POWER SYMBOLS:
<br />NOTE: A COMPLETE LIST OF RECEPTACLE SYMBOLS IS SHOWN
<br />FOR THE DUPLEX
<br />RECEPTACLE ONLY. OTHER RECEPTACLE
<br />SYMBOLS WILL FOLLOW THE SAME SHADING CONVENTION AS
<br />THE DUPLEX RECEPTACLE, UNO.
<br />CENTER HATCH: ISOLATED GROUND RECEPTACLE
<br />OUTER HATCH: GFCI RECEPTACLE
<br />RIGHT HATCH: CONTROLLED RECEPTACLE
<br />(b 6 :16
<br />20A, 125V, RECEPTACLE
<br />(NEMA 5-20R), WALL MTD
<br />(SIMPLEX LEFT, DUPLEX CENTER, QUAD RIGHT)
<br />TR =TAMPER RESISTANT
<br />U = USB OUTLET
<br />WP = WEATHERPROOF
<br />WR = WEATHER RESISTANT
<br />20A, 125V, IG DUPLEX RECEPTACLE
<br />(NEMA 5-20R), WALL MTD
<br />20A, 125V, GFCI DUPLEX RECEPTACLE
<br />(NEMA 5-20R), WALL MTD
<br />6
<br />20A, 125V, CONTROLLED DUPLEX RECEPTACLE
<br />(NEMA 5-20R), WALL MTD D=DUAL SWITCHED
<br />di b
<br />20A, 125V, RECEPTACLE ON EMERGENCY
<br />CIRCUIT (NEMA 5-20R), WALL MTD
<br />(SIMPLEX LEFT, DUPLEX CENTER, QUAD RIGHT)
<br />®®®
<br />20A, 125V, RECEPTACLE
<br />(NEMA 5-20R), FLOOR MTD
<br />(SIMPLEX LEFT, DUPLEX CENTER, QUAD RIGHT)
<br />® ®®
<br />20A, 125V, RECEPTACLE ON EMERGENCY
<br />CIRCUIT (NEMA 5-20R), FLOOR MTD
<br />(SIMPLEX LEFT, DUPLEX CENTER, QUAD RIGHT)
<br />20A, 125V, RECEPTACLE
<br />(NEMA 5-20R), CEILING MTD
<br />(SIMPLEX LEFT, DUPLEX CENTER, QUAD RIGHT)
<br />[]
<br />[
<br />20A, 125V, RECEPTACLE ON EMERGENCY
<br />CIRCUIT (NEMA 5-20R), CEILING MTD
<br />(SIMPLEX LEFT, DUPLEX CENTER, QUAD RIGHT)
<br />Fe
<br />MULTI -SERVICE, FLOOR BOX, FLUSH MNT
<br />(SEE SPECS OR NOTES)
<br />FB = FLOOR BOX
<br />FF =FURNITURE FEED
<br />PT
<br />MULTI -SERVICE, POKE-THRU, 2 HR. FIRE -RATED,
<br />FLUSH MNT (SEE SPECS OR NOTES)
<br />PT =POKE-THRU
<br />FF =FURNITURE FEED
<br />cs
<br />MULTI -SERVICE, CEILING BOX WITH PROJECTOR
<br />MOUNT (SEE SPECS OR NOTES)
<br />ws
<br />MULTI -SERVICE, WALL BOX, RECESSED MNT
<br />(SEE SPECS OR NOTES)
<br />®
<br />SPECIAL PURPOSE RECEPTACLE
<br />(SEE EQUIPMENT SCHEDULE OR NOTES)
<br />(WALL MNT LEFT, FLOOR MTD RIGHT)
<br />®
<br />SPECIAL PURPOSE RECEPTACLE ON
<br />EMERGENCY CIRCUIT
<br />(SEE EQUIPMENT SCHEDULE OR NOTES)
<br />(WALL MNT LEFT, FLOOR MTD RIGHT)
<br />®OA
<br />60A, 480V, 3PH, WELDING RECEPTACLE, WALL
<br />MTD
<br />0
<br />DROP CORD (SEE SPECS OR NOTES)
<br />@
<br />POWER POLE (SEE SPECS OR NOTES)
<br />®
<br />RECEPTACLE RACEWAY / PLUG MOLD
<br />JUNCTION BOX, WALL MTD
<br />OWP
<br />JUNCTION BOX
<br />WP = WEATHERPROOF
<br />C-
<br />JUNCTION BOX, FLOOR MTD
<br />0
<br />JUNCTION BOX, EXPLOSION PROOF
<br />30
<br />3NF
<br />L=
<br />SAFETY SWITCH, 30A, 3-POLE, NON -FUSED
<br />30
<br />320
<br />Lm
<br />SAFETY SWITCH, 30A, 3-POLE, FUSED @ 20A
<br />®
<br />STARTER OR MOTOR CONTROLLER
<br />L11:20
<br />STARTER, COMBINATION W/ DISC. SWITCH
<br />Q
<br />TRANSFORMER
<br />ELECTRICAL PANEL / ENCLOSURE AS NOTED ON
<br />PLAN DRAWINGS
<br />(SURFACE MTD LEFT, RECESSED MTD RIGHT)
<br />ELECTRIC UTILITY METER
<br />Is a
<br />GROUNDING BUSBAR (SEE SPECS OR NOTES)
<br />�3P
<br />UTILITY POWER POLE
<br />ELECTRICAL SHEET INDEX
<br />LIGHTING SYMBOLS:
<br />NOTE: REFER TO LIGHTING FIXTURE SCHEDULE FOR FIXTURE
<br />TYPES AND SENSOR SCHEDULE FOR SENSOR TYPES. REFER TO
<br />PLAN DRAWINGS FOR ADDITIONAL SYMBOLS.
<br />A:
<br />CAPITAL LETTER ADJACENT TO FIXTURE = TYPE
<br />a:
<br />LOWERCASE LETTER = SWITCHING GROUP
<br />EM:
<br />EMERGENCY LIGHTING IS DESIGNATED BY AN
<br />"EM" ADJACENT TO THE FIXTURE AND/OR A "HALF
<br />SHADED" OR "FULL SHADED" FIXTURE SYMBOL
<br />NL:
<br />NIGHT LIGHTING (UNSWITCHED FIXTURE)
<br />$xx
<br />SWITCH, 20A, 120/277V, TOGGLE TYPE, U.N.O.
