Laserfiche WebLink
ROOF FLASHING AND ROOF FLASHING COMPONENTS <br />TO BE IN ACCORDANCE w/ R903.2, FLORIDA BUILDING <br />CODE 7TH EDITION (2020) RESIDENTIAL <br />12 <br />I <br />INSULATION — <br />BAFFLE <br />INSULATION PER -- <br />CHART ON FLOOR <br />PLAN <br />5/8" OR 1/2" HIGH STRENGTH CEILING <br />BOARD PER CODE W/ 1 3/8" DRYWALL <br />NAILS OR DRYWALL SCREWS 7" O/C CEILING & 8" O/C WALLS <br />1/2" GYP WB � <br />DOUBLE 2x S.P.F. TOP PLATE - ATTACH 2x STUDS <br />TO TOP PLATE w/ (1) SIMPSON SP2 TYP. @ <br />CORNERS, SP2 MAY BE SUBSTITUTED w/ (1) H2.5A <br />2X BLOCKING @ EA. WALL <br />SHEATHING JOINT <br />16" O.C. 2X S.P.F. STUDS <br />2x BOT. PLATE W/ (2) 10d @ 6" O.C. <br />3/4" PLYWOOD DECKING GLUED AND NAILED W/ 10d <br />COMMON @ 6" O/C EDGES AND 12" O.C. FIELD <br />1/2" GYP. WB OR 3/8" PLYWOOD/ TYPE 2-M-W <br />OSB (DRAFTSTOPPING) TO BE NAILED W/8d <br />COMMON @ 6" O/C TO ONE SIDE OF THE FLOOR TRUSS FOR <br />AN AREA 51000 SQ. FT. OF FLOOR AREA & SEALED <br />PENATRATION AREA W/ FOAM. DRAFTSTOPPING SHALL <br />DIVIDE THE CONCEALED SPACE INTO APPROX. EQU . <br />AREAS. <br />FLOOR SYSTEM <br />ERPLAN I <br />1/2" HIGH STRENGTH OR 5/8" GYP WB (OR 5/8" — <br />GYP. TYPE "X" @ GARAGE ONLY) W/ 1 3/8" <br />DRYWALL NAILS OR DRYWALL SCREWS 7" O/C <br />CEILING & 8' O/C WALLS <br />1/2" GYP WB <br />INSTALLATION PER <br />CHART ON FLOOR PLAN -� <br />NOTE: LAP SHEATHING TO BOTTOM OF <br />BAND JOIST TYPICAL <br />1x WD FURRING @ 24" O.0 <br />FOR UNDERLAYMENTvi <br />STD. 90 HOOK (SEE DETAIL) <br />8"x8"X16" CONC. KNOCKOUT <br />BLK. W/1#5 ROD CONT. FILLED <br />SOLID W/GROUT <br />REQUIREMENTS SEE R905.1.1 <br />PRE ENGINEERED WOOD TRUSS @ 24" O.C. MAX. <br />HURRICANE ANCHOR @EACH TRUSS <br />SHINGLE ROOF, SHINGLES TO BE IN <br />ACCORDANCE w/ ASTM D7158-CLASS G or <br />H, or ASTM D3161-CLASS F, IN <br />ACCORDANCE w/ TABLE R905.2.6.1, <br />FLORIDA BUILDING CODE 7TH EDITION <br />(2020) RESIDENTIAL <br />ROOF SHEATHING -SEE <br />SCHEDULE - [RSH] - ON <br />FRAMING SHEET FOR <br />SHEATHING AND FASTENERS <br />ALUMINUM DRIP EDGE <br />ALUMINUM FASCIA <br />✓- 2x SUB FASCIA <br />SEE STRUCTURAL SOFFIT SHEET SS <br />ATTACHED WALL SHEATHING TO <br />(2) TOP PLATE W/ 8d @ 4" <br />O.C., 2 ROWS <br />1x2 NAILER <br />� ~ <br />PLYWOOD SHEATHING <br />NAILED PER NAILING SCHEDULE SEE DETAIL C/S6 <br />N <br />FOR MORE INFO <br />w <br />m <br />7l8" CEMENTITIOUS FINISH PER ASTM C. 926 <br />APPLY 3 LAYERS W/ TOTAL THICKNESS 7/8" OVER <br />� � <br />METAL LATH. FIRST 2 LAYERS 3/8" THICK EACH. 3RD <br />LAYER 1/8"THICK. <br />w <br />INSULATION PER <br />CHART ON FLOOR PLAN <br />B R <br />S6 S6 <br />ETAL SEAT <br />OR FELT <br />PAPER FOR <br />MOISTURE <br />JBARRIER <br />BASEBOARD <br />MIN. 2500 PSI CONC. SLAB <br />MIN. PSI MAY VARY PER <br />MUNICIPALITY <br />CV • • d <br />6x6W1.4xW1.4 — —-1-�JJ— a '. <br />WWF OR FIBERMESH _ I I _ •. , <br />ARCHITECTURAL <br />FINISH <br />(1) #5 VERT. IN FILL CELLS (SEE <br />FOUNDATION PLAN & NOTES) <br />M <br />v 4"x4" INSPECTION PORT AT <br />0- EACH FILL CELL TYPICAL <br />a u) <br />AT GARAGE CONTRACTOR <br />N TO CUT BLOCK OR POUR <br />CURB DUE TO SLOPE <br />NOTE: EXTEND DECO FINISH <br />411to 6" BELOW GRADE <br />INISH GRADE <br />"s ' —'Tr— "'' "jT� `-STD.90'HOOK <br />(3) # 5 REBAR ON 3" CHAIR (SEE DETAIL) <br />W/3" MIN. CLEARANCE 4" V-8" <br />TYP 2—STORY WALL SECTION 1 <br />REV.03.16.21 SCALE:3/4"=1'-0" S6 <br />SIMPSON LSTA24 STRAP wl (8) 10d x 1 1/2" NAILS TO <br />2ND FLOOR FRAME CONNECTION <br />SEE J/S-6 FOR ADDITIONAL INFORMATION. <br />SIMPSON LSTA24 STRAP w/ (8)10d x 1 1/2" <br />NAILS TO STUD & (8)10d x 1 1/2" TO BAND <br />JOIST AT EA. STUD � / <br />2nd FLOOR WALL----- <br />BAND JOIST <br />*SIMPSON LTP4 w/ <br />(12) 8d x1 1/2" NAILS <br />@ 24" O.C. <br />1st FLOOR WALL <br />SIMPSON LSTA24 STRAP w/ (8)10d x 1 1/2" <br />NAILS TO STUD & (8)1 Od x 1 1/2" TO BAND — <br />JOIST AT EA. STUD <br />2ND FLOOR FRAME CONNECTION <br />@ WOOD 1ST FLR. <br />UPLIFT CAP = 928 PLF <br />SHEAR CAP = 355 PLF <br />SEE J/S6 FOR ADDITIONAL INFORMATION. <br />SCALE: N.T.S. <br />SCALE: N.T.S. <br />SPACER <br />BLOCKS <br />'END SHEATHING TO <br />)F BEAM OR GIRDER <br />TE W/ <br />O.C. <br />OR TRUSS/JOIST <br />2"x BOT. PLATE W/ <br />(2)10d @ 6" O.C. <br />NOTES: ` USE <br />LTP4 & EXTEND <br />SHEATHING TO <br />BOTTOM OF RIM <br />BOARD/BAND <br />JOIST FOR <br />SHEAR WALL <br />ONLY. <br />'7 CORNER <br />TYPICAL "T" AND CORNER <br />DETAILS rN <br />SCALE: N.T.S. S6 <br />2ND FLOOR FRAMING - SEE <br />SECTION J/S6 <br />DECKING ATTACHED WALL SHEATHING <br />TO BOTTOM PLATE/CHORD W/ 8d <br />@ 4" 0/C, 2 ROWS STAGGERED <br />°O FLOOR TRUSS SEE FRAMING PLAN <br />FLOOR TRUSS <br />00 SEE FRAMING WEEP SCREED <br />z PLAN 19f <br />INSTALLED PER MANUF. <br />2"x4" CROSS BRACE @ 48" SIMPSON HETA20 w/ (8) 10dx1 1/2" <br />O/C FOR THE 1ST T-O" OF NAILS @ 24" O.C. INTO TRUSS <br />END WALL W/ (2)1063" @ EA. BLOCKING & MIN. 4" EMBEDMENT <br />END INTO 2"x4" BLOCKING IN KO BLOCK <br />SEE DETAIL 2/D2 FOR —Tt <br />MORE INFORMATION <br />2ND FLOOR FRAME CONNECTION R <br />PARALLEL TO MASONRY WALL SCALE: 3/4"=V-0" S6 <br />SEE TYP. 2-STORY WALL SECTION <br />FOR ADDITIONAL INFORMATION. <br />2x STUDS @ 1 <br />2"x BOT. PLATE <br />(2)10d @ 6" 0.