My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
36507 Well Hill Way
Zephyrhills
>
Building Department
>
Building Plans
>
36507 Well Hill Way
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:48:43 AM
Creation date
2/19/2025 2:26:58 PM
Metadata
Fields
Template:
Building Plans
Street #
36507
Location
Well Hill Way
Contractor
Lennar Homes LLC
Building Plans - Permit #
6543
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />I <br />I <br />--------- <br />CROSS BRACING DETAIL (TYP.)/,/- <br />SCALE: N.T.S. <br />TRUSS NOTES: <br />1. WOOD TRUSS ERECTOR SHALL PROVIDE BRACING ACCORDING TO ANSUCONV. FRAMED RIDGE <br />MAY NAILED <br />TPI-2014 <br />(TRUSS PLATE INSTITUTE) NOTE THAT THE COMBINED WIND AREA IS GREATER MIN. (4) 1 WHEN <br />BEFORE THE ROOF SHEATHING IS APPLIED, AND BRACING SHALL THEREFORE BE IT LANDS NEXT TO <br />INSTALLED AS THE TRUSSES ARE ERECTED. INADEQUATE BRACING IS THE MOST PRE-ENG. TRUSS <br />COMMON CAUSE OF ACCIDENT IN WOOD TRUSS CONSTRUCTION. FULL BUNDLES <br />OF PLYWOOD SHALL NOT BE PLACED ON TRUSSES. THIS CONSTRUCTION LOAD <br />SHOULD BE LIMITED TO 8 SHEETS OF PLYWOOD ON ANY PAIR OF TRUSSES & <br />SHALL BE LOCATED ADJACENT TO THE SUPPORTS. NO EXCESS CONCENTRATION <br />OF ANY CONSTRUCTION MATERIAL (SUCH AS GRAVEL OR SHINGLES) SHALL BE PLACED <br />ON THE TRUSSES IN ANY ONE AREA THEY SHALL BE SPREAD OUT EVENLY OVER <br />A LARGE AREA SO AS TO AVOID OVERLOADING ANY ONE TRUSS. <br />2. ALL BRACING (DB,CB,BB) SHOWN ABOVE SHALL BE IN ADDITION TO CONTINUOUS <br />LATERAL BRACING SPECIFIED BY THE TRUSS MANUFACTER ALL LATERAL BRACING <br />SPECIFIED BY TRUSS MANUF. SHALL HAVE ADDITIONAL DIAGONAL BRACES AT 20'-0" <br />O.C. MAXIMUM. <br />3. ALL BRACES SHALL BE 2X4 NOMINAL DIMENSION LUMBER & SHALL BE ATTACHED w/ (3) 12d <br />NAILS AT EACH TRUSS INTERSECTION. CB <br />4. ADDITIONAL BOTTOM CHORD BRACING SHALL BE INSTALLED AS REQUIRED BY TRUSS <br />DESIGN WHEREVER ADEQUATE STRUCTURAL CEILING ARE NOT <br />ATTACHED DIRECTLY TO THE BOTTOM CHORD OF THE TRUSS. pg <br />5. PROVIDE TRUSS BLOCKING AT ALL TRUSS BEARING SUPPORTS WHERE TRUSS <br />DEPTH EXCEEDS STANDARD HEEL HEIGHT SEE TYP TRUSS BLOCKING DETAILS <br />TYP. HAND FRAMING ABOVE TRUSS <br />2X4 STUDS & PLATES AT 2'-0" O.C. <br />EACH DIRECTION TYP. U.N.O. <br />2x8 BLOCKING NAILED @ <br />- EACH SIDE w/ (3) 12d NAILS <br />WHEN REQUIRED w/ (2) <br />SIMPSON HTS20 w/ (24) 10d x <br />1 1/2" NAILS EACH <br />PRE-ENG. TRUSS <br />2X4 DIAGONAL AT 8'-0" O.C. 2X4 BLOCKING <br />MAX &EACH END ALTERNATE BETWEEN EA. TRUSS CONT. ROOF SHEATHING AT TRUSS TOP — <br />CHORD AT ALL