<br />SECTION 01 5400
<br />TESTING IDENTICAL PRODUCTS PER TEST METHOD BELOW BY UL, OR ANOTHER
<br />ANCHORED TO ROOF DECK AT PENETRATIONS AND TERMINATIONS AND THAT
<br />D. ADDITIONAL TESTING AND INSPECTING, AT CONTRACTOR'S EXPENSE, WILL BE
<br />D. SEALER DIMENSIONS:
<br />THERMOPLASTIC MEMBRANE ROOFING
<br />TESTING AND INSPECTING AGENCY ACCEPTABLE TO AUTHORiTIES HAVING
<br />NAILERS MATCH THICKNESSES OF INSULATION.
<br />PERFORMED TO DETERMINE COMPLIANCE OF
<br />1. MINIMUM JOINT SIZE: 1/4 X 1/4 INCH.
<br />(CONTINUED)
<br />JURISDICTION. MATERIALS SHALL BE IDENTIFIED WITH APPROPRIATE MARKINGS OF
<br />BLOCKING, CURBS, AND HAILERS ARE REQUIRED AT EDGES OF ROOF
<br />E. REPLACED OR ADDITIONAL WORK WITH SPECIFIED REQUIREMENTS.
<br />2. JOINTS 1/4 TO 1/2 INCH WIDE: DEPTH EQUAL TO WIDTH.
<br />APPLICABLE TESTING AND INSPECTING AGENCY.
<br />PENETRATIONS, AREA DIVIDERS, AND TERMINATIONS.
<br />6.9 PROTECTION AND GLEANING
<br />3. JOINTS OVER i/2 INCH WIDE: DEPTH EQUAL t0 ONE HALF OF WIDTH.
<br />3.1
<br />ALTERNATE APPROVED INSTALLATION METHOD - INDUCTION WELDED ROOFING
<br />1. EXTERIOR FIRE -TEST EXPOSURE: CLASS3/4A1y'/45-1* 3/4Q16i ASTME 108, FOR
<br />2. ENSURE GENERAL RIGIDITY AND PROPER SLOPE FOR DRAINAGE.
<br />A. PROTECT ROOFING SYSTEM FROM DAMAGE AND WEAR DURING REMAINDER OF
<br />32 APPLICATION
<br />MEMBRANE INSTALLATION
<br />APPLICATION AND ROOF SLOPE$ INDICATED.
<br />3. VERIFY THAT DECK IS SECURELY FASTENED WITH NO PROJECTING FASTENERS
<br />CONSTRUCTION PERIOD.
<br />A APPLY PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
<br />A.
<br />INSTALL ROOFING MEMBRANE OVER AREA TO RECEIVE ROOFING ACCORDING TO
<br />2. FIRE -RESISTANCE RATINGS- ASTM E 11% FOR FiRE-RESISTANCE-RATED ROOF
<br />ASSEMBLIES OF WHICH ROOFING SYSTEM 1$ A PART.
<br />AND WITH NO ADJACENT UNITS IN EXCESS OF 1/16 INCH (1.6 MM) OUT OF PLANE
<br />RELATIVE TO ADJOINING DECK
<br />B. CORRECT DEFICIENCIES IN OR REMOVE ROOFING SYSTEM THAT DOES NOT COMPLY
<br />5. INSTALL SEALERS AND ACCESSORIES IN ACCORDANCE WiTH ASTM C1193.
<br />ROOFING SYSTEM MANUFACTURER'S WRITTEN INSTRUCTIONS. UNROLL ROOFING
<br />WITH REQUIREMENTS, REPAIR SUBSTRATES, AND REPAIR OR REINSTALL ROOFING
<br />MEMBRANE AND ALLOW TO RELAX BEFORE INSTALLING.
<br />4.1
<br />DELIVERY, STORAGE, AND HANDLING
<br />B.
<br />UNACCEPTABLE PANELS SHOULD BE BROUGHT TO THE ATTENTION OF THE GENERAL
<br />SYSTEM TO A CONDITION FREE OF DAMAGE AND DETERIORATION AT TIME OF
<br />C. INSTALL JOINT BACKING TO MAINTAIN REQUIRED SEALER DIMENSIONS. COMPRESS
<br />DIMESKINNSIONS.
<br />S.
<br />B.
<br />ACCURATELY ALIGN ROOFING MEMBRANES AND MAINTAIN UNIFORM SIDE AND ENO
<br />A.
<br />DELIVER ROOFING MATERIALS iN ORIGINAL CONTAINERS WITH SEALS UNBROKEN
<br />CONTRACTOR AND PROJECT OWNER'S REPRESENTATIVE AND MUST BE CORRECTED
<br />SUBSTANTIAL COMPLETION AND ACCORDING TO WARRANTY REQUIREMENTS.
<br />BACKING APPROXIMATELY 25 PERCENT WITHOUT PUNCTURING NOT TWIST
<br />LAPS OF MINIMUM DIMENSIONS REQUIRED BY MANUFACTURER. STAGGER END LAPS.
<br />AND LABELED WiTH MANUFACTURER'S NAME, PRODUCT BRAND NAME AND TYPE,
<br />PRIOR TO INSTALLATION OF ROOFING SYSTEM.
<br />C. CLEAN OVERSPRAY AND SPILLAGE FROM ADJACENT CONSTRUCTION USING
<br />OR STRETCH.
<br />C.
<br />APPLY ROOFING MEMBRANE WITH SiDE LAPS SHINGLED WITH SLOPE OF ROOF
<br />DATE OF MANUFACTURE, AND DIRECTIONS FOR STORAGE.
<br />C.
<br />PROCEED WITH INSTALLATION ONLY AFTER UNSATISFACTORY CONDITIONS HAVE
<br />CLEANING AGENTS AND PROCEDURES RECOMMENDED BY MANUFACTURER OF
<br />D. USE BONDBREAKER TAPE WHERE JOINT BACKING IS NOT INSTALLED.
<br />DECK WHERE POSSIBLE.
<br />B.
<br />STORE LIQUID MATERIALS iN THEIR ORIGINAL UNDAMAGED CONTAINER$ iN A
<br />BEEN CORRECTED.
<br />AFFECTED CONSTRUCTION.
<br />E. FILL JOINTS FULL WITHOUT AIR POCKETS, EMBEDDED MATERIALS, RIDGES, AND
<br />D.
<br />SEAMS. CLEAN SEAM AREAS, OVERLAP ROOFING MEMBRANE, AND HOT-AiR WELD
<br />CLEAN, DRY, PROTECTED LOCATION AND WITHIN THE TEMPERATURE RANGE
<br />62
<br />PREPARATION
<br />SECTION 016200
<br />SAGS.
<br />SIDE AND END LAPS OF ROOFING MEMBRANE ACCORDING TO MANUFACTURER'S
<br />REQUIRED BY ROOFING SYSTEM MANUFACTURER
<br />A
<br />CLEAN AND REMOVE FROM SUBSTRATE SHARP PROJECTIONS, DUST, DEBRIS,
<br />SHEET METAL FLASHING AND TRiM
<br />F. TOOL SEALER TO SMOOTH PROFILE.
<br />WRITTEN INSTRUCTIONS TO ENSURE A WATERTIGHT SEAM INSTALLATION.
<br />C.
<br />PROTECT ROOF INSULATION MATERIALS FROM PHYSICAL DAMAGE AND FROM
<br />MOISTURE, AND OTHER SUBSTANCES DETRIMENTAL To ROOFING INSTALLATION IN
<br />PART I GENERAL
<br />G. APPLY SEALER WITHIN MANUFACTURER'S RECOMMENDED TEMPERATURE RANGE.
<br />1. TEST LAP EDGES WITH PROBE TO VERIFY SEAM WELD CONTINUITY. APPLY LAP
<br />DETERIORATION BY SUNLIGHT, MOISTURE, SOILING, AND OTHER SOURCES. COMPLY
<br />ACCORDANCE WITH ROOFING SYSTEM MANUFACTURER'S WRITTEN INSTRUCTIONS.
<br />11 SUMMARY
<br />33 CLEANING
<br />SEALANT TO SEAL CUT EDGES OF ROOFING MEMBRANE.
<br />WITH INSULATION MANUFACTURER'S WRITTEN INSTRUCTIONS FOR HANDLING, STORING,
<br />B.
<br />PREVENT MATERIALS FROM ENTERING AND CLOGGING ROOF DRAINS AND
<br />A. GLEAN ADJACENT SURFACES.