( <br />PRE-ENGINEE <br />FLOOR TRUSS <br />FLOOR CONNECTION <br />ATTACHED WALL SHEATHING <br />CONTINUOUS TO BOTTOM RIBBON <br />W/ 8d @ 4" O.C., 2 ROWS STAGGERED <br />2X4 RIBBONS, EACH W/ 4-16d <br />NAILS INTO EA. FLOOR TRUSS <br />WEEP SCREED <br />INSTALLED PER. MANUF. <br />SIMPSON HETA20 w/ (8)10dx1 1/2" <br />NAILS AT EA. TRUSS w/ MIN. 4" <br />EMBEDMENT IN KO BLOCK <br />@ MASONRY 1ST FLR. SEE J/S6 SCALE: 3/4"=V-0" <br />FOR ADDITIONAL INFORMATION. <br />TR <br />RIBBONS <br />DETAIL FLOOR TRUSS 0 <br />SCALE: 1 1 /2"=V-0" S6 <br />NOTE: SEE TYPICAL WALL <br />SEE SHEATHING <br />SECTION C/S3 FOR <br />SPECS ON FLOOR <br />ADDITIONAL INFORMATION <br />1/2" GYP. W.B. MIN. @ <br />GARAGE SIDE IF APPLICABLE <br />2x BLOCKING HORIZONTALLY <br />@ INTERVALS NOT <br />5/8"DIA. x 10" "J" BOLT W/ 8" <br />EXCEEDING 1V-0" (R302.11) <br />EMBEDMENT @ 24" O.C. W/ <br />SIMPSON SP1 w/ (10) 10d <br />2"DIA.X 3/16" PLATE WASHER <br />NAILS AT EA. STUD <br />(MIN. SHEAR 3500#. MIN. <br />2 x STUDS @ 16" O.C. <br />TYPICAL TENSION 2600#.) <br />2X P.T. PLATE <br />6 x 6 W1.4 x W1.4 WWF OR FIBERMESH <br />d <br />- <br />• d A" <br />• '. .�.r <br />— •, • <br />- <br />11 F77 <br />�[j�=CLEARANCE <br />(3) #5 CONT. ON 3" <br />8" 1'-8"CHAIR W/ 3" MIN. <br />INTERIOR 2-STORY FRAME SECTION <br />SEE TYP. 2-STORY WALL SECTION FOR SCALE: 3/4"=V-0" <br />ADDITIONAL SLAB INFORMATION. <br />15132"OSB <br />EXPOSUREI <br />SHEATHING <br />�I <br />x <br />PROVIDE <br />x <br />II II <br />BLOCKING AS <br />REQUIRED PER <br />D <br />w <br />o SECTION X-X IF <br />II II <br />NOT FULL <br />vwzi <br />< HEIGHT SHEET <br />C IIZ II <br />o <br />U) <br />Z <br />N <br />II II <br />G FLOOR SYST <br />M <br />(2)- 2x TOP PLATE <br />BEYOND I <br />T_ T _TII <br />F <br />EXPDXPOSUREI F <br />SHEATHING W <br />II II II <br />M <br />SOLID 2x rn <br />III <br />C <br />III II II II I <br />BLOCKING @ ALL o <br />C <br />SHEATHING 0 <br />TEDGES <br />(SEE <br />III <br />OPENING <br />SECTION X-X <br />III <br />III x II II <br />R W <br />ON <br />II <br />Ilf x <br />E <br />_ <br />2x STUDS W <br />III <br />I <br />III II II II <br />BEYOND. N <br />I <br />SEE PLAN o <br />III <br />I I I II <br />II I II II I� I <br />CC <br />II <br />Ll - IVL <br />_L -1 _II <br />2x4 P.T. BASE <br />2x RIBBON OR VERTICAL A HORIZONTAL PLATE BEYOND <br />BLOCKING SEE PLAN <br />BETWEEN FLOOR WALL SHEATHING <br />SYSTEM WALL ELEVATION DIAGRAM <br />3/8" "S" = NA <br />SPACIN <br />I c 3/4" <br />S-- 112" <br />SINGLE NAIL EDGE SPACING DOUBLE NAIL EDGE SPACING <br />AT ALL PANEL BLOCKING <br />LOCATIONS SHALL BE MIN 2x4 #2 <br />SPF TURNED VERTICAL w/ 7/16" <br />FLITCH PLATE TO w/ (2) 12d <br />TOENAILS EA. END. NAIL FLITCH <br />PLATE TO VERTICAL w/ (4) 8d NAILS <br />(2) 8d NAILS @ 3" O.C. <br />STAGGERED FOR