Laserfiche WebLink
UL DESIGNS <br />Design No. U904 <br />September 30, 20 10 <br />Bearing Wall Rating - 3 HR. <br />Nonbearing Wall Rating - 3 JUL <br />Load Restricted for Canadian Applications - See Guide BXUV7 <br />0. <br />n <br />7 MIN", <br />izontol Section <br />4 <br />(D(� <br />1. Concrete Blocks* - Various designs. Classification C-3 (� hr). <br />See Concrete Blocks category for list of eligible manufacturers. <br />2. Mortar - Blocks laid in full bed of mortarnom. 3/8 in. thick, of not less than 2-1/4 and not more than 3- <br />1/2 parts of clean sharp sand to I part Portland cement (proportioned by volume) and not more than 50 <br />percent hydrated lime (by cement volume). Verticaljoints staggered. <br />3. Portland Cement Stucco or Gypsum Plaster - Add 1/2 hr to Classification if used- Attached to <br />concrete bolcks (Itern 1). <br />4. Loose Masonry FM - If all core spaces are filled with loose dry expanded slag, expanded clay or shale <br />(Rotary Kiln Process), water repellant vermiculite masonry fill insulation, or silicone treated perlite loose fill <br />insulation add I hr to Classification. <br />5. Foamed Plastic* - (Optional -Not Shown) - 1- 1/2 in. thick max, 4 ft wide sheathing attached to <br />concrete blocks (Item 1). <br />THE DOW CHEMICAL CO - Type Thermax Sheathing, Thermax Light Duty Insulation, Thermax <br />Heavy Duty Insulation, Thermax Metal Building Board, Thermax White Finish Insulation, Thermax ci <br />Exterior Insulation, Thermax IH Insulation, Thermax Plus Liner Panel and Thermax Heavy Duty Plus (HDP) <br />*Bearing the UL Classification Mark <br />Reprinted from the Online Certifications Directory with permission from UL <br />C 2013 UL LLC <br />Through -penetration Firestop Systems <br />System No. C-AJ-1364 <br />February 08, 2010 <br />F Rating - 2 Hr <br />T Rating - 0 Hr <br />L Rating At Ambient - L ass Than I CFMsq ft <br />L Rating At 400 F - 2 CFAVsq ft <br />W Rating - Class I <br />SECTION' A -A <br />1. Floor Assembly -Min4-1/2 in.( 114mm) thick reinforced lightweight or normal weight (100-150pcf <br />or 1600 - 2400 lcg/m 3 ) concrete. Wall may also be constructed of any UL Classified Concrete Blocks'. Max <br />diam of opening is 25-7/8 in. (657 min). <br />See Concrete Blocks (CAZT) category in the Fire Resistance Directory for names of <br />manufactafers- <br />2. Through Penetrants - One metallic pipe, tubing or conduit to be installed either concentrically or <br />eccentrically within the firestop system- The annular space between tube and periphery of opening shall be <br />min 0 im(point contact) to max 1-7/8 in. (48 mm). Penetrants to be rigidly supported on both sides of floor <br />assembly. The following types and sizes of metallic pipes, tubing or conduit maybe use& <br />.A. Steel Pipe- Nom 