My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
6118 8th St (4)
Zephyrhills
>
Building Department
>
Building Plans
>
6118 8th St (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2025 11:30:30 AM
Creation date
2/25/2025 4:13:34 PM
Metadata
Fields
Template:
Building Plans
Street #
6118
Location
8th St
Contractor
Air Mechanical Service Corp
Building Plans - Permit #
21503
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r-� <br />1 I-IC,:JR RATED <br />F;- E PARTMG)Nl, <br />YP <br />I'v EC I i AC:_. <br />/1 l C)zM I_.A Dr <br />L. ` ; ET Al I .7, <br />;FTAIL " <br />DARTITi-N-\1 ._ Lr <br />NORTH <br />KEY NOTES <br />MEZZANINE PLAN <br />0 4' 8' 24' <br />I . CONTRACTOR TO REMOVE EXISTING D15CONNECT SWITCH SERVING EXISTING HVAC UNIT AND REPLACE <br />WITH NEW FUSED DISCONNECT A5 SHOWN AND CONNECT TO NEW HVAC UNIT. PROVIDE NEW CONDUIT <br />AND CONDUCTORS A5 NECESSARY. <br />GENERAL NOTES <br />A. THE CONTRACTOR SHALL VERIFY, CONFIRM, AND COORDINATE ALL POWER, TELEPHONE, AND CABLE TV <br />5ERVICE REQUIREMENT5 WITH THE APPROPRIATE UTILITY PRIOR TO SUBMITTING A BID. <br />B. THE ELCTRICAL CONTRACTOR SHALL INSTALL A GREEN EQUIPMENT GROUNDING CONDUCTOR IN ALL <br />CONDUITS AND BOND TO ALL EQUIPMENT AND DEVICES. BONDING SHALL BE ACCOMPLISHED IN <br />ACCORDANCE WITH ARTICLE 250 OF THE N.E.C. GROUND CONDUCTORS SHALL BE SIZED IN <br />ACCORDANCE WITH TABLE 250-1 22 OF THE N.E.C. <br />C. WHERE UNGROUNDED CONDUCTORS ARE INCREASED IN 51ZE, CORRE5PONDING EQUIPMENT GROUNDING <br />CONDUCTORS SHALL BE INCREASED IN SIZE PROPORTIONATELY ACCORDING TO CIRCULAR MIL AREA OF <br />THE UNGROUNDED CONDUCTORS. <br />D. CONTRACTOR TO INSPECT EXI5TING FEEDERS, CIRCUIT BREAKERS AND DISCONNECTS FOR RE -USE IN <br />NEW BUILDING ELECTRICAL LAYOUT. <br />E. PANEL AND CIRCUIT DE5IGNATION5 SHOWN ARE TO THE BEST OF THE ENGINEERS KNOWLEDGE FROM <br />EXISTING DRAWING5, CONTRACTOR TO VERIFY PANEL AND CIRCUIT DE5IGNATION5 IN FIELD AND <br />COORDINATE ANY DE5CREPENCIE5 WITH ARCHITECT/ENGINEER. <br />F. PROVIDE NEW ELECTRICAL EQUIPMENT NAMEPLATE A5 DETAILED TH15 SHEET FOR ALL NEW EQUIPMENT. <br />ru041�ls1'J"T <br />IT IS THE INTENT OF THESE PLANS AND SPECIFICATIONS TO RESULT IN A <br />COMPLETE ELECTRICAL INSTALLATION IN ACCORDANCE WITH ALL <br />STATE/LOCAL CODES/ORDINANCES, THE NATIONAL ELECTRIC CODE AND <br />THE LANDLORDS/OWNERS MINIMUM REQUIREMENTS. IN THE EVENT ANY <br />PORTION OF THE INSTALLATION SHOWN OR SPECIFIED FAILS TO MEET <br />THESE REQUIREMENTS, IT SHALL BE THE ELECTRICAL CONTRACTORS <br />RESPONSIBILITY TO ALTER THE LAYOUT TO MEET THE REQUIREMENTS OF <br />SAID GOVERNING CODES AND/ OR LANDLORDS/ OWNERS MINIMUM <br />REQUIREMENTS AND TO NOTIFY THE ARCHITECT OF SUCH CHANGES IN <br />THESE PORTION OF THE PLANS AND SPECIFICATIONS. WHERE INSTALLATION, <br />SHOWN OR DESCRIBED EXCEEDS THE REQUIREMENTS OF TH STATE AND <br />LOCAL CODES, THE SPECIFICATIONS AND PLANS SHALL GOVERN. <br />NAMEPLATE COLOR <br />BLACK <br />HEM <br />120/208V, 3PH, 4W' <br />® FED FROM MSB BKR. 11 <br />PHASE A -BLACK WIRE <br />PHASE B - RED WIRE <br />PHASE C - BLUE WIRE <br />LETTERING SHALLNEUTRAL - WHITE WIRE <br />BE1/4'HIGH GROUND - GREEN WIRE <br />LETTER (FILL) COLOR <br />WHITE <br />INDICATED VOLTAGE, <br />NO. OF PHASES, <br />NO OF WIRES <br />ATTACH NAMEPLATE <br />WITH 2 SCREWS (MIN) <br />INDICATES WHERE <br />THIS EQUIPMENT <br />IS FED FROM <br />(TRANSFER SWITCHES <br />WILL HAVE TWO LINES.) <br />ELECTRICAL EQUIPMENT NAMEPLATE <br />SCALE: NONE <br />TYPICAL FOR ALL PANELS, SWITCHBOARDS, TRANSFER SWITCHES AND DISCONNECT SWITCHES. <br />NORTH <br />(J� FLOOR PLAN <br />0 4' 8' 24' <br />CONSULTING <br />ENGINEERING <br />ASSOCIATES <br />SEAL <br />8365 GUNN HIGHWAY <br />TAMPA, FL 33626 <br />25 <br />FA81(844 482 X13)0226 <br />EB — 0003962 <br />Mechanical Plumbing <br />Fire Protection <br />t <br />Michael P. Spyychala P.E <br />Fla PE# 31533 <br />Fla COA# 3967 <br />z <br />O <br />CV <br />d' <br />In <br />Q <br />co <br />CO <br />U <br />Q <br />0 <br />W <br />oc <br />U <br />O <br />_I <br />J <br />LL <br />O <br />w <br />J <br />U) <br />J_ <br />= <br />J <br />z <br />= <br />X <br />CL <br />W <br />N <br />W <br />W <br />Q <br />W <br />W <br />J <br />N <br />~ <br />W <br />0 <br />U <br />Ld <br />MM <br />T <br />Q� <br />Q <br />v(_n <br />�+ <br />T <br />i <br />(L <br />0 <br />REVISIONS <br />delta I date I revision <br />SHEET TITLE <br />HVAC FLOOR <br />PLAN <br />DRAWN BY: <br />DATE: <br />PROJ. NO. <br />SHEET NO <br />MPS <br />02/1 2/1 9 <br />:r r <br />2/13/2019 2:06:23 PM E: \2180\218014 — Zephyrhills Police Station HVAC\Drawings\E2 Power Plan.dgn <br />E-002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.