<br />ABBREVIATIONS
<br />I GENERAL NOTES
<br />CODE CRITERIA
<br />* NOTE: AMVIAMM AND SYMBOLS OONTAM HUE
<br />fT MAY OR MAY NOT BE USED ON IM PROTECT +
<br />1. PLANS INDICATE THE SCHEMATIC LAYOUT AND LOCATION OF THE MECHANICAL SYSTEM COMPONENTS. UNLESS SPECIFIC DIMENSIONS
<br />13. PROVIDE P-TRAPS AS PER DETAIL AT ALL CONDENSATE DRAIN LINE CONNECTIONS. SLOPE DRAIN LINES TOWARD THE POINT OF
<br />NOTE:
<br />A
<br />T
<br />ARE NOTED, THE ACTUAL LOCATION OF THESE COMPONENTS SHALL BE DETERMINED IN THE FIELD IN COORDINATION WITH THE WORK
<br />DISCHARGE (MIN 1/8"/FOOT). INSULATE CONDENSATE DRAIN LINES WITH 3/4" THICK SEAMLESS CLOSED CELL RUBBER PIPE
<br />ALL CODES SHALL COMPLY WITH THE FLORIDA STATUES 69A-3.012 AND THE STATE
<br />AFF
<br />ABOVE FINISHED FLOOR
<br />TEMP TEMPERATURE
<br />OF OTHER TRADES, THE USE OF MANUFACTURER'S SHOP DRAWINGS AND SIMILAR CERTIFIED DATA. PLANS SHALL NOT BE SCALED.
<br />INSULATION. CONDENSATE DRAIN LINES TO BE PVC. LINES SHALL BE ONE DIAMETER LARGER THAN THE UNIT DRAIN CONNECTION,
<br />FIRE MARSHALLS RULE. THIS LIST IS NOT INCLUSIVE OF ALL CODES AND
<br />ACU
<br />AIR CONDITIONING UNIT
<br />TSP TOTAL STATIC PRESSURE
<br />BUT NOT LESS THAN 3/4 INCH. PROVIDE CLEANOUTS AT ALL CHANGES OF DIRECTION. THE FOLLOWING MINIMUM PIPE SIZES
<br />STANDARDS THAT MAY OR MAY NOT APPLY TO THIS PROJECT.
<br />ACC
<br />AIR COOLED CONDENSER
<br />TYP TYPICAL
<br />2. NO EXCLUSIONS FROM OR LIMITATIONS IN THE LANGUAGE USED IN THE CONTRACT DOCUMENTS SHALL BE INTERPRETED AS MEANING
<br />SHALL BE USED:
<br />ACCU
<br />AIR COOLED CONDENSING UNIT
<br />U
<br />THAT THE EQUIPMENT, APPURTENANCES, AND/OR ACCESSORIES NECESSARY FOR A COMPLETE AND OPERATIONAL SYSTEM ARE NOT
<br />*FLORIDA BUILDING CODE (FBC), SIXTH EDITION (2017) - ALL SECTIONS
<br />AHU
<br />AIR HANDLING UNIT
<br />UL UNDERWRITERS LABORATORIES
<br />TO BE PROVIDED AS REQUIRED.
<br />EQUIPMENT CAPACITY MINIMUM PIPE DIAMETER
<br />*FLORIDA BUILDING CODE (FBC), SIXTH EDITION (2017) ENERGY CONSERVATION
<br />A/E
<br />ARCHITECT/ENGINEER
<br />V
<br />UP TO 20 TONS 3/4"
<br />SOFTWARE ENERGY GAUGE SUMMIT VERSION 6.00
<br />B
<br />VI VIBRATION ISOLATOR
<br />THE SEPARATE DIVISIONAL DRAWINGS AND SPECIFICATIONS DO NOT RELIEVE THE CONTRACTOR FROM THE RESPONSIBILITY TO
<br />OVER 20 TONS UP TO 40 TONS 1"
<br />*FLORIDA FIRE PREVENTION CODE 2017
<br />BHP
<br />BRAKE HORSEPOWER
<br />VERT VERTICAL
<br />PROVIDE THE WORK WHICH IS INDICATED ON ANY OF THE DRAWINGS OR DIVISION OF THE SPECIFICATIONS. REVIEW AND
<br />*FLORIDA BUILDING CODE (FBC), SIXTH EDITION (2017) ACCESSIBILITY - 2012 FLORIDA
<br />BTU
<br />BRITISH THERMAL UNIT
<br />VD VOLUME DAMPER
<br />COORDINATE THE SCOPE OF WORK WITH ALL SECTIONS TO ASSURE A COMPLETE AND FUNCTIONAL SYSTEM IS INSTALLED.