<br />2. VERIFY FIELD STRENGTH OF SEAMS A MINIMUM OF TWICE DAILY AND REPAIR
<br />AND PROTECTING DURING INSTALLATION.
<br />CONDUCTORS AND FROM SPILLING OR MIGRATING ONTO SURFACES OF OTHER
<br />A. SECTION INCLUDES:
<br />SEAM SAMPLE AREAS.
<br />D.
<br />HANDLE AND STORE ROOFING MATERIALS AND PLACE EQUIPMENT IN A MANNER TO
<br />CONSTRUCTION
<br />1. COPINGS.
<br />SECTION 081113
<br />a. REMOVE AND REPAIR ANY UNSATISFACTORY SECTIONS BEFORE
<br />AVOID PERMANENT DEFLECTION OF DECK
<br />C.
<br />PROCEED WITH INSTALLATION ONLY AFTER UNSATISFACTORY CONDITIONS HAVE
<br />2. EDGE FLASHINGS.
<br />HOLLOW METAL DOORS AND FRAMES
<br />PROCEEDING WITH WORK
<br />4B
<br />PROJECT CONDITIONS
<br />BEEN CORRECTED.
<br />3. SCUPPERS, CONDUCTOR HEADS AND DOWNSPOUTS.
<br />3. REPAIR TEARS, VOIDS, AND LAPPED SEAMS IN ROOFING MEMBRANE THAT DO
<br />A.
<br />WEATHER LIMITATIONS: PROCEED WITH INSTALLATION ONLY WHEN CURRENT AND
<br />63
<br />INSULATION INSTALLATION
<br />4. COUNTERFLASHINGS OVER MEMBRANE ROOF BASE FLASHINGS.
<br />PART 1 GENERAL
<br />NOT MEET REQUIREMENTS.
<br />FORECASTED WEATHER CONDITIONS PERMIT ROOFING SYSTEM TO BE INSTALLED IN
<br />A
<br />COORDINATE INSTALLATION OF ROOF SYSTEM COMPONENTS SO INSULATION AND
<br />5. COINTERFLASHINGS AT ROOF MOUNTED EQUIPMENT AND UTILITY PENETRATIONS.
<br />E.
<br />SPREAD SEALANT OR MASTIC BED OVER DECK DRAIN FLANGE AT DECK DRAINS
<br />ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS AND GUARANTEE
<br />COVER BOARD IS NOT EXPOSED To PRECIPITATION OR LEFT EXPOSED AT THE
<br />1-3SUBMITTALS1.1
<br />SUMMARY
<br />AND SECURELY SEAL ROOFING MEMBRANE iN PLACE WITH CLAMPING RING.
<br />REQUIREMENTS.
<br />END OF THE WORKDAY.
<br />A. SUBMIttAJ..S FOR REVIEW:
<br />A SECTION INCLUDES:
<br />F.
<br />INDUCTION WELDING INSTALLATION:
<br />4.9
<br />GUARANTEES
<br />B.
<br />COMPLY WITH ROOFING SYSTEM MANUFACTURER'S WRITTEN INSTRUCTIONS FOR
<br />1. SHOP DRAWINGS: SHOW LOCATIONS, TYPES AND THICKNESSES OF METAL,
<br />I. HOLLOW STEEL DOORS AND FRAMES.
<br />1. PERFORM CALIBRATION AND SET-UP AS DETAILED BY THE INDUCTION WELDER
<br />A
<br />PROVIDE MANUFACTURER'S SYSTEM GUARANTEE EQUAL TO JOHNS MANVILLE'S
<br />INSTALLATION OF ROOF INSULATION AND COVER BOARD.
<br />PROFILES, DIMENSIONS, FASTENING METHODS, PROVISIONS FOR EXPANSION AND
<br />12 SUBMITTALS
<br />OWNER'S MANUAL
<br />PEAK ADVANTAGE NO DOLLAR LiMIT ROOFING SYSTEM GUARANTEE.
<br />C.
<br />INSTALL TAPERED INSULATION UNDER AREA OF ROOFING TO CONFORM TO SLOPES
<br />CONTRACTION, AND JOINT DETAILS.
<br />A SUSTAINABLE DESIGN SUBMITTALS:
<br />2. CENTER THE INDUCTION WELDER OVER THE FIRST PLATE IN PATTERN AND
<br />i. SINGLE -SOURCE SPECIAL GUARANTEE INCLUDES ROOFING MEMBRANE, BASE
<br />INDICATED.
<br />B. SUSTAINABLE DESIGN SUBMITTALS:
<br />1. RECYCLED CONTENT.
<br />ACTIVATE THE WELD.
<br />FLASHINGS, ROOFING MEMBRANE ACCESSORIES, ROOF INSULATION, FASTENERS,
<br />p.
<br />INSTALL INSULATION BOARDS WiTH LONG JOINTS IN A CONTINUOUS STRAIGHT LINE
<br />1. RECYCLED CONTENT.
<br />2. REGIONAL MATERIALS.
<br />a. INDUCTION WELDER MUST BE CENTERED OVER THE PLATE TO GATE A
<br />WALKWAY PRODUCTS, AND OTHER SINGLE -SOURCE COMPONENTS OF ROOFING
<br />WITH END JOINTS STAGGERED BETWEEN ROWS ABUTTING EDGES AND ENDS
<br />�
<br />2. REGIONAL MATERIALS.
<br />13 QUALITY ASSURANCE
<br />100% BOND
<br />SYSTEM MARKETED BY THE MANUFACTURER
<br />BETWEEN BOARDS. FiLL GAPS EXCEEDING i/4 INCH C(p MM) WITH LiKE MATERIAL.
<br />1.4 QUALITY ASSURANCE
<br />A DOORS: b.
<br />AVY
<br />b. ERROR OCCURS DURING ACTIVATION, REFER to THE INDUCTION
<br />2. GUARANTEE PERIOD: 15 YEARS FROM DATE OF SUBSTANTIAL COMPLETION.
<br />E.
<br />INSTALL 2 OR MORE LAYERS WITH JOINTS OF EACH SUCCEEDING LAYER
<br />A. DESIGN, FABRICATE, AND INSTALL METAL COPINGS IN 4CCORDANGE WITH ANSI/SPR(
<br />E: If - H
<br />1. GRADE: If -HEAVY DUTY - 16 GAGE
<br />D
<br />W D
<br />WELDER OWNER'S MANUAL FOR CORRECTIVE ACTION
<br />B.
<br />INSTALLERS GUARANTEE: SUBMIT ROOFING INSTALLER'S GUARANTEE SIGNED BY
<br />STAGGERED FROM JOINTS OF PREVIOUS LAYER A MINIMUM OF 6 INCHES (150 MM) IN
<br />ES-1.
<br />2. MODEL: I - FULL FLUSH.
<br />3. PRIOR t0 EVERY USE, CLEAN FACE OF HEAT SINK MAGNET.
<br />INSTALLER COVERING WORK OF THiS SECTION, INCLUDING ALL COMPONENTS OF
<br />INSTALLER,
<br />SYSTEM, FOR THE FOLLOWING GUARANTEE PERIOD:
<br />F.
<br />EACH DIRECTION.
<br />TRIM SURFACE OF INSULATION BOARDS WHERE NECESSARY AT ROOF DRAINS SO
<br />3. EXTERIOR DOORS: MAXIMUM THERMAL TRANSMITTANCE U-VALUE OF 050,
<br />4. PLACE HEAT SINK MAGNET OVER THE WELDED PLATE.
<br />1. GUARANTEE PERIOD: TWO YEARS FROM DATE OF SUBSTANTIAL COMPLETION.
<br />COMPLETED SURFACE IS FLUSH AND DOES NOT RESTRICT FLOW OF WATER
<br />PART 2 PRODUCTS
<br />TESTED TO ASTM C518.
<br />a. KEEP HEAT SINK MAGNET iN PLACE AT LEAST 45 SECONDS WHiLE THE
<br />C.
<br />EXISTING GUARANTEES: GUARANTEES ON EXISTING BUILDING ELEMENTS SHOULD NOT
<br />G.
<br />INSTALL TAPERED EDGE STRIPS AT PERIMETER EDGES OF ROOF THAT DO NOT
<br />2.1 MATERIALS
<br />B. FRAMES: ANSI/SDI A250B, GRADE 11 - HEAVY DUTY - 16 GAGE.
