My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7344 Gall Blvd (3)
Zephyrhills
>
Building Department
>
Building Plans
>
7344 Gall Blvd (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 12:53:19 AM
Creation date
2/25/2025 9:51:11 AM
Metadata
Fields
Template:
Building Plans
Street #
7344
Location
Gall Blvd
Contractor
Intrastruct Tampa
Building Plans - Permit #
21056
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KEY PLAN <br />EXTERIOR DEMOLITION NOTES <br />I. DRIVE THROUGH LANES, GURB5, CANOPY, GOLUMN5 AND BANKING EQUIPMENT TO BE REMOVED IN THEIR ENTIRETY; SEE <br />51TE PLAN <br />2. DRIVE THROUGH WINDOW TO BE REMOVED; OPENING TO BE IN -FILLED TO MATCH EXI5TIN6 BUILDING EXTERIOR; <br />5ALVA6E BRIGK FROM CANOPY IF POSSIBLE <br />3. ATM TO BE REMOVED; OPENING TO BE IN -FILLED TO MATCH EXISTING BUILDING EXTERIOR; 5ALVA6E BRICK FROM <br />GANOPY IF POSSIBLE; GOORDINATE RETURN OF ATM WITH PNG BANK <br />4. GANOPY ROOF TO BE REMOVED; REMOVE 5TRUGTURAL GOLUMN5; PREPARE BUILDING ROOF TO MATGH EXI5TIN6; SEE <br />A201 <br />*NOTE - EXTERIOR WALL5 AND BRICK VENEER ARE EXISTING TO REMAIN UKLE55 NOTED OTHERWISE. <br />DEMOLITION LE62END <br />D201 <br />CANOPY TO BE REMOVED UP TO THI5 <br />POINT; STOP DEMOLITION AT TOP OF <br />SOLDIER GOUR5E <br />SCALE: 3/16" = V-0" <br />nt-kj/ /r t[vir Tm/ T m, T -i-I ! Aki^r <br />REMOVE EXISTING DRIVE THRU GANOPY — <br />BAGK TO MAIN BUILDING ROOF 5TRUGTURE; <br />5ALVAGE UNDAMAGED BRICK FROM <br />CANOPY FOR INFILL OF EXTERIOR HALL <br />NLL DiVwRV nt1LVtk"E mu K=_ 1v 1 vY� L/N[J111N <br />DRIVE -THROUGH GANOPY BRICK FOR NEW BRICK INFILL. 6.G. TO PROVIDE DRIVE -THROUGH GANOPY <br />GOLUMNS AND BRICK KRAP5. 5UPPORT FOR BRICK DURING DEMOLITION. GOLUMN5 AND BRICK WRAP5. <br />D201 <br />Exterior Elevation - Demo <br />SCALE: 3/16" = V-0" <br />(n <br />w <br />U <br />O <br />U) <br />ARCHITECTURE <br />ENGINEERING <br />3680 Pleasant Hill Road <br />Suite 200 <br />Duluth, Georgia 30096 <br />p 770.622.9858 <br />f 770.622.9535 <br />www.hillfoleyrossi.com <br />© Copyright (as dated below). <br />This drawing and all reproductions thereof are the <br />property of Hill Foley Rossi & Associates, LLC.(HFR). <br />It is intended for the sole use of the project named <br />hereon. Reproduction without the written consent of <br />HFR is unlawful. All copies are to be returned to HPR <br />upon project completion. <br />1 sealed: 02-13-2019 1 <br />OF F�� <br />CJ.• ey <br />��76108 <br />0 <br />L <br />i_ <br />� <br />U <br />CN <br />c <br />N <br />J <br />•O <br />E <br />LL <br />C <br />T <br />� <br />z <br />� <br />s <br />U)_ <br />(� <br />O <br />O <br />O <br />2 <br />W <br />i <br />\ <br />L <br />O <br />LL <br />CAI <br />W <br />N <br />}v, <br />M <br />> <br />O <br />O <br />a) <br />o� <br />_o <br />L <br />W <br />ti <br />N <br />02/13/19 For <br />Construction <br />mk date I issue <br />Exterior <br />Demolition <br />Elevations <br />EXISTING GONSTRUGTION TO BE REMOVED <br />- — — — — — — — — — — — — — — — — — — — — — — - <br />REPRESENTED BY A DASHED LINE; SEE <br />ELEVATIONS FOR EXTENT OF WORK <br />D201 <br />HFR 18.945 <br />
The URL can be used to link to this page
Your browser does not support the video tag.