<br />a,b,c,... =SWITCHING GROUP
<br />BLANK =SINGLE POLE
<br />2 =DOUBLE POLE
<br />3 =THREE-WAY
<br />4 =FOUR-WAY
<br />D =DIMMER SWITCH
<br />K =SINGLE POLE KEY OPERATED
<br />M =MOTOR RATED
<br />MA = MAINTAINED CONTACT
<br />MO =MOMENTARY CONTACT
<br />P =SINGLE POLE W/ PILOT LIGHT
<br />P2 =DOUBLE POLE W/ PILOT LIGHT
<br />RC = REMOTE CONTROL
<br />T =TIMER OPERATED SWITCH
<br />WP = WEATHERPROOF
<br />( xx
<br />OCCUPANCY SENSOR, WALL MTD
<br />[ x x
<br />LOW VOLTAGE DIGITAL SWITCH, WALL MTD
<br />o]
<br />LIGHTING CONTROL DEVICE
<br />DP =DIMMABLE POWER PACK (ON/OFF
<br />WITH DIMMING)
<br />PP =POWER PACK (ON/OFF)
<br />RP = AUX. RELAY PACK (ON/OFF)
<br />GW =GATEWAY
<br />PS =POWER SUPPLY
<br />BR =BRIDGE
<br />LC =LIGHTING CONTACTOR
<br />TC =TIME CLOCK
<br />MS = MOTION SENSOR
<br />PC = PHOTOCELL
<br />PL
<br />PLUG LOAD CONTROLLER (ON/OFF)
<br />eac
<br />EMERGENCY POWER CONTROLLER
<br />0o
<br />OCCUPANCY SENSOR, CORNER MTD
<br />os
<br />OCCUPANCY SENSOR, CEILING MTD
<br />os
<br />DAYLIGHT SENSOR, CEILING MTD
<br />®
<br />COMBINATION OCCUPANCY / DAYLIGHT SENSOR,
<br />CEILING MTD
<br />Q2'X4'
<br />LAY -IN TROFFER
<br />2'X2' LAY -IN TROFFER
<br />1'X4' LAY -IN TROFFER
<br />l-O��—��—yy—���
<br />STRIP/CHANNEL FIXTURE
<br />i�
<br />TRACK LIGHTING W/ DIRECTIONAL HEADS
<br />O ®
<br />DOWNLIGHT, CEILING MTD
<br /><O C®
<br />WALL WASHER, CEILING MTD
<br />LIGHT FIXTURE, CEILING MTD
<br />LIGHT FIXTURE, WALL MTD
<br />Q
<br />WALL PACK
<br />�®
<br />SINGLE HEAD AREA LIGHT FIXTURE, POLE MTD
<br />TWIN HEAD AREA LIGHT FIXTURE, POLE MTD
<br />®
<br />EXHAUST FAN
<br />0=1
<br />EMERGENCY WALL PACK (BUG EYE)
<br />(WALL MTD LEFT, CEILING MTD RIGHT)
<br />®
<br />EXIT SIGN, SINGLE FACE
<br />(ARROW INDICATES DIRECTION OF EGRESS)
<br />(WALL MTD LEFT, CEILING MTD RIGHT)
<br />ICI
<br />8
<br />EXIT SIGN, DOUBLE FACE
<br />(ARROW INDICATES DIRECTION OF EGRESS)
<br />(WALL MTD LEFT, CEILING MTD RIGHT)
<br />EXIT SIGN W/ COMBINATION EMERGENCY LIGHT,
<br />SINGLE FACE
<br />(ARROW INDICATES DIRECTION OF EGRESS)
<br />(WALL MTD LEFT, CEILING MTD RIGHT)
<br />E-001 ELECTRICAL LEGEND, ABBREVIATIONS, AND GENERAL NOTES
<br />E-101 ELECTRICAL DEMOLITION PLAN
<br />E-201 ELECTRICAL PROPOSED FLOOR PLAN
<br />E-202 ELECTRICAL PROPOSED CEILING PLAN
<br />E-203 ELECTRICAL PROPOSED ROOF PLAN
<br />E-301 ELECTRICAL DETAILS
<br />E-401 ELECTRICAL RISER DIAGRAM AND PANEL SCHEDULE
<br />E-402 ELECTRICAL EQUIPMENT AND PANEL SCHEDULES
<br />E-501 ELECTRICAL SPECIFICATIONS
<br />SPECIAL SYSTEMS SYMBOLS:
<br />NOTE: UNLESS NOTED OTHERWISE, PROVIDE OVERSIZED
<br />JUNCTION BOX AND 1" EMPTY CONDUIT WITH PLASTIC
<br />INSULATING BUSHINGS AND PULL STRING STUBBED MIN. 6" INTO
<br />ACCESSIBLE CEILING SPACE. COORDINATE WITH LV
<br />CONTRACTOR FOR FINAL REQUIREMENTS.
<br />�X TELEPHONE OUTLET, WALL MTD
<br />X =NUMBER OF TELEPHONE PORTS
<br />Y
<br />DATA OUTLET, WALL MTD
<br />Y =NUMBER OF DATA PORTS
<br />X,Y
<br />0
<br />COMBINATION TELE/DATA OUTLET, WALL MTD
<br />X =NUMBER OF TELEPHONE PORTS
<br />Y =NUMBER OF DATA PORTS
<br />❑V ®
<br />TELEPHONE OUTLET
<br />(FLOOR MTD LEFT, CEILING MTD RIGHT)
<br />V ®
<br />DATA OUTLET
<br />(FLOOR MTD LEFT, CEILING MTD RIGHT)
<br />®
<br />COMBINATION TELE/DATA OUTLET
<br />(FLOOR MTD LEFT, CEILING MTD RIGHT)
<br />® vA
<br />WIRELESS ACCESS POINT
<br />(CEILING MTD LEFT, WALL MTD RIGHT)
<br />TELEPHONE BACKBOARD (TBB)
<br />INTERCOM OUTLET
<br />QM
<br />INTERCOM STATION
<br />BLANK = REMOTE
<br />M =MASTER
<br />Av Av
<br />AUDIO / VIDEO DEVICE
<br />(WALL MTD LEFT, CEILING MTD RIGHT)
<br />AV =AUDIO / VIDEO OUTLET
<br />M =MICROPHONE OUTLET
<br />SM =SECURITY MONITOR OUTLET
<br />TV =TELEVISION OUTLET
<br />V = VOLUME CONTROL
<br />AMP
<br />SOUND SYSTEM AMPLIFIER
<br />H- I Qs
<br />SPEAKER
<br />(WALL MTD LEFT, CEILING MTD RIGHT)
<br />r
<br />AUDIBLE NOTIFICATION DEVICE
<br />B =BELL
<br />C =CHIME
<br />G =GONG
<br />LJ
<br />BUZZER
<br />CEV
<br />BELL & BUZZER COMBINATION
<br />Ell
<br />AUDIBLE NOTIFICATION DEVICE
<br />H =HORN
<br />S = SIREN
<br />eT
<br />AUXILIARY SYSTEM DEVICE
<br />BT =BELL RINGING TRANSFORMER
<br />R = RELAY
<br />D =ELECTRIC DOOR OPENER
<br />LV =LOW VOLTAGE TRANSFORMER
<br />FO
<br />ANNUNCIATOR
<br />eL eL
<br />INDICATOR LIGHT
<br />(WALL MTD LEFT, CEILING MTD RIGHT)
<br />BL =BURGLAR ALARM LIGHT
<br />CLOCK
<br />M
<br />M =MASTER
<br />DF=DOUBLEFACE
<br />S =COMBINATION SPEAKER
<br />ocE-EY-M-1
<br />SECURITY DEVICES
<br />DC = DOOR CONTACT
<br />GB =GLASS BREAK DETECTOR
