Laserfiche WebLink
DRINK FIXTURE WALL MOUNTING <br />SUPPORT NOTES: <br />1. PROVIDE AND INSTALL 2X6 WHITE PINE - <br />GRADE 2 OR BETTER. <br />2. PROVIDE AND INSTALL 2X4 WHITE PINE - <br />GRADE 2 OR BETTER. <br />3. FASTEN THE 2X6 TO THE WALL WITH THE TOP <br />EDGE OF THE BOARD AT 78" A.F.F., REFER TO <br />FINAL DG FIXTURE PLAN FOR LENGTH AND <br />LOCATION OF BOARD. <br />4. FASTEN THE 2X4 TO THE WALL WITH THE TOP <br />EDGE OF THE BOARD AT 12" A.F.F., REFER TO <br />FINAL DG FIXTURE PLAN FOR LENGTH AND <br />LOCATION OF BOARD. <br />5. PRE -DRILL PILOT HOLES IN ALL BOARDS <br />PRIOR TO INSTALLATION TO PREVENT WOOD <br />SPLITS, <br />6. SECURE THE 2X6 WITH TWO SELF -TAPPING <br />SCREWS PER WALL STUD. MINIMUM SCREW <br />SIZE IS 4"x 1" <br />7. FASTEN THE 2X4 WITH WITH ONE <br />SELF -TAPPING SCREW PER WALL STUD. <br />MINIMUM SCREW SIZE IS 4"x 4'. <br />8. CAULK THE EDGES OF THE 2X6 AT THE TOP <br />AND BOTTOM WHERE IT MEETS THE WALL PRIOR <br />TO PAINTING. <br />LINE OF FREEZER <br />COOLERS BEYOND <br />CONTRACTOR TO <br />PROVIDE AND INSTALL <br />2x6 WHITE PINE GRADE <br />2 OR BETTER <br />I <br />®i <br />®LLLL� <br />® II I I <br />® (FIXTURE APPLIED ANb <br />� II II II <br />a <br />® INSTALLED <br />® II II <br />I <br />®! <br />®I i® <br />a <br />® BY DOLLA� GENERAL( I <br />®i IMERCHANIPISING II <br />9j IDEPARTM�INT <br />a <br />H CONTRACTOR TO I Ifl <br />e <br />B <br />j® <br />®'; I INSTALL( �x WOOD 1 1 <br />®! FRAMINd TO ALLOV� <br />.1 - <br />I <br />1. HORIZO ITAL ANCH R <br />e III <br />BOARD �i 0 RUN <br />®� 1 1 CONTIN IOUSLY PAO <br />e <br />a <br />B NTRA T R T <br />CO C O O <br />(PROVIDE <br />®' 1 1 PEMB C LUMNSI <br />a <br />!® D INSTAL I� <br />!� <br />j <br />12x4 WHITE INE GRA <br />12 OR BETl, R <br />e <br />® II II I <br />II II II L® <br />Ell I I I I <br />1 <br />INTERIOR FACE OF PEMB <br />FRAMING BEYOND <br />ANCHOR BOARD: <br />CONTRACTOR TO PROVIDE <br />AND INSTALL 2x6 WHITE <br />PINE GRADE 2 OR BETTER <br />TOP OF FIXTURE TO BE <br />AFFIXED TO DRIED PINE <br />NAILER BY DOLLAR GENERAL <br />MERCHANDISING DEPT <br />FIXTURE SUPPLIED & INSTALLED <br />BY DOLLAR GENERAL <br />MERCHANDISING DEPT <br />MTL LINER PANELS <br />CONTRACTOR TO INSTALL <br />VERTICAL 2X WOOD FRAMING SO <br />THAT HORIZONTAL ANCHOR <br />BOARDS RUN CONTINUOUSLY <br />PAST PEMB COLUMNS <br />ANCHOR BOARD: <br />CONTRACTOR TO PROVIDE <br />AND INSTALL 2x4 WHITE PINE <br />GRADE 2 OR BETTER <br />1/2" GYP BOARD OVER LINER <br />PANELS - REFER TO INTERIOR <br />ELEVATIONS FOR LOCATIONS <br />INSULATION REFER TO <br />SECTIONS FOR MORE <br />INFORMATION (BY GC) <br />FIBER CEMENT