<br />14. PROVIDE FLEXIBLE CONNECTIONS BETWEEN ALL AIR MOVING APPARATUS AND DUCTWORK. RECOMMENDED WIDTH IS 4".
<br />ACCESSIBILITY CODE FOR BUILDING CONSTRUCTION
<br />BLDG
<br />BUILDING
<br />W
<br />C
<br />WB WET BULB
<br />3. THE DIMENSIONS AND CONDITIONS SHOWN ON THE CONTRACT DOCUMENTS ARE BASED ON AVAILABLE EXISTING INFORMATION.
<br />15. WHERE INDICATED ON DRAWINGS AND/OR EQUIPMENT SCHEDULES EXTERNAL STATIC PRESSURE IS DEFINED AS NOT INCLUDING
<br />NATIONAL FIRE PROTECTION ASSOCIATION (NFPA):
<br />CONC
<br />CONCRETE
<br />AFTER WALLS AND/OR CEILINGS ARE REMOVED, VERIFY EXISTING CONDITIONS AND DIMENSIONS TO ESTABLISH DUCT, PIPING AND
<br />LOSSES DUE TO UNIT MOUNTED FILTER(S), RETURN AIR PLENUM OR MIXING BOXES. THOSE LOSSES SHALL BE PART OF THE
<br />*NFPA-70 (2014) NATIONAL ELECTRICAL CODE
<br />CONN
<br />CONNECTION
<br />EQUIPMENT CLEARANCES. NOTIFY THE ENGINEER ANY DEVIATIONS FROM THE CONTRACT DOCUMENTS.
<br />EQUIPMENT INTERNAL LOSSES SAME AS THOSE CAUSED BY COILS, CABINET, ETC.
<br />*NFPA-72 (2013) NATIONAL FIRE ALARM CODE
<br />CONTR
<br />CONTRACTOR
<br />DUCTWORK
<br />INSTALLATION (2015) STANDARD FOR THE INSTALTION OF AIR-CONDITIONING AND
<br />CFM
<br />CUBIC FEET PER MINUTE
<br />4. NOTIFY THE ENGINEER OF ANY DAMAGE TO THE EXISTING INSTALLATION BEFORE PROCEEDING WITH WORK.
<br />16. CONCRETE PAD SHALL BE SIZED TO ACCOMMODATE THE REQUIRED SERVICE CLEARANCES AND/OR EXTEND A MINIMUM OF 6 INCHES
<br />VENTILATING SYSTEMS
<br />CEA
<br />CONSULTING ENGINEERING ASSOCIATES
<br />NET INSIDE DIMENSION
<br />5. SUBMIT FULL SHOP DRAWINGS OF ALL EQUIPMENT AND MATERIALS FOR REVIEW. WHERE MANUFACTURERS ARE LISTED IN THE
<br />PAST UNIT IN ALL DIRECTIONS AND PLACE THE CONDENSING UNIT BASE A MINIMUM OF 4" ABOVE ADJOINING
<br />D
<br />SIZE IN INCHES (PLAN DIM. FIRST)
<br />PROJECT MANUAL, ONE OF THOSE MANUFACTURERS SHALL BE PROVIDED UNLESS A REQUEST FOR SUBSTITUTION HAS BEEN
<br />GRADE. PROVIDE 1" NEOPRENE PADS UNDER CONDENSING UNIT. SECURE CONDENSING UNIT(S) TO PAD USING ONE INCH WIDE 16
<br />AMERICAN SOCIETY OF HEATING. REFRIGERATION AND AIR CONDITIONING
<br />DET
<br />DETAIL
<br />SUBMITTED PRIOR TO BID AND THE MANUFACTURER SUBSEQUENTLY IS LISTED AS AN ACCEPTABLE MANUFACTURER IN
<br />GAGE STAINLESS STEEL STRAPS AND STAINLESS STEEL SCREWS, AT A MAXIMUM 18 INCHES ON CENTER, ON ALL SIDES OF THE
<br />ENGINEERS. INC. (ASHRAE):
<br />DIM
<br />DIMENSION
<br />.AN
<br />ADDENDUM. PARTIAL SUBMITTALS WILL NOT BE ACCEPTED FOR REVIEW AND APPROVAL. INSTALL AND TEST ALL EQUIPMENT AND
<br />UNIT. MODIFY EXISTING PAD AS REQUIRED TO COMPLY WITH THIS REQUIREMENT.