<br />ASSEMBLY COOLS.
<br />BE AFFECTED BY SCOPE OF WORK
<br />TERMINATE AT VERTICAL SURFACES.
<br />A ALUMINUM SHEET:
<br />IA DELIVERY, STORAGE AND HANDLING
<br />5. REPEAT PROCESS FOR EACH PLATE.
<br />1. INSTALLER 18 RESPONSIBLE FOR COORDINATING WiTH BUILDING OWNER'S
<br />H.
<br />PRELIMINARILY FASTENED INSULATION FOR MECHANICALLY FASTENED SYSTEMS:
<br />1. ASTM 5209, ALLOY 3003, TEMPER H14, 0.032 INCH THICK
<br />A SHIP DOOR FRAMES WITH REMOVABLE ANGLE SPREADER* DO NOT REMOVE UNTIL
<br />G.
<br />PROCEED WITH INSTALLATION ONLY AFTER UNSATISFACTORY CONDITIONS HAVE
<br />REPRESENTATIVE TO VERIFY COMPLIANCE.
<br />INSTALL INSULATION WITH FASTENERS At RATE REQUIRED BY ROOFING SYSTEM
<br />2. FINISH: NATURAL.
<br />FRAME IS INSTALLED.
<br />BEEN CORRECTED.
<br />MANUFACTURER OR APPLICABLE AUTHORITY, WHICHEVER 18 MORE STRINGENT.
<br />22 FABRICATION
<br />B. STORE DOORS UPRIGHT IN PROTECTED, DRY AREA, OFF GROUND OR FLOOR, WITH
<br />PART 5 PRODUCTS
<br />1. FASTEN TOP LAYER TO RESIST UPLIFT PRESSURE AT CORNERS, PERIMETER AND
<br />A. FABRICATE COMPONENTS IN ACCORDANCE WITH 3/4SMACNA MANUAL.3b 3/4GDA
<br />AT LEAST 1/4 INCH SPACE BETWEEN INDIVIDUAL UNITS.
<br />3B
<br />BASE FLASHING INSTALLATION
<br />5.1
<br />POLYVINYL -CHLORIDE ROOFING MEMBRANE -PVC
<br />FIELD OF ROOF.
<br />H,di.LpgOOlC,1�
<br />A.
<br />INSTALL SHEET FLASHINGS AND PREFORMED FLASHING ACCESSORIES AND ADHERE
<br />A
<br />PVC SHEET: ASTPt D 4434, TYPE 111, FABRIC REINFORCED THAT CONTAINS KEE
<br />RETAIN PARAGRAPH BELOW IF ADHERING EACH LAYER OF INSULATION AND COVER
<br />B. FABRICATE CORNERS IN SINGLE UNITS WITH MINIMUM IS INCH LONG LEGS.
<br />PART 2 PRODUCTS
<br />TO SUBSTRATES IN ACCORDANCE WITH MEMBRANE ROOFING SYSTEM
<br />MANUFACTURER'S WRITTEN INSTRUCTIONS.
<br />(ELVALOY) TO REDUCE PLASTICIZER MIGRATION. BASIS OF DESIGN: JM PVC
<br />BOARD.
<br />C. FABRICATE VERTICAL FACES WITH BOTTOM EDGE FORMED OUTWARD 1/4 INCH AND
<br />2.1 MANUFACTURERS
<br />i• CERTIFICATION, BY LETTER STATING THAT THE FORMULATION HAS A MINIMUM 20
<br />RETAIN
<br />PARAGRAPH BELOW IF MECHANICALLY FASTENING LAYERS.
<br />HEMMED TO FORM DRIP.
<br />,q ACCEPTABLE MANUFACTURERS:
<br />B.
<br />APPLY SOLVENT -BASED BONDING ADHESIVE AT REQUIRED RATE AND ALLOW TO
<br />PARTIALLY DRY. DO NOT APPLY BONDING ADHESIVE TO SEAM AREA OF
<br />YEARS OF PERFORMANCE HISTORY iN NORTH AMERICA.
<br />I.
<br />LOOSE LAID INSULATION WITH TOP INSULATION LAYER MECHANICALLY FASTENED:
<br />D. FORM SECTIONS ACCURATE TO SIZE AND SHAPE, SQUARE AND FREE FROM
<br />1. STEELCRAFT. (WUQ.STEELCRAFT.0 M
<br />FLASHING.
<br />2. THICKNESS: 50 MILS (121 MM), NOMINAL
<br />LOOSE LAY INSULATION WITH STAGGERED JOINTS AND SECURE TOP LAYER OF
<br />DISTORTION AND DEFECTS.
<br />22 MATERIALS
<br />C.
<br />FLASH PENETRATIONS AND FIELD -FORE iED INSIDE AND OUTSIDE CORNERS PER
<br />3. EXPOSED FACE COLOR WHiTE
<br />INSULATION TO DECK USING MECHANICAL FASTENERS SPECIFICALLY DESIGNED AND
<br />SIZED FOR FASTENING SPECIFIED BOARD -TYPE TO DECK TYPE.
<br />E. PROVIDE FOR THERMAL EXPANSION AND CONTRACTION IN SHEET METAL-
<br />A STEEL SHEET:
<br />MANUFACTURER'S INSTALLATION INSTRUCTIONS.
<br />52
<br />AUXILIARY ROOFING MATERIALS - SINGLE PLY
<br />1. FASTEN TOP LAYER TO RESIST UPLIFT PRESSURE AT CORNERS, PERIMETER AND
<br />1. OTHER SHEET METAL:
<br />i. ASTM AIOOOAOOSM, COLD ROLLED.
<br />D.
<br />CLEAN SEAM AREAS AND OVERLAP AND FIRMLY ROLL SHEET FLASHINGS INTO THE
<br />A
<br />GENERAL: AUXILIARY MATERIALS RECOMMENDED BY ROOFING SYSTEM
<br />FIELD OF ROOF.
<br />a. PROVIDE EXPANSION JOINTS IN SHEET METAL EXCEEDING 15 FEET IN
<br />2. RECYCLED CONTENT: MINIMUM PERCENT, WITH MINIMUM PERCENT CLASSIFIED AS
<br />ADHESIVE. WELD SIDE AND END LAPS TO ENSURE A WATERTIGHT SEAM
<br />MANUFACTURER FOR INTENDED USE AND COMPATIBLE WITH MEMBRANE ROOFING.
<br />J.
<br />PROCEED WITH INSTALLATION ONLY AFTER UNSATISFACTORY CONDITIONS HAVE
<br />RUNNING LENGTH.
<br />POST -CONSUMER AS SHOWN ON DRAWINGS
<br />INSTALLATION.
<br />I. LIQUID -TYPE AUXILIARY MATERIALS SHALL MEET VOC LIMITS OF AUTHORITIES
<br />BEEN CORRECTED
<br />b. PLACE EXPANSION JOINTS AT 10 FEET ON CENTER MAXIMUM AND MAXIMUM 2
<br />B. DOOR CORE:
<br />E.
<br />TERMINATE AND SEAL TOP OF SHEET FLASHINGS AND MECHANICALLY ANCHOR TO
<br />HAVING JURISDICTION.
<br />&A
<br />ROOFING MEMBRANE INSTALLATION GENERAL
<br />FEET FROM CORNERS AND INTERSECTIONS.
<br />1. EXTERIOR DOORS. FOAMED -IN -PLACE POLYURETHANE INSULATION
<br />SUBSTRATE THROUGH TERMINATION BARS.
<br />B.
<br />SHEET FLASHING: MANUFACTURER'S INTERNALLY REINFORCED OR SCRIM
<br />A,
<br />INSTALL ROOFING MEMBRANE iN ACCORDANCE WITH ROOFING SYSTEM
<br />2. JOINT WIDTH: CONSISTENT WITH TYPES AND SIZES OF MATERIALS, MINIMUM WIDTH
<br />MANUFACTURED USING LOW -EMITTING, UREA FORMALDEHYDE -FREE BINDERS.
<br />F.
<br />PROCEED WITH INSTALLATION ONLY AFTER UNSATISFACTORY CONDITIONS HAVE
<br />REINFORCED, SMOOTH BACKED MEMBRANE WITH SAME THICKNESS AND COLOR AS
<br />MANUFACTURER'S WRITTEN INSTRUCTIONS, APPLICABLE RECOMMENDATIONS OF THE
<br />1/4 NCH.