PANELS <br />REFER TO EXTERIOR <br />ELEVATIONS <br />PILASTER (REF <br />EXTERIOR ELEVATIONS) <br />COI METAL BUILDING COLUMNS <br />SHALL BE STRAIGHT. TAPERED <br />COLUMNS & INTERIOR COLUMNS <br />REQUIRE WRITTEN APPROVAL. <br />MAINTAIN INTERIOR CLEARANCE <br />1. OF 74'-0" BETWEEN FACE OF <br />COLUMNS ON SALES FLOOR <br />001, <br />COI <br />4 DETAIL @ COLUMN <br />3/4 = 1-0 <br />1/2" GYP BOARD OVER LINER COI <br />PANELS - REFER TO INTERIOR <br />ELEVATIONS FOR LOCATIONS --\ <br />INSULATION REFER TO <br />SECTIONS FOR MORE <br />INFORMATION (BY GC) <br />00 <br />00 <br />VERIFY ANCHOR BOARDS \ �_ FIBER CEMENT PANELS <br />9. PRIME AND PAINT BOTH BOARDS TO MATCH FINISHED FLOOR REFER TO EXTERIOR 1'-6'_� 1'-6" <br />WALL COLOR. LOCATION WITH FIXTURE PLAN ELEVATIONS DETAIL @COLUMN <br />ANCHOR BOARD DETAIL <br />/ 7 1 <br />1 L <br />0 <br />00 <br />1 <br />A6 <br />2 1/2" <br />1/2" <br />--- <br />— — —I— <br />— <br />I--------- <br />—;—� <br />� —I---- <br />15 <br />26 <br />31 <br />15 <br />-I <br />2r� <br />31 <br />15 <br />24 <br />! <br />31 <br />15 <br />\ <br />26 <br />31 <br />j 15 <br />j <br />Z6� <br />31 <br />26 <br />ao <br />00 <br />126 <br />— <br />— — — <br />( <br />I- <br />eo <br />=�L <br />00 <br />- <br />GENDER <br />NEUTRAL I <br />6 7 V O <br />7 <br />1 <br />04 - <br />SIM SIM 1 z <br />6 <br />\ \ <br />03 <br />I113'-8"< <br />107 <br />— <br />SALES AREA <br />` - <br />105 <br />102 <br />6 <br />- <br />1 1 <br />4 <br />GENDER z 5 <br />SIM <br />NEUTRAL pl Al <br />105 �� �� <br />INTERIOR DIMENSION NOTE: <br />SALES AREA MINIMUM <br />8 <br />107 5 <br />DIMENSIONS TO BE MAINTAINED <br />IM <br />SERVI E <br />CLOSET - <br />106 91H <br />3 <br />10 <br />1 29 30 <br />J Oz <br />6 21 30 U <br />BREAK UJ <br />ROOM 0 <br />W <br />0 13'-0" <br />10 <br />13 9'-10 1/2" 13 <br />7 <br />13 13'-11" <br />I W <br />w <br />U 2 5 <br />$FI—'-0" <br />5 <br />o I 21 <br />— <br />1y�� <br />Q <br />I <br />Z <br />- - - - - - - - - - --I-- -�- - - - - - <br />- - - <br />100 I CA) w <br />I <br />84'-3" FROM FINISH FACE L __11 <br />RECEIVING g <br />103 <br />6 '-2 <br />1/2" FROM FINISH FACE <br />101 ? <br />I <br />z5 <br />z <br />48'-1" <br />5 N <br />21 <br />OFFICE 5 IV <br />g I 21 <br />o I <br />25 <br />o <br />FROM FINISH FACE <br />4 101 <br />5'-5" <br />1- = <br />5 m <br />- <br />- <br />15 <br />m <br />N <br />22 <br />22 25 22 <br />fl2l <br />22 <br />5 23 <br />M <br />4 21 _ <br />` <br />Z <br />21 30 <br />RISER <br />I <br />FIRE <br />24 <br />— <br />19 <br />\ <br />29 25 <br />`- <br />25 <br />Z1 - T-10" 25 - <br />J <br />OU <br />ILL <br />O <br />4 <br />27 <br />— <br />01 <br />'° ' <br />a <br />N <br />_ _ 21 2 _J N <br />0 - ---- 0 <br />w <br />Q <br />CLEAR F <br />FACE OF <br />171" \ �l 06 DOOR TACTILE <br />U_ U z U_ U <br />ELECTRI <br />16 SIGNAGE <br />— _ — — <br />N O 2 D N O <br />_J <br />0 <br />rn -„ <br />PANEL <br />, 21 30 <br />9 <br />9 �0 0 � 9 12 21 9 �U <br />9 9 9 11 4A <br />III I <br />J \ <br />�/ / <br />2 <br />� = o U <br />_6„ <br />w <br />Q <br />- o <br />�\ <br />o SIM .� <br />� <br />\ <br />\\ <br />11 <br />11 IDE [IFIE, <br />7741 <br />_41 <br />0D <br />1 2 <br />00 <br />A3 <br />28 <br />NZ� <br />15 <br />SIM <br />24 <br />15 <br />Z <br />15 <br />! <br />— <br />- <br />-- <br />4 <br />is <br />Al <br />l <br />15 <br />14 <br />4 <br />l0A <br />All <br />1 FLOOR PLAN <br />NORTH <br />1/2" <br />-2 1/2" <br />=R <br />COLD FORMED FRAMING AT THE <br />PILASTERS TO BE PROVIDED BY GC AND <br />TO BE DESIGNED, SIGNED AND SEALED <br />BY A STRUCTURAL ENGINEER LICENSED <br />co IN THE STATE OF FLORIDA AND <br />RETAINED BY GC. <br />1/2" PLYWOOD SHEATHING <br />FIBER CEMENT PANELS REFER <br />TO EXTERIOR ELEVATIONS <br />METAL BUILDING COLUMNS <br />SHALL BE STRAIGHT. TAPERED <br />COLUMNS & INTERIOR COLUMNS <br />REQUIRE WRITTEN APPROVAL. <br />MAINTAIN INTERIOR CLEARANCE <br />OF 74'-0" BETWEEN FACE OF <br />COLUMNS ON SALES FLOOR <br />COLD FORMED FRAMING AT THE <br />PILASTERS TO BE PROVIDED BY GC AND <br />TO BE DESIGNED, SIGNED AND SEALED <br />BY A STRUCTURAL ENGINEER LICENSED <br />IN THE STATE OF FLORIDA AND <br />RETAINED BY GC. <br />1/2" PLYWOOD SHEATHING <br />FIBER CEMENT PANELS REFER <br />TO EXTERIOR ELEVATIONS <br />6' CMU WALL FOR <br />THE DUMPSTER <br />ENCLOSURE REF. <br />CIVIL DRAWINGS FOR <br />LOACTION <br />o <br />3I �- <br />in -1 <br />IT IT o <br />LID <br />N N r- <br />N <br />r` <br />tOM N <br />;AL `V <br />"0 <br />L�J <br />O <br />WALL TYPES LEGEND <br />SEE SHEET Al 1 FOR ADDITIONAL NOTES AND DETAILS <br />WALL TYPE <br />(I.E. FULL HEIGHT) <br />MOP HOLDER <br />USE REMAINDER OF <br />4'X8' FRP SHEET ON <br />THIS WALL STARTING <br />48" HIGH FIBERGLASS IN CORNER <br />REINFORCING PANEL ' <br />( 1 <br />MOP SINK (BELOW) FAUCET ON THIS WALL <br />WATER HEATER <br />"EWH-2" ON SHELF <br />ABOVE MOP SINK <br />5 ���TPLAN DETA3/8 <br />NOTES: <br />1. METAL BUILDING COLUMNS SHALL BE STRAIGHT. TAPERED <br />COLUMNS & INTERIOR COLUMNS REQUIRE WRITTEN <br />APPROVAL. <br />2. MAINTAIN MINIMUM INTERIOR CLEARANCE OF 74'-0" BETWEEN <br />FACE OF EXTERIOR WALL COLUMNS ON SALES FLOOR. <br />3. THE ALLOWABLE CLEAR DISTANCE BEHIND THE SALES FLOOR <br />FIXTURES IS 1-'/" MAXIMUM TO THE FACE OF DRYWALL. IF IT <br />IS LARGER THAN THIS, PROVIDE HORIZONTAL WOOD FURRING <br />STRIPS, PAINTED WALL COLOR, MOUNTED ON THE DRYWALL <br />AT 78" AFF TO THE TOP OF THE STRIP TO REDUCE THE GAP <br />TO LESS THAN 1-1/2". <br />4. MAINTAIN 2" AIR GAP BETWEEN THE REACH IN <br />COOLER/FREEZER AND THE WALL FOR VENTILATION. <br />FLOOR PLAN KEYED NOTES <br />1❑ RECEIVING DOOR BUZZER. <br />2❑ 2" DOOR SCOPE (REF DOOR SCHEDULE SHEET A5). <br />ROOF ACCESS LADDER - REFER TO EXTERIOR <br />ELEVATIONS SHEET A2. FIXED LADDER TO ROOF W/ <br />LOCKABLE SAFETY GATE AT BASE. <br />STRIPE FLOOR AT RECEIVING DOOR AS INDICATED FOR <br />DESIGNATED CLEAR EGRESS PATH (PAINT YELLOW) AND <br />DESIGNATED T-0" EMS PANEL CLEARANCE (PAINT RED). <br />STRIPE FLOOR FOR DESIGNATED CLEAR ADA EGRESS <br />4A PATH (PAINT YELLOW). <br />PROVIDE AND INSTALL WATER HEATER ABOVE THE MOP <br />SINK (REF 4/A1 AND 2/P1). <br />H13 5/8" METAL STUD @ 16" O.C. WITH 1/2" GYPSUM BOARD. <br />METAL LINER PANELS TO 8'-0" A.F.F. (BY <br />PRE-ENGINEERED BUILDING MANUFACTURER). <br />❑8 CART AREA. REFER TO 5/A6. <br />❑g WALL OUTLETS FOR BANKS OF COOLERS AND <br />FREEZERS, SEE ELECTRICAL FOR DETAILS. OUTLETS TO <br />BE 11" FROM RIGHT SIDE OF UNITS AS YOU FACE THEM <br />FROM THE SALES FLOOR <br />t 0 CONCRETE SLAB ON VAPOR BARRIER <br />(REF STRUCTURAL SHEET S2). <br />1 oA CONCRETE SLAB AT EXTERIOR DOOR REF. <br />STRUCTURAL DRAWINGS. <br />t 1 METAL BUILDING FRAME, REFER TO NOTED WALL <br />SECTIONS FOR ADDITIONAL INFORMATION. <br />1 2 METAL LINER PANELS (28/29 GAUGE) WITH 1/2" GYPSUM <br />H BOARD. SEE INTERIOR ELEVATIONS ON SHEET A4. <br />PROVIDE R-13 BATT INSULATION. <br />13 ROOF MOUNTED HVAC UNITS - (REF SHEET M1). <br />FBROO14 <br />M FINISH CONCRETE SIDEWALK - SLOPE <br />CONCRETE 1/8" PER FOOT AWAY FROM BUILDING (TYP) <br />(COORDINATE WITH CIVIL PLANS). <br />1 5 FIBER CEMENT PANELS ON 3 5/8' METAL STUD <br />PILASTERS (REF EXTERIOR ELEVATIONS). <br />16 STOREFRONT SYSTEM (REF SHEETS A5). <br />1 7 LINE OF CANOPY ABOVE. REFERENCE EXTERIOR <br />ELEVATIONS. <br />1 s A.D.A. COMPLIANT CURB RAMP. (REF CIVIL PLANS). <br />MC CUE CART AND BUMPER GUARDS T-5" A.F.F., <br />19 ORDER TRIMKIT FOR THIS PROTOTYPE. <br />WALL HYDRANT (REF PLUMBING SHEET P1 <br />20 FOR ADDITIONAL INFORMATION). <br />z 1 REFRIGERATION BY DOLLAR GENERAL. <br />22 ROUND STEEL PIPE COLUMN WITH RECESSED BASE <br />PLATE. PAINT SECOND CONRETE POUR SW6991 BLACK <br />MAGIC. PAINT STEEL COLUMN SW7005 PURE WHITE. <br />WRAP STEEL COLUMN WITH TIGHT LOOP CARPET <br />(BLACK) FROM BASE TO 48" A.F.F. <br />23 POWER POLE. COORDINATE FINAL LOCATION