Laserfiche WebLink
i HOUR RATEDriRE CART, ON, <br />.ryp <br />MECH. A.CCE ": <br />r—n±DE <br />?.._A rt_.HfV1 I._,, .F. <br />SHEET <br />Al <br />DETAIL D <br />PARTITION -\,I <br />BE[ ...0W I <br />so <br />503 AHU-1 <br />200 <br />l 1 150 3 <br />,2 <br />F I <br />MECH, MELZANII'JE I <br />M P-19,21,23 <br />P OA-1 <br />MECI iAA ICAL <br />ME AAN NE -s�1E <br />S <br />M <br />Nv i <br />60 <br />50 3 <br />NORTH <br />(_[_� MEZZANINE PLAN <br />0 4' 8' 24' <br />DEMO GENERAL NOTES <br />A. THE INFORMATION SHOWN ON THIS PLAN AND ANY FOLLOWING SHEET IS FOR REFERENCE ONLY. <br />THIS IS NOT AN AS -BUILT DRAWING AND THERE MAY BE EQUIPMENT THAT WAS NOT SEEN DURING <br />THE INITIAL FIELD SURVEY AND THEREFORE MAY BE DIFFERENT THAN WHAT IS INDICATED ON THESE <br />PLANS. THE CONTRACTOR SHALL VERIFY ALL FIELD CONDITIONS ON HIS/HER OWN TO COORDINATE <br />THE NEW CONSTRUCTION WITH EXISTING FIELD CONDITIONS. MAJOR DISCREPANCIES BETWEEN THE <br />DRAWINGS AND FIELD CONDITIONS MUST BE BROUGHT TO THE ATTENTION OF THE <br />ARCHITECT/ENGINEER IN A TIMELY MANNER. FAILURE TO NOTIFY THE ARCHITECT /ENGINEER OF <br />MAJOR DISCREPANCIES BETWEEN FIELD CONDITIONS AND THESE DRAWINGS THAT MAY CAUSE <br />DELAYS IN PREDETERMINED CONSTRUCTION SEQUENCES AND SCOPE DESIGN WILL RESULT IN THE <br />CONTRACTOR'S RESPONSIBILITY TO PROVIDE, AT NO CHARGE TO THE OWNER, ALL ADDITIONAL <br />EXPENSES AND/OR EQUIPMENT TO COMPLETE THE TASK. <br />B. CONDUIT SIZES AND NUMBERS HAVE BEEN ESTIMATED TO THE BEST ABILITY OF THE FIELD <br />SURVEYOR/ ENGINEER. THE CONTRACTOR SHALL SURVEY THE FIELD CONDITIONS ON HIS/HER OWN <br />PRIOR TO COMMENCEMENT OF DEMOLITION AND/OR CONSTRUCTION TO DETERMINE THE BEST <br />POSSIBLE WAY TO RE-ROUTE, RE -USE AND/OR DEMOLISH THE EXISTING CONDUIT AND EQUIPMENT. <br />ALL EXISTING CONDUIT RUNS INDICATED ON THIS SHEET ARE DIAGRAMMATIC ONLY AND SHALL BE <br />TRACED OUT IN THEIR ENTIRETY. <br />C. ALL POWER CONDUITS THAT ARE ACTIVE SHALL NOT BE DISTURBED UNTIL SHUT -DOWN OF POWER <br />HAS BEEN COORDINATED WITH FACILITY. ALL OTHER ELECTRICAL CONDUITS (LOW VOLTAGE) SHALL <br />NOT BE DISTURBED UNTIL PROPER FACILITY STAFF HAS BEEN ALERTED OF POSSIBLE SYSTEM'S <br />SHUT -DOWN. <br />D. ALL ABANDONED AND/OR EMPTY CONDUIT, RACEWAY, JUNCTION BOXES, PULL -BOXES, ETC. THAT <br />TRAVERSE THROUGH THE PROJECT AREA SHALL BE REMOVED IN THEIR ENTIRETY. <br />E. DURING THE DEMOLITION AND CONSTRUCTION OF THIS PROJECT, THE CONTRACTOR MUST <br />PROTECT ALL CEILING MOUNTED SMOKE DETECTORS FROM DUST AND DEBRIS. PROVIDE <br />REMOVABLE COVERS FOR EACH DETECTOR WITHIN THE WORK AREA THAT MAY BE AFFECTED BY <br />THE CONSTRUCTION. NOTIFY THE OWNER WHEN THESE DETECTORS ARE COVERED OR PROTECTED. <br />DURING NON -CONSTRUCTION OR DEMOLITION WORKING HOURS, THE DETECTOR COVERS SHALL BE <br />REMOVED. ANY SMOKE DETECTOR DAMAGED DURING THE CONSTRUCTION AND/OR DEMOLITION <br />PROCESS SHALL BE REPLACED WITH A NEW DETECTOR. TYPICAL THROUGHOUT THIS PROJECT. <br />o DEMO KEYED NOTES <br />I EXISTING ELECTRICAL EQUIPMENT TO BE REMOVED AND TURNED OVER TO OWNER. <br />NORTH <br />//� FLOOR PLAN <br />1 /811 = 1 1-011 <br />0 4' 8' 24' <br />CONSULTING <br />ENGINEERING <br />ASSOCIATES <br />8365 GUNN HIGHWAY <br />TAMPA, FL 33626 <br />25 <br />FA81(844 482 X13)0226 <br />EB — 0003962 <br />Mechanical Plumbing <br />Fire Protection <br />SEAL : <br />r <br />{ <br />i <br />Michael PE#p3 533 P E <br />Fla COA* 3967 <br />z <br />O N <br />U1 <br />Q co <br />CO <br />W� <br />U 0 <br />J <br />J IL <br />O <br />I <br />J <br />J <br />J = <br />-� Z <br />T W <br />W <br />i- N W <br />MV <br />0. W Q <br />W w J <br />N Ir CL <br />~ <br />LL VJ W <br />1 <br />O <br />F_MM Z <br />.. � W O <br />U MM � <br />W F. T 0� <br />Q� V � Li = <br />REVISIONS <br />0 <br />delta date revision <br />SHEET TITLE : <br />HVAC DEMO <br />FLOOR PLAN <br />DRAWN BY: MPS <br />DATE: 02/12/19 <br />PROJ. NO. 18010 <br />2/13/2019 2:06:12 PM E:\2180\218014 — Zephyrhills Police Station HVAC\Drawings\E1 Demo Plan.dgn <br />SHEET NO. <br />-001 <br />