<br />23 FABRICATION
<br />BEEN CORRECTED.
<br />SHEET MEMBRANE. BASIS OF DESIGN- JM PVC
<br />ROOFING MANUFACTURER AND REQUIREMENTS IN THIS SECTION.
<br />F. FABRICATE EXPANSION JOINTS IN METAL COPINGS WITH BACKING AND COVER
<br />A. FABRICATE DOORS AND FRAMES IN ACCORDANCE WITH ANSI/SDI A250B.
<br />C.
<br />BONDING ADHESIVE: MANUFACTURER'S STANDARD SOLVENT -BASED BONDING
<br />5•
<br />TART INSTALLATION of ROOFING MEMBRANE IN PRESENCE OF ROOFING SYSTEM
<br />PLATES FORMED TO FLASHING PROFILE, MINIMUM 8 INCHES LONG.
<br />B. FABRICATE EXTERIOR DOORS AND FRAMES FROM GALVANIZED STEEL SHEET.
<br />3.9
<br />WALKWAY INSTALLATION
<br />ADHESIVE FOR MEMBRANE, AND SOLVENT -BASED BONDING ADHESIVE FOR BASE
<br />MANUFACTURER'S TECHNICAL PERSONNEL.
<br />G. UNLESS OTHERWISE INDICATED, PROVIDE MINIMUM 3/4 INCH WIDE FLAT LOCK
<br />C. DOORS:
<br />A.
<br />FLEXIBLE WALKWAYS: INSTALL WALKWAY PRODUCTS IN LOCATIONS INDICATED.
<br />D.
<br />FLASHINGS. BASIS OF DESIGN: JM PVC MEMBRANE ADHESIVE (LOW VOC)
<br />METAL TERMINATION BARS: MANUFACTURER'S STANDARD PREDRILLED
<br />G.
<br />WHERE ROOF SLOPE EXCEEDS 1/2 INCH PER 12 INCHES (1:24), CONTACT THE
<br />SEAMS* LAP IN DIRECTION OF WATER FLOW.
<br />I. FABRICATE FROM MINIMUM 16 GAGE SHEETS.
<br />HEAT -WELD WALKWAY PRODUCTS TO SUBSTRATE ACCORDING TO ROOFING SYSTEM
<br />ALUMINUM BARS, WITH ANCHORS. BASIS OF DESIGN: ,�[
<br />MEMBRANE MANUFACTURER FOR INSTALLATION INSTRUCTIONS REGARDING
<br />H. FABRICATE CLEATS AND STARTER STRIPS OF SAME MATERIAL AS SHEET METAL.
<br />2. CLOSE TOP AND BOTTOM EDGES OF DOORS WITH STEEL CHANNEL, MINIMUM 16,
<br />MANUFACTURER'S WRITTEN INSTRUCTIONS.
<br />TERMINATIONSTAINLESS-S
<br />TERMINATION SYSTEMS
<br />EM
<br />SYSEELTEMS
<br />INSTALLATION DIRECTION AND BACKNAILiNG.
<br />GAGE, EXTENDING FULL WIDTH OF DOOR AND SPOT WIELDED TO BOTH FACES,
<br />B.
<br />PROCEED WITH INSTALLATION ONLY AFTER UNSATISFACTORY CONDITIONS HAVE
<br />E
<br />FASTENERS: FACTORY -COATED STEEL FASTENERS AND METAL OR PLASTIC
<br />D.
<br />COOPERATE WITH TESTING AND INSPECTING AGENCIES ENGAGED OR REQUIRED TO
<br />PART 3 EXECUTION
<br />WITH TOP CHANNEL FLUSH AND BOTTOM CHANNEL RECESSED.
<br />BEEN CORRECTED.
<br />PLATES MEETING CORROSION -RESISTANCE PROVISIONS IN FMG 4410, DESIGNED
<br />PERFORM SERVICES FOR INSTALLING ROOFING SYSTEM.
<br />3.1 INSTALLATION
<br />D. FRAMES:
<br />FOR FASTENING MEMBRANE TO SUBSTRATE, AND ACCEPTABLE TO MEMBRANE
<br />E.
<br />COORDINATE INSTALLING ROOFING SYSTEM So INSULATION AND OTHER
<br />A. INSTALL CLEATS AND STARTER STRIPS BEFORE STARTING INSTALLATION OF SHEET
<br />1. FABRICATE FROM MINIMUM 16 GAGE SHEETS.
<br />3.10
<br />FIELD QUALITY CONTROL
<br />ROOFING SYSTEM MANUFACTURER BASiS OF DESIGN: HIGH LOAD FASTENERS AND
<br />COMPONENTS of THE ROOFING MEMBRANE SYSTEM NOT PERMANENTLY EXPOSED
<br />METAL. FASTEN AT 6 INCHES ON CENTER MAXIMUM.
<br />2. PROVIDE SELF -ALIGNING TABS AND SLOTS TO HOLD CORNERS IN ALIGNi-IENT.
<br />A.
<br />FINAL ROOF INSPECTION: ARRANGE FOR ROOFING SYSTEM MANUFACTURER'S
<br />PLATES
<br />ARE NOT SUBJECTED TO PRECIPITATION OR LEFT UNCOVERED AT THE END OF THE
<br />B. EXPANSION JOINTS iN METAL COPINGS:
<br />3. ANCHORS:
<br />REGISTERED ROOF OBSERVER (RRO) TO INSPECT ROOFING INSTALLATION ON
<br />F.
<br />INDUCTION !WELDING PLATE: A ROUND SPECIALLY COATED GALVALUME� PLATE
<br />WORKDAY OR WHEN RAIN IS IMMINENT.
<br />I, CENTER BACKING PLATE BETWEEN FLASHING PIECES AT END JOINTS.
<br />a. PROVIDE ONE ANCHOR At EACH JAMB FOR EACH 30 INCHES OF DOOR
<br />COMPLETION AND SUBMIT REPORT TO ARCHITECT.
<br />WITH A RECESSED CENTER AND RAISED FLAT BONDING SURFACE SPECIFICALLY
<br />i. PROVIDE TIE -OFFS AT END OF EACH DAY'S WORK TO COVER EXPOSED
<br />2. APPLY TWO CONTINUOUS BEADS OF JOINT SEALER BETWEEN BACKING PLATE
<br />HEIGHT.
<br />1. NOTIFY ARCHITECT OR DINER 48 HOURS IN ADVANCE OF DATE AND TIME OF
<br />DESIGNED FOR INDUCTION WELDING APPLICATION. BASIS OF DESIGN: JM PVC
<br />ROOFING MEMBRANE SHEETS AND INSULATION WiTH JOINTS AND EDGES SEALED.
<br />AND FLASHING SECTIONS AT EACH END.
<br />b. PROVIDE ONE FLOOR ANCHOR WELDED TO EACH JAMB.
<br />INSPECTION.
<br />RHINOPLATE
<br />2. COMPLETE TERMINATIONS AND BASE FLASHINGS AND PROVIDE TEMPORARY
<br />SEALS TO PREVENT WATER FROM ENTERING COMPLETED SECTIONS OF ROOFING
<br />3. INSTALL FLASHING PIECES WITH 1/2 INCH EXPANSION SPACE AT ABUTTING ENDS'
<br />E. ACCURATELY FORM TO REQUIRED SIZES AND PROFILES.
<br />B.
<br />REPAIR OR REMOVE AND REPLACE COMPONENTS OF ROOFING SYSTEM WHERE
<br />G.
<br />MISCELLANEOUS ACCESSORIES: PROVIDE POURABLE SEALERS, PREFOR"ED CONE
<br />SYSTEM.
<br />APPLY SEALER TO EXPANSION SPACE.
<br />F. DO NOT USE METALLIC FILLER TO CONCEAL MANUFACTURING DEFECTS.
<br />TEST RESULTS OR INSPECTIONS INDICATE THAT THEY DO NOT COMPLY WITH
<br />REQUIREMENTS.
<br />SPECIFIED RE
<br />AND VENT SHEET FLASHINGS, PREFORMED INSIDE AND OUTSIDE COSNER SHEET
<br />FLASHI$, T-JOINT COVERS, COVER STRIPS, SEALANTS, AND OTHER ACCESSORIES.