<br />*ASHRAE GUIDELINE 4-2008 -PREPARATION OF OPERATING AND MAINTENANCE
<br />DX
<br />DMSD
<br />DIRECT EXPANSION
<br />DUCT MOUNTED SMOKE DETECTOR
<br />RADIUS TYPE ELBOW
<br />MATERIALS IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS. FOR ALL EQUIPMENT, WHICH HAS
<br />17. PROVIDE PAINTED GALVANIZED EXPANDED METAL GRILLE OVER ALL CONDENSER COILS.
<br />DOCUMENTATION FOR BUILDING SYSTEMS
<br />*ASHRAE STANDARD 621-2016 AND APPROVED ADDENDA -VENTILATION FOR
<br />DB
<br />DRY BULB
<br />BEEN SCHEDULED DIRECTLY ON THE DRAWINGS, PROVIDE WITHIN THE SUBMITTAL, A PERFORMANCE SCHEDULE FOR THE PROPOSED
<br />DISCH
<br />DISCHARGE
<br />EQUIPMENT IN THE SAME FORMAT AS INCLUDED ON THE CONTRACT DOCUMENTS. FAILURE TO PROVIDE REQUIRED PERFORMANCE
<br />18. ALL NEW EQUIPMENT SHALL BE LABELED WITH PLASTIC SIGNS, LAMINATED, ENGRAVED: 1/8" THICK BLANKS FOR SIGNS SHALL BE A
<br />ACCEPTABLE INDOOR AIR QUALITY
<br />*ASHRAE STANDARD 126-2016 - METHOD OF TESTING HVAC AIR DUCTS
<br />E
<br />SCHEDULE WILL RESULT IN REJECTION OF THE ENTIRE SUBMITTAL. BIND SHOP DRAWINGS/CATALOG-CUTS IN THREE RING
<br />MINIMUM OF 1 3/4" HIGH, WITH 1" HIGH LETTERS. LENGTH OF THE SIGN SHALL BE THE SUM OF THE LETTERS/NUMBERS PLUS 3/4"
<br />*ASHRAE STANDARD 180-2012 - STANDARD PRACTICE FOR INSPECTION AND
<br />ELEV
<br />ELEVATION
<br />ITEM TO BE REMOVED
<br />BINDERS WITH A TITLE SHEET AND IDENTIFICATION ON FRONT AND SIDE OF THE BINDER. SUBMIT DRAWINGS AND CUT SHEETS FOR
<br />EACH END. SIGNS DESIGNATED FOR INSTALLATION ON THE OUTSIDE, IN OPEN AREAS, OR LOCATED IN A PROTECTED AREA THAT IS
<br />MAINTENANCE OF COMMERCIAL BUILDING HVAC SYSTEMS
<br />ENGR
<br />ENGINEER
<br />ALL PRODUCTS ALL AT ONE TIME. INDEX ALL ITEMS TO THE PROJECT MANUAL OR DRAWINGS AS APPLICABLE. SHOP DRAWINGS
<br />SUBJECT TO DIRECT SUNLIGHT, SHALL BE UV RATED, DESIGNATED AND MANUFACTURED TO BE EXPOSED TO THE ELEMENTS.
<br />EAT
<br />ENTERING AIR TEMPERATURE
<br />THAT DEVIATE FROM THE REQUIREMENTS OF THE CONTRACT DOCUMENTS SHALL LIST ALL DIFFERENCES IN A COVER LETTER
<br />SUBMITTAL DATA INDICATING THE ABOVE WILL BE REQUIRED. LABELS SHALL ALSO INCLUDE THE ROOM NUMBER, CORRESPONDING
<br />EQUIP
<br />ESP
<br />EQUIPMENT
<br />EXTERNAL STATIC PRESSURE
<br />VOLUME DAMPER
<br />ATTACHED TO FRONT OF THE SUBMITTAL. ANY UNLISTED DEVIATIONS FOUND DURING REVIEW WILL RESULT IN THE REJECTION OF
<br />THE ENTIRE SUBMITTAL. FOR ITEMS REVIEWED AND MARKED `REJECTED" OR `REVISE AND RESUBMIT"ONLY ONE ADDITIONAL
<br />,
<br />AIR HANDLER LOCATION OR AREA SERVED TO ASSIST IN THE DETERMINATION OF THE SERVICE LOCATION OF SAID EQUIPMENT.