<br />HD =HEAT DETECTOR
<br />HU =HOLD-UP BUTTON
<br />KP = KEY PAD
<br />MD =MOTION DETECTOR
<br />PB =PANIC BUTTON
<br />PVM =PUBLIC VIEW MONITOR
<br />SD =SOUND DETECTOR
<br />SEC =SECURITY CONTROL PANEL
<br />VS = VIBRATION SENSOR
<br />WC = WINDOW CONTACT
<br />cRE-AC-P-1
<br />ACCESS CONTROL DEVICE
<br />ACP =ACCESS CONTROL PANEL
<br />CR =CARD READER
<br />ES =ELECTRIC STRIKE
<br />ML =MAGNETIC LOCK
<br />PS =PROXIMITY SENSOR
<br />PWR =POWER SUPPLY
<br />RX =REQUEST EXIT PUSH BUTTON
<br />04
<br />SECURITY CAMERA
<br />xx�
<br />(WALL MTD LEFT, CEILING MTD RIGHT)
<br />PTZ =PAN/TILT/ZOOM
<br />BX =BOX
<br />D =MINI DOME
<br />BL =BULLET
<br />WP = WEATHERPROOF
<br />• • •••
<br />PUSHBUTTON STATION
<br />(BUTTONS REPRESENTED BY SOLID DOTS)
<br />NH
<br />NORMAL / EMERGENCY CALL BUTTON
<br />PUSH BUTTON
<br />F0 Q
<br />THERMOSTAT
<br />(WALL MTD LEFT, CEILING MTD RIGHT)
<br />CODES IN EFFECT:
<br />ALL WORK SHALL BE IN STRICT ACCORDANCE WITH:
<br />• NATIONAL ELECTRICAL CODE - 2014
<br />• FLORIDA BUILDING CODE - 2017 (6TH EDITION)
<br />• ASHRAE 90.1 - 2013
<br />• INTERNATIONAL ENERGY CONSERVATION CODE - 2015
<br />RACEWAY SYMBOLS:
<br />-~` HOMERUN CIRCUIT TO PANELBOARD
<br />— LV — LOW VOLTAGE CABLE
<br />- CONDUIT BURIED
<br />CONDUIT CONCEALED
<br />CONDUIT EXPOSED
<br />1 FLEXIBLE CONDUIT
<br />0
<br />CONDUIT UP
<br />C
<br />CONDUIT DOWN
<br />p
<br />CONDUIT SEAL -OFF
<br />CONDUIT TEE BODY
<br />El
<br />CONDUIT EL BODY
<br />T
<br />CONDUIT CAP
<br />u
<br />CONDUIT SLEEVE WITH BUSHINGS
<br />PB
<br />PULL BOX
<br />HH
<br />HAND HOLE
<br />ABBREVIATIONS:
<br />A
<br />AMPERE
<br />AFC
<br />AVAILABLE FAULT CURRENT
<br />AFCI
<br />ARC FAULT CIRCUIT INTERRUPTER
<br />AFF
<br />ABOVE FINISHED FLOOR
<br />AFG
<br />ABOVE FINISHED GRADE
<br />AHJ
<br />AUTHORITY HAVING JURISDICTION
<br />AIC
<br />AMPERE INTERRUPTING CAPACITY
<br />ATS
<br />AUTOMATIC TRANSFER SWITCH
<br />BLDG
<br />BUILDING
<br />BRKR
<br />BREAKER
<br />C
<br />CONDUIT
<br />CKT
<br />CIRCUIT
<br />CLG
<br />CEILING
<br />CPT
<br />CONTROL POWER TRANSFORMER
<br />CT
<br />CURRENT TRANSFORMER
<br />CU
<br />COPPER
<br />CTR
<br />CENTER
<br />EA
<br />EACH
<br />EG
<br />EQUIPMENT GROUND
<br />EGC
<br />EQUIPMENT GROUNDING CONDUCTOR
<br />EM
<br />EMERGENCY
<br />EOL
<br />ELECTRONIC OVERLOAD
<br />FDR
<br />FEEDER
<br />FLA
<br />FULL LOAD AMPS
<br />GEC
<br />GROUNDING ELECTRODE CONDUCTOR
<br />GFI
<br />GROUND FAULT INTERRUPTER
<br />GFCI
<br />GROUND FAULT CIRCUIT INTERRUPTER
<br />GND
<br />GROUND
<br />GRS
<br />GALVANIZED RIGID STEEL
<br />HOA
<br />HAND -OFF -AUTO
<br />IG
<br />ISOLATED GROUND
<br />JB
<br />JUNCTION BOX
<br />KVA
<br />KILOVOLT -AMPERE
<br />KW
<br />KILOWATT
<br />L.S.I.G.
<br />LONG, SHORT, INSTANTANEOUS, GROUND
<br />FAULT TRIP
<br />LTG
<br />LIGHTING
<br />MCA
<br />MINIMUM CIRCUIT AMPS
<br />MCB
<br />MAIN CIRCUIT BREAKER
<br />MCC
<br />MOTOR CONTROL CENTER
<br />MCCB
<br />MOLDED CASE CIRCUIT BREAKER
<br />MCP
<br />MOTOR CIRCUIT PROTECTOR
<br />MDP
<br />MAIN DISTRIBUTION PANEL
<br />MFS
<br />MAXIMUM FUSE SIZE
<br />MGB
<br />MAIN GROUNDING BUSBAR
<br />MLO
<br />MAIN LUG ONLY
<br />MOCP
<br />MAXIMUM OVERCURRENT PROTECTION
<br />MTD
<br />MOUNTED
<br />MTS
<br />MANUAL TRANSFER SWITCH
<br />N.C.
<br />NORMALLY CLOSED
<br />N.O.
<br />NORMALLY OPEN
<br />NL
<br />NIGHT LIGHT
<br />NTS
<br />NOT TO SCALE
<br />OCPD
<br />OVERCURRENT PROTECTION DEVICE
<br />OH
<br />OVERHEAD
<br />P
<br />POLE
<br />PH
<br />PHASE
<br />PNL
<br />PANEL
<br />PWR
<br />POWER
<br />RECEP
<br />RECEPTACLE
<br />RM
<br />ROOM
<br />SCCR
<br />SHORT CIRCUIT CURRENT RATING
<br />SW
<br />SWITCH
<br />SWBR
<br />SWITCHBOARD
<br />SWGR
<br />SWITCHGEAR
<br />TBB
<br />TELEPHONE BACKBOARD
<br />TELCO
<br />TELEPHONE COMPANY
<br />TELE
<br />TELEPHONE
<br />TGB
<br />TELECOMMUNICATIONS GROUNDING BUSBAR
<br />TMGB
<br />TELECOMMUNICATIONS MAIN GROUNDING
<br />BUSBAR
<br />TYP
<br />TYPICAL
<br />UG
<br />UNDERGROUND
<br />LINO
<br />UNLESS NOTED OTHERWISE
<br />UPS
<br />UNINTERRUPTIBLE POWER SUPPLY
<br />V
<br />VOLT
<br />VIF
<br />VERIFY IN FIELD
<br />W/
<br />WITH
<br />W
<br />WIRE
<br />WP
<br />WEATHERPROOF
<br />WR
<br />WEATHER RESISTANT
<br />XFMR
<br />TRANSFORMER
<br />WORK AND EQUIPMENT UNDER THIS DIVISION SHALL BE IN STRICT
<br />COMPLIANCE WITH THE CODES, STANDARDS, AND PRACTICES LISTED
<br />HEREIN. THEIR RESPECTIVE DATES ARE FURNISHED AS THE MINIMUM
<br />REQUIREMENTS (UNLESS OTHERWISE DETERMINED BY THE LOCAL
<br />AUTHORITIES HAVING JURISDICTION).