<br />NG
<br />3. REMOVE AND DISCARD TEMPORARY SEALS BEFORE BEGINNING WORK ON
<br />4. APPLY TWO CONTINUOUS BEADS OF JOINT SEALER BETWEEN COVER PLATE AND
<br />FABRICATE WITH INTERNAL REINFORCEMENT FOR HARDWARE SPECIFIED IN SECTION
<br />C.
<br />ADDITIONAL TESTING AND INSPECTING, AT CONTRACTOR'S EXPENSE, WILL BE
<br />BASIS OF DESIGN: JM PVC POURABLE SEALER JM PVC PIPE BOOTS, PVC SPLIT
<br />ADJOINING ROOFING.
<br />FLASHING SECTIONS At EACH ENDREINFORCEMENTG.
<br />C. SECURE WITH CONCEALED FASTENERS WHERE POSSIBLE.
<br />081100' WELD IN PLACE.
<br />PERFORMED TO DETERMINE COMPLIANCE OF REPLACED OR ADDITIONAL WORK
<br />PIPE BOOT. PVC SQUARE PIPE BOOT, JM PVC PENETRATION PAN, JM PVC
<br />F.
<br />PROCEED WITH INSTALLATION ONLY AFTER UNSATISFACTORY CONDITIONS HAVE
<br />D. APPLY PLLASTICASTIC CEMENT BETWEEN METAL AND BITUMINOUS FLASNINGB.
<br />H. DESIGN CLEARANCES-.
<br />WITH SPECIFIED REQUIREMENTS.
<br />UNIVERSAL CORNERS. JM PVC T-JOINT PATCH, JM PVC MEMBRANE CLEANER (LOW
<br />BEEN CORRECTED.
<br />1. BETWEEN DOOR AND FRAME: MAXIMUM 1/8 INCH.
<br />VOC), JM PVC -COATED METAL. JM PVC EDGE SEALANT. JM PVC PROFILE. JM PVC
<br />65
<br />MECHANICALLY FASTENED ROOFING MEMBRANE INSTALLATION
<br />E. FIT FLASHINGS TIGHT, WITH SQUAD CORNERS AND SURFACES TRUE AND STRAIGHT.
<br />2. UNDERCUT:
<br />3.11
<br />PROTECTION AND CLEANING
<br />DETAIL STRIP, JM PVC DETAIL MEMBRANE AND JM SINGLE PLY CAULK
<br />A
<br />INSTALL ROOFING MEMBRANE OVER AREA t0 REROOFING IN ACCORDANCE
<br />FSEAM AND SEAL FIELD JOINTS
<br />F. JOINTS.
<br />a. NON -FIRE RATED DOORS: MAXIMUM 3/4 INCH.
<br />A.
<br />PROTECT ROOFING SYSTEM FROM DAMAGE AND WEAR DURING REMAINDER OF
<br />53
<br />AUXILIARY ROOFING SYSTEM COMPONENTS
<br />WITH ROOFING SYSTEM MANUFACTURER'S WRITTEN INSTRUCTIONS.
<br />G. SEPARATE DISSIMILAR METALS WITH BITUMINOUS COATING OR NON -ABSORPTIVE
<br />3. BETWEEN FACE OF DOOR AND STOP: IA6 TO 3/32 INCH.
<br />CONSTRUCTION PERIOD.
<br />A
<br />EXPANSION JOINTS- PROVIDE FACTORY FABRICATED WEATHERPROOF, EXTERIOR
<br />i. UNROLL ROOFING 1'11°MBR�QNIE AND ALLOW t0 RELAX BEFORE INSTALLING,
<br />GASKETS.
<br />1. MANUFACTURING TOLERANCES: IN ACCORDANCE With 80I-111.
<br />B.
<br />CORRECT DEFICIENCIES IN OR REMOVE ROOFING SYSTEM THAT DOES NOT COMPLY
<br />COVERS FOR EXPANSION JOINT OPENINGS CONSISTING OF FLEXIBLE RUBBER
<br />2. INSTALL SHEET IN ACCORDANCE WITH ROOFING SYSTEM MANMANUFACTURER'SMEMBRANE,
<br />W. DO . WNSPOUTS:
<br />2.4 FINISHES
<br />WITH REQUIREMENTS, REPAIR SUBSTRATES, AND REPAIR OR REINSTALL ROOFING
<br />SUPPORTED BY A CLOSED CELL FOAM TO FORM FLEXIBLE BELLOWS,
<br />WITH TWO METAL FLANGES, ADHESIVELY AMC) MECHANICALLY COMBINED TO THE
<br />WRITTEN INSTRUCTIONS.
<br />I. SECURE WITH STRAPS SPACED MAXIMUM 8 FEET ON CENTER AND WITHIN 2 FEET
<br />OF ENDS AND ELBOWS.
<br />A• DRESS TOOL MARKS AND SURFACE IMPERFECTIONS TO SMOOTH SURFACES.
<br />SYSTEM TO A CONDITION FREE OF DAMAGE AND DETERIORATION At TIME OF
<br />SUBSTANTIAL COMPLETION AND ACCORDING TO WARRANTY REQUIREMENTS.
<br />BELLOWS BY A BIFURCATION PROCESS. PROVIDE PRODUCT MANUFACTURED AND
<br />B.
<br />ACCURATELY ALIGN ROOFING MEMBRANES AND MAINTAIN UNIFORM SIDE AND END
<br />LAPS OF MINIMUM DIMENSIONS REQUIRED BY MANUFACTURER STAGGER END LAPS.
<br />2. FLASH D011NSPOUITS INTO CONDUCTOR HEADS AND FASTEN.
<br />B. CLEAN AND CHEMICALLY TREAT STEEL SURFACES.
<br />C.
<br />CLEAN OVERSPR4Y AND SPILLAGE FROM ADJACENT CONSTRUCTION USING
<br />MARKETED BY SINGLE -SOURCE MEMBRANE SUPPLIER THAT IS INCLUDED IN THE NO
<br />DOLLAR LIMIT GUARANTEE. BASIS OF DESIGN: 3/4EXPAND-O-FLASH1b
<br />C.
<br />MECHANICALLY FASTEN ROOFING MEMBRANE SECURELY AT TERMINATIONS,
<br />3. FLASH UPPER SECTIONS INTO LOWER SECTIONS MINIMUM 2 INCHES AT JOINTS'
<br />C. TOUCH UP DAMAGED METALLIC COATINGS.
<br />CLEANING AGENTS AND PROCEDURES RECOMMENDED BY MANUFACTURER OF
<br />3/4EXPAND-O-GARD1{6
<br />PENETRATIONS, AND PERIMETER OF ROOFING.
<br />FASTEN SECTIONS TOGETHER
<br />D. APPLY MANUFACTURER'S STANDARD RUST INHIBITING PRIMER PAINT, AIR-DRIED OR
<br />AFFECTED CONSTRUCTION
<br />B.
<br />COPING SYSTEM: MANUFACTURERS FACTORY FABRICATED COPING CONSISTING OF
<br />D.
<br />PER
<br />'PICTURE FRAME" INSTALLATION METHOD IS NOT PERMITTED.
<br />I. APPLY JOINT SEALERS AS SPECIFIED IN SECTION 0113200.
<br />BARGED ON, MEETING REQUIREMENTS OF ANSI/SDI A25010.
<br />SECTION 015419
<br />BASE PIECE AND A SNAP -ON CAP. PROVIDE PRODUCT MANUFACTURED AND
<br />E.
<br />APPLY ROOFING MEMBRANE WITH SIDE LAPS SHINGLED WITH SLOPEOF ROOF
<br />32 CLEANING
<br />PART 3 EXECUTION
<br />POLYVINYL CHLORIDE (PVC) MEMBRANE ROOFING
<br />MARKETED BY SINGLE -SOURCE MEMBRANE SUPPLIER THAT IS INCLUDED IN THE NO
<br />MARKETED
<br />DECK WHERE POSSIBLE.
<br />A. GLEAN SHEET METAL* REMOVE SLAG, FLUX, STAINS, SPOTS, AND MINOR ABRASIONS
<br />PART i GENERAL
<br />DOLLAR LIMIT GUARANTEE. BASIS OF DESIGN: PRESTO -LOCK COPING
<br />F.
<br />SEAMS: GLEAN SEAM AREAS, OVERLAP ROOFING MEMBRANE, AND NOT -AIR WELD
<br />WITHOUT ETCHING SURFACES.
<br />3.1 INSTALLATION
<br />4.1
<br />SECTION INCLUDES
<br />C.
