Laserfiche WebLink
FOOTING SCHEDULE <br />FOOTING <br />FOOTING SIZE <br />FOOTING REINFORCEMENT <br />NOTES <br />MARK <br />T <br />W X L <br />BOTTOM <br />TOP <br />FT2.0 <br />2'-4" <br />2'-0" CONT. <br />2- #6 CONT. <br />2- #6 CONT. <br />FT4 <br />2'-4" <br />4'-0" X 4'-0" <br />6-#6 EA. WAY <br />5-#6 EA. WAY <br />FT6 <br />2'-4" <br />6'-0" X 6'-0" <br />9-#6 EA. WAY <br />7-#6 EA. WAY <br />FT64 <br />2'-8" <br />6'-0" X 4'-0" <br />10-#6 x3'-6" <br />7-#6 x5'-6" <br />10-#6 x3'-6" <br />7-#6 x5'-6" <br />FT8 <br />2'-8" <br />8'-0" X 8'-0" <br />13-#6 EA. WAY <br />13-#6 EA. WAY <br />FT86 <br />2'-8" <br />8'-0" X <br />13-#6 x5'-6" <br />10-#6 x7'-6" <br />13-#6 x5'-6" <br />10-#6 x7'-6" <br />6 5 4 3 2 1 <br />AND BEAM <br />END WALL <br />S3A LIE D <br />LINE D� 2 2A 4--L/- r7 <br />r2A a <br />S3 S3A S3 A00 <br />D ' �= �- D <br />$ 60° I 60° 1 60° 60° 00 4 FOUNDATION NOTES: <br />S3 I I o0 <br />-/ �, _ STEP r S3 1. ALL DIMENSIONS SHALL BE COORDINATED WITH <br />ARCHITECTURAL DRAWINGS. <br />FTG <br />`t 8" CMU SILL 3 �,r 2. SJ DESIGNATES SHRINKAGE CONTROL JOINT OR <br />N WALL TO N CONSTRUCTION JOINT. <br />10'-0" AFF <br />Si S3A RE DETAIL 1/S3 <br />3. CONTRACTOR TO COORDINATE ALL CONDUIT AND PLUMBING <br />rn 5 <br />STUB -UP LOCATIONS WITH ELECTRICAL AND PLUMBING PLANS. <br />00 N s\3� �- - 4. FTx INDICATES FOOTING MARK- RE: FOOTING SCHEDULE. <br />iti ( ( FT64 <br />I 5. SIDEWALKS ARE NOT SHOWN ON STRUCTURAL PLANS OR <br />i I I I <br />C t I � y C RE: ARCH AND OR CIVIL DRAWINGS FOR TYPICAL SIDEWALK <br />1 1 I <br />m S3A I � �� m INFO. <br />t, —I 1 1, J <br />w _:_ LL w <br />`�' SJ 6. T/FTG INDICATES TOP OF FOOTING ELEVATION <br />Qf 1 I 3 a 7. TOP OF BEAM DESIGNATED (XX'-X") ABOVE FINISHED FLOOR <br />00 8. RE: SHT S1 FOR GENERAL NOTES <br />FF ELEV 0'-0" LINE(j) 3 cn cn cn cn cn cn cn cn cn U) <br />N ? S3A N .1-0 <br />KEY NOTES: <br />1 4 �1 4" CONCRETE SLAB WITH 6x6-W2.9xW2.9 WWF ABOVE VAPOR RETRADER <br />mIL 1 1'-6" x V-0" x 9 1/2" S3 TYP m OVER 6" AGGREGATE BASEOR COMPACTED GRANULAR FILL OVER <br />STEP DEEP COL POCKET T/FTG 0'-0" S3A Q PREPARED SUBGRADE. RE: 1/S3 <br />FTG <br />TYP @ INT TYP @ INT Si <br />wSIM S3 <br />> �� FT64 FT64 2 RE: ARCH FOR DOOR OPENING LOCATION. <br />(:B z r o -�-L�Ll -{— g <br />:N S3 �� _ - — j L 1 0� S2 I__ — L <br />N FT8 FT8 FT8 FT8 <br />6 <br />o �SZ <br />FIRE <br />FT2.0 r I I Si <br />T/FTG 0'-0" i \ <br />I 11 - <br />�; TYP UON S3 <br />N <br />1 N <br />1 # 8 HAIRPIN TYP -'_'-' - -'-'-' ...... <br />i •---- ---@ EACH PEMB o ��� r �� <br />COLUMN o V <br />1 S2 � 1 6° I I 6° ° I ° 1 <br />FT86 FT86 <br />�o � i i I��- 60 � 6o i PRE-ENGINEERED METAL BUILDING PEMB <br />1 FT6 I I FT6 1 I -- <br />1 I' FT4 I I T 1 1- 1 2 [FT4 A. PRE-ENGINEERED METAL BUILDING MANUFACTURER SHALL DESIGN <br />IT/FTG I AND FURNISH ALL FRAMING UNLESS SPECIFICALY STATED ON THE <br />A I j _1.4 I I T — — I n STRUCTURAL DRAWINGS OTHERWISE. <br />� - /"1 B. PRE-ENGINEERED METAL BUILDING MANUFACTURER SHALL DESIGN & <br />(` - - - -'-I _ -'- 8" CMU SILL �._,_,_ _ � �, -dam �' -'-' SUPPLY ENGINEERING FOR ROOF OPENINGS, ROOF TOP UNITS, AND <br />� I _ <br />S4 WALL TO 9 ANY HUNG LOADS WITH OTHER TRADES. <br />�..-�_�_�_ �_,_ _�_�_ _/ - - _ - - �� 5 3 10'-0" AFF 5 $ S3 4 - <br />S2 S4 THE SCOPE OF THE PRE -MANUFACTURED METAL BUILDING STRUCTURE <br />2 4' 0" 4' 8" SHALL INCLUDE THE DESIGN, ENGINEERING, FABRICATION, DELIVERY, <br />S3 S3 / 9 / 11 OOAND ERECTION OF THE COMPLETE STRUCTURAL STEEL FRAMING AND <br />�/ _p" -� 2 Sq S3 LINE4A 4 EXTERIOR SKIN PACKAGE. THE METAL BUILDING MANUFACTURER SHALL <br />CL S3 4 BE CERTIFIED BY AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC) <br />COL S3 METAL BUILDING CERTIFICATION PROGRAM <br />POST AND BEAM 12'-10%" <br />ALONG END WALL <br />2 8'-8" 2 8'-0" 2 8'-0" 2 8'-0" 2 8'-0" <br />ROOF BRACING THIS BAY BY PEMB VERT WALL BRACING THIS BAY BY PEMB <br />140'-8" A <br />00 <br />6 5 4 3 2A 1 <br />j� EDGE OF <br />8 CMU -/ SLAB <br />1'-4" <br />8" CMU <br />SILL WALL <br />FOUNDATION PLAN NORTH 5 END UVALL DETAIL <br />B � Scale: 1/8" = 1'-0" Scale: NTS <br />CONT C8x11.5 FOUNDATION 6 <br />(10'-10") DESIGN LOAD <br />ALONG © FOUNDATION <br />FROM 4A TO © P GRAVITY = +7K 1'-0" 3'-0" DESIGN LOAD P <br />HEAVY HEX P UPLIFT = -6K PGRAVITY = 37K <br />NUT W/ 1'-0" COL BY COL, BASE PL AND <br />2 �1� OVERSIZED H LATERAL = t2K PEMB PUPLIFT = -29K ANCHOR BOLTS <br />S4 NgSHEAVY PLATE - - - MANUF BY PEBM <br />ti WASHER z I - - - BASE �NPOCKET <br />S'S O CONCRETE I ! I MONOLITHIC FOOTING <br />PIER BELOW = AND SLAB ON GRADE <br />SOFFIT FRAMING `�+ "%„ 1 1/2 NOW w I I co ! i <br />(BY PEMB) s+u'�dn ��0�' SHRINK GROUT P z 0 I � I c� 9 1/2" DEEP1 1/2' ( I <br />-T/ CONC AT N I COL POCKET I GROUT NON -SHRINK <br />S�XAX 6 F1554 POCKET RE: S3 FIN FL <br />GR36 ROD «s <br />S4 RE: SCHED O Q ¢ O Q 8" CMU COLUMN COVER REINF I � ELEV 0'-0" <br />_ U_ -p o u_ W/ #5 EA CORNER AND MASONRY � <br />o �o JOINT REINF @ 16" OC • • • • - <br />L/ HEAVY r i M r I— <br />'4 NUT W/ W/ <br />PROVIDE CMU BOND