<br />GENERAL NOTES:
<br />1. PRE -BID SITE VISIT: CONTRACTOR PROPOSING TO UNDERTAKE WORK UNDER THIS DIVISION SHALL VISIT THE SITE OF THE WORK AND FULLY INFORM THEMSELVES OF ALL
<br />CONDITIONS THAT EFFECT THE WORK AND COST THEREOF AND EXAMINE THE DRAWINGS AS RELATED TO THE SITE CONDITIONS. BIDDERS WHO DO NOT VISIT THE SITE MAY BE
<br />UNILATERALLY NOT PERMITTED TO SUBMIT A BID IF THE OWNER SO DESIGNATES.
<br />2. BID TERMS AND CONDITIONS: THE ELECTRICAL CONTRACTOR SHALL OBTAIN A FULL SET OF PLANS AND SPECIFICATIONS FROM THE GENERAL CONTRACTOR PRIOR TO BID.
<br />CONSIDERATION WILL NOT BE GRANTED FOR ANY ALLEGED MISUNDERSTANDINGS OF THE AMOUNT OF WORK TO BE PERFORMED. TENDER OF PROPOSAL SHALL CONVEY FULL
<br />AGREEMENT TO THE ITEMS AND CONDITIONS INDICATED IN THE PLANS AND SPECIFICATIONS. ANY DISCREPANCIES OR OMISSIONS FOUND IN THE CONTRACT DOCUMENTS OR
<br />DOUBT AS TO THE INTENT THEREOF, SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ARCHITECT IN WRITING TO OBTAIN CLARIFICATION FROM THE ENGINEER AND/OR
<br />OWNER'S REPRESENTATIVE PRIOR TO SUBMITTING PROPOSAL FOR WORK. WHERE CLARIFICATION CANNOT BE PROVIDED PRIOR TO BID, THE CONTRACTOR SHALL ASSUME THE
<br />MORE EXPENSIVE METHOD FOR THE BID. WITHOUT FORMAL AUTHORIZATION, THE ARCHITECT AND OWNER RESERVE THE RIGHT TO REQUIRE THE MORE RESTRICTIVE
<br />SPECIFICATION.
<br />3. EXCLUSIONS: MATERIAL AND LABOR EXCLUDED BY THE ELECTRICAL CONTRACTOR SHALL NOT RELIEVE THE GENERAL CONTRACTOR FROM PROVIDING SAME.
<br />4. COMPLETE SYSTEM: FURNISH ALL LABOR, MATERIALS, EQUIPMENT, TOOLS, TRANSPORTATION, SUPERINTENDENTS AND SERVICES REQUIRED TO CONSTRUCT, INSTALL, AND
<br />MODIFY THE ELECTRICAL SYSTEMS AS HEREIN SPECIFIED AND SHOWN ON THESE DRAWINGS FOR A COMPLETE AND FULLY OPERATIONAL SYSTEM. COORDINATE WORK TO BE
<br />PERFORMED OR INSTALLED BY OTHERS AFFECTING THE ELECTRICAL WORK AND FURNISH AND INSTALL ALL NECESSARY STEEL SHAPES, BLOCKING, ANCHORS, SLEEVES,
<br />HANGERS, ETC. FOR ATTACHING OR CONNECTING ELECTRICAL WORK TO RELATED WORK OF OTHER TRADES. ALL ITEMS NOT SPECIFICALLY MENTIONED HEREIN OR NOT INDICATED
<br />IN THE DRAWINGS, WHICH ARE NECESSARY TO MAKE A COMPLETE WORKING INSTALLATION, SHALL BE PROVIDED WITHOUT ADDITIONAL EXPENSE TO THE OWNER. DRAWINGS AND
<br />SPECIFICATIONS DO NOT UNDERTAKE TO INDICATE EVERY ITEM OF MATERIAL, EQUIPMENT, OR LABOR REQUIRED TO PRODUCE A COMPLETE AND PROPERLY OPERATING
<br />INSTALLATION.
<br />5. PERMITS: OBTAIN ALL NECESSARY PERMITS, LICENSES, AND INSPECTIONS AS REQUIRED BY ANY OF THE FOREGOING AUTHORITIES AND PAY FOR ALL OTHER COSTS IN
<br />CONNECTION WITH THE WORK.
<br />6. INSPECTIONS: CONTRACTOR SHALL NOT CONCEAL ANY WORK UNTIL INSPECTED AND APPROVED BY ELECTRICAL INSPECTOR AND/OR ARCHITECT/ENGINEER.
<br />7. REGULATIONS: ALL ELECTRICAL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE LATEST ADOPTED NATIONAL ELECTRICAL CODE (NEC) AND ALL OTHER
<br />APPLICABLE FEDERAL, STATE, AND LOCAL BU:LDING CODES, RULES, REGULATIONS AND AUTHORITIES HAVING JURISDICTION.
<br />8. WORKMANSHIP: ALL WORK SHALL BE INSTALLED IN A NEAT AND WORKMANLIKE MANNER IN ACCORDANCE WITH APPLICABLE NECA STANDARDS SUBJECT TO THE APPROVAL OF THE
<br />OWNER OR OWNER'S AUTHORIZED REPRESENTATIVE. RACEWAY, FIXTURES, AND WIRING DEVICES SHALL BE PROPERLY ALIGNED, LEVELED, PLUMBED AND SUPPORTED. RACEWAY
<br />SHALL BE GROUPED AND INSTALLED IN RUNS WHICH ARE PARALLEL AND PERPENDICULAR WITH BUILDING LINES,
<br />9. COORDINATION: PRIOR TO COMMENCEMENT OF WORK, EXAMINE ALL CONSTRUCTION DRAWINGS AND SPECIFICATIONS AND COORDINATE WITH ALL OTHER TRADES INCLUDING
<br />GENERAL CONTRACTOR, MECHANICAL CONTRACTOR, LOW VOLTAGE CONTRACTOR, AND SECURITY CONTRACTOR IN ORDER TO BECOME FAMILIAR WITH ALL ASPECTS OF THE
<br />DESIGN AFFECTING THE ELECTRICAL WORK AND TO CONFIRM SITE SPECIFIC INSTALLATION REQUIREMENTS. REFER TO ARCHITECTURAL DRAWINGS AND EQUIPMENT CUT SHEETS
<br />FOR EQUIPMENT POWER/CONTROL REQUIREMENTS, CONNECTIONS, WIRING DEVICE TYPE, MOUNTING HEIGHTS, MEANS OF ATTACHMENT, AND LOCATIONS OF ALL NEW EQUIPMENT
<br />AND ELECTRICAL DEVICES. FIELD VERIFY EXACT NAMEPLATE DATA ON ALL EQUIPMENT FURNISHED UNDER OTHER DIVISIONS AND/OR BY THE OWNER PRIOR TO THE INSTALLATION
<br />OF ELECTRICAL WORK AND MAKE ANY ADJUSTMENTS TO OUTLETS, CONDUITS, WIRE, AND/OR CIRCUIT BREAKER/FUSE RATINGS AS REQUIRED TO MATCH EQUIPMENT ACTUALLY
<br />FURNISHED.