<br />FASCIA SYSTEM: MANUFACTURER'S FACTORY FABRICATED FASCIA CONSISTING OF
<br />SIDE AND END LAPS OF ROOFING MEMBRANE ACCORDING TO MANUFACTURER'S
<br />SECTION 019200
<br />A INSTALL DOORS AND FRAMES IN ACCORDANCE WITH ANSI/SDI A250.11.
<br />A.
<br />PVC MECHANICALLY FASTENED MEMBRANE ROOFING SYSTEM.
<br />A BASE PIECE AND A SNAP -ON COVER PROVIDE PRODUCT MANUFACTURED AND
<br />WRITTEN INSTRUCTIONS TO ENSURE A WATERTIGHT SEAM INSTALLATION.
<br />JOINT SEALERS
<br />B. SET PLUMB AND LEVEL.
<br />B.
<br />ROOF INSULATION.
<br />MARKETED BY SINGLE -SOURCE MEMBRANE SUPPLIER THAT IS INCLUDED IN THE NO
<br />i. TEST LAP EDGES WITH PROBE TO VERIFY SEAM WELD CONTINUITY.
<br />PART I GENERAL
<br />C. SECURE TO ADJACENT CONSTRUCTION USING FASTENER TYPE BEST SUITED t0
<br />DOLLAR LIMIT GUARANTEE. BASIS OF DESIGN- 3/4PRESTO LOCK FASCIA%
<br />2. VERIFY FIELD STRENGTH OF SEAMS A MINIMUM OF TWiCE DAILY AND REPAIR
<br />1•i SUMMARY
<br />APPLICATION.
<br />4.4
<br />DESIGN CRITERIA
<br />3j4PRESTO-TITS FASCIA16
<br />SEAM SAMPLE AREAS.
<br />A SECTION INCLUDES:
<br />32 ADJUSTING
<br />A.
<br />GENERAL: INSTALLED ROOFING MEMBRANE SYSTEMS SHALL REMAIN WATERTIGHT'
<br />D.
<br />METAL EDGE SYSTEM: MANUFACTURER'S FACTORY FABRICATED METAL EDGE
<br />a. REMOVE AND REPAIR ANY UNSATISFACTORY SECTIONS BEFORE
<br />1. JOiNT BACKUP MATERIALS.
<br />A TOUCH UP MINOR SCRATCHES AND ABRASiONS IN PRIMER PAINT TO MATCH
<br />AND RESIST SPECIFIED WIND UPLIFT PRESSURES, THERMALLY INDUCED MOVEMENT,
<br />SYSTEM USED TO TERMINATE THE ROOF AT THE PERIMETER OF THE STRIUCTURE.
<br />PROCEEDING WITH WORK
<br />2. JOINT SEALERS.
<br />FACTORY FINISH.
<br />AND EXPOSURE TO WEATHER WITHOUT FAILURE.
<br />PROVIDE PRODUCT MANUFACTURED AND MARKETED BY SINGLE -SOURCE
<br />3. REPAIR TEARS, VOIDS, AND LAPPED SEAMS IN ROOFING MEMBRANE THAT DO
<br />13 SUBMITTALS
<br />SECTION 081416
<br />B.
<br />MATERIAL COMPATIBILITY: ROOFING MATERIALS SHALL BE COMPATIBLE WITH ONE
<br />MEMBRANE SUPPLIER THAT IS INCLUDED IN THE NO DOLLAR LIMiT GUARANTEE.
<br />BASIS OF DESIGN: PRESTO STOP GRAVEL STOP
<br />NOT MEET REQUIREMENTS.
<br />A SUBMITTALS FOR REVIEW
<br />FLUSH WOOD DOORS
<br />ANOTHER UNDER CONDITIONS OF SERVICE AND APPLICATION REQUIRED, AS
<br />DEMONSTRATED BY ROOFING SYSTEM MANUFACTURER BASED ON TESTING AND
<br />E.
<br />METAL FLASHING SHEET: METAL FLASHING SHEET IS SPECIFIED IN DIVISION 01
<br />G.
<br />SPREAD SEALANT OR MASTIC BED OVER DECK DRAIN FLANGE AT DECK DRAINS
<br />AND SECURELY SEAL ROOFING MEMBRANE iN PLACE WITH CLAMPNG RING.
<br />1. PRODUCT DATA: INDICATE SEALERS, PRIMERS, BACKUP MATERIALS, BOND
<br />PART I GENERAL
<br />i.i SUMMARY
<br />FIELD EXPERIENCE.
<br />SECTION "SHEET METAL FLASHING AND TRIM."
<br />H.
<br />IN -SPLICE ATTACHMENT: SECURE ONE EDGE OF ROOFING MEMBRANE USING
<br />AND ACCESSORIES PROPOSED FOR USE.
<br />A. SECTION INCLUDES:
<br />C.
<br />WIND UPLIFT PERFOR'1ANGE: ROOFING SYSTEM SHALL BE IDENTICAL TO SYSTEMS
<br />5A
<br />WALKWAYS AND SAFETY STRIPS
<br />FASTENING PLATES OR METAL BATTENS CENTERED WITHIN MEMBRANE SPLICE AND
<br />B. SUSTAINABLE DESIGN SUBMITTAL$BREAKERS,
<br />.
<br />1. WOOD VENEER FACED FLUSH DOORS.
<br />THAT HAVE BEEN SUCCESSFULLY TESTED BY A QUALIFIED TESTING AND INSPECTING
<br />A-
<br />FLEXIBLE WALKWAYS: FACTORY -FORMED, NONPOROUS, HEAVY-DUTY,
<br />MECHANICALLY FASTEN ROOFING MEMBRANE TO ROOF DECK FIELD -SPLICE SEAM.
<br />i. REGIONAL MATERIALS.
<br />B. RELATED SECTIONS -
<br />CODANCE WITH
<br />AGENCY TO RESIST WIND UPLIFT PRESSURE CALCULATED IN ACCORDANCE
<br />SLIP -RESISTING, SURFACE -TEXTURED WALKWAY PADS SOURCED FROM MEMBRANE
<br />I.
<br />INSTALL ROOFING MEMBRANE AND AUXILIARY MATERIALS TO TIE IN TO EXISTING
<br />2. LOW -EMITTING MATERIALS.
<br />ASCE 1.
<br />ROOFING SYSTEM MANUFACTURER BASIS OF DESIGN: JMPVC WALKPAD
<br />ROOFING.
<br />1.4 QUALITY ASSURANCE
<br />I. SECTION 081100 -DOOR HARDWARE.
<br />I. FIELD -OF -ROOF UPLIFT PRESSURE:
<br />B.
<br />SAFETY STRIPS: MANUFACTURER'S MINIMUM 45 MILS, REINFORCED, UV -RESISTANT
<br />J.
<br />PROCEED WITH INSTALLATION ONLY AFTER UNSATISFACTORY CONDITIONS HAVE
<br />A. MAXIMUM VOLATILE ORGANIC COMPOUND (VOC) CONTENT' INTERIOR SEALERS AND
<br />13 SUBMITTALS
<br />2. PERIMETER UPLIFT PRESSURE:
<br />PVC (POLYVINYL CHLORIDE) WiTH ELVALOY KEE (KETONE ETHYLENE ESTER)
<br />BEEN CORRECTED.
<br />ACCESSORIES:
<br />A SUSTAINABLE DESIGN SUBMITTALS:
<br />3. CORNER UPLIFT PRESSURE:
<br />SAFETY WARNING LINE FOR ROOF PERIMETERS. BASIS OF DESIGN: JM PVC SAFETY
<br />bb
<br />BASE FLASHING INSTALLATION
<br />1. SEALANTS: 250 GRAMS PER LITER
<br />1. RECYCLED CONTENT.
<br />45
<br />SUBMITTALS
<br />STRIP
<br />A.
<br />INSTALL SHEET FLASNINGS AND PREFORMED FLASHING ACCESSORIES AND ADHERE
<br />2. PRIMERS FOR NON -POROUS SUBSTRATES: 250 GRAMS PER LITER
<br />2. REGIONAL MATERIALS.
<br />A.
<br />PRODUCT DATA: MANUFACTURER'S PRODUCT DATA SHEETS FOR EACH PRODUCT
<br />i. EXPOSED FACE COLOR: YELLOW
<br />TO SUBSTRATES IN ACCORDANCE WITH MEMBRANE ROOFING SYSTEM
<br />3. PRIMERS FOR POROUS SUBSTRATES: 115 GRAMS PER LITER
<br />3. RAPIDLY RENEWABLE MATERIALS.