HAND FRAMED AREAS TYP. <br />DIRECTION TYP. A <br />-----L WOOD TRUSS -j <br />A <br />TYP. WOOD TRUSS BLOCKING DETAIL <br />SCALE: N.T.S. <br />PORCH SLAB SEE <br />FOUNDATION PLAN <br />EXTEND <br />SLAB 1 1/2" <br />(2) #5's CONT. T&B w/ <br />#3 STIRRUPS AT 4'-0" <br />WHEN DEPTH <br />EXCEEDS 30" <br />GRADE <br />CV <br />PORCH SILL 15 <br />SCALE: N.T.S. <br />DIAGONAL - <br />AT 8'-0" <br />MAX <br />TRUSS <br />VERTICAL SCAB 2 x 6 <br />#2 SPF 48" O.C. W/ (4) <br />10d TOP & BOTTOM <br />OR SIMPSON H2.5A w/ <br />(10) 8d NAILS <br />COLLAR TIE <br />EVERY 3rd <br />RAFTER <br />2X4 SPF 2 (2) #7X 3-1/2" <br />WOOD SCREW EACH <br />TRUSS OR SIMPSON <br />H2.5A w/ (10) 8d NAILS <br />AT 48" O.C. <br />BEVEL CUTS <br />(OPTIONAL) <br />2x8 #2 SPF RIDGE BEAM <br />2x6 RAFTERS FOR SPANS 4FT TO 8FT <br />2X4 RAFTERS FOR SPANS LESS THAN <br />4FT @ 2'4"O.C. MAX. w/ (3) 10d <br />COMMON TOENAILS TO BEAM <br />2X4 CONT. ATE CONC. MASONRY <br />T & B CHORD STEEL OR WOOD <br />BEARING SUPPORT <br />A —A ALTERNATE BLOCKING <br />DETAIL @ INTERIOR BEARING <br />PROVIDE BLOCKING AT ALL TRUSS BEARING <br />SUPPORT WHERE TRUSS DEPTH EXCEEDS <br />STANDARD HEEL HEIGHT <br />SEE FLOOR PLAN SEE PLAN FOR <br />FOR BRG. OR REQ'D STAIR INFO, <br />NON-BRG. WALL IF CONCRETE STAIRS <br />FORMED & POURED <br />W/ (1) #5 EACH STEP <br />2" <br />- - -Y, <br />X <br />F° <br />- <br />d <br />UJI <br />- - <br />Z <br />PORCH SLAB SEE <br />N <br />FOUNDATION PLAN <br />w <br />(2) #5's CONT. T&B <br />tW <br />Z <br />W/ #3 STIRRUPS AT <br />iv z <br />4'-0" WHEN DEPTH <br />EXCEEDS 30" <br />LOWER OR <br />Ilk <br />GARAGE SLAB <br />SEE PLAN <br />LARGE <br />STEP <br />DOWN <br />1� <br />SCALE: N.T.S. <br />SCALE: N.T.S <br />K, <br />2X4 STUDS w/ SIMPSON <br />SP1 w/ (10) 10d NAILS <br />AT BASE SEE J/S6 FOR <br />MORE INFO. <br />SEE ROOF <br />PLAN SHEATHING <br />2X4 BLOCKING <br />BETWEEN TRUSSES <br />SECT. A -A <br />PROVIDE 2X4 MIN. BLOCKING AT <br />Q OF HIP/RIDGE, TYP.BETWEEN <br />TRUSSES W/ (2) 12D NAILS EACH <br />END TO TRUSS TOP CHORD <br />TYP. <br />➢A TRUSS <br />G.T. <br />ADD 2X4 ALONGSIDE <br />TOP CHORD WHEN REQ'D <br />TO PREVENT PLYWOOD <br />SPAN FROM EXCEEDING <br />MAX 24" SPAN (EITHER A USSES HIP <br />SIDE OR BOTH IF REQ'D) C. <br />(2) 12D NAILS AT 12" O.C. MAX <br />HIP/RIDGE BLOCKING DETAIL <br />z <br />O <br />Q <br />J <br />LU <br />LU <br />LU <br />SCALE: N.T.S. <br />WOOD POST. SEE FLR__T <br />PLAN FOR SIZE & BASE <br />CONNECTION SEE <br />PLAN <br />EXTEND <br />SLAB 1 1/2" <br />- (2) #5's CONT. T&B w/ <br />4" <br />#3 