRUGTION ONLY TO THE EXTENT REQUIRED BY NEW GON5TRUGTION AND A5 INDICATED. USE ONLY METHODS REQUIRED <br />TO COMPLETE THE WORK AS INDIGATED ON PLAN AND AS NOTED. ALL METHODS MUST BE WITHIN LIMITATION OF GOVERNING REGULATIONS; G.G. TO <br />COORDINATE. <br />2. G.G. TO VERIFY LOCATIONS OF ALL EXISTING UTILITIES PRIOR TO START OF DEMOLITION. COORDINATE WITH UTILITY GOMPANIES AS REQUIRED. <br />3. G.G. TO VERIFY LOCATIONS OF ALL EXISTING 5TRUGTURAL COMPONENTS; REPORT ANY FINDINGS BACK TO ARGHITEGT <br />4. IN PARTITIONS TO BE REMOVED, REMOVE AND GAP ALL OUTLETS, 5WITGHES, WIRE5, THERMOSTATS, ETC. TO THEIR 5OURGE-5 AS REQUIRED. <br />5. REMOVE AND PROPERLY TERMINATE PER CURRENT CODES ALL PIPES, VENT5, APPLIANGE5 OR DRAINS NOT BEING RE -USED. <br />6. REMOVAL OF ANY EQUIPMENT GABLIN6 5WITGHE5 AND CONDUIT PERTAINING TO DATA/GOMMUNIGATION5 AND TELEPHONE SHALL BE VERIFIED WITH <br />TELEPHONE GOMPANIE5 SERVICE OWNER OR TENANT DATA/GOMMUNIGATION5 REPRESENTATIVE AS REQUIRED TO PREVENT NEW GON5TRUGTION DELAYS. <br />7. WHEN UNANTICIPATED MECHANICAL, ELECTRICAL, OR STRUCTURAL ELEMENTS THAT GONFLIGT WITH INTENDED FUNCTION OR DESIGN ARE ENCOUNTERED, <br />INVE5TI6ATE AND MEASURE THE NATURE AND EXTENT OF CONFLICT. PROMPTLY SUBMIT A WRITTEN REPORT TO ARCHITECT AND TENANT. <br />8. SURVEY EXISTING CONDITIONS AND CORRELATE WITH REQUIREMENTS INDIGATED TO DETERMINE EXTENT OF SELECTIVE DEMOLITION REQUIRED. <br />G. PERFORM SURVEYS AS THE WORK PR061RE55E5 TO DETECT HAZARDS RESULTING FROM 5ELEGTIVE DEMOLITION AGTIVITIE5. <br />10. IT 15 NOT ANTIGIPATED THAT ANY 5TRUGTURAL ELEMENTS WILL BE EFFECTED BY DEMOLITION. HOWEVER, IF STRUCTURAL ELEMENTS ARE EFFECTED, 6.G. 15 <br />TO PROVIDE AND MAINTAIN 5HORIN6, BRAGING, AND STRUCTURAL SUPPORTS AS REQUIRED TO PRESERVE 5TABILITY AND PREVENT MOVEMENT, SETTLEMENT, <br />OR COLLAPSE OF CONSTRUCTION AND FINISHES TO REMAIN, AND TO PREVENT UNEXPECTED OR UNCONTROLLED MOVEMENT OR COLLAPSE OF CONSTRUCTION <br />BEING DEMOLISHED. NOTIFY ARGHITEGT IMMEDIATELY. <br />11. GUT OR DRILL FROM THE EXPOSED OR FINISHED 51DE INTO CONGEALED SURFACES TO AVOID MARRING EXISTING FINISHED 5URFAGE5. <br />12. REMOVE DECAYED, VERMIN-INFE5TED, OR OTHERWISE UNSUITABLE MATERIALS AND PROMPTLY DISPOSE OF OFF-51TE. <br />13. DISPOSE OF DEMOLISHED ITEMS AND MATERIALS PROMPTLY. <br />D15P05AL OF DE:MOL15HED MATERIALS <br />I. EXGEPT FOR ITEMS OR MATERIALS INDIGATED TO BE REUSED, SALVAGED, REINSTALLED, OR OTHERWISE INDICATED TO REMAIN TENANT'S PROPERTY, <br />REMOVE DEMOLISHED MATERIALS FROM PROJECTS 51TE AND LEGALLY DISPOSE OF THEM IN AN EPA -APPROVED LANDFILL. <br />2. DEBR15 REMOVAL MUST BE PERFORMED PER BUILDING REGULATION5. GONTAGT THE BUILDING MANAGEMENT OFFIGE TO OBTAIN REGULATIONS AND SCHEDULE <br />FOR THE USE OF THE ELEVATORS PRIOR TO 5UBMITTIN6 BID. ALL DEBRIS REMOVAL SHALL BE PERFORMED IN AGGORDANGE WITH BUILDING MANAGEMENT <br />REQUIREMENTS AND PROGEDURES. <br />3. DO NOT ALLOW DEMOLISHED MATERIALS TO ACCUMULATE ON-51TE. REMOVE AND TRANSPORT DEBRIS IN A MANNER THAT WILL PREVENT SPILLAGE ON <br />ADJACENT 5URFAGE5 AND AREAS. DO NOT BURN DEMOLISHED MATERIALS. TRANSPORT DEMOLISHED MATERIALS OFF OWNER'5 PROPERTY AND LEGALLY <br />DISPOSE OF THEM. COORDINATE DISPOSAL WITH PROPERTY OWNER AND GOVERNING MUNICIPALITY. <br />GLEANING AND PREPARATION FOR GONSTRUGTION <br />I. PROVIDE STRICT CONTROL OF JOB GLEANING DURIN6 AND AFTER GON5TRUGTION. PREVENT DUST AND DEBRIS FROM EMANATING FROM <br />5)EMOLITION/GON5TRUGTOIN AREA, KEEP AREA GLEAN. <br />2. GLEAN ADJACENT 5TRUGTURE5 AND IMPROVEMENTS OF DUST, DIRT AND DEBRIS CAUSED BY 5ELECTIVE DEMOLITION OPERATIONS. RETURN ADJACENT <br />AREAS TO CONDITION EXI5TIN6 BEFORE SELECTIVE DEMOLITION OPERATIONS BEGAN. <br />DEMOLITION LEGEND <br />_ _ I EXISTIN6 CONSTRUCTION TO BE REMOVED <br />EXISTIN6 GON5TRUGTION TO REMAIN <br />I. EXI5TIN6 MEGHANIGAL UNITS AND ELECTRICAL PANELS TO BE REMOVED; REMOVE ALL WIRING BACK TO 5OURGE <br />2. ALL EXISTING NON-5TRUGTURAL INTERIOR WALL5 TO BE REMOVED UNLE55 NOTED OTHERWISE <br />3. ALL EXI5TIN6 PLUMBIN6 FIXTURES TO BE REMOVED; PIPES AT GROUND FLOOR TO BE GUT ABOVE SLAB AND GAPPED <br />4. EXISTING DROP GEILIN6 TO BE REMOVED IN ITS ENTIRETY; ALL GEILI% AGGE55ORIE5 INGLUDING 1-161 DIFFU5ER5 ETC. TO BE REMOVED; MECHANICAL <br />DUCTS TO BE REMOVED BACK TO UNITS <br />5. REMOVE EXISTING FLOOR FINISH IN ITS ENTIRETY TO CONCRETE 5UB-FLOOR; SCRATCH SMOOTH; PATCH AND REPAIR A5 NEEDED TO A 'LIKE NEW' CONDITION <br />6. BANK VAULT TO BE REMOVED; DEMOL15H VAULT INTERIOR FURRIN6/FIRAMING; REMOVE MODULAR VAULT PANELS IN THEIR ENTIRETY; REPAIR FLOOR TO 'LIKE <br />NEW' GONDITION AS APPLICABLE <br />7. DRIVE THROU6H LANES, CURBS, CANOPY, COLUMNS AND BANKING EQUIPMENT TO BE REMOVED IN THEIR ENTIRETY <br />8. DRIVE THROUGH WINDOW TO BE REMOVED; OPENING TO BE IN -FILLED TO MATGH EXI5TIN6 BUILDING EXTERIOR, 5ALVA6E BRIGK FROM CANOPY IF P0551BLE <br />a. ATM OPENING TO BE IN -FILLED TO MATGH EXI5TIN6 BUILDING EXTERIOR; 5ALVA6E BRICK FROM GANOPY IF POSSIBLE <br />� II II 1 <br />oft Detail <br />' <br />`-t-------------------------------------------------------rr---' <br />I I <br />I I <br />I I <br />I I <br />I HVAC #1 I <br />I I <br />I I <br />I I <br />I I <br />L___ <br />EXI5TIN6 WAG EQUIPMENT TO <br />BE REMOVED 4 REPLACED; <br />REFER TO MEP DRAWINGS <br />SCALE: 1 /2" = V-Ott I <br />II II <br />EXI5TIN6 DRIVE-THROU514 <br />WINDOW TO BE REMOVED; <br />INFILL OPENING TO MATGH <br />EXI5TIN6; 5EE RENO WALL <br />5EGTION <br />II II <br />II II <br />I I OI I <br />SAFE <br />J--J--------------- L_ - - - - - - - - <br />tt <br />Cr--------------I <br />-JEXI5TIN6 LOAD BEARING GMU I I I I <br />F--- MA50NRY WALL; PROTEGT I I I I I <br />FF - I it I I DURING DEMOLITION o °� - - - <br />FTU-4 <br />F- <br />I�=� ==== I ��---------- - --------- I BANK VAULT TO LL n <br />FTU 1 I I I I I o \\ / III BE REMOVED IN 1 <br />I I/ L__ J y I IT5 ENTIRETY <br />�� � I I I I L-- -� I I I I i I <br />L� _______= L----------- - - - - -- L - <br />� <br />\\ <br />EXI5TIN6 % \ <br />\\ \ I <br />MEGHANIGAL / I <br />Room TO / ALL GA5EWORK t <br />AIN -_- - - - -� I CABINETRY TO BE <br />REMOVED IN 1T5 II o LEI I 7 I I J <br />' I/ - - III t I ENTIRETY I it <br />� I <br />A <br />II <br />r---I I� � F -----i I ------I F -1 <br />/// \\ II --------- ----------- ------1_ J Ilp----7--1 1 1 I s <br />\ I I I I <br />EXI5TIN6 ELEGTRIGAL PANELS TO I I ii r r -' III- <br />I L BE REMOVED AND RELOCATED; <br />REFER TO MEP DRAWINGS FOR <br />NEW PANELS INFORMATION <br />EXISTING Wx24" POURED <br />GONGRETE GOLUMN TO <br />l REMAIN; F.V. LOGATION <br />------------- - EXI5TIN6 GMU WALL TO BE <br />- REMOVED; REINFORGE UPPER WALL <br />ii WITH STEEL FRAME PER DETAIL5 THI5 SHEET I I <br />II <br />FTU-2 I j <br />II-----J <br />III r--- III <br />I I III <br />l l ALL INTERIOR, NON-5TRUGTURAL j <br />I I WALL5 TO BE REMOVED UNLE55 FTU-5 I <br />NOTED OTHEM15E I I I <br />I I I I I III I <br />II ---------- L---J <br />---------� III II <br />_________ ALL III <br />EQUIPMENT TO BE REMOVED III <br />- <br />---------------------------- <br />I FTU-3 <br />I I jlj �---J III I I <br />I I � I;I III <br />I I ' III III �°ti I I <br />lil III s� <br />3N <br />--- -' <br />II I I�� I II II I� I I II <br />--------J L-------J�--------J�--------J sou`--------� <br />Demolition Floor Plan <br />SCALE: 3/16" = V-0" <br />2 <br />Nv <br />ARCHITECTURE <br />ENGINEERING <br />3680 Pleasant Hill Road <br />Suite 200 <br />Duluth, Georgia 30096 <br />p 770.622.9858 <br />f 770.622.9535 <br />www.hillfoleyrossi.com <br />© Copyright (as dated below). <br />This drawing and all reproductions thereof are the <br />property of Hill Foley Rossi & Associates, LLC.(HFR). <br />It is intended for the sole use of the project named <br />hereon. Reproduction without the written consent of <br />HFR is unlawful. All copies are to be returned to HFR <br />upon project completion. <br />1 sealed: 02-13-2019 1 <br />0 <br />L <br />� <br />O <br />17qUCq <br />Z3 <br />N <br />C <br />J <br />.0 <br />E <br />LL <br />T <br />Z <br />s <br />NC04 <br />O <br />:)- <br />O <br />_ <br />W <br />L <br />O <br />JC <br />LL <br />CL <br />N <br />- <br />C <br />1 <br />E <br />r <br />CU <br />U) <br />0 <br />cc <br />'i <br />Q <br />Q <br />> <br />d <br />O <br />E <br />z <br />LL <br />C:�--r <br />m <br />N <br />Co <br />CU <br />C <br />L <br />C <br />Z. <br />(1) <br />(1) <br />CL <br />r <br />i- <br />ti <br />N <br />02/13/19 For <br />Construction <br />mk I date issue <br />Demo <br />Floor Plan <br />D101 <br />HFR 18.945 <br />