<br />TO BE PROVIDED.
<br />5.5
<br />ROOF INSULATION
<br />MANUFACTURER'S WRITTEN INSTRUCTIONS.
<br />15 PROJECT CONDITIONS
<br />4. CERTIFIED WOOD.
<br />B.
<br />DETAIL DRAWINGS: PROVIDE ROOFING SYSTEM PLANS, ELEVATIONS, SECTIONS,
<br />A
<br />GENERAL: PREFORMED ROOF INSULATION BOARDS THAT COMPLY WITH �
<br />REQUIREMENTS AND REFERENCED STANDARDS, SELECTED FROM MANUFACTURERS
<br />B.
<br />APPLY SOLVENT -BASED BONDING ADHESIVE AT REQUIRED RATE AND ALLOW TO
<br />PARTIALLY DRY. DO NOT APPLY BONDING ADHESIVE TO BEAM AREA OF
<br />A DO NOT APPLY SEALERS AT TEMPERATURES BELOW 40 DEGREES F UNLESS
<br />IN
<br />IA DELIVERY, STORAGE AND HANDLING
<br />DETAILS, AND DETAILS OF ATTACHMENT TO OTHER WORK, INCLUDING:
<br />STANDARD SIZES AND OF THICKNESSES INDICATED.
<br />FLASHING.
<br />APPROVED dY SEALER MANUFACTURER
<br />A PACKAGE DOORS IN HEAVY PLASTIC WITH IDENTIFYING MARKS' SLIT PLASTIC
<br />1. BASE FLASHINGS, CANTS, AND MEMBRANE TERMINATIONS.
<br />B.
<br />POLYISOCYANURATE BOARD INSULATION: ASTM C 1285, TYPE 11, CLASS I GRADE 2
<br />C.
<br />FLASH PENETRATIONS AND FIELD -FORMED INSIDE AND OUTSIDE CORNERS PER
<br />PART 2 PRODUCTS
<br />WRAP ON SITE TO PERMIT VENTILATION, BUT DO NOT REMOVE FROM PLASTIC UNTIL
<br />READY TO INSTALL.
<br />2. TAPERED INSULATION, INCLUDING SLOPES.
<br />(20 PSi), BASIS OF DESIGiN: ENRGY 3
<br />MANUFACTURER'$ INSTALLATION INSTRUCTIONS.
<br />2.1 MATERIALS
<br />B. DD NOT DELIVER DOORS UNTIL BUILDING IB SUBSTANTIALLY WATER AND tlJ1=AtHER
<br />3. CRICKETS, SADDLES, AND TAPERED EDGE STRIPS, INCLUDING SLOPES.
<br />1. PROVIDE INSULATION PACKAGE WITH MINIMUM R VALUE: (MINIMUM REQUIRED BY
<br />D.
<br />CLEAN SEAM AREAS AND OVERLAP AND FIRMLY ROLL SHEET FLASHINGS INTO THE
<br />A JOINT SEALER TYPE I:
<br />JOINT
<br />TIGHT.
<br />4. INSULATION FASTENING PATTERNS.
<br />APPLICABLE CODE).
<br />ADHESIVE. WELD SIDE AND END LAPS TO ENSURE A WATERTIGHT SEAM
<br />1. ASTM C920, GRADE NO, SINGLE COMPONENT BUTYL RUBBER TYPE, NON SAG.
<br />C. STORE DOORS FLAT AND LEVEL, WITH SPACERS BETWEEN DOORS TO ALLOW FOR
<br />C.
<br />VERIFICATION SAMPLES: PROVIDE FOR EACH PRODUCT SPECIFIED.
<br />2. PROVIDE INSULATION PACKAGE iN MULTIPLE LAYERS.
<br />INSTALLATION.
<br />2. MOVEMENT CAPABILITY: PLUS OR MINUS 12-1/2 PERCENT.
<br />AIR CIRCULATION, IN PROTECTED, DRY AREA
<br />D.
<br />INSTALLER CERTIFICATES: SIGNED BY ROOFING SYSTEM MANUFACTURER
<br />3. MINIMUM LONG-TERM THERMAL RESISTANCE CLTTRh 5.1 PER INCH.
<br />E.
<br />TERMINATE AND SEAL TOP OF SHEET FLASHINGS AND MECHANICALLY ANCHOR TO
<br />3. COLOR: TO BE SELECTED FROM MANUFACTURER'S FULL COLOR RANGE, MATCH
<br />D. ENVIRONMENTAL REQUIREMENTS: MAINTAIN FOLLOWING CONDITIONS IN BUILDING FOR
<br />CERTIFYING THAT INSTALLER IS APPROVED, AUTHORIZED, OR LICENSED BY
<br />a. DETERMINED IN ACCORDANCE WITH GAN/ULC 6110 AT 15P (24�)
<br />SUBSTRATE THROUGH TERMINATION BARB.
<br />ADJACENT FINISH.
<br />MINIMUM 1 DAYS PRIOR t0, DURING, AND AFTER INSTALLATION OF DOORS:
<br />MANUFACTURER TO INSTALL ROOFING SYSTEM.
<br />5.6
<br />TAPERED INSULATION
<br />F.
<br />PROCEED WITH INSTALLATION ONLY AFTER UNSATISFACTORY CONDITIONS HAVE
<br />B. JOINT SEALER TYPE 2:
<br />1. TEMPERATURE: 60 t0 80 DEGREES F.
<br />E.
<br />MAINTENANCE DATA: REFER TO JOHNS MANViLLE'S LATEST PUBLISHED DOCUMENTS
<br />A,
<br />TAPERED INSULATION: ASTM C 1289, TYPE 11, CLASS i GRADE 2 (20 PSI), PROVIDE
<br />BEEN CORRECTED.
<br />1. ASTM C920, GRADE NS, SINGLE COMPONENT SILICONE, NON BAG, MiLDEW
<br />2. HUMIDITY: 25 t0 55 PERCENT.
<br />ON WWW.JM.COM.
<br />FACTORY -TAPERED INSULATION BOARDS FABRICATED TO SLOPE OF 1/4 INCH PER
<br />6.1
<br />WALKWAY INSTALLATION
<br />RESISTANT.
<br />PART 2 PRODUCTS
<br />F.
<br />GUARANTEES- PROVIDE MANUFACTURER'S CURRENT GUARANTEE SPECIMEN.
<br />12 INCHES (1:48), UNLESS OTHERWISE INDICATED. BASIS of DESIGN: TAPERED
<br />A
<br />FLEXIBLE WALKWAYS: INSTALL WALKWAY PRODUCTS IN LOCATIONS INDICATED.
<br />2. MOVEMENT CAPABILITY: PLUS OR MINUS 25 PERCENT.
<br />2.1 MATERIALS
<br />4.6
<br />QUALITY ASSURANCE
<br />ENRGY 3
<br />HEAT -WELD WALKWAY PRODUCTS TO SUBSTRATE ACCORDING TO ROOFING SYSTEM
<br />3. COLOR: to BE SELECTED FROM MANUFACTURER'S FULL COLOR RANGE, MATCH
<br />A.
<br />INSTALLER QUALIFICATIONS: QUALIFIED FIRM THAT IS APPROVED, AUTHORIZED, OR
<br />5.1
<br />INSULATION ACCESSORIES
<br />MANUFACTURER'S WRITTEN INSTRUCTIONS.
<br />ADJACENT FINISH.
<br />A FLUSH WOOD DOORS:
<br />LICENSED BY ROOFING SYSTEM MANUFACTURER TO INSTALL MANUFACTURER'S
<br />A.
<br />GENERAL: ROOF INSULATION ACCESSORIES RECOMMENDED BY INSULATION
<br />B.
<br />ROOF -PAVER WALKWAYS: INSTALL WALKWAY ROOF PAVERS ACCORDING TO
<br />22 ACCESSORIES
<br />1. WOMA I.S.IA
<br />PRODUCT AND IS ELIGIBLE TO RECEIVE THE SPECIFIED MANUFACTURER'S
<br />MANUFACTURER FOR INTENDED USE AND COMPATIBLE WITH MEMBRANE ROOFING.