STIRRUPS AT 4'-0" <br />PORCH SLAB SEE - WHEN DEPTH <br />7 <br />FOUNDATION PLAN <br />EXCEEDS 30" <br />- J4 <br />U ON <br />GRADE <br />— —_ • -. — N ZZ <br />ENTRY PORCH SILL 14 <br />SCALE: N.T.S. <br />WOOD OR MASONRY ABOVE <br />MASONRY PIER SEE FLOOR PLAN <br />FOR COLUMN INFO <br />WOOD OR MASONRY <br />INTEGRATE MASONRY <br />ABOVE MASONRY <br />KNEEWALL INTO CMU BASE OR <br />PIER SEE FLOOR <br />MAIN HOUSE PER ELEVATION IF <br />PLAN FOR COLUMN <br />REQUIRED <br />INFO <br />MASONRY KNEE WALL MAX 3 <br />- <br />COURSES w/ TOP K.O. COURSE <br />CMU BASE W/ (1) #5 <br />W/ (1) #5 CONT. FILLED CELL <br />VERTICAL EACH <br />REQ'D @ MID SPAN MAX 6'-8" <br />CORNER FILLED <br />MAX 3 <br />SOLID. SEE ELEV. <br />I I I <br />r- <br />- — <br />I II <br />I I <br />I <br />I <br />I <br />I <br />F'IF <br />COURSE FOR BASE SIZE <br />(3) #5's EA. WAY <br />I I <br />$„ <br />SLAB PORCH SLAB SEE <br />Ak LEVEL FOUNDATION PLAN <br />2 #5' CONT T&B / °'' -z <br />TOP COURSE TO <br />BE CHAIR BLOCKS. <br />ENTIRE BASE TO <br />BE FILLED SOLID <br />SEE ELEV. FOR <br />BLK HGT. <br />#5 REBAR CONT <br />@ SLAB LEVEL <br />EXTEND SLAB <br />1 1/2" BEYOND <br />BLOCK FACE <br />EXTEND <br />SLAB 1 1/2" <br />CONTRACTOR TO INSTALL SEE CUT O s , w„ • T 2 <br />MIN 3" x 3" WEEP HOLE SECTION FOR #3 STIRRUPS AT 4 -0 <br />MORE INFO WHEN DEPTH <br />ALONG w/ PITCHING SLAB EXCEEDS 30"' <br />TO DRAIN WATER 1 -4 <br />KNEEWALL OPT. (ELEV TO INDICATE) MASONRY COLUMN <br />ENTRY PORCH SILL 16 <br />SCALE: N.T.S. <br />SIMPSON LSTA18 <br />w/ (12) 10d NAILS <br />CENTERED AT <br />SPLIT TO TIE <br />BEAMS TOGETHER <br />SEE FLOOR PLAN <br />FOR COLUMN SIZE <br />& ADDITIONAL INF( <br />EXTERIOR SHEATHING <br />ATTACHED PER <br />NAILING SCHEDULE <br />2X4 BASE PLATE W/ <br />SIMPSON LSTA30 w/ <br />(22) 10d NAILS OR <br />SIMPSON MTS12 w/ <br />(14) 10d x 1 1/2" NAILS <br />TO FLOOR GIRDER <br />BELOW @ 16" O.C. <br />16" FLOOR SYSTEM <br />FLOOR GIRDER <br />SEE PLAN FOR <br />SEE PLAN FOR <br />DIRECTION <br />CONNECTION <br />SECTION @ <br />FLOOR <br />CONNECTION 22 <br />SCALE: N.T.S. <br />— <br />— <br />SEE PLAN <br />SIMPSON HUC410 w/ (14) <br />F <br />I <br />I <br />FOR CANT. <br />16d INTO HEADER & (6) <br />10d INTO BEAM - SEE <br />ROOF PLAN FOR MORE <br />INFO <br />I <br />I <br />SEE FLOOR PLAN <br />I <br />I <br />COLUMN SIZE & BASE <br />7/16" OSB FLITCH PLATE <br />CONNECTION INFO <br />_ REQ'D ONLY WHEN <br />INDICATED ON BM. <br />— <br />— SCHEDULE/PLAN <br />7/16" OSB FLITCH PLATE <br />SEE FLOOR PLAN FOR <br />REQ'D ONLY WHEN <br />COLUMN