24 in. (610 mm) diam (or smaller) Schedule 10 (orheavier) steel pipe. <br />B. Iron Pipe-Nom 24 in. (610 mm) diam (or smaller) cast or ductile iron pipe. <br />C. Conduit - Nom 6 in. (152 mm) diam (or smaller) rigid steel conduit. <br />D. Conduit- Nom 4 in. (102 min) (or smaller) steel electrical metallic tubing. <br />E. Copper Tubing - Nom 6 in. (152 min) diam (or smaller) Type L (or heavier) copper <br />tube. <br />F. Copper Pipe - Nom 6 in. (152 nun) diam (or smaller) Regular (or heavier) copper pipe. <br />3. Firestop System - The details ofthe firestop system shall be as follows: <br />A. Packing Material - Min 3 in. (76 mrn) thickness ofmin 4 pef(64 kg J M) mineral wool <br />bait insulation firmly packed into opening as a permanent form. Packing material to be <br />recessed from top surface of floor to accommodate the required thickness of fill material. <br />B. Fill, Void or Cavity Materials* - Sealant - Min 1/4 in. (6 nim) thickness of fill <br />material applied within the annulus, flush with top surface of floor. Min 1/2 in. (13 mm) diam <br />bead of caulk applied to the penetrant/concrete interface at the point contact location on the <br />top surface of floor. <br />3M COMPANY - FB- 1000 NS, FB- 1003 SL or FB-3000 WT <br />*Bearing the UL Classification Mark <br />02013ULLLC Reprinted from the Online Certifications Directory with permission from UL <br />G=R & D.S. CALC <br />.Mhift,FL <br />Zo�&, <br />Guft,ff and Downspout SidBg <br />Building A <br />BuildingB <br />Building F <br />Bulding Parww.ters <br />Depth <br />DVth <br />Depth <br />Bldg Depth.at Gatter (ft) <br />130 <br />30 <br />-40 <br />GWu Igmgth (ft) <br />24: <br />Gutter Width (m) <br />Gutter Depth (in) <br />S <br />J15 <br />6 <br />DS Width (in) <br />41 <br />4 <br />DS, Depth (in) <br />6 <br />4, <br />4 <br />2017 Ftoridis Phind4ug Code 1166 <br />100 Year Hourly Rainfal.1 Rate (in per hr) F1 106-1 <br />45 <br />43 <br />-4.5 <br />CF per Hr per DS or Gufter Icagth <br />1170 <br />�34 <br />450 <br />,GPIH perDS or Gutter 1AM0 <br />9752 <br />2529 <br />3366 <br />GPM per DS or Gutter I&ngffi <br />146 <br />43 <br />57 <br />DoWnWuts;-_ <br />Max GPM Capacity (T 11 W-2) <br />563 OK <br />4W OK <br />1,180 OK <br />Gutters - <br />Max GPM Capacity @ 1/16" perl (T 1106-2) <br />__505� OK <br />24-3 OK <br />.:243 OK <br />1993 S1%LkC3NA <br />QW Fact" <br />10"'Vi <br />i0eyr <br />10 Yr <br />100 yr <br />10 Yr <br />100 Yr <br />5 Nfinute Intensity (in per hr for S min) <br />93 <br />191 <br />1-111111, <br />1.0-1 <br />RoofArea per DS Arm (sfper si) <br />140.01 <br />11"� <br />140-0 <br />Downspouts-- <br />DS Area (sq in) <br />36 <br />16 <br />16 <br />b&x Roof A= per DS <br />5W <br />3960 <br />2240 <br />1760 <br />22240 <br />1760 <br />Actual Factored