BEAM REINF 2�-8 <br />8" CMU W/ (2) #4 CONT ON ALL FOUR SIDES I- - - - - - - - -� N <br />1 SILL WALL OVERSIZED AT TOP OF COL COVER AT EL 10'-8" <br />CONT C8x11.5 WASHER � 1 <br />S4 (10'-10") TACK WELD <br />OO O TO ROD FOR ANCHOR ROD SIZE, �� � • • • • 1 <br />ALOMG () 5 QUANTITY, AND LOCATIONS VERT T/8P ER @ EL 0'-0"/ (8) #5 <br />RE: PEMB DRAWINGS AND #4@6" TIES EL -0'-1 1/2" <br />6 3" COVER RE: PLAN RE: PLAN RE: FTG SCHEDULE FOR <br />TYP REINF T&B <br />ENTRANCE FRAMING PLAN 3 TYP ANCHOR ROD DETAIL 4 EXTERIOR FTG AND COLUMN 6 INTERIOR FTG AT PEMB COLUMN <br />2 _ Scale: 1" = V-0" Scale, 1/2 - 1-0 Scale: 1/2" = V-0" <br />Scale: 1/8 - 1-0 <br />A <br />28'-8° <br />28'-0° <br />28'-0° <br />zs'-o" <br />28'-0° <br />ROOF BRACING THIS BAY BY PEMB <br />VERT WALL BRACING THIS BAY BY PEMB <br />POST <br />ALONG <br />140'-8" <br />T/ FTG=-2'-9" <br />IBC MASONRY SPLICE TP�� <br />REINFORCING <br />SIZE <br />8" MASONRY <br />1 BAR CENTERED <br />8" MASONRY <br />2 BARS IN CELL <br />OR OFFSET BARS <br />#4 <br />15" <br />26" (2" CLR) <br />#5 <br />23" <br />40" (2" CLR) <br />#6 <br />43" <br />74" (2" CLR) <br />CONSULTANT: <br />SEAL: GARY MAEDA, PE 68724 <br />THIS DRAWING SHALL NOT BE USED FOR <br />CONSTRUCTION PURPOSES UNTIL THE SEAL AND <br />SIGNATURE OF THE RESPONSIBLE REGISTRANT <br />APPEARS ON THE DRAWING, AND PROPER PERMIT <br />FORMS AND RELATED FEES ARE TRANSMITTED BY <br />THE OWNER, OWNER'S AGENT OR CONTRACTOR <br />TO THE AUTHORITY HAVING JURISDICTION. <br />DATE <br />ISSUED FOR <br />REV <br />03/29/2021 <br />PEMB COORDINATION <br />05/20/2021 <br />CIVIL SUBMISSION <br />05/20/2021 <br />DUKE COORDINATION <br />06/07/2021 <br />PEMB COORDINATION 02 <br />08/09/2021 <br />CIVIL RESUBMISSION 1 <br />08/25/2021 <br />OWNER REVIEW <br />1 1 /08/2021 <br />REVISED ELEVATIONS <br />11/29/2021 <br />PERMIT SUBMITTAL <br />Project Manager <br />Drawn <br />L. LONG <br />D. GRIFFIN <br />Project Leader <br />Checked <br />L. LONG <br />Date <br />Dept Mgr Approval <br />02/23/2021 <br />G MAEDA <br />Client <br />PALMETTO ZEPHYRHILLS -GALL BLVD., LLC <br />P.O. Box 1615, <br />Thomasville, GA 31 799 <br />Office: (229) 226-1 1 77 <br />Contact: Daniel Tubb <br />Project <br />DOLLAR GENERAL <br />Corner of Gall Boulevard and C <br />Avenue, <br />Zephyrhills, FL 33542 <br />(City of Zephyrhills) <br />Store #: 23227 <br />Drawing Title <br />FOUNDATION PLAN <br />AND SCHEDULES <br />DO NOT SCALE DRAWING <br />Project No. <br />Drawing No. <br />.ICDT.20.0451 <br />S2 <br />