SIZE & BASE <br />RE <br />FOR <br />OPTION A SC EDULDE/PLANM OPTION B CONNECTION INFO OPTION C <br />COMMON BM. TO POST ATTACHMENT <br />SEE ROOF PLAN <br />FOR BEAM SIZE & <br />CONNECTION INFO. <br />SIMPSON (2) HTS20 w/ (14) <br />10d NAILS TYP. U.N.O. <br />SEE FLOOR PLAN FOR — <br />COLUMN SIZE & <br />ADDITIONAL INFO. <br />(WOOD COLUMN SHOWN) <br />A � A <br />SEE PLAN FOR <br />TOPOFgEAM <br />o <br />SEE PLAN FOR <br />CANT. IF <br />INDICATED <br />CORNER SEE FOUNDATION <br />PLAN FOR MORE INFO <br />5" <br />�i <br />COMMON BM. ATTACHMENT <br />SCALE: N.T.S. <br />SCALE: N.T.S. <br />1 <br />MIDDLE <br />BM. SPLICE OVER <br />CENTER OF POST <br />WOOD WALL <br />OR TRUSS. <br />SEE PLAN <br />STRUCTURAL SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE <br />VARIES W/ <br />ROOF SLOPE <br />2X4 CONT. W/ (2) <br />16d COMMONS <br />NAILS EACH <br />STUD TYP. T&B <br />-TRUSS OR <br />ROOF SYSTEM <br />SHEAR TRANSFER <br />EXTERIOR. WALL � <br />SCALE: N.T.S. <br />2x4 #2 SYP NAILER. NA <br />TO STUDS w/ (3) 16d @ <br />EACH STUD - TOENAIL <br />EACH TRUSS TO <br />NAILER w/ (3) 10d <br />IF 2x DOUBLE LEDGER, <br />ATTACH FIRST PLY <br />w/ (4) 16d NAILS TO EA. <br />END OF TRUSS THEN <br />ATTACH SECOND PLY w/ <br />(3) ROWS OF 16d NAILS <br />AT 24" O.C. r <br />1 <br />ROOF AND EXTERIOR SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE <br />SEE 2ND FLOOR WALL SECTION <br />FOR ADDITIONAL INFORMATION <br />VERIFY FLOOR JOIST W/ RIM <br />BOARD OR FLOOR GABLE W/ <br />FRAMING PLAN <br />SIMPSON LUS26 w/ (8) 10d JH <br />NAILS OR IF 2 PLY TRUSS SEE FLOOR FRAMING PLAN <br />SIMPSON LUS26-2 w/ (8) 16d AND J/S6 FOR MORE INFO. <br />NAILS TO LEDGER VERIFY WITH PLAN FOR <br />2X8 #2 SYP CONT. LEDGER W/ LOCATION AND DIRECTION <br />(4) 16d NAILS ATTACH NAILS (IF PARALLE SEE 2/D2 FOR <br />INTO END OF EACH FLOOR BLOCKING INFO) <br />TRUSS, 24" O.C. MAX. (AT EACH <br />SIDE OF G.T. INSTALL (4) NAILS MASONRY WALL <br />EACH SIDE) (TYPICAL) <br />SECTION AT LOW ROOF 9 <br />SCALE. 1/2 - 1'-0" <br />COMMON TRUSS <br />W/ INTERIOR BRG. <br />SEE PLAN FOR <br />CONNECTIONS <br />INFO. <br />% <br />RUSS/ <br />OP WAL <br />-FSEE PLAN <br />Y2" CDX PLYWOOD OR 16" O.S.B. <br />MIN. (2) 2x8 #2 SYP <br />SHEATHING REQ'D FROM BOTTOM <br />HEADER. SEE Q/S4 FOR <br />OF WALL TO ROOF SHEATHING <br />REQ'D CONNECTIONS <br />ABOVE W/ 8d NAILS @ 4" O.C. IN <br />FIELD, EDGES & BOUNDARIES-------.