XoofAaa per DS <br />3120 <br />900 <br />1200 <br />Check <br />OK <br />OK <br />OK <br />OK <br />OK <br />OK <br />Rtetangular CAtters (NIST Fomm1a)-- <br />Gutter Depth -to -Width -Nr <br />1-0000 <br />LOW0 <br />1-0000 <br />M11-0 <br />1-0000 <br />1-0000 <br />1.00,00 <br />L11,3/28 <br />1.4057 <br />1.4397 <br />1-4397 <br />LA-A5114 <br />37-68-379 <br />4139923 <br />24.1729. <br />26-55624 <br />26.79858 <br />2.9-42981 <br />Min Gutter Width W (m) <br />6-7379, <br />7.4022 <br />4.4267 <br />4_8631 <br />4.9057 <br />53894 <br />Check <br />OK <br />OK <br />OK <br />OK <br />OK <br />OK <br />Mm Gutter Depth (in) <br />-6-7379 <br />7-4022 <br />4..4267 <br />4-9631 <br />4�9057 <br />5,3894 <br />Check <br />OK <br />OK <br />0K <br />OK <br />OK <br />OK <br />Zeptlyrhills Storage <br />stinam Arcuttectw, tnc- <br />Unit Mix Tabulation <br />41112019 <br />SF per Unit <br />.25 <br />40 <br />50 <br />80 <br />100 <br />150 <br />200 <br />250 <br />300 <br />375 <br />Bldg A Conditioned Storage: <br />Ist Floor <br />Gross SF <br />5X5 <br />5X8 <br />_r�xio <br />8XIO <br />10XIO <br />IGX15 <br />I0x20 <br />10x25 <br />1=0 <br />15x25 <br />Total <br />Units <br />18 <br />0 <br />51 <br />2 <br />-49 <br />26 <br />24 <br />8 <br />7 <br />0 <br />185 Total Units <br />Total SF <br />23,677 <br />450 <br />0 <br />2.55,0 <br />160 <br />4,900 <br />3.900 <br />4.800 <br />2, <br />2,100 <br />0 <br />20,8M Net Rentable <br />Znd, Flo" <br />Gross SF <br />'5x5 <br />5xg <br />5xI0 <br />OxIO: <br />IWO <br />10x`t5 <br />10x2b <br />lQk2,6 <br />IOX-30 <br />15X25 <br />T <br />utfits <br />Z6 <br />1 <br />41 <br />1 <br />46 <br />25 <br />19 <br />10 <br />7 <br />0 <br />1185 Total Units <br />Total SF <br />26�174 <br />900 <br />40 <br />2.050 <br />80 <br />4,500 <br />3,750 <br />3�800 <br />7_50D <br />2,10D <br />0 <br />19,72G Net Rentable <br />Bldg A Total Conditioned <br />Gross SF <br />5x5 <br />5x8 <br />5XI0 <br />8xI0 <br />1OXIO <br />10x15 <br />10x20 <br />IOX25 <br />10x30 <br />15x2Ek <br />Total <br />urift <br />54 <br />1 <br />92 <br />3 <br />94 <br />51 <br />43 <br />16 <br />14 <br />0 <br />370 Tbtal Units <br />81% Efficiency <br />Office SF 83,0 <br />SF per Unit <br />25 <br />40 <br />'50 <br />80 <br />100 <br />150, <br />200 <br />250 <br />300 <br />375 <br />Non -Conditioned Storage: <br />Bldg 8 <br />Gross SF <br />ZX5 <br />fixg <br />5xI0 <br />8x10 <br />'IIDX10 <br />10x15 <br />M20 <br />IOX,26 <br />IWO <br />1SX25 <br />Total <br />unlits <br />0 <br />a <br />& <br />0 <br />0 <br />17 <br />0 <br />17 Total Units <br />Total SF <br />5,100 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />5,10D <br />0 <br />5,100 Net Rentable <br />Bldg C <br />Gross SF <br />5x5 <br />5XS <br />5xIQ <br />800 <br />10xI0 <br />10x15 <br />IWO <br />10x25 <br />14Dx30 <br />15x25 <br />Total <br />units <br />0 <br />4 <br />15 <br />0 <br />a <br />ig Total Units <br />TGWSF <br />3,4QO <br />0 <br />0 <br />0 <br />0 <br />400 <br />0 <br />3,000 <br />a <br />a <br />.0 <br />3,400 Net RentaNe <br />Bldg.D <br />Gross SF <br />5x5 <br />5x8 <br />500 <br />8xI0. <br />10x10 <br />10x.15 <br />IWO <br />10x25 <br />10x30 <br />15M <br />Total <br />Units <br />0 <br />0 <br />2 <br />173 <br />7 <br />0 <br />0 <br />1 <br />23. Total Units <br />Total SF <br />3.925 <br />a <br />a. <br />a <br />0- <br />200 <br />1 �9,50 <br />1,AW <br />a <br />0 <br />375 <br />31925 Net Rentable <br />Bldg E <br />Gross SF <br />5x5 <br />5xg <br />5xI0 <br />8x10 <br />IOXIO <br />10xI5 <br />I0x20 <br />10x,25 <br />10X30 <br />15X25 <br />Total <br />units <br />a <br />0 <br />0 <br />0 <br />20 <br />12 <br />14 <br />46 Total Units <br />Total -SF <br />6,600 <br />0 <br />0 <br />2,000 <br />11,11M <br />2`800 <br />a, <br />0 <br />0 <br />6,600 Net Rentable <br />Bldg F <br />Gross SF <br />5x5 <br />5x8 <br />5xI0 <br />8xI0, <br />-10xI0 <br />I-OxIS <br />10x20 <br />10x25 <br />I OX-30 <br />15X25 <br />Total <br />Units <br />a <br />0 <br />0 <br />18 <br />10 <br />0 <br />ID <br />in <br />a <br />4.8 Total Units <br />Total sF <br />8,800 <br />0 <br />0 <br />0 <br />6 <br />1,800 <br />1,500 <br />0 <br />25M <br />3.000 <br />0 <br />818M Net Rentable <br />Bldg A-F Grand Total <br />Gross SF <br />5x5 <br />54 <br />8x19 <br />11OX10 <br />10x!5 <br />�IWO <br />110%25 <br />10x30 <br />Ift25 <br />Total <br />54 <br />1 <br />138 <br />86 <br />79 <br />�28 <br />41 <br />1 <br />Total U�ts <br />Total SF <br />TU76 <br />1,350 <br />40 <br />4,600 <br />240 <br />13,800 <br />14W0 <br />15,8M <br />7,000:12�3(Xl <br />375 <br />1538�QW Net Rentable <br />130, Ave SFJUnJt <br />" EWIO" <br />uplo " @ <br />51% <br />5 <br />0 <br />6 <br />0 <br />0 <br />.0 <br />0 <br />0 <br />0 <br />0 <br />11 5% <br />Over 2W @ <br />.2% <br />a <br />0 <br />0, <br />4 <br />2 <br />0 <br />0 <br />0 <br />0, <br />2% <br />'Total <br />a <br />16 <br />0" <br />4 <br />2 <br />a <br />a <br />a <br />0 <br />�m <br />NDle: Unit sizes indicated are noKmal, and are subject to valriation <br />COMCBECK <br />COMcheck Software Version 4.0.8.2 <br />Envelope Compliance Certificate <br />Project Information <br />Energy Code: 2017 Florida Building Code, Energy Conservation <br />Project Title: Zephyrhills Seff Storage <br />W.4 4_ZP1yM11lS, rfV[[Ua <br />Climate Zone: 2a <br />Project Type: New Construction <br />Vertical Gla2ing / Wall Area: 3% <br />Construction Site: Owner/Agent: <br />Designer/Contracgor: <br />Zephyrhills, FL <br />Stinard Architecture, Inc. <br />Cartersville, GA <br />Additional Efficiency Package(s) <br />High efficiency HVAC. Systems that do not meet the performance requirement will be identified in the mechanical requirements checklist <br />report. <br />Building Area <br />Floor Area <br />1 -Warehouse: Nonresidential <br />26041 <br />Envelope Assemblies <br />Assembly <br />Gross Area Cavity Cont. Proposed Budget U- <br />or R-Value R-Value 1.11-Factor Factor(a) <br />Perimeter <br />Floor 1: Slab-On-Grade:Unheated, (Bldg. Use 1 - Warehouse] (c) <br />663 - - 0.730 0.730 <br />Roof 1: Metal Building, Standing Seam-, High Athedo Roof Required, <br />2604 30.0 0.0 O�041 0.035 <br />Filled Cavity with Thermal Blocks (d), 3-Year-Aged Solar Roffectance <br />Index = 75.00 (e), [Bldg. Use 1 - Warehouse] <br />North Waft MTL PNL: Steel -Framed, 16" o.c., [Bldg. Use I - <br />5W7 <br />19�0 4.0 <br />O�076 <br />0,077 <br />Warehouse] <br />EASI <br />East Wail MTL PNL Steel -Framed, 16"o,c., [Bldg. Use 1 - Warehouse) <br />3380 <br />19�0 4.0 <br />0.076 <br />0.077 <br />Door 3: Glass (> 50% glazing): Metal Frame, Entrance Door, Perf. <br />96 <br />- - <br />0.290 <br />0.830 <br />Specs.: Product ID Kawneer, SHGC 0.23, VT 0.51, f8ldg. Use 1 - <br />Warehouse) (b) <br />SOUTH <br />South MTL PNL: Steel -Framed, 16" o.c., [Bldg. Use 1 - Warehouse] <br />2003 <br />19.0 4,0 <br />0.076 <br />OX7 <br />South EIFS: Steel -Framed, 16" o.c., (Bldg, Use I - Warehouse] <br />1211 <br />19.0 5.7 <br />0.067 <br />0.077 <br />South Stone: Steel -Framed, 16'o.c., [Bldg. Use I - Warehouse] <br />342 <br />19.0 0.0 <br />0.109 <br />0.077 <br />WEST <br />West EIFS: Steel -Framed, 16" o.c,, [Bldg, Use I - Warehouse] <br />1453 <br />19.0 5.7 <br />0.067 <br />O�077 <br />Window 1 - Metal Frame with Thermal Break:Fixed, Perf. Specs.: <br />128 <br />- - <br />0.290 <br />0.500 <br />Product ID Kaweer, SHGC 0.23, VT 0.51, (Bldg. Use I - <br />Warehouse] (b) <br />Door 1: Glass (> 50% gtazing):Metal Frame, Entrance Door, Perf. <br />168 <br />0.290 <br />0,830 <br />Specs.: Product ID kawneer, SHGC 0.23, VT 0,51, [Bldg, Use I - <br />Warehouse] (b) <br />Door 2: Insulated Metal, Swinging, [Bldg. Use I - Warehouse] <br />72 <br />0.313 <br />0.610 <br />Project Title: Zephyrhills Self Storage <br />Report date: 10/18/18 <br />Data filename: P:NNorth America Dev - Todd Addison\Zephyrhills FL\CD's\Zephyrhills COMcheck.cck <br />Page <br />I Of 10 <br />(8) 111000 U4400M ** U04 Ibr saftmre bnalive V04006MONLY� W-4 am not cmin ""mm4 <br />(0� FerfttmbOn W*daO PWtMW_4V MuU to MrMW 0 swwdarm with NFRC ana wpAAn nWorft doaxwrAstion- <br />(c) _149H:)r� pvposed and budipt UAmun &'am in Ublo am P-twbm <br />4) Th4"n0I Waw Wck *th mkrkMffll R-IS MUSI tin kWWJW ebm 0* louriktibeft, and Ow r*& do* *&MAred to thepwdinc <br />hi <br />Envem" c4mownwe statment. <br />Compfiance Statement The proposea envelope ft�gn reprew�teci in "ft doCument Is Consistent voith the building plam, <br />Specifications, and other caillcu"_ions submittect WiM fts PerMit 3WIC400M The proposed cAvelope *rstems have been <br />designed to meet ttle 2017 Florida Suiliding, C-ode, En"y Coo r on ulre COMcfteck V0'rlon 4,0.8.2 and to com;#y <br />with any applicable mandatory requi, s listed lo on chec <br />Name - Title -0 <br />Ngnatum, Date <br />OUnM SPECIMCATIONS <br />IGENERAL <br />1.01 FORM OF AGREEMENT: AIA DOCUNENT A101-2007, "STANDARD FORM OF <br />AGREEMENT BETWEEN OWNER AND CONTRACTOR VaffiRE THE BASIS OF PAYMENT <br />IS A STIPULATED SUM", WITH AIA DOCUMENT A201-2007 "GENERAL CONDITIONS OF <br />TBE CONTRACT FOR CONSTRUCTION". <br />ADMIMSTRAT10N OF THE CONTRACT WILL BE BY THE OWNER- <br />1.02 CONTRACT DOCUMENT AND FEELD CONDITION REVIEW: THE GENERAL <br />CONTRACTOR SHALL COMPARE TBE CONTRACT DOCUMENTS WITH EACH OTFIER <br />AND THE FIELD CONDITIONS, AND REPORT ANY INCONSISTENCIES, ERRORS, OR <br />ONUSSIONS, TO THE ARC111TECT BEFORE BEGMNING THE WORK. VERIFY <br />DEYMNSIONS AND FIELD CONDITIONS AND NOTFY TBE ARCHITECT OF ANY <br />DISCREPANCIES BEFORE BEG1NNING TflE WORK. VTMRE DETAELED INFORMATION <br />IS LACKING, REQUEST INSTRUCTIONS FROM TBE ARCHITECT. <br />1.03 DEFINITIONS: <br />FURNISH: UNLESS OT-FIERWISE DEFINED IN GREATER DETAEL, SUPPLY AND <br />DELIVER AN ITEM TO THE PROJECT SITE, READY FOR INSTALLATION. <br />INSTALL: UNLESS OTFIERWISE DEFINED IN GREATER DETAIL, PLACE AN ITEM IN <br />THE PROJECT SO THAT IT IS READY FOR SERVICE OR USE. <br />PROV1DE: UNLESS OTBERWISE DEFINED IN GREATER DETAIL, FURNISH AND <br />INSTALL AN ITEM, COMPLETE AND READY FOR INTENDED USE. <br />1.04 SUBNHTTALS: TBE CONTRACTOR SHALL REVIEW EACH StTBNUTTAL FOR <br />CONFORMANCE WITH TBE CONTRACT DOCUMENTS AND COORDINATION WITH THE <br />WORK, AND APPLY TUE CONTRACTOWS SIGNED REVIEW STAMT TO THE SUBNHTTAL <br />CERTIFYING COMPLIANCE WITH TBE CONTRACT DOCUMENTS. SUBMITTALS <br />WITHOUT THE CONTRACTOR'S REVIEW STAW WELL BE RETURNED WITHOUT <br />REVIEW. TRANSNUT ALL SUBMITTALS TO TTIE ARCIRTECT. REVISE AND RESUBNUT <br />SUBNHTTALS AS REQUIRED. SCIHEDULE SUBNUTTALS TO AVOID DELAY IN TBE <br />PROGRESS OF TBE WORK, ALLOWING 14 DAYS FROM ARC141TECT'S RECEIPT FOR <br />MITIAL SUBMITTAL REVIEW, AND 7 DAYS FOR SUBSEQUENT RESUBNHTTAL <br />REVIEWS. Stfl3NUT RELATED ITEMS AS A SINGLE PACKAGE. <br />PRODUCT DATA: SLTBI�HT PDFs NLARKED TO CLEARLY INDICATE APPLICABLE <br />PRODUCTS, MODELS, OPTIONS, AND ANY DEVIATIONS FROM TBE CONTRACT <br />DOCUMENTS. <br />SHOP DRAWINGS: SUBMIT PDFs UNLESS OTHERWISE INDICATED OR REQUIRED. <br />PROVIDE DRAENSIONED DRAWINGS AND DETAILS, INCLUDING ADJACENT <br />CONSTRUCTION AND RELATED WORK, AND CLEARLY