GENERAL NOTES
<br />CONSTRUCTION SITE NOTES:
<br />1. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR SITE SAFETY AND CONSTRUCTION MEANS AND METHODS IN THE PERFORMANCE OF THE WORK. PROVIDE ALL
<br />MEASURES REQUIRED TO PROTECT THE STRUCTURE, WORKERS AND OTHER PERSONS DURING CONSTRUCTION OPERATIONS.
<br />2. CONTRACTOR TO COMPLY WITH ALL OSHA REGULATIONS, AND ANY OTHER SITE SAFETY REQUIREMENTS OF THE OWNER IN THE PERFORMANCE OF THE WORK.
<br />ALL WORK SHALL BE PERFORMED IN A SAFE MANNER AND ALL CONTRACTOR EMPLOYEES SHALL AT ALL TIMES WORK IN COMPLIANCE WITH THE OWNER'S
<br />SAFETY REGULATIONS AND ANY GENERAL CONTRACTOR SAFETY REQUIREMENTS.
<br />3. PROVIDE ADEQUATE BRACING AND SHORING FOR CONSTRUCTION EQUIPMENT AND FOR THE BUILDING. PROVIDE SCAFFOLDING, SHEETING, TEMPORARY
<br />BARRIERS, BRACING OF EXCAVATIONS AND OTHER TEMPORARY SUPPORTS AS REQUIRED. DO NOT STORE OR STACK CONSTRUCTION MATERIALS ON ERECTED
<br />FLOORS OR ROOFS IN EXCESS OF 80 PERCENT OF THE SPECIFIED DESIGN LIVE LOAD. MINIMIZE DYNAMIC IMPACT TO EXISTTNG STRUCTURES WHEN PLACING
<br />MATERIALS ON FLOORS OR ROOFS.
<br />4. DO NOT OBSTRUCT EXISTING BUILDING DOORS OR EGRESS PATHS DURING THE PERFORMANCE OF THE WORK.
<br />5. CONTRACTOR SHALL CLEAN THE SITE OF CONSTRUCTION DEBRIS TO MAINTAIN A SAFE ENVIRONMENT ON A DAILY BASIS. LEGALLY DISPOSE OF ALL
<br />HAZARDOUS AND NON -HAZARDOUS MATERIALS.
<br />GENERAL COORDINATION NOTES:
<br />6. CONFORM TO ALL OWNER'S GENERAL AND SPECIAL CONDITIONS IN THE PERFORMANCE OF THE WORK OR AS HEREIN SPECIFED.
<br />7. ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH THE APPLICABLE BUILDING CODE AND ALL APPLICABLE STATE AND LOCAL CODES, ACCESSIBILITY
<br />STANDARDS AS WELL AS ANY APPLICABLE OWNER'S CORPORATE STANDARDS. THE LOCAL CODE AUTHORITY HAS THE AUTHORITY TO INTERPRET CODE
<br />REQUIREMENTS AND THESE INTERPRETATIONS MAY VARY FROM NORMAL INTERPRETATION AND INFORMATION REPRESENTED IN THE CONTRACT DOCUMENTS.
<br />THE CONTRACTOR SHALL INFORM THE OWNER'S REPRESENTATIVE OR THE ARCHITECT/ ENGINEER OF ANY DISCREPANCIES OR DIFFERENCES AND SHALL
<br />PROCEED WITH THE WORK ONLY UPON RECEIVING WRITTEN AUTHORIZATION
<br />8. THE DRAWINGS SHALL NOT BE USED FOR CONSTRUCTION PURPOSES UNTIL THE SEAL AND SIGNATURE OF THE RESPONSIBLE REGISTRANT APPEARS ON THE
<br />DRAWING, AND PROPER PERMIT FORMS AND RELATED FEES ARE TRANSMITTED BY THE OWNER, OWNER'S AGENT, OR CONTRACTOR TO THE AUTHORITY HAVING
<br />JURISDICTION.
<br />9. CONTRACTOR TO OBTAIN ALL REQUIRED CONSTRUCTION PERMIT FORMS, PAY ALL RELATED FEES, AND ARRANGE FOR ALL REQUIRED INSPECTIONS AND
<br />APPROVALS.