<br />HVAC DESIGN CRITERIA
<br />F
<br />SUBMITTAL WILL BE REVIEWED TO VERIFY PRODUCT COMPLIANCE WITH THE CONTRACT DOCUMENTS. SHOULD FURTHER SUBMITTALS
<br />OUTDOOR 'F
<br />SUMMER INDOOR
<br />WINTER INDOOR
<br />BE REQUIRED FOR THE DESIGN PROFESSIONAL VERIFY THE SUBMITTAL WITH THE REQUIREMENTS OF THE CONTRACT DOCUMENTS 19. RETAIN THE SERVICES OF A NEBB AND/OR AABC CERTIFIED TEST AND BALANCE AGENCY TO PERFORM FINAL TESTING AND
<br />ES O
<br />FV
<br />FACE VELOCITY
<br />NEW CONNECTION
<br />THE HOURLY RATE OF $DESGN WILL BILLED THE CONTRACTOR FOR THE PROFESSIONAL(S) TIME SPENT ON THE REVIEW.
<br />BALANCING OF ALL HVAC SYSTEMS. RECORD ALL DATA ON STANDARD "AABC" OR OTHER APPROVED FORMS, AND SUBMIT TO THE
<br />LOCATION
<br />TEMP DB/WB
<br />TEMP 'F DB/WB
<br />TEMP 'F DB
<br />FT
<br />FEET
<br />I
<br />ENGINEER FOR REVIEW.
<br />ZEPHYRHILLS,
<br />SUMMER
<br />WINTER
<br />DUCT MOUNTED
<br />FPM FEET PER MINUTE
<br />FC FLEXIBLE CONNECTOR
<br />6. DUCTWORK AND OTHER ITEMS OF THE AIR DISTRIBUTION SYSTEM SHALL BE SUPPORTED DIRECTLY FROM THE BUILDING STRUCTURE
<br />FLORIDA
<br />75/63
<br />70
<br />91/80
<br />36
<br />SMOKE DETECTOR, PROVIDED BY
<br />AND NOT FROM THE CEILING OR CEILING SUSPENSION SYSTEM. COORDINATE LOCATION OF EQUIPMENT WITH EXISTING ELECTRICAL,
<br />20. PROVIDE SCHEDULE 40 STEEL PIPE SLEEVES FOR REFRIGERANT AND CONDENSATE DRAIN LINES PENETRATING EXTERIOR WALLS.
<br />FLOOR INSULATION
<br />N/A
<br />G
<br />DIVISION 26000, INSTALLED BY
<br />SD
<br />FIRE PROTECTION AND PLUMBING WORK. NEATLY SEAL VOIDS AROUND PIPING WITH A WEATHER TIGHT PERMANENT NON -SHRINKING SEALANT.
<br />GALV
<br />GALVANIZED
<br />DIVISION 23000. SEE ELECTRICAL
<br />LOAD
<br />WALL INSULATION
<br />EXISTING R=5
<br />H
<br />HTG
<br />HEATING
<br />PLANS FOR EXACT QUANTITY.
<br />7. ALL NEW DUCTWORK SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE WITH THE LATEST EDITION OF "SMACNA" DUCT
<br />21. REFRIGERANT LINES SHALL BE SIZED AS PER THE EQUIPMENT MANUFACTURER'S RECOMMENDATIONS. PROVIDE SIZING AND
<br />CRITERIA
<br />ROOF INSULATION.
<br />EXISTING R=20
<br />HORIZ HORIZONTAL
<br />CONSTRUCTION STANDARDS AND COMPLY WITH THE LATEST "NFPA" 90A REQUIREMENTS.
<br />ACCESSORY DATA WITH THE EQUIPMENT PACKAGE SUBMITTAL. PIPING IS TO BE FILLED WITH DRY NITROGEN WHILE SOLDERING.