SHEATHING <br />SECTION X-X <br />T�7 <br />SFFA �O�L <br />�N <br />2x CRIPPLES @ — <br />16" O.C. W/ (2) 12d <br />TOENAILS T/B <br />10d NAILS @ <br />8" O/C TYP. <br />DOUBLE 2x <br />CRIPPLE STUD <br />TYPICAL (U.N.O.) <br />WALL SHEATHING MAY BE INSTALLED VERTICALLY OR HORIZONTALLY, <br />ATTACH PER NAILING SCHEDULE. PANEL EDGES WILL NEED TO BE <br />ATTACHED TO STUD AND OR BLOCKING AT ALL EDGES. A MINIMUM Ya" <br />SPACE IS RECOMMENDED BETWEEN PANELS AT EDGES AND END <br />JOINTS TO ALLOW FOR EXPANSION. FASTENERS SHALL NOT <br />w <br />PENETRATE SURFACE MORE THAN Y". <br />r— <br />z <br />? <br />r� NAIL AT BASE 2 ROWS @ 4" O.C. w/ 8d COMMON NAIL <br />O <br />© NAIL AT TOP PLATE TWO ROWS @ 4" O.C. w/ Sd COMMON NAIL <br />Z <br />© NAIL OPENING PERIMETER w/ (2) ROWS @ 4" O.C. w/ 8d COMMON NAIL. <br />O <br />0 NAIL INTERIOR AT 6" O.C. w/ 8d COMMON NAIL. <br />C. of <br />O STAGGER ALL VERTICAL JOINTS & NAIL @ 4" O.C. <br />J <br />w/ 8d COMMON NAIL <br />J <br />w - o <br />in <br />O PLYWOOD SPLICES @ HEADER - NAIL SHEATHING TO HEADER <br />u- ¢ <br />W,v~im02 <br />w/ 8d COMMON NAILS @ 4" O.C. (2) ROWS @ TOP & BOTT. <br />v7 OF U.- � <br />@ (2) 8d NAILS @ 3" O.C. TO EACH TRUSS END OR @ VERTICAL <br />N w O'— <br />MEMBER IF GABLE END <br />NOTE <br />C WALL SHEATHING INSTALL. <br />S6 & NAILING SCHED. <br />REVISION 12-7-2020 <br />2-ROWS 12d NAILS <br />STAGGERED @ 12" O/C EACH <br />FACE OR 3-ROWS 12d NAILS <br />STAGGERED @ 12" O/C FOR <br />2"x10" OR GREATER HEADER <br />SEE FLOOR PLAN NOTES FOR <br />REQUIRED CONNECTION <br />(2) 2x HEADER SEE PLAN <br />S4 • INTERIOR HEADER: <br />BOX HEADER (1) 2x SILL PLATE W/ (2) <br />ONLY 12d TOENAILS <br />• EXTERIOR HEADERS: <br />(1) 2x SILL PLATE W/ (2) <br />12d TOENAILS <br />• OPENING LARGER THAN 4 FT: <br />(1) 2x SILL PLATE w/ SIMPSON <br />LS30 w/ (6)10d x 1 1/2" EACH SIDE <br />2x STUDS TYP. <br />P.T. BOT. PLATE <br />A/ ?/0, / �BEOMR TRUSS ! <br />SEE PLAN FOR REQUIRED--�' <br />CONNECTIONS <br />LOAD BEARING/EXTERIOR FRAME <br />WALL HEADER DETAIL <br />2x BLOCKING HORIZONT <br />@ INTERVALS NOT <br />EXCEEDING 10'-0" (R302.11) <br />5/8"DIA. x 10" "J" BOLT W/ 8" <br />EMBEDMENT @ 24" O.C. W/ 2"DIA. <br />x 3/16" PLATE WASHER (MIN. <br />SHEAR 3500#. MIN. TYPICAL <br />TENSION 2600#.) <br />2500 PSI CONCRETE MIN. <br />SLAB W/ 6x6 W1.4xW1.4 <br />`r WWF OR FIBERMESH <br />c <br />-III ; III,,,II n �. <br />M <br />S6 <br />Sd NAILS FOR WALL SHEATHING MUST BE MIN. 131 X 2 1/2 <br />DO NOT OVERDRIVE NAILS, FASTENERS SHALL NOT PENETRATE <br />SURFACE MORE THAN 1/8". <br />HEADER SUPPORT <br />NO. OF JACKS & STUDS <br />REQ. AT OPENINGS <br />OPENING <br />2" x 4" WALL <br />2" x 6" WALL <br />STRAPS <br />JACKS <br />STUDS <br />JACKS <br />STUDS <br />SIMPSON <br />SIZE <br />EA END <br />EA END <br />EA END <br />EA END <br />1'4 <br />(1) <br />(2) <br />1 <br />2 <br />(1) LSTA30 <br />4'4 <br />(2) <br />(3) <br />(2) <br />(2) <br />(1) LSTA30 <br />9'-16' <br />1 (3) <br />(3) <br />1 (2) <br />(3) <br />1 (2) LSTA30 <br />PLYWOOD SHEATHING NAILED PER NAILING <br />SCHEDULE SEE DETAIL C/S6 FOR MORE INFO <br />2X STUDS @ 16" O/C <br />7/8" STUCCO FINISH PER ASTM C. 926 <br />APPLY 3 LAYERS W/ TOTAL THICKNESS <br />7/8" OVER METAL LATH. FIRST 2 LAYERS <br />3/8" THICK EACH. 3RD LAYER 1/8" THICK. <br />SIMPSON SP1 w/ (10) 10d NAILS <br />AT EA. STUD <br />2X P.T. PLATE <br />WEEP SCREED INSTALLED PER. MANUF. <br />FINISH GRADE <br />(= o0 <br />r <br />(3) # 5 REBAR ON 3" CHAIR JI 4" ! V-8" <br />W/3" MIN. CLEARANCE 1 1 <br />ALTERNATE FOOTING V <br />@ WOOD 1ST FLR. SEE J/S6 FOR SCALE: 3/4"=V-0" G <br />ADDITIONAL INFORMATION. S6 <br />77 <br />N <br />N <br />�.. <br />f-:. . , - - <br />J ' <br />C / <br />L <br />u <br />t <br />r <br />j.j <br />t <br />ot <br />To the best of the Engineer's knowledge, information and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2020 <br />Florida Building Code - <br />Residential <br />7th Edition. Engineer's signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineer's <br />signature and seal. <br />g <br />m <br />�8. <br />m $ <br />�. <br />0) <br />Ni <br />U) rA LL <br />Q) M J <br />W <br />��u_ a <br />Lu <br />. a <br />Z <br />- <br />m v <br />ca 5 <br />W <br />W <br />:3 <br />in °i °' m <br />Z <br />u4 c+) Z d J <br />Z <br />N OU C <br />W <br />❑ ❑ <br />z <br />z <br />q � <br />U 6 <br />z0. <br />W <br />ll <br />` <br />4-1 <br />U. <br />�Ul <br />c 8 <br />�N <br />7 <br />U <br />111 J <br />`� <br />.. <br />U <br />c <br />q v°D o <br />� 0 <br />r <br />U_ <br />a E <br />Wo <br />R <br />`® <br />c <br />Co <br />1g <br />90 <br />a�� <br />z <br />N <br />L <br />m <br />= <br />N� <br />g0 <br />z <br />� v <br />� <br />aW <br />Z <br />2 <br />� <br />°$ <br />o <br />�o <br />w <br />W <br />w <br />c7 r <br />'o <br />O <br />zla <br />R r <br />0 3 <br />c <br />3 T <br />ai <br />rn <br />N <br />0 <br />co <br />T <br />T <br />..L <br />-~ <br />ti 7 <br />T <br />E <br />O <br />O <br />Lc7 <br />00 <br />m <br />O <br />O <br />00 <br />C r <br />N <br />CN <br />LC� <br />F— <br />O <br />CD <br />rn <br />c <br />d <br />co <br />CF) <br />Q00 <br />Ln <br />00 <br />n <br />T <br />o <br />Z <br />Z <br />O <br />E <br />N <br />_ <br />o- <br />U <br />Q 0 <br />JOB <br />NO : 22-08433-08426 <br />SCALE : <br />AS NOTED <br />SHEET NO. <br />S6 <br />(MONO) <br />