<br />10. BIDDER/CONTRACTOR SHALL VISIT THE SITE, EXAMINE AND VERIFY EXISTING CONDITIONS UNDER WHICH THE WORK SHALL BE CONDUCTED AND ACCOUNT
<br />FOR EXISTING FIELD CONDITIONS AND ACTUAL FIELD DIMENSIONS IN ALL BIDS SUBMITTED AND ALL WORK PERFORMED. REPORT ANY DISCREPANCIES IN THE
<br />EXISTING CONDITIONS IMMEDIATELY TO THE OWNER'S REPRESENTATIVE OR ARCHITECT/ ENGINEER
<br />1 1 . CONTRACTOR SHALL REVIEW ALL CONTRACT DOCUMENTS, INCLUDING SPECIFICATIONS, OF INTERFACING TRADES AND OTHER RELATED CONTRACTS PRIOR TO
<br />BIDDING AND COMMENCEMENT OF WORK TO ENSURE COMPLETE COORDINATION OF FINISHED WORK.
<br />12. EACH SUBCONTRACTOR IS RESPONSIBLE TO COORDINATE AND SCHEDULE THEIR WORK WITH THE GENERAL CONTRACTOR AND ALL OTHER CONTRACTORS
<br />WHO'S WORK WILL BE AFFECTED. SPECIFICATIONS ARE APPLICABLE AND BINDING TO ALL CONTRACTORS AND SUBCONTRACTORS. REPORT ANY
<br />DISCREPANCIES, PRIOR TO CONSTRUCTION, TO THE OWNER'S REPRESENTATIVE OR ARCHITECT/ ENGINEER FOR REVIEW AND CLARIFICATION.
<br />13. BEFORE AWARD OF CONTRACT, IF THERE ARE QUESTIONS ABOUT INTENT, CLARITY, APPLICATION OF NOTES, OR WORK SHOWN OR SPECIFIED, OR IF
<br />CONFLICTING DIRECTIONS ARE FOUND IN THE DOCUMENTS, THE GENERAL CONTRACTOR SHALL REQUEST WRITTEN CLARIFICATION FROM THE OWNER'S
<br />REPRESENTATIVE OR ARCHITECT/ ENGINEER. ANY CLARIFICATIONS OR INTREPRETATIONS OF THE CONTRACT DOCUMENTS PROVIDED AFTER CONTRACT
<br />AWARD SHALL BE AT NO ADDITIONAL COST.
<br />14. CONTRACTOR SHALL NOT SCALE DRAWINGS FOR CONSTRUCTION PURPOSES. IN THE EVENT OF AN OMMISSION OF NECESSARY DIMENSIONS OR INFORMATION.,
<br />CONTRACTOR SHALL NOTIFY THE OWNER'S REPRESENTATIVE OR ARCHITECT/ ENGINEER. FIGURED AND CALCULATED DIMENSIONS TAKES PRECEDENCE OVER
<br />SCALED MEASUREMENTS. DETAIL DRAWINGS AND LARGER SCALE DRAWINGS TAKES PRECEDENCE OVER SMALLER SCALE DRAWINGS. ALL PLAN DETAILS AND
<br />WALL SECTIONS ARE ASSUMED TO BE TYPICAL CONDITIONS UNLESS DETAILED OR NOTED OTHERWISE.
<br />15. SOME STANDARD SYMBOLS, ABBREVIATIONS AND DETAILS INDICATED IN CONTRACT DOCUMENTS MAY NOT BE APPLICABLE TO THIS SPECIFIC CONTRACT ISSUE.
<br />16. DRAWING DETAILS ARE CONCEPTUAL IN NATURE AND ACTUAL FIELD CONDITIONS MAY VARY SLIGHTLY FROM CONCEPTUAL DEPICTIONS. DETAILS LABELED
<br />"TYPICAL DETAILS" ON DRAWINIGS APPLY TO SITUATIONS THAT ARE THE SAME OR SIMILAR TO THOSE SPECIFICALLY DETAILED. SUCH DETAILS APPLY WHETHER
<br />OR NOT DETAILS ARE REFERENCED AT EACH LOCATION
<br />17. SUBSTITUTIONS ARE SUBJECT TO THE APPROVAL OF THE OWNER. IF A SUBSTITUTION IS PROPOSED, SUBMIT COMPLETE SPECIFICATION AND PERFORMANCE
<br />DETAILS FOR EVALUATION. IF SUBSTITUTIONS ARE APPROVED, NOTIFY ALL OTHER CONTRACTORS AND SUBCONTRACTORS AFFECTED BY THE CHANGE AND
<br />FULLY COORDINATE ALL RELATED WORK. ANY COSTS RESULTING FROM THE SUBSTITUTION AND CHANGE IS THE RESPONSIBILITY OF THE CONTRACTOR.