<br />WINDOW TYPE
<br />SINGLE PANE /LIGHT TINT
<br />TEST, CLEAN, AND DEHYDRATE PIPES AND PROVIDE CHARGE OF REFRIGERANT AS PER EQUIPMENT MANUFACTURER'S
<br />L
<br />HP
<br />HORSEPOWER
<br />FABRICATE DUCTWORK TO THE FOLLOWING DUCT PRESSURE CLASS:
<br />RECOMMENDATION. PROVIDE ALL NECESSARY VALVES, TRAPS, FILTER/DRYERS, SIGHT GLASS, ETC. AS REQUIRED FOR A COMPLETE
<br />LAT
<br />LEAVING AIR TEMPERATURE
<br />AND READY TO OPERATE INSTALLATION. INCLUDE ACCESSIBLE SERVICE FITTINGS.
<br />M
<br />DUCT PRESSURE CLASS OPERATING PRESSURE
<br />NOTES
<br />MBH
<br />1000 BTU PER HOUR
<br />1/2" W.G. UP TO 1/2" W.G.
<br />22. ALL REFRIGERANT PIPING SHALL BE INSULATED WITH 3/4" THICK SEAMLESS CLOSED CELL RUBBER PIPE INSULATION. INSULATION
<br />MECH MECHANICAL
<br />1 " W.G. OVER 1/2" UP TO 1 " W.G. EXPOSED TO THE OUTSIDE ENVIRONMENT SHALL BE PAINTED WITH TWO COATS OF UV -RESISTANT WHITE ARMAFLEX PAINT.
<br />MEZZ
<br />MEZZANINE
<br />2" W.G. OVER 1" UP TO 2" W.G.
<br />1. THE NOTES SHOWN ON THIS SHEET APPLY TO GENERAL CONDITIONS OF HEATING,
<br />MAT
<br />MIXED AIR TEMPERATURE
<br />23. EQUIPMENT SERVICE ACCESS
<br />VENTILATING AND AIR CONDITIONING WORK REQUIRED FOR THIS PROJECT.
<br />MOTDPR
<br />MT
<br />MOTORIZED DAMPER
<br />MECHANICAL TRADES
<br />DUCTWORK SHALL BE SEALED TO:
<br />PROVIDE ADEQUATE SERVICE SPACE AROUND AIR HANDLING UNITS, ELECTRIC DUCT HEATERS AND THE PULL SIDE OF FILTERS, OR
<br />2 SPECIFICATIONS, PROJECT MANUALS AND DRAWINGS, REFER. TO THIS SHEET FOR
<br />MTG
<br />MOUNTING
<br />APPLICABLE DUCT PRESSURE CLASS SEAL CLASS
<br />AS REQUIRED BY THE MANUFACTURER'S INSTALLATION INSTRUCTIONS.
<br />APPLICABLE REFERENCES.
<br />N
<br />2" W.G. AND BELOW A
<br />NIC
<br />NOT IN CONTRACT
<br />SERVICE AREA SHALL BE CLEAR OF DUCTS, PIPES, CONDUITS, WALL STUDS, CEILING HANGERS, AND ANY OTHER CONSTRUCTION
<br />3. THE DESIGN DRAWINGS OF ALL CATEGORIES AND TRADES (HEATING, VENTILATING
<br />NTS
<br />NOT TO SCALE
<br />8. ALL DUCT DIMENSIONS SHOWN ON DRAWINGS ARE CLEAR INSIDE DIMENSIONS.
<br />APPURTENANCE.
<br />AND AIR CONDITIONING AND ELECTRICAL) AND ALL SPECIFICATIONS AND SHOP
<br />O
<br />9. SUPPLY AND OUTSIDE AIR DUCTWORK SHALL BE GALVANIZED SHEET METAL. SEAL ALL DUCT JOINTS WITH HARDCAST. ALL SUPPLY
<br />24. OUTSIDE AIR UNIT SHALL BE PROVIDED WITH A MINIMUM 24 GAGE GALVANIZED STEEL SECONDARY DRAIN PAN. PAN SHALL BE
<br />DRAWINGS MUST BE COORDINATED AND BE VIEWED IN CONNECTION AND
<br />OA
<br />OAI
<br />OUTSIDE AIR
<br />OUTSIDE AIR INTAKE
<br />AND OUTSIDE AIR DUCTS SHALL BE INSULATED WITH BLANKET TYPE INSULATION WITH VAPOR BARRIER (MINIMUM INSTALLED R =
<br />THREE INCHES DEEP AND EXTEND A MINIMUM OF SIX INCHES PAST THE AIR HANDLER IN ALL DIRECTIONS. THE PAN SHALL BE
<br />CONJUNCTION WITH EACH OTHER TO INSURE THE PROPER LOCATION OF ALL
<br />DEVICES AND EQUIPMENT. MAKE PARTICULAR NOTE OF LOCATIONS AND
<br />OAT
<br />OUTSIDE AIR TEMPERATURE
<br />6.0). DUCT INSULATION SHALL BE LABELED AND MARKED AT REQUIRED INTERVALS PER THE FLORIDA BUILDING CODE.