<br />10. EQUIPMENT AND DEVICE LOCATIONS: LOCATIONS ON THE ELECTRICAL PLANS ARE APPROXIMATE. EXACT LOCATIONS SHALL BE DETERMINED FROM ARCHITECTURAL PLANS,
<br />SECTIONS, AND ELEVATIONS. FINAL LOCATION OF EQUIPMENT AND DEVICES TO BE COORDINATED WITH ARCHITECT, OWNER, AND/OR OWNER'S REPRESENTATIVE. VERIFY STUB -UP
<br />LOCATION FOR ALL UNDER SLAB CONDUITS PRIOR TO ROUGH -IN.
<br />11. UTILITIES: UTILITY COORDINATION INFORMATION SHOWN ON THE DRAWINGS SHALL BE CONSIDERED PRELIMINARY. COORDINATE WITH LOCAL POWER COMPANY AND TELCO
<br />(TELEPHONE/CABLE/INTERNET) PROVIDERS FOR SERVICE REQUIREMENTS AND VERIFY FINAL POINT OF CONNECTION PRIOR TO MOBILIZATION IN THE FIELD. NOTIFY UTILITIES OF
<br />COMMENCEMENT OF WORK AND MAKE ALL ARRANGEMENTS FOR TEMPORARY AND PERMANENT SERVICES. PROVIDE ALL EQUIPMENT, MATERIAL, AND LABOR TO MEET UTILITY
<br />REQUIREMENTS. INCLUDE ALL ASSOCIATED COSTS TO SET-UP AND COORDINATE TEMPORARY AND PERMANENT ELECTRIC AND TELCO SERVICES IN BID. ALL MATERIALS MUST BE
<br />APPROVED BY THE LOCAL UTILITY. IF REQUIRED, THE ELECTRICAL CONTRACTOR SHALL PROVIDE CONDUIT SYSTEMS FOR UTILITY MEDIUM VOLTAGE FROM UTILITY PRIMARY TO
<br />POINT OF INTERCEPTION AT EDGE OF PROPERTY LINE.
<br />12. TEMPORARY POWER: PROVIDE TEMPORARY SERVICE FOR LIGHTING, POWER EQUIPMENT (DRILLS, SAWS, ETC.), AND CONTRACTOR MOBILIZED WORK TRAILERS. VERIFY
<br />TEMPORARY SERVICE REQUIREMENTS WITH GENERAL CONTRACTOR. TEMPORARY LIGHTING AND POWER SHALL MEET OSHA REQUIREMENTS AND LOCAL CODE.
<br />13. INTERRUPTION OF SERVICE: COORDINATE ALL WORK REQUIRING INTERRUPTION OF SERVICE (POWER, SECURITY, DATA, FIRE ALARM, ETC) WITH ALL AFFECTED PARTIES,
<br />INCLUDING BUT NOT LIMITED TO GENERAL CONTRACTOR, BUILDING OWNER AND/OR LANDLORD, TENANT(S), AND OWNER AND/OR OWNER'S REPRESENTATIVE AND OBTAIN WRITTEN
<br />PERMISSION FROM SAID PARTIES AT LEAST 48 HOURS PRIOR TO SHUT DOWN. PROVIDE NOTICE TO ALL OTHER TRADES OF ALL SCHEDULED INTERRUPTIONS. ALL OUTAGES OR
<br />INTERRUPTIONS SHALL BE KEPT TO MINIMUM DURATION. PROVIDE TEMPORARY SERVICE DURING OUTAGE WHEN REQUIRED BY AFFECTED PARTIES. CONTRACTOR SHALL BE
<br />RESPONSIBLE TO PROVIDE PERSONNEL FOR FIRE AND SECURITY WATCH DURING OUTAGES TO FIRE AND SECURITY SYSTEMS.
<br />14. PRODUCTS: ALL ELECTRICAL MATERIALS SHALL BE NEW EXCEPT WHERE SPECIFICALLY NOTED AS EXISTING TO BE REUSED. MATERIAL AND METHODS OF INSTALLATION SHALL
<br />CONFORM TO THE STANDARDS OF UNDERWRITERS LABORATORIES, INC. (UL), ANSI, NFPA, ADA, AND ALL OTHER APPLICABLE LOCAL ORDINANCES. DEFECTIVE EQUIPMENT AND/OR
<br />EQUIPMENT DAMAGED DURING INSTALLATION AND/OR TESTING SHALL BE REPLACED OR REPAIRED IN A MANNER MEETING THE APPROVAL OF THE ARCHITECT AND THE ENGINEER.
<br />PROPOSED EQUIPMENT SHALL BE NRTL LISTED, LABELED, OR APPROVED.
<br />15. SHOP DRAWINGS AND SUBMITTALS: SUBMIT MANUFACTURER'S STANDARD PRODUCT INFORMATION, PERFORMANCE SPECIFICATIONS, ELECTRICAL RATINGS, PHYSICAL
<br />DIMENSIONS, AND OTHER INFORMATION NECESSARY FOR ENGINEER TO ENSURE COMPLIANCE WITH SPECIFICATIONS. SHOP DRAWINGS SHALL BE SUBMITTED FOR APPROVAL
<br />PRIOR TO ORDERING AND INSTALLING ANY EQUIPMENT. SUBMITTALS AND SHOP DRAWINGS SHALL CLEARLY INDICATE ITEMS TO BE REVIEWED BY HIGHLIGHTING, AND ITEMS NOT
<br />TO BE REVIEWED SHALL BE CROSSED OUT. SUBMITTALS WITHOUT HIGHLIGHTING AND CROSSED OUT ITEMS SHALL NOT BE REVIEWED. ALL SUBMITTALS MUST BE RECEIVED BY THE
<br />ENGINEER WITHIN 30 DAYS OF CONTRACT AWARD TO THE GENERAL CONTRACTOR; NO EXCEPTIONS. EQUIPMENT ORDERED OR INSTALLED WITHOUT A FAVORABLY REVIEWED
<br />SUBMITTAL IS DONE AT THE CONTRACTOR'S OWN RISK.
<br />16. VALUE ENGINEERING SUBMITTALS: VALUE ENGINEERING SUBMI I-TALS SHALL BE LABELED AS SUCH AND INDICATE A'DEDUCT' OR CREDIT BACK TO THE OWNER. VE SUBMITTALS NOT
<br />CLEARLY LABELED OR NOT INCLUDING A DEDUCT SHALL BE REJECTED.
<br />17. SUBSTITUTION AND ALTERATIONS: THERE SHALL BE NO DEVIATION FROM THE REQUIREMENTS HEREIN WITHOUT THE WRITTEN APPROVAL OF THE ENGINEER. CONTRACTOR SHALL
<br />ASSUME RESPONSIBILITY FOR ALL COSTS INCURRED RESULTING FROM SUBSTITUTION OF EQUIPMENT AS WELL AS THE PERFORMANCE AND SPACE REQUIREMENTS OF SUCH
<br />EQUIPMENT.