<br />18. COORDINATE AND PERFORM WORK BASED ONLY ON REVIEWED/ CERTIFIED SHOP DRAWINGS, A FIELD CHECK OF EXISTING CONDITIONS, AND INSPECTION OF
<br />NEWLY INSTALLED WORK. VERIFY THE LATEST REVISION OF CONTRACT DOCUMENTS, INCLUDING ALL INTERFACING DISCIPLINE DRAWINGS, BEFORE
<br />PROCEEDING WITH THE PROCUREMENT, DETAILING, FABRICATION OR INSTALLATION OF THE WORK. ANY SYSTEMS OR EQUIPMENT INSTALLED PRIOR TO REVIEW
<br />OF SHOP DRAWINGS BECOMES THE RESPONSIBILITY OF THE CONTRACTOR.
<br />19. ALL EQUIPMENT SHALL BE INSTALLED IN FULL ACCORDANCE WITH MANUFACTURER'S DATA AND INSTALLATION INSTRUCTIONS. IT IS THE CONTRACTOR'S
<br />RESPONSIBILTY TO CHECK AND CONFORM TO MANUFACTURER SPECIFICATIONS AND REQUIREMENTS PRIOR TO STARTING THE WORK. VERIFY SIZE, LOCATIONS
<br />AND CHARACTERISTICS OF ALL EQUIPMENT TO BE FURNISHED WITH MANUFACTURER OR SUPPLIERS BEFORE COMMENCEMENT OF CONSTRUCTION. VERIFY SIZE
<br />AND LOCATIONS OF ALL OPENINGS AND SUPPORTS WITH ACTUAL EQUIPMENT PURCHASED. REFER TO MANUFACTURERS STANDARD DETAILS FOR
<br />INSTALLATION.
<br />20. ALL EQUIPMENT AND SYSTEMS SHALL BE COMPLETE AND OPERATIONAL IN ALL RESPECTS, SECURED IN LOCATION AND PROPERLY ADJUSTED. PROVIDE
<br />OPERATIONS AND MAINTENANCE MANUALS FOR THE OWNER AT THE COMPLETION OF THE WORK.
<br />21. FULLY WARRANT ALL MATERIALS, EQUIPMENT AND WORKMANSHIP FOR ONE (1) YEAR FROM DATE OF ACCEPTANCE, UNLESS OTHERWISE SPECIFIED. REPAIR OR
<br />REPLACE WITHOUT CHARGE TO THE OWNER ALL ITEMS FOUND DEFECTIVE DURING THE WARRANTY PERIOD.
<br />22. BEFORE PENETRATING EXISTING CONCRETE OR SOIL SURFACES, CONSULT WITH ALL LOCAL UTILITIES' PROGRAMS FOR THE AREA OF WORK AND VERIFY
<br />LOCATION OF ALL EXISTING UNDERGROUND UTILITIES AND STRUCTURES BY USE OF "ELECTRONIC" OR SIMILAR NON-INVASIVE DETECTOR DEVICES. IF
<br />POTENTIAL INTERFERENCES ARE DISCOVERED, PROPOSE ALTERNATE ROUTING AND ASSOCIATED COSTS TO THE OWNER'S REPRESENTATIVE OR
<br />ARCHITECT/ENGINEER FOR APPROVAL BEFORE PROCEEDING.
<br />23. MAINTAIN MINIMUM CLEARANCE REQUIREMENTS OF EQUIPMENT MANUFACTURER'S SPECIFICATIONS OR RECOMMENDATIONS, OWNER STANDARDS, NATIONAL
<br />ELECTRICAL CODE (NEC), AND ALL APPLICABLE FEDERAL, STATE AND LOCAL CODES, AND REGULATIONS.
<br />24. MAINTAIN A MINIMUM OF 6' 8" HEADROOM CLEARANCE FOR BULKHEADS, SUPPORTS AND UTILITIES PASSING OVER WALKWAYS, PLATFORMS OR CATWALKS.