<br />PROVIDED WITH A FLOAT SWITCH WIRED TO SHUT DOWN THE SYSTEM WHEN WATER IS DETECTED. ALL COMPONENTS OF THE
<br />DIMENSIONS SHOWN ON THE ARCHITECTURAL FLOOR PLANS AND ELEVATIONS.
<br />OUTSIDE AIR UNIT AND PIPING SUBJECT TO CONDENSATION SHALL BE PROTECTED BY THE PAN.
<br />P
<br />PVC
<br />POLYVINYL CHLORIDE
<br />10. ALL PIPING AND/OR DUCTWORK MUST BE INSTALLED 6" AWAY FROM ANY FIRE RATED WALL.
<br />25. DURING THE DEMOLITION PHASE, REMOVE ALL EXISTING MECHANICAL SYSTEMS NO LONGER REQUIRED, INCLUDING BUT NOT LIMITED
<br />4. TO THE BEST OF THE ENGINEERS KNOWLEDGE, THE PLANS AND SPECIFICATIONS
<br />PRESS
<br />PRESSURE
<br />TO, EQUIPMENT, DUCTWORK, PIPING, AND DUCT AND PIPING HANGERS. OWNER HAS FIRST RIGHT TO ALL EQUIPMENT AND
<br />COMPLY WITH THE APPLICABLE MINIMUM BUILDING CODES AND THE APPLICABLE
<br />PD
<br />PRESSURE DROP
<br />11. PROVIDE ADDITIONAL PIPING SUPPORTS ON BOTH SIDES AND WITHIN 18" OF FIRE RATED WALLS. PIPING SHALL NOT BE SUPPORTED
<br />DEMOLISHED ITEMS.
<br />FIRE -SAFETY STANDARDS AS DETERMINED BY THE LOCAL AUTHORITY IN
<br />Q
<br />FROM ANY FIRE RATED WALL.
<br />ACCORDANCE WITH SECTION 110B.4.4 OF THE FLORIDA BUILDING CODE AND 633
<br />QTY
<br />QUANTITY
<br />26. ACCESS PANELS THAT MAY BE REQUIRED FOR INSPECTION OF DUCTWORK OR DUCT MOUNTED DEVICES SHALL BE PROVIDED. REFER
<br />FLORIDA STATUTES.
<br />R
<br />12. SMOKE AND HIGH TEMPERATURE PROTECTION OF MECHANICAL AIR DISTRIBUTION SYSTEMS.
<br />TO THE ARCHITECTURAL CONTRACT DOCUMENTS FOR DOOR SPECIFICATIONS.
<br />R
<br />REFRIGERANT
<br />REQ'D
<br />REQUIRED
<br />a. EXISTING DUCT MOUNTED SMOKE DETECTORS SHALL BE REUSED. TEST OPERATION OF DETECTORS AND PROVIDE A REPORT TO THE
<br />27. ALL NEW DUCTWORK SHALL BE STORED IN CLEAN AREAS. PROTECT ALL DUCTWORK FROM DUST AND DEBRIS WHILE IT IS STORED
<br />N AIR
<br />ENGINEER.
<br />SITE. CONSTRUCTION,ED DUCTWORK SHALLUARILY E D NTH EEO O TEST
<br />WHILEON
<br />DRAWING
<br />INDEX
<br />RPM
<br />REVORA
<br />LUTIIONS PER MINUTE
<br />AND ALANCETOIMIT AC UMU ATIONOF CONSTRUCTION DST INSIDE DUCTWORK S STEM. FEITH ROF ESE
<br />IN ORDER
<br />S
<br />PROCEDURES IS NOT CONDUCTED, THE ENTIRE ASSOCIATED DUCTWORK SYSTEM AND MECHANICAL EQUIPMENT SHALL BE CLEANED TO
<br />SCH
<br />SCHEDULE
<br />THE OWNER'S SATISFACTION.