<br />MANUFACTURER'S WRITTEN INSTRUCTIONS IN LOCATIONS INDICATED, t0 FORM
<br />A PRIMERS, BONDBREAKERS, AND SOLVENTS: AS RECOMMENDED BY SEALER
<br />2. CODE TYPE -
<br />GUARANTEE.
<br />B.
<br />FASTENERS: FACTORY -COATED STEEL FASTENERS AND METAL OR PLASTIC
<br />WALKWAYS. LEAVE 3 INCHES (15 MM) OF SPACE BETWEEN ADJACENT ROOF
<br />MANUFACTURER.
<br />a. SOLID, NON -RATED: TYPE PC - PARTICLEBOARD CORE, BONDED,
<br />B.
<br />MANUFACTURER QUALIFICATIONS: QUALIFIED MANUFACTURER THAT HAS UL LISTING
<br />PLATES MEETING CORROSION -RESISTANCE PROVISIONS IN R iG 4410, DESIGNED
<br />PAVERS.
<br />d. JOINT BACKING:
<br />3. WOOD VENEER FACES:
<br />FOR ROOFING SYSTEM IDENTICAL TO THAT USED FOR THIS PROJECT.
<br />FOR FASTENING ROOF INSULATION TO SUBSTRATE, AND FURNISHED BY ROOFING
<br />C.
<br />PROCEED WITH INSTALLATION ONLY AFTER UNSATISFACTORY CONDITIONS HAVE
<br />1. ASTM C1330, CLOSED CELL POLYETHYLENE FOAM, PREFORMED ROUND JOINT
<br />a. CLOSED GRAIN HARDWOOD, OF QUALITY SUITABLE FOR OPAQUE FINISH.
<br />C.
<br />TESTING AGENCY QUALIFICATIONS: INDEPENDENT TESTING AGENCY WITH THE
<br />SYSTEM MANUFACTURER BASIS OF DESIGN: ULTRAFAST FASTENERS AND PLATES
<br />BEEN CORRECTED.
<br />FILLER, NON ASSORBIWex, NON STAINING, RESILIENT, COMPATIBLE WITH SEALER
<br />b. CERTIFIED TO FSC STD-04-004.
<br />EXPERIENCE AND CAPABILITY TO CONDUCT THE TESTING INDICATED, AS
<br />C.
<br />WOOD NAILER STRIPS: COMPLY WITH REQUIREMENTS IN DIVISION 06 SECTION
<br />6.8 FIELD QUALITY CONTROL
<br />AND PRIMER; RECOMMENDED BY SEALER MANUFACTURER FOR EACH SEALER
<br />4. ADHESIVES: WATER RESISTANT.
<br />DOCUMENTED IN ACCORDANCE WITH ASTM E329. I
<br />"MISCELLANEOUS ROUGH CARPENTRY."
<br />A
<br />TESTING AGENCY: OWNER WILL ENGAGE A QUALIFIED INDEPENDENT TESTING AND
<br />TYPE.
<br />22 FABRICATION
<br />D.
<br />TEST REPORTS:
<br />INSPECTING AGENCY TO PERFORM ROOF TESTS AND INSPECTIONS AND To
<br />2. SIZE: MINIMUM 125 TIMES JOINT WIDTH.
<br />A. FABRICATE DOORS IN ACCORDANCE WITH WOMA I.S.iA
<br />1. ROOF DRAIN AND LEADER TEST OR SUBMIT PLUMBER'S VERIFICATION.
<br />PART 6 EXECUTION
<br />PREPARE TEST REPORTS.
<br />2. CORE CUT (IF REQUESTED).
<br />6.1
<br />EXAMINATION
<br />B.
<br />FINAL ROOF INSPECTION: ARRANGE FOR ROOFING SYSTEM MANUFACTURER'S
<br />PART 3 EXECUTION
<br />1. DUTY LEVEL: HEAVY DUTY.
<br />3. ROOF DECK FASTENER PULLOUT TEST.
<br />A
<br />EXAMINE SUBSTRATES, AREAS, AND CONDITIONS FOR COMPLIANCE WITH tNE
<br />REGISTERED ROOF OBSERVER (RRO) TO INSPECT ROOFINSTALLATION ON
<br />3.1 PREPARATION
<br />NUMBEPEFiFOR
<br />2. NUMBER OF PLIES: 5.
<br />E.
<br />SOURCE LIMITATIONS: OBTAIN ALL COMPONENTS FROM THE SINGLE SOURCE
<br />REQUIREMENTS At-FECTNG PERFORMANCE OF ROOFING SYSTEM.
<br />COMPLETION AND SUBMIT REPORT TO ARCHITECT.
<br />A REMOVE LOOSE AND FOREIGN MATTER THAT COULD IMPAIR ADHESION F SURFACE
<br />3. VENEER MAtCHiHG:
<br />ROOFING SYSTEM MANUFACTURER GUARANTEEING THE ROOFING SYSTEM. ALL
<br />i. GENERAL:
<br />1. NOTIFY ARCHITECT OR OWNER 48 HOURS IN ADVANCE OF DATE AND TIME OF
<br />HAS BEEN SUBJECT TO CHEMICAd.. CONTAMINATION, CONTACT SEALER
<br />a. PIECE MATCH: SLIP.
<br />PRODUCTS USED IN THE SYSTEM SHALL BE LABELED BY THE SINGLE SOURCE
<br />a. VERIFY THAT ROOF OPENINGS AND PENETRATIONS ARE IN PLACE AND SET
<br />INSPECTION
<br />MANUFACTURER FOR RECOMMENDATION.
<br />PART 3 EXECUTION
<br />ROOFING SYSTEM MANUFACTURER ISSUING THE GUARANTEE.
<br />AND BRACED AND THAT ROOF DRAINS ARE SECURELY CLAMPED IN PLACE.
<br />C.
<br />REPAIR OR REMOVE AND REPLACE COMPONENTS OF ROOFING SYSTEM WHERE
<br />B. GLEAN AND PRIME JOINTS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
<br />3.1 PREPARATION
<br />F.
<br />FIRE -TEST -RESPONSE CHARACTERISTICS: ROOFING MATERIALS SHALL COMPLY
<br />b. VERIFY THAT WOOD CANTS, BLOCKING, CURDS, AND NAILERS ARE SECURELY
<br />TEST RESULTS OR INSPECTIONS INDICATE THAT THEY DO NOT COMPLY WITH
<br />SPECIFIED REQUIREMENTS.
<br />C. PROTECT ADJACENT SURFACES WITH MASKING TAPE OR PROTECTIVE COVERINGS.
<br />A CONDITION DOORS TO AVERAGE HUMIDITY THAT WiLL BE ENCOUNTERED AFTER
<br />WITH THE FIRE -TEST -RESPONSE CHARACTERISTICS INDICATED AS DETERMINED BY
<br />INSTALLATION.
<br />(CONTINUED ON NEXT SHEET)
<br />REVISION$ BY
<br />IV
<br />'n00
<br />U V Cr)
<br />Y04
<br />-3 to
<br />�z7, "
<br />o .8 I` E
<br />= N y
<br />ti
<br />rn Ex
<br />Cates
<br />N
<br />o � . 2
<br />Lu
<br />QZ i
<br />¢ E , . =
<br />.< - o
<br />W co 3
<br />c
<br />r- 3
<br />w ,- 3
<br />o cd ti
<br />.0 b C
<br />v V a
<br />o
<br />I
<br />I
<br />I
<br />mmi
<br />0
<br />• .�1
<br />w
<br />LL�.:Ov o :Q
<br />LL-t J ::! : 0
<br />W
<br />�s��
<br />.
<br />Q
<br />,
<br />o
<br />.,-i N
<br />b
<br />a (v71:
<br />t �
<br />O 0
<br />l a y
<br />.J 1+ r
<br />- )
<br />4)
<br />.r U
<br />a
<br />O
<br />'-i
<br />i
<br />O
<br />4-
<br />.0
<br />O L �
<br />}O p L
<br />p - m O Li
<br />C Z 3
<br />4) O .- w
<br />m Y m i �
<br />>. C
<br />0 m v
<br />t 0 N
<br />x N O
<br />W v- 0
<br />i t0 C
<br />O d.
<br />.0
<br />C
<br />Date: 07. 26. 22
<br />Scale: AS NOTED
<br />Project Mgr: JDR
<br />Drawn: JDR
<br />Job: 21-202
<br />Sheet
<br />N4