�� <br />2x4 #2 SPF STUDS @ <br />12" O.C. W/ USP SPT22 <br />@ BASE & S PT24 @ <br />TOP <br />2x4 #2 SYP P.T. PLATE W/ <br />5/$" EPDXY ANCHOR OR <br />J-BOLT OR Y TITEN HD <br />/ <br />2„ <br />I ANCHOR @ 24" O.C. W/ <br />SEE PLAN MAX. <br />MIN. 6 EMBEDMENT <br />24" STEPS <br />SEE PLAN FOR OPT. <br />. Aa <br />° ' ° <br />STAIR INFO. IF <br />"° d ° <br />CONCRETE STAIRS <br />Q <br />FORMED &POURED <br />MAIN HOUSE <br />a .' a. <br />W/ (1) #5 EACH STEP <br />�a <br />" SLAB <br />d s. <br />(2) #5's CONT. T&B <br />a w/ #3 STIRRUPS AT <br />i <br />a ® 4'-0" WHEN DEPTH <br />EXCEEDS 30" <br />GARAGE OR <br />LOWER SLAB <br />.' g <br />SEE PLAN <br />° <br />1'-4" <br />SECTION GARAGE MONO 21 <br />SCALE: N.T.S. <br />i <br />N <br />N <br />0 <br />o <br />Cu <br />`-amu <br />LiL- <br />!2 <br />M C= <br />o L <br />H Z9 N L <br />3 E CD <br />=BCD <br />E <br />� <br />3 <br />6 <br />,...... <br />a �. . <br />^ fir ">"e <br />�O <br />i? <br />To the best of the Engineer's knowledge, information and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2020 Florida Building Code - <br />Residentlal 7th Edition. Engineer's signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineer's signature and seal. <br />{' w <br />TE <br />co8 <br />O N p <br />v Cq Cq 6. N <br />0 <br />t U) :%i r ° <br />C J LL LL W <br />7>> 4J LL 5 0_ <br />Lu <br />—a a 4 <br />Z mCv n <br />wC 2 O � O <br />o2N� o <br />W U)°_' <br />Z NZ 4 J <br />�n N M <br />-0 V <br />Z OU < O <br />W ❑ O <br />V M � <br />N M <br />00 <br />Z <br />N <br />z o � <br />� <br />N z <br />c� o <br />Xw <br />� N <br />Q) <br />0 LU <br />N Ly N <br />�U0 <br />U 6 <br />•. <br />% E <br />8 <br />I <br />I <br />0 <br />w <br />c <br />M <br />N< <br />z <br />Z <br />G <br />LL <br />C E <br />ZO <br />oo <br />Zo <br />< <br />O <br />E <br />z0 <br />rts0 <br />oo <br />o E <br />' <br />00 <br />�< <br />ro <br />1— <br />o <br /><o <br />0 <br />z <br />ww <br />ra <br />¢ ❑ <br />m a <br />z� <br />z <br />m J <br />maw <br />�z <br />� <br />¢e8 <br />o. <br />aLL <br />go <br />az <br />W <br />m� <br /><o <br />w <br />o <br />M <br />w� <br />.s <br />>° <br />d <br />v <br />03 <br />zI< <br />=O <br />0 <br />= <br />10 <br />- <br />J <br />L.(') <br />0 <br />19} <br />v <br />rn <br />m <br />(� <br />T <br />L.f') <br />L 0 <br />QCT <br />T 9+ <br />T <br />0 2 <br />N <br />ca- <br />-_ <br />LO <br />L.n <br />O <br />j <br />-0 co <br />O N <br />U) <br />T <br />Q LO <br />T <br />2_1M <br />6i U <br />o <br />Z <br />Z <br />E Tai <br />c <br />co <br />a <br />U _j Q p <br />a) <br />JOB <br />NO : 23-06121 <br />SCALE: AS NOTED <br />SHEET NO. <br />D1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.