<br />SHT
<br />SHEET
<br />M-001 HVAC LEGEND, NOTES, SYMBOLS AND CONTROLS
<br />SPECS
<br />SPECIFICATIONS
<br />28. SYSTEMS SHALL BE MAINTAINED IN ACCORDANCE WITH ASHRAE STANDARD 180-2012 - STANDARD PRACTICE FOR INSPECTION AND
<br />M-101 HVAC DEMOLITION PLAN
<br />STD
<br />STANDARD
<br />MAINTENANCE OF COMMERCIAL BUILDING HVAC SYSTEMS.
<br />M-102 HVAC FLOOR PLAN
<br />SP
<br />STATIC PRESSURE
<br />M-501 HVAC DETAILS AND SCHEDULES
<br />STL
<br />STEEL
<br />STRUCT
<br />STRUCTURAL
<br />SA
<br />SUPPLY AIR
<br />SYS
<br />SYSTEM
<br />rm
<br />O/
<br />BO - DX CLG STAGE 1 BO - DX CLG STAGE 2
<br />Al - STATIC PRS
<br />n
<br />2/3 DOWN DUCT
<br />Al - STATIC PRS
<br />EXISTING SEQUENCE OF OPERATION:
<br />THE UNIT WILL OPERATE BASED ON REQUESTS TO RUN FROM THE VAV ZONES SERVED, BY SOFTWARE MANUAL OVERRIDE. FAN STATUS IS
<br />BASED ON A FEEDBACK STATUS SIGNAL FROM THE SUPPLY FAN VFD MONITORING ACTUAL DRIVE OUTPUT LEVEL THE MAKE-UP OUTSIDE AIR
<br />UNIT OAU-1, THE AHU DX COOLING STAGES, AND THE ASSOCIATED EXHAUST FANS WILL REMAIN OFF UNTIL THE SUPPLY FAN STATUS IS
<br />PROVEN.
<br />ON INITIAL START-UP, A WARM-UP/COOL-DOWN CYCLE IS INITIATED IF THE RETURN AIR TEMPERATURE IS BELOW/ABOVE AN ADJUSTABLE
<br />SETPOINT. THE WARM-UP/COOL-DOWN CYCLE WILL CONTINUE UNTIL THE SETPOINT IS SATISFIED, OR MAY BE DISABLED AT THE START OF
<br />SCHEDULED OCCUPANCY. DURING THIS CYCLE, THE MAKE-UP OUTSIDE AIR UNIT OAU-1 AND THE ASSOCIATED EXHAUST FANS WILL REMAIN
<br />OFF.
<br />ONCE REQUESTED TO RUN, THE SUPPLY FAN VFD IS ENABLED AND RAMPS UP TO A MINIMUM OUTPUT. ONCE THE SUPPLY FAN STATUS IS
<br />PROVEN, THE VFD OUTPUT WILL MODULATE AS REQUIRED TO MAINTAIN DUCT STATIC PRESSURE SETPOINT BASED ON A SENSOR LOCATED
<br />2/3 DOWN THE SUPPLY DUCT RUN. A HARD -WIRED SUPPLY AIR STATIC PRESSURE HIGH LIMIT SWITCH WILL SHUT DOWN THE SUPPLY FAN VFD
<br />IF THE PRESSURE EXCEEDS 4.0 IN.W.C.
<br />WHEN OPERATING IN THE OCCUPIED MODE, THE MAKEUP OUTSIDE AIR UNIT OAU-1 AND THE ASSOCIATED EXHAUST FANS WILL OPERATE
<br />CONTINUOUSLY. THE DX COOLING STAGES WILL SEQUENCE ON AS REQUIRED TO MAINTAIN SUPPLY AIR TEMPERATURE SETPOINT. THE
<br />SETPOINT CAN BE RESET BASED ON DEMAND FROM THE VAV ZONES SERVED.
<br />ALARMS:
<br />1. AHU SUPPLY FAN FAILURE
<br />2 AHU SUPPLY FAN IN HAND -ON OPERATION.
<br />3. AHU SUPPLY AIR TEMPERATURE OUT OF RANGE.
<br />4. AHU HIGH DUCT STATIC PRESSURE.