<br />ARCHITECTURAL NOTES:
<br />25. ALL FINISH FLOOR ELEVATIONS ARE FOR ARCHITECTURAL PURPOSES ONLY. REFER TO CIVIL AND STRUCTURAL DRAWINGS FOR ACTUAL ELEVATIONS AND
<br />RELATIONSHIP TO SITE BENCHMARKS.
<br />26. COORDINATE WITH MECHANICAL CONTRACTOR THE LOCATIONS OF ALL FLOOR DRAINS.
<br />27. TRANSITION OF DIFFERENT FLOORING MATERIALS AT DOORWAYS SHALL OCCUR AT CENTERLINE OF DOORS AND SHALL BE %" HIGH MAXIMUM.
<br />28. ALL PLAN DIMENSIONS ARE TO FINISHED FACE OF FINISHED WALLS, FACE OF MASONRY, AND CENTERLINE OF COLUMNS, UNLESS NOTED OTHERWISE.
<br />29. PARTITIONS ARE TO EXTEND AND SEAL AGAINST THE BOTTOM OF THE DECK ABOVE UNLESS OTHERWISE NOTED.
<br />30. INSTALL METAL TRIM ON ALL GYPSUM BOARD EDGES ABUTTING OTHER MATERIALS OR WHERE GYP BD STOPS SHORT OF OTHER MATERIALS TO FORM A REVEAL
<br />OR RECESS. USE METAL CORNER BEAD ON ALL GYPSUM BOARD EXTERIOR CORNERS.
<br />31. ADD SUFFICIENT BLOCKING IN STUD WALLS TO SUPPORT ALL ITEMS OR EQUIPMENT SHOWN OR SPECIFIED TO BE ATTACHED TO WALLS. PROVIDE ADDITONAL
<br />STRUCTURAL SUPPORT (PLATES, ANGLES, CHANNELS, ETC.) WITHIN WALLS WHERE WEIGHT OF ATTACHED ITEMS EXCEED WALL CAPACITY. PROVIDE BACKING
<br />PLATES OR BLOCKING FOR ANY OWNER FURNISHED OR INSTALLED ITEMS.
<br />32. PAINT ALL WALL SURFACES, DOOR FRAMES, BULKHEADS AND CEILINGS IN ROOMS WHERE INDICATED ON PLANS OR ROOM FINISH SCHEDULE. PAINT BEHIND
<br />ALL MOVEABLE ITEMS ADJACENT TO WALLS RECEIVING PAINT AND RELOCATE ITEMS AS NECESSARY.
<br />33. ALL EXTERIOR SURFACES TO HAVE A TEMPORARY OR PERMANENT WEATHER RESISTIVE BARRIER DURING CONSTRUCTION OPERATIONS TO PROTECT THE
<br />BUILDING INTERIOR AND WALL SURFACES. EXTERIOR OPENINGS SHALL BE FLASHED IN SUCH A MANNER AS TO MAKE THEM WATERPROOF.
<br />34. THE AREA OF WORK SHALL BE MAINTAINED WEATHERTIGHT AND IN A SECURED CONDITION AT ALL TIMES. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS
<br />NECESSARY TO SECURE THE AREA OF WORK.
<br />35. REFER TO FLOOR AND REFLECTED CEILING PLANS AND MECHANICAL AND ELECTRICAL DRAWINGS FOR SPACE ALLOCATIONS IN ROUTING OF ALL MECHANICAL
<br />AND ELECTRICAL WORK INCLUDING DIFFUSERS, REGISTERS, GRILLES, LIGHTS, ETC. THE REFLECTED CEILING PLAN LOCATIONS SHALL BE ADHERED TO UNLESS
<br />OTHERWISE NOTED ON DRAWINGS. EXCEPTIONS SHALL REQUIRE SPECIFIC WRITTEN APPROVAL BY THE OWNER'S REPRESENTATIVE OR ARCHITECT/ ENGINEER.