INDICATE ANY <br />DEVIATIONS FROM TBE CONTRACT DOCUMENTS. WHERE INDICATED, SUBMT <br />SHOP DRAWINGS AND ENGINEERING CALCULATIONS SEALED BY A DESIGN <br />PROFESSIONAL REGISTERED TO PRACTICE IN TTIE JURISDICTION WHERE THE <br />PROJECT IS LOCATED. CLOUD AND IDENTIFY ALL REVISIONS ON EACH <br />RESUBMITTAL. <br />SANWLES: SUBMIT 2 SAMTLES PLUS TUE NUMBER REQUIRED BY TBE <br />CONTRACTOR, UNLESS OTBERWISE INDICATED. SUBMIT ADDITIONAL SAMPLES <br />AS NECESSARY TO INDICATE THE RANGE OF COLOR, FIMSH AND TEXTURE TO <br />BE PROVIDED. <br />1.05 CUTITNG AND PAMUNG: CONTRACTOR IS RESPONSIBLE FOR CUTTING, FITTING, <br />AND PAMENG REQUIRED TO CONWLETE TBE WORK OR TO MAKE ITS PARTS FIT <br />TOGETI]ER PROPERLY. DO NOT CUT AND PATCH STRUCTURAL ELEMENTS IN <br />AMANNER T14AT WILL REDUCE TBEIR LOAD CARRYING CAPACITY. PROTECT <br />EXISTING CONSTRUCTION DURING CUTTING AND PATCHING TO PREVENT DAMAGE. <br />PATCHWITH DURABLE SEAMS THAT ARE AS R'OnSIBLE AS POSSEBLE. RESTORE <br />EXPOSED FMSFIES OF PATCBED AREAS AND EXTEND FMSH RESTORATION INTO <br />ADJODUNG CONSTRUCTION IN A MANNER T14AT WILL ELMNATE EV1DENCE OF <br />PATCHING. <br />1.06 PRODUCTS: PRODUCTS ARE ITEMS PURCHASED BY TBE CONTRACTOR FOR <br />INCORPORATION INTO THE WORK. SELECT PRODUCTS T1-1AT COMPLY WITHT THE <br />CONTRACT DOCUMENTS AND GOVERNING REGULATIONS ACCORDING TO TBE <br />FOLLOWING: <br />SEMI -PROPRIETARY SPEC1FICATION: WHERE PRODUCTS OR MANUFACTURERES <br />ARE NANED FOLLOWED BY TTIE TERM "OR APPROVED SUBSTITUTE", TBE <br />CONTRACTOR MAY SUBMIT UNNAMED PRODUCTS TO TTIE ARCFHTECT FOR <br />APPROVAL. <br />CONWL1ANCE SPECrFICATION: VJMRE ONLY COMPLLkNCE WITT-1 A CODE, <br />STANDARD, OR REGULATION IS INDICATED, PROV1DE A PRODUCT THAT <br />COMPLIES. <br />DESCRIPTIVE SPECIFICATION: WHERE EXACT CHARACTERISTICS ARE <br />INDICATED, PROVIDE A PRODUCT T11AT CONWLIES. <br />DELfVER, STORE, AND HANDLE PRODUCTS IN ACCORDANCE WITH TTIE <br />MANUFACTUREWS RECOMAffiNDATIONS. INSTALL PRODUCTS IN ACCORDANCE <br />WITH TBIE MANUFACTUREWS INSTRUCTIONS; ViFIERE MANUFACTUREWS <br />INSTRUCTIONS CONFLICT WITT-1 THE CONTRACT DOCUMENTS, REQUEST DIRECTION <br />FROM TBE ARMTECT. <br />1.07 QUALITY CONTROL: THE OViNER WILL PROVIDE AN 1NDEPENDENT AGENCY TO <br />PERFORM TESTING AND INSPECTIONS INDICATED, OR REQUIRED BY THE <br />AUTHORITTES HAVING JUSRISDICTION. TBE CONTRACTOR IS RESPONSIBLE FOR THE <br />COSTS OF RETESTING, WHERE THE RESULTS OF TESTS AND INSPECTIONS <br />PERFORMED INDICATE NONCOMPLLANCE WITH REQUIREMENTS. COOPERATE WITH <br />TESTING AND INSPECTION AGENCEES, INCLUDING SCHEDULING TESTS AND <br />INSPECTIONS, PROV1DING ACCESS TO TBE WORK, FURNISEIING INCIDENTAL LABOR, <br />AND PROVIDING SECURITY AND PROTECTION OF SAWLES. PROTECT <br />CONSTRUCTION EXPOSED BY OR FOR TESTING AND INSPECTION, AND REPAIR <br />CONSTRUCTION DAMAGED BY TESTING OR INSPECTION. <br />2 SITEWORK <br />2.01 EARTHWORK <br />GENERAL: SEE CIVIL DRAWINGS, STRUCTURAL DRAWINGS, AND GEOTECEMCAL <br />REPORT FOR ADDMONAL REQUIREMENTS THAT APPLY TO TfHS SECTION. <br />GEOTECEMCAL ENGINEERING: PERFORM SITE PREPARATION, FELL, BACKFILL, <br />COMPACTION AND GRADING OPERATIONS UNDER A QUALITY CONTROL PROGRAM <br />MONITORED BY TIHE OWNEWS GEOTECEMCAL ENGINEER. <br />2.02 TERMITE TREATMENT: ENGAGE A LICENSED PROF'ESSIONAL PEST CONTROL <br />OPERATOR TO APPLY A SOIL TREATMENT TERNUTICIDE BEARING A FEDERAL <br />REGISTRATION NUMBER OF THE EPA AND REGISTERED WITH TBE LOCAL <br />AUTHORITI]ES 11AVING JURISDICTION. APPLY IN ACCORDANCE WITH TBE <br />MANUFACTUREWS INSTRUCTTONS.TREAT LJNDER ALL BUILDING SLABS, ALONG <br />BOTH SMES OF FOUNDATION WALLS, AT ALL PENETRATIONS, AND IN ALL HOLLOW <br />VOIDS OF FOUNDATION CONSTRUCTION. REAPPLY TREATMENT TO AREAS <br />DISTURBED BY SUBSEQUENT CONSTRUCTION OR LANDSCAPING. PROVIDE A FIFVE <br />YEAR WRITTEN WARRANTY AGAINST TERMITE INFESTATION, AGREEING TO <br />RETREAT AND REPAIR DAMAGE. <br />2.03 FOLTNDATION DRAINAGE: <br />PRODUCTS: <br />DRAINAGE PIPE: ASTM F667, CORRUGATED POLYETHYLENE PIPE AND FITTINGS, <br />PERFORATED, WITH COUPLINGS FOR SOIL TIGHT JOINTS. <br />FILTER FA_BR1C: NONWOVEN SYNTBETIC FEBER GEOTEXTILE FABRIC; "N11RAFIL <br />160N" BY TENCATE GEOSYNTLIETICS AMERICAS, OR APPROVED SUBSTITUTE. <br />DRAINAGE FILL: WASBED CRUSHED STONE, ASTM C33 NO. 57. <br />INSTALLATION: INSTALL PERFORATED ME WITH PERFORATIONS DOWN, JORSHNG <br />PIPES AND FITTINGS WITH SOIELTIGHT JOINTS. PROV1DE CLEAN -OUTS AT MAXPAUM <br />75 FOOT INTERVALS. PLACE GRAVEL AS INDICATED, SURROUNDED BY FILTER <br />FABRIC. <br />EXTEND PIPE TO DAYLIGHT, PITCHED IN DIRECTION OF FLOW AT MINDAUM 1% <br />SLOPE. <br />W =W, W) q� <br />W a�20DW CDW <br />0 U_J U_ 00 C) Z _J <br />Z 3: ��- - 11� < Z >_ E < <br />< _J >_ UJ W 0 __J W < Z LU U <br />0 _J W a- L_ < co rr < UJ <br />Z < 0 W 0,- U <br />�2 T- C/) _J F-- �- �_ 0 0 <br />0 =M<wu CfZ <br />Wa I— < D <br />< �E �_ 1� < 0 <br />Z 0 co Z a W W C� <br />< Z-,-) Z D C/) �- E of <br />Z =OOZCnLUZZ-0 2� <br />U) 0 0 0 �- LL 0 <br />W 1­ 7) - U 0 W <br />LLZ3:a0 0 0 zm�- <br />(D 0- Z W U <br />Z >- Ldw 0- a D LU W 0 <br />LU W Ix <br />W <br />< a �- U �- <br />< UJ I- C) F_ 0 UJ - Z C/) <br />afCLUOU0 QLL_J =<Z <br />M 0 W W W U Z LL _J 0 U a- 0 <br />W of F- I— Q� Z < Es < W Q� W U Z <br />., a- 5E uj 4� < UJ . E < of 3: <br />W W U a U a- W < UJ E W U < <br />of W . w. - < z uj T LI) a <br />< co < CL o) C� 3 5 �-- n n <br />a) <br />bfi <br />M <br />4-1 <br />7� <br />C�l <br />0 <br />N_ <br />U <br />oil <br />0 <br />ISSUE: FOR CONSTRUCTION <br />REVISIONS: I I <br />PROJECT NUMBER <br />201812 <br />DATE 4-3-19 <br />I I SUEET NUMMER I I <br />