<br />5. OAU-1 UNIT FAILURE
<br />6. OAU-1 IN HAND -ON OPERATION.
<br />NOTE
<br />THIS SEQUENCE OF OPERATION IS PROVIDED TO CLARIFY THE EXISTING CONTROLS SYSTEM OPERATION. THE NEW EQUIPMENT SHALL BE
<br />CONNECTED TO THE EXISTING ENERGY MANAGEMENT SYSTEM, AS REQUIRED FOR A COMPLETE AND OPERATIONAL SYSTEM. EXISTING
<br />CONTROLLERS SHALL BE REPLACED AS MAY BE REQUIRED TO ENSURE THAT THE SYSTEM IS FULLY OPERATIONAL AT THE COMPLETION OF
<br />THIS PROJECT. ALL NEW CONTROLS SHALL BE AN EXTENSION OF AND FULLY COMPATIBLE WITH THE EXISTING DELTA CONTROLS SYSTEM.
<br />BACNET OVER ETHERNET (10B)
<br />ETHERNET HUB (10MB)
<br />E
<br />COMPUTER WORKSTATION
<br />C
<br />INTERNET CONNECTION
<br />24VAC
<br />BACNET MS/TP (76r8KB MINIMUM)
<br />TO VAV CONTROLLERS
<br />lftvft
<br />AHU-1 FAN STATUS - BI BO - AHU-1 SUPPLY FAN S/S
<br />SA AHU-1 SUPPLY AIR TEMP - Al -Iftvft . AO - AHU-1 SUPPLY FAN VFD OUTPUT
<br />AHU-1 RETURN AIR TEMP - Al BO - AHU-1 DX COOL STAGE 1
<br />AHU-1 STATIC PRESSURE - Al - BO - AHU-1 DX COOL STAGE 2
<br />AHU-2 FAN STATUS - BI BO - AHU-2 SUPPLY FAN S/S
<br />AHU-2 SUPPLY AIR TEMP - Al AO - AHU-2 SUPPLY FAN VFD OUTPUT
<br />2/3 DOWN DUCT
<br />AHU-2 RETURN AIR TEMP - Al - - BO - AHU-2 DX COOL STAGE 1
<br />AHU-2 STATIC PRESSURE - Al - 1 BO - AHU-2 DX COOL STAGE 2
<br />OAU-1 UNIT STATUS - BI - 1 BO - OAU-1 UNIT ENABLE
<br />OAU-1 SUPPLY AIR TEMP - Al - UO - SPARE UNIVERSAL OUTPUT
<br />SPARE UNIVERSAL INPUT - UI ' - - - UO - SPARE UNIVERSAL OUTPUT
<br />SPARE UNIVERSAL INPUT - UI v - ' - UO - SPARE UNIVERSAL OUTPUT
<br />�'•"8 �..... .DRESS, 13
<br />GENERAL NOTES:
<br />1. INTERLOCK ALL ASSOCIATED EXHAUST FANS TO OPERATE WHEN MAKE-UP OUTSIDE AIR UNIT IS RUNNING.
<br />2 ALL ASSOCIATED EXHAUST FANS ARE ENABLE TO OPERATE WHENEVER MAKE-UP OUTSIDE AIR UNIT IS RUNNING.
<br />CONSULTING
<br />ENGINEERING
<br />ASSOCIATES
<br />8365 GUNN HIGHWAY
<br />TAMPA, FL 33626
<br />(813) 448-0225
<br />FAX (813) 448-0226
<br />EB - 0003962
<br />Mechanical Plumbing
<br />Fire Protection
<br />SEAL :
<br />BIDDING DOCUMENTS
<br />SIGNATURE DATE
<br />JOHN W. WELLS, III, PE
<br />PE 0049347
<br />zN
<br />OLO
<br />�
<br />co
<br />�a
<br />wo
<br />ULL
<br />J
<br />Omr
<br />� J
<br />J F_=
<br />2 W W
<br />� N W
<br />�W U
<br />W � J
<br />N(L
<br />LL 0) W
<br />0 -r
<br />..moo �U
<br />� Q
<br />co �2
<br />delta I date I revision
<br />SHEET TITLE:
<br />HVAC LEGEND,
<br />NOTES,
<br />SYMBOLS AND
<br />CONTROLS
<br />DRAWN BY: T IH/ JWW
<br />DATE 02/12/19
<br />SHEET NO.:
<br />M-001