<br />18. SUBSTITUTIONS AND ALTERATIONS OF OTHER DISCIPLINE'S EQUIPMENT: SUBSTITUTED AND ALTERED EQUIPMENT BY OTHER DISCIPLINES SHALL INCLUDE ALL MATERIAL AND
<br />LABOR COSTS FOR ELECTRICAL CONTRACTOR TO PROVIDE COMPLETE AND FULLY FUNCTIONAL SYSTEMS TO ACCOMMODATE THESE SUBSTITUTED AND ALTERED EQUIPMENT.
<br />THESE ADDITIONAL ELECTRICAL COSTS MUST BE ABSORBED BY THE OTHER DISCIPLINE'S CONTRACTOR IN ORDER FOR THE SUBSTITUTED OR ALTERED GEAR TO BE ACCEPTED.
<br />19. FAULT CURRENT PROTECTION: ALL EQUIPMENT SHORT CIRCUIT CURRENT RATINGS (SCCR) AND OVERCURRENT PROTECTIVE DEVICE AMPERE INTERRUPTING CAPACITY (AIC)
<br />RATINGS SHALL BE GREATER THAN THE AVAILABLE FAULT CURRENT AT EACH RESPECTIVE PIECE OF EQUIPMENT. COORDINATE EQUIPMENT SCCR AND OVERCURRENT PROTECTIVE
<br />DEVICE AIC RATINGS WITH POWER COMPANY. OBTAIN THE AVAILABLE FAULT CURRENT AT TRANSFORMER SECONDARY FROM THE POWER COMPANY AND PROVIDE PROPOSED
<br />EQUIPMENT SCCR AND OVERCURRENT PROTECTIVE DEVICE AIC RATINGS FOR ENGINEER APPROVAL. OVERCURRENT PROTECTIVE DEVICES AIC RATINGS SHALL BE FULLY RATED
<br />WITH A MINIMUM 10% MARGIN BETWEEN THE CALCULATED FAULT LEVEL AND THE SPECIFIED SHORT CIRCUIT RATING OF THE EQUIPMENT LINO ON PLANS.
<br />20. VOLTAGE DROP: WIRE SIZES SPECIFIED IN THESE PLANS ARE MINIMUM WIRE SIZES. THE ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR INCREASING WIRE SIZES BASED ON
<br />ACTUAL CIRCUIT LENGTH TO MAINTAIN VOLTAGE DROP AT A MAXIMUM OF 3% FOR BRANCH CIRCUITS AND 2% FOR FEEDERS. THE CUMULATIVE VOLTAGE DROP FROM THE SOURCE
<br />TO THE END DEVICE SHALL NOT EXCEED 5% OF NOMINAL SYSTEM VOLTAGE.
<br />21. WIRING: ALL CONDUCTORS CARRYING 50 VOLTS OR MORE SHALL BE MINIMUM #12 AWG, CU, LINO. PROVIDE DUAL RATED TYPE THHN-THWN FOR ABOVE GROUND AND TYPE THWN
<br />OR XHHW FOR BELOW GROUND, COORDINATE INSULATION TYPES WITH ENVIRONMENTAL CONDITIONS, NEC REQUIREMENTS, AND CONDUIT FILL REQUIREMENTS. CONDUCTORS #12
<br />AND #10 SHALL BE SOLID, CONDUCTORS #8 AND LARGER SHALL BE STRANDED. ALL CONDUCTOR SIZES ARE BASED ON COPPER WITH 60°C INSULATION FOR CIRCUITS RATED 100A
<br />OR LESS AND 75"C FOR CIRCUITS RATED MORE THAN 100A.
<br />22. LOW VOLTAGE WIRING: LOW VOLTAGE WIRING FOR SPECIAL SYSTEMS IS PERMITTED TO BE FREE -WIRED ONLY ABOVE ACCESSIBLE CEILINGS AND BELOW RAISED FLOOR SYSTEMS,
<br />UNO. FREE -WIRED CABLE SHALL BE LIL LISTED, PLENUM RATED. LOW VOLTAGE WIRING IN OPEN CEILINGS, HARD CEILINGS, WALLS, PASSING THROUGH ADJACENT TENANT SPACES,
<br />OR ROUTED UNDERGROUND OR BELOW SLAB SHALL BE INSTALLED IN CONDUIT. LOW VOLTAGE WIRING IS NOT SHOWN ON PLANS, UNLESS SPECIFICALLY CALLED OUT.
<br />23. COLOR CODING: FOR EXISTING WIRING SYSTEMS, COLOR CODING SHALL FOLLOW EXISTING SITE REQUIREMENTS. FOR NEW INSTALLATIONS OR WHERE EXISTING INSTALLATIONS
<br />DO NOT HAVE A COLOR CODING CONVENTION, THE FOLLOWING SYSTEMS OF COLOR CODING SHALL BE STRICTLY ADHERED TO AND FOLLOWED THROUGHOUT:
<br />CONDUCTOR 480Y/277V, 3-PH 208Y/120V, 3-PH 240D/12OV, 3-PH 240/120V, 1-PH
<br />PHASE A: BROWN BLACK BLACK BLACK
<br />PHASE B: ORANGE RED ORANGE RED
<br />PHASE C: YELLOW BLUE BLUE ---
<br />NEUTRAL: GRAY WHITE WHITE WHITE
<br />EQUIPMENT GROUND: GREEN GREEN GREEN GREEN
<br />ISOLATED GROUND: -- GREEN/YELLOW GREEN/YELLOW GREEN/YELLOW
<br />2A. SHARED CIRCUIT NEUTRALS: SHARED CIRCUIT NEUTRALS SHALL NOT BE USED UNLESS INDICATED OTHERWISE ON PANEL SCHEDULE. WHERE USED, CIRCUIT BREAKER HANDLE
<br />TIES SHALL BE PROVIDED TO DISCONNECT POWER TO EACH PHASE CONDUCTOR OF THE SHARED NEUTRAL CIRCUIT.
<br />25. GROUNDING: ALL CIRCUITS SHALL BE PROVIDED WITH AN INSULATED GREEN COPPER EQUIPMENT GROUND CONDUCTOR SIZED PER NEC. THE EQUIPMENT GROUND CONDUCTOR
<br />SHALL BE INCREASED IN SIZE BY EQUAL PROPORTION TO T HE PHASE CONDUCTORS WHENEVER THE PHASE CONDUCTORS HAVE BEEN UPSIZED TO MAINTAIN ACCEPTABLE
<br />VOLTAGE DROP LEVELS. EQUIPMENT GROUNDS SHALL BE BONDED TO ALL EQUIPMENT AND DEVICES. USE OF METALLIC CONDUIT SHALL NOT TAKE THE PLACE OF AN EQUIPMENT
<br />GROUND CONDUCTOR.