<br />NOTE THAT ELECTRIC LIGHT FIXTURE LOCATIONS AND FIRE SPRINKLER HEADS SHALL TAKE PRECEDENCE OVER OTHER UTILITY ITEMS IN ANY AND ALL
<br />LOCATIONS FOR AREAS WITH OR WITHOUT CEILINGS; THE CONTRACTOR SHALL COORDINATE AS REQUIRED, AND IF THERE IS NO APPARENT SOLUTION TO
<br />COORDINATION ISSUE, CONTACT THE OWNER'S REPRESENTATIVE OR ARCHITECT/ ENGINEER FOR A RESOLUTION.
<br />36. REFER TO STRUCTURAL DRAWINGS FOR SUPPORT STRUCTURE INFORMATION, DETAILS AND DIMENSIONS NOT INDICATED ON THE ARCHITECTURAL DRAWINGS.
<br />REPORT ANY DISCREPANCIES BETWEEN THE ARCHITECTURAL AND STRUCTURAL DRAWINGS TO THE ARCHITECT/ ENGINEER OR OWNER'S REPRESENTATIVE, PRIOR
<br />TO CONSTRUCTION.
<br />37. COORDINATE MECHANICAL AND ELECTRICAL EQUIPMENT CONCRETE PADS AND ROOF CURB LOCATIONS, SIZES, SUPPORTS AND CONSTRUCTION
<br />REQUIREMENTS, ONLY WITH REVIEWED AND CERTIFIED SHOP DRAWINGS OF THE RELATED TRADES.
<br />38. REFER TO AND COORDINATE WITH STRUCTURAL DRAWINGS FOR ALL FLOOR AND EXTERIOR WALL PENETRATIONS. INSULATE AND WATERTIGHT SEAL ALL
<br />EXTERIOR WALL PENETRATIONS.
<br />39. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS AND THE SPECIFICATIONS FOR WALL, FLOOR AND BUILDING SURFACES PENETRATION AND SEALING
<br />REQUIREMENTS. FIRE STOP ALL PENETRATIONS OF FIRE RATED WALL OR FIRE RATED FLOOR OPENINGS PER TESTED UL ASSEMBLIES AND AS REQUIRED BY CODE.
<br />40. PROVIDE WALL AND CEILING ACCESS DOORS AS MAY BE REQUIRED BY CODE OR TO PROPERLY SERVICE OR ADJUST ALL VALVES, DAMPERS, CLEAN OUTS,
<br />ELECTRICAL JUNCTION BOXES AND OTHER DEVICES.
<br />DEMOLITON NOTES:
<br />41. PLAN AND SCHEUDLE CONSTRUCTION AND DEMOLITION ACTIVITIES TO AVOID INTERFERENCE AND TO MINIMIZE DISRUPTION OF THE OWNER'S OPERATIONS.
<br />42. SCHEDULE AND COORDINATE ALL DEMOLITION WORK AND UTILITY SHUT DOWNS AND TIE INS WITH THE OWNERS REPRESENTATIVE. PROCEED WITH WORK
<br />ONLY AFTER RECEIPT OF WRITTEN AUTHORIZATION.
<br />43. DEMOLISHED MATERIALS, UNLESS OTHERWISE DIRECTED, SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE PROMPTLY REMOVED FROM THE
<br />SITE BEFORE THE END OF EACH WORKDAY. OWNER RETAINED SALVAGED EQUIPMENT SHALL BE PROPERLY PROTECTED FOR REUSE OR CRATED FOR PROTECTION
<br />AND DELIVERED TO THE OWNER'S SITE STORAGE. ALL HAZARDOUS AND NON -HAZARDOUS MATERIALS SHALL BE PROPERLY DISPOSED OF OFF SITE AND PER ALL
<br />APPLICABLE FEDERAL, STATE AND LOCAL CODES.
<br />44. PERFORM CONSTRUCTION AND SELECTIVE DEMOLITION IN A MANNER TO PREVENT DAMAGE TO ANY EXISTING AND NEW STRUCTURES, UTILITIES AND OTHER
<br />PROPERTY.
<br />45. ALL CUTTING AND CHASING OF BUILDING CONSTRUCTION SHALL BE IN A NEAT AND WORKMANLIKE MANNER. NEATLY SAWCUT ALL RECTANGULAR OPENINGS,
<br />SET SLEEVES THROUGH OPENINGS, AND FINISH PATCH OR PROVIDE TRIM AROUND OPENINGS. CORE DRILL AND SLEEVE ALL ROUND OPENINGS.