WITH <br />ELECTRICAL DRAWINGS AND FINAL DOLLAR GENERAL <br />FIXTURE PLAN F1. <br />z4 FIBER CEMENT PANELS ON 7/8" HAT CHANNEL ON <br />METAL WALL PANELS REFER TO ELEVATIONS FOR <br />COLOR <br />z5 FREESTANDING COOLER/FREEZER (INCLUDING <br />PRODUCE COOLER AND DISPLAY LIGHTING) TO BE <br />HARDWIRED THROUGH SO COR). GC TO LEAVE BOTTOM <br />OF CORD HANGING AT 80" A.F.F. (REF. ELECTRICAL). SO <br />CORD ANCHORED TO PURLINS ABOVE. COORDINATE <br />LOCATION WITH FINAL DOLLAR GENERAL FIXTURE PLAN. <br />26 PRE -FINISHED METAL DOWNSPOUTS (COORDINATE <br />SIZE AND LOCATIONS WITH PEMB AND CIVIL PLANS} <br />27 MC CUE RAILING IN FRONT OF ELECTRICAL PANELS <br />8'-0" LONG WITH TOP TWO RAILINGS AND NO MIDDLE <br />POST. <br />Zs FIBERS CEMENT PANELS ON 7/8" HAT CHANNEL ON 8" <br />SMOOTH -FACED CMU. ALIGN FACE OF BLOCK WITH <br />STEEL GIRT. PROVIDE PROPER ANCHORAGE TO <br />STRUCTURE. <br />29 NON -REFRIGERATION EQUIPMENT (REGISTERS, HGI <br />KIOSK, ATM, KEYME) BY DOLLAR GENERAL. <br />30 REFRIGERATION AND NON-REFIRGERATION EQUIPMENT <br />ON WALLS TO BE POWERED THROUGH OUTLETS - SEE <br />ELECTRICAL. COORDINATE LOCATION WITH FINAL <br />DOLLAR GENERAL FIXTURE PLAN. <br />31 SPANDREL GLAZING STOREFRONT, REFERENCE <br />EXTERIOR ELVATIONS <br />CONSULTANT: <br />SEAL: JOHN BENEDICT POLSINELLI, AR96059 <br />r 1 <br />THIS DRAWING SHALL NOT BE USED FOR <br />CONSTRUCTION PURPOSES UNTIL THE SEAL AND <br />SIGNATURE OF THE RESPONSIBLE REGISTRANT <br />APPEARS ON THE DRAWING, AND PROPER PERMIT <br />FORMS AND RELATED FEES ARE TRANSMITTED BY <br />THE OWNER, OWNER'S AGENT OR CONTRACTOR <br />TO THE AUTHORITY HAVING JURISDICTION. <br />DATE <br />ISSUED FOR <br />REV <br />03/29/2021 <br />PEMB COORDINATION <br />05/20/2021 <br />CIVIL SUBMISSION <br />05/20/2021 <br />DUKE COORDINATION <br />06/07/2021 <br />PEMB COORDINATION 02 <br />08/09/2021 <br />CIVIL RESUBMISSION 1 <br />08/25/2021 <br />OWNER REVIEW <br />11 /08/2021 <br />REVISED ELEVATIONS <br />1 1 /29/2021 <br />PERMIT SUBMITTAL <br />Project Manager <br />Drawn <br />L. LONG <br />B. WILLIAMS <br />Project Leader <br />Checked <br />L. LONG <br />Date <br />Dept Mgr Approval <br />02/23/2021 <br />Client <br />PALMETTO ZEPHYRHILLS -GALL BLVD., LLC <br />P.O. Box 1615, <br />Thomasville, GA 31 799 <br />Office: (229) 226-1 1 77 <br />Contact: Daniel Tubb <br />Project <br />DOLLAR GENERAL <br />Corner of Gall Boulevard and C <br />Avenue, <br />Zephyrhills, FL 33542 <br />(City of Zephyrhills) <br />Store #: 23227 <br />Drawing Title <br />FLOOR PLAN <br />DO NOT SCALE DRAWING <br />Project No. <br />Drawing No. <br />JCDT.20.04S1 <br />Al <br />J <br />