<br />26. CONDUIT: ALL WIRING SHALL BE INSTALLED IN CONDUIT, MINIMUM 1/2" FOR INDOOR AND 3/4" FOR OUTDOOR AND UNDER SLAB. EMT IS ACCEPTABLE WITH COMPRESSION FITTINGS
<br />ONLY. ALL HOMERUNS SHALL BE HARD PIPED. MC IS ACCEPTABLE FOR FIXTURE WHIPS ONLY. ALL CONDUIT AND WIRING SHALL BE CONCEALED IN FLOORS, WALLS, AND/OR
<br />CEILINGS UNLESS SPECIFICALLY NOTED OTHERWISE. CHANNEL EXISTING WALLS WHERE REQUIRED. WHERE CONDUITS ARE UNABLE TO BE CONCEALED, HARD PIPED CONDUIT
<br />SHALL BE USED AND PAINTED TO MATCH ADJOINING SURFACE.
<br />27. UNDERGROUND CONDUITS: MINIMUM BURIAL DEPTH SHALL BE 24" TO TOP OF CONDUIT. PROVIDE DETECTABLE WARNING TAPE WHERE REQUIRED BY AHJ OR CODE.
<br />28. ROUTING: FOR CLARITY, CONDUIT ROUTING SHOWN IS SYMBOLIC AND DIAGRAMMATIC. INSTALL CONDUIT TO FIT ACTUAL FIELD CONDITIONS.
<br />29. OPEN CEILINGS: IN AREAS W'17HOUT CEILINGS OR WHERE ANY CONDUITS, CONDUCTORS, FEEDERS, OR LOW VOLTAGE CABLING IS VISIBLE, ALL WIRING SHALL BE HARD PIPED IN
<br />CONDUIT. BX, AC, AND MC CABLE OR FLEX CONDUIT ARE NOT PERMITTED. CONDUITS SHALL BE ROUTED TIGHT TO DECK EITHER PARALLEL OR PERPENDICULAR TO BUILDING LINES,
<br />GROUPED ALONG STRUCTURAL MEMBERS, AND DROP AT POINT OF CONNECTION. MAINTAIN 1-1/2" CLEARANCE FROM ROOF DECK PER NEC 300.4(E). WHERE EXPOSED TO VIEW, ALL
<br />MATERIALS (CONDUIT, JUNCTION BOXES, ETC.) SHALL BE INSTALLED IN AN ORDERLY FASHION AND SHALL BE CLEAN, FREE FROM ALL VISIBLE MARKINGS, AND PAINTED TO MATCH
<br />ADJOINING SURFACE. JUNCTION BOXES SHALL HAVE CIRCUIT NUMBERS WRITTEN ON THE INSIDE OF THE JUNCTION BOX COVER.
<br />30. PENETRATIONS: CONTRACTOR SHALL INSPECT AREA OF WORK AND PERFORM GROUND PENETRATING RADAR (GPR) SCAN OR X-RAY ALL PROPOSED PENETRATIONS PRIOR TO
<br />WORK TO DETERMINE EXACT LOCATIONS OF STRUCTURAL_ REINFORCEMENT OR EMBEDDED SYSTEMS. COORDINATE FLOOR AND WALL PENETRATIONS WITH STRUCTURAL
<br />ENGINEER. ALL PENETRATIONS SHALL BE SEALED BY APPROVED MEANS TO PREVENT ENERGY LOSS AND MOISTURE AND RODENT INTRUSION.
<br />31. FIRE -RATED PENETRATIONS: ALL PENETRATIONS THROUGH FIRE -RATED SLABS AND/OR PARTITIONS SHALL BE SEALED WITH A UL LISTED FIRE -RATED ASSEMBLY OF EQUAL OR
<br />GREATER RATING THAN THAT OF THE EXISTING SLAB OR PARTITION.
<br />32. TRENCHING: FIELD VERIFY UNDERGROUND UTILITIES PRIOR TO TRENCHING. ALL PROPOSED EXCAVATION IN THE VICINITY OF EXISTING UTILITIES, PIPING SYSTEMS, OR SIMILAR
<br />SHALL BE HAND EXCAVATED. HAND EXCAVATE IN THE VICINITY OF EXISTING TREES WHERE TRENCHING MAY DAMAGE TREE ROOT SYSTEM.
<br />33. SLEEVES: SLEEVES AND SLEEVE SEALS SHALL BE PROVIDED AT PENETRATIONS OF WALL ASSEMBLIES.
<br />34. SUPPORTS: ALL CONDUIT AND CABLING SHALL BE PROPERLY SUPPORTED AS REQUIRED BY CODE.
<br />35. REPAIRS: THE CONTRACTOR SHALL REPAIR ALL WALL, CEILING, FLOOR, OR ROOF OPENINGS WHICH ARE CREATED BY DEMOLITION OR PENETRATION. THE REPAIRS SHALL BE WITH
<br />MATERIAL AND FINISHES TO MATCH EXISTING ADJACENT UNDISTURBED FINISHED SURFACES.
<br />36. IDENTIFICATION: ALL ELECTRICAL DISTRIBUTION EQUIPMENT, TRANSFORMERS, PANELBOARDS, AND OTHER ENCLOSED EQUIPMENT SHALL BE IDENTIFIED AS INDICATED IN THE
<br />CONTRACT DOCUMENTS. SAID IDENTIFICATION SHALL CONSIST OF PERMANENTLY ATTACHED ENGRAVED LAMINATED PLASTIC NAMEPLATES. EACH BRANCH CIRCUIT OVERCURRENT
<br />PROTECTION DEVICE SHALL BE IDENTIFIED BY CIRCUIT NUMBER AND SCHEDULED INSIDE PANEL DOOR WITH A TYPEWRITTEN CIRCUIT DIRECTORY. EACH BRANCH CIRCUIT SPLICE
<br />OR TERMINATION SHALL BE IDENTIFIED BY PANEL AND CIRCUIT DESIGNATION SHOWN ON THE JUNCTION OR OUTLET BOX, OR UPON INDIVIDUAL WIRES IN CASES WHERE MORE
<br />THAN ONE OF EACH PHASE CONDUCTOR OCCUR. RECEPTACLES AND SWITCH COVER PLATES SHALL BE LABELED WITH PANEL AND CIRCUIT DESIGNATION USING TYPEWRITTEN
<br />CHARACTERS OF CONTRASTING COLOR (BLACK OR WHITE) ON CLEAR ADHESIVE BACKED LABELS OR FACTORY ENGRAVED COVER PLATES.
<br />37. PANEL CLEARANCE: MAINTAIN ALL WORKING SPACE AND DEDICATED EQUIPMENT SPACE CLEARANCES AS REQUIRED BY ARTICLE 110 OF THE NEC. GENERAL CONTRACTOR SHALL
<br />COORDINATE BETWEEN TRADES SO THAT NO FOREIGN SYSTEMS ARE LOCATED IN THE DEDICATED EQUIPMENT SPACE. IN THE EVENT THAT FOREIGN SYSTEMS ARE INSTALLED
<br />ABOVE A PANEL'S DEDICATED EQUIPMENT SPACE, THE GENERAL CONTRACTOR SHALL ABSORB THE COST TO RELOCATE THE FOREIGN SYSTEMS.
<br />38. WIRING DEVICES: WIRING DEVICES AND COVER PLATES SHALL BE DECORA STYLE OF COLORS SELECTED BY THE ARCHITECT OR INTERIOR DESIGNER. GANG ADJACENT DEVICES
<br />WITH A SINGLE ONE-PIECE COVER PLATE, LINO. FOR REMODELS, ALL DEVICES AND COVER PLATES WITHIN THE CONTRACT AREA SHALL BE REPLACED WITH NEW DECORA STYLE
<br />DEVICES AND COVER PLATES, LINO.