<br />46. REPAIR SURFACES THAT HAVE BEEN DAMAGED BY THE WORK. REPAIR DAMAGE TO MATCH EXISTING CONSTRUCTION, INCLUDING BUT NOT LIMITED TO
<br />WEATHER AND FIRE SEALING, INSULATING, PATCHING AND PAINTING TO MATCH.
<br />MISCELLANEOUS SUPPORT RELATED NOTES:
<br />47. PROVIDE SUPPLEMENTARY OR MISCELLANEOUS STEEL FOR SUPPORT, SWAY BRACING, CROSS BRACING, AND ANCHORAGE OF BUILDING SYSTEMS OR UTILITIES, IN
<br />ORDER TO MEET SITE SEISMIC AND SYSTEM SPECIFIC INSTALLATION AND OPERATING CONDITIONS.
<br />48. COORDINATE SUPPLEMENTARY OR MISCELLANEOUS STEEL WITH THE PRIMARY STRUCTURAL STEEL WORK. SUPPORT, BRACE, CROSS BRACE, GUIDE AND
<br />ANCHOR AS REQUIRED SO AS TO IMPOSE NO OVERSTRESSING OF THE BUILDING STRUCTURE BEYOND STATED LOADS INDICATED ON THE STRUCTURAL
<br />DRAWINGS.
<br />49. DO NOT WELD TO, CUT OR DRILL BUILDING STEEL.
<br />50. DO NOT WELD SUPPLEMENTARY OR MISCELLANEOUS STEEL TO BUILDING STEEL WITHOUT PRIOR WRITTEN APPROVAL OF PROPOSED DETAIL BY THE STRUCTURAL
<br />ENGINEER. WELDING TO SUPPLEMENTARY STEEL IS PERMITTED.
<br />51. DO NOT HANG SUPPORTS FROM TOP CHORD OF TRUSS. USE ONLY APPROVED BEAM CLAMPS, C CLAMPS ARE PROHIBITED.
<br />CONSULTANT:
<br />SEAL: JOHN BENEDICT POLSINELLI, AR96059
<br />OF FC o
<br />aicTPOLSIN, 7
<br />AR96059 c%
<br />C.
<br />THIS DRAWING SHALL NOT BE USED FOR
<br />CONSTRUCTION PURPOSES UNTIL THE SEAL AND
<br />SIGNATURE OF THE RESPONSIBLE REGISTRANT
<br />APPEARS ON THE DRAWING, AND PROPER PERMIT
<br />FORMS AND RELATED FEES ARE TRANSMITTED BY
<br />THE OWNER, OWNER'S AGENT OR CONTRACTOR
<br />TO THE AUTHORITY HAVING JURISDICTION.
<br />DATE
<br />ISSUED FOR
<br />REV
<br />03/29/2021
<br />PEMB COORDINATION
<br />05/20/2021
<br />CIVIL SUBMISSION
<br />05/20/2021
<br />DUKE COORDINATION
<br />06/07/2021
<br />PEMB COORDINATION 02
<br />08/09/2021
<br />CIVIL RESUBMISSION 1
<br />08/25/2021
<br />OWNER REVIEW
<br />1 1 /08/2021
<br />REVISED ELEVATIONS
<br />1 1 /29/2021
<br />PERMIT SUBMITTAL
<br />Project Manager
<br />Drawn
<br />L. LONG
<br />S. KORTMAN
<br />Project Leader
<br />Checked
<br />L. LONG
<br />G. KARANFILOVSKI
<br />Date
<br />Dept Mgr Approval
<br />02/23/2021
<br />L. LONG
<br />Client
<br />PALMETTO ZEPHYRHILLS - GALL BLVD., LLC
<br />P.O. Box 1615,
<br />Thomasville, GA 31799
<br />Office: (229) 226-1 1 77
<br />Contact: Daniel Tubb
<br />Project
<br />DOLLAR GENERAL
<br />Corner of Gall Boulevard and C
<br />Avenue,
<br />Zephyrhills, FL 33542
<br />(City of Zephyrhills)
<br />Store #: 23227
<br />Drawing Title
<br />GENERAL NOTES
<br />DO NOT SCALE DRAWING
<br />Project No.
<br />Drawing No.
<br />,JCDT.20.0451
<br />Al2
<br />
|