<br />39. CLEANING: UPON COMPLETION OF WORK, THE CONTRACTOR SHALL THOROUGHLY CLEAN THE CONTRACT AREA AND ALL OTHER AREAS USED FOR STORAGE, STAGING, ETC. ALL
<br />EQUIPMENT AND DEVICES SHALL BE CLEANED AND POLISHED'N ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. SOAP AND WATER CLEANING OR OTHER METHODS
<br />THAT LEAVE A FILM SHALL BE CORRECTED UPON REQUEST BY THE ENGINEER OR ARCHITECT.
<br />40. TESTING: THE CONTRACTOR SHALL TEST ALL EQUIPMENT INSTALLED UNDER THIS CONTRACT AND DEMONSTRATE TO THE OWNER ITS PROPER OPERATION. AT THE TIME OF FINAL
<br />INSPECTION AND TESTS, ALL CONNECTIONS AT PANELBOARDS, CONTROL PANELS, DEVICES, AND EQUIPMENT AND ALL SPLICES MUST BE COMPLETED. EACH BRANCH CIRCUIT AND
<br />ITS RESPECTIVE CONNECTED EQUIPMENT MUST TEST FREE OF SHORT CIRCUITS.
<br />41. TRAINING: OWNER AND/OR OWNER'S REPRESENTATIVE SHALL BE TRAINED ON THE USE OF ANY NEW ELECTRICAL EQUIPMENT AND LIGHTING CONTROLS PRIOR TO FINAL
<br />ACCEPTANCE.
<br />42. FINAL ACCEPTANCE: AT THE END OF CONSTRUCTION, A FINAL WALK-THROUGH SHALL BE PERFORMED. ALL DEFICIENCIES IDENTIFIED DURING FINAL INSPECTION SHALL BE
<br />CORRECTED.
<br />43. CERTIFICATES OF APPROVAL: ALL CERTIFICATES OF APPROVAL SHALL BE IN DUPLICATE, DELIVERED TO THE ARCHITECT, AND BECOME THE PROPERTY OF THE OWNER.
<br />44. PROJECT RECORD DOCUMENTS: THE ELECTRICAL CONTRACTOR SHALL MAINTAIN AT THE SITE, FOR THE OWNER, ONE COPY OF ALL DRAWINGS, ADDENDA, APPROVED SHOP
<br />DRAWINGS, REVISIONS AND OTHER MODIFICATIONS IN GOOD ORDER AND MARKED TO RECORD ALL CHANGES MADE DURING CONSTRUCTION. THE SET OF DRAWINGS AND OTHER
<br />INFORMATION SHALL BE DELIVERED TO THE OWNER WITHIN 30 DAYS AFTER THE DATE OF SYSTEM ACCEPTANCE AND ONE COPY GIVEN TO THE ENGINEER UPON COMPLETION OF
<br />WORK. DRAWINGS SHALL INCLUDE AT A MINIMUM:
<br />A. A SINGLE -LINE DIAGRAM OF THE BUILDING ELECTRICAL DISTRIBUTION SYSTEM AND
<br />B. FLOOR PLANS INDICATING LOCATION AND AREA SERVED FOR ALL DISTRIBUTION.
<br />45. OPERATIONS AND MAINTENANCE (OEM) MANUALS: PROVIDE TWO COPIES OF OPERATIONS AND MAINTENANCE MANUALS TO THE BUILDING OWNER IN HARD COPY AND ELECTRONIC
<br />FORMAT. HARD COPIES SHALL BE COMPILED AND ORGANIZED IN A BINDER. THE MANUALS SHALL INCLUDE, AT A MINIMUM, THE FOLLOWING:
<br />A. SUBMITTAL DATA STATING EQUIPMENT RATING AND SELECTED OPTIONS FOR EACH PIECE OF EQUIPMENT REQUIRING MAINTENANCE,
<br />B. OPERATING AND MAINTENANCE MANUALS FOR EACH PIECE OF EQUIPMENT REQUIRING MAINTENANCE. REQUIRED ROUTINE MAINTENANCE ACTIONS SHALL BE CLEARLY
<br />IDENTIFIED.
<br />C. NAMES AND ADDRESSES OF AT. LEAST ONE QUALIFIED SERVICE AGENCY.
<br />D. WARRANTY INFORMATION.
<br />46. WARRANTY: THE ENTIRE ELECTRICAL SYSTEM INSTALLED UNDER THIS CONTRACT SHALL BE HANDED OVER IN PROPER WORKING ORDER. ANY WORK OR MATERIALS WHICH
<br />DEVELOP DEFECTS, EXCEPT FROM ORDINARY WEAR AND TEAR, WITHIN ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE SHALL BE REPLACED WITHOUT CHARGE. IF MATERIALS
<br />HAVE A STANDARD WARRANTY GREATER THAN ONE YEAR, THE MANUFACTURER'S STANDARD WARRANTY SHALL APPLY. BENEFICIAL USE SHALL NOT BE CONSTRUED AS FINAL
<br />ACCEPTANCE. THE ELECTRICAL CONTRACTOR SHALL, DURING THE ONE YEAR GUARANTEE PERIOD, BE RESPONSIBLE FOR THE PROPER REPAIR AND ADJUSTMENTS OF ALL
<br />ELECTRICAL SYSTEMS AND EQUIPMENT, APPARATUS, DEVICES, ETC. INSTALLED BY HIM, AND DO ALL WORK NECESSARY TO ENSURE EFFICIENT AND PROPER FUNCTIONING.
<br />o�
<br />0
<br />0
<br />0
<br />a.
<br />n
<br />a
<br />N
<br />w
<br />c
<br />0
<br />0
<br />LL
<br />T
<br />CO
<br />CO
<br />0
<br />z
<br />INFINITY ENGINEERING
<br />GROUP, LLC
<br />1208 East Kennedy Boulevard
<br />Suite 230
<br />Tampa, Florida 33602
<br />[p]: 813.434.4770
<br />[f]: 813.445.4211
<br />www.iegroup.net
<br />Cert. of Auth. No. 27889
<br />Client Name and Address
<br />1201 OAKFIELD DRIVE, NO. 109
<br />BRANDON, FLORIDA 33509
<br />.E.
<br />3 7
<br />®
<br />* •
<br />1G1�:
<br />AT C F
<br />D
<br />a
<br />W
<br />N
<br />MM
<br />w
<br />p
<br />Z
<br />W
<br />J
<br />W
<br />LL
<br />k =
<br />W
<br />Z
<br />J
<br />�a
<br />a
<br />0W
<br />J
<br />azp
<br />v '
<br />co
<br />-O
<br />Q
<br />y
<br />0
<br />0a
<br />W
<br />Q
<br />LO
<br />co
<br />W
<br />W
<br />d
<br />z
<br />4)
<br />/y�
<br />W
<br />m
<br />M
<br />aa.
<br />U)
<br />Project No.
<br />Sheet
<br />140-88.00
<br />E-001
<br />Date
<br />05/03/2019
<br />Scale
<br />AS NOTED
<br />
|