WW :1�11�LI4111111�I1i1W4�r. - --
<br />SECTION 08 5100
<br />CLEANING METHOD TO REQUIREMENTS OF ASTM 04258.
<br />C. JOINT SEALER: SPECIFIED iN SECTION 01 9200.
<br />F. APPLY COATINGS TO UNIFORM APPEARANCE WITHOUT LAPS, SAGS, CURTAINS,
<br />22 ACCESSORIES
<br />ACOUSTICAL CEILINGS
<br />C. TEST SUBSTRATE FOR MOISTURE CONTENT TO ASTM FlObSt DO NOT INSTALL
<br />D. PATCHING COMPOUND: WHITE LATEX TYPE.
<br />HOLIDAYS, AND BRUSH MARKS.
<br />A. FASTENERS: STAINLESS STEEL WHERE EXPOSED, HOT DIP GALVANIZED WHERE
<br />(CONTINUED)
<br />FLOORING UNTIL MOISTURE EMISSION LEVEL IS ACCEPTABLE TO FLOORING
<br />G. ALLOW APPLIED COATS TO DRY BEFORE NEXT COAT IS APPLIED.
<br />CONGEALED( TYPE BEST SUITED TO SUBSTRATE CONDITIONS.
<br />22 MATERIALS
<br />MANUFACTURER
<br />PART 3 EXECUTION
<br />H. WHEN REQUIRED ON DEEP AND BRIGHT COLORS APPLY AN ADDITIONAL FINISH
<br />23 FABRICATION
<br />A SUSPENSION GRID SYSTEM:
<br />D, APPLY PRIMER TO SUBSTRATE SURFACES.
<br />3.1 PREPARATION
<br />COAT TO ENSURE COLOR CONSISTENCY.
<br />A PROVIDE HANGERS, ADAPTERS, ANCHOR PLATES, AND ACCESSORIES REQUIRED
<br />33INSTALLATION
<br />I. CONTINUE PAINT FINISHES BEHIND WALL -MOUNTED ACCESSORIES,
<br />FOR INSTALLATION.
<br />1. GRID TYPE: EXPOSED T.
<br />A. INSTALL COVE STRIP AT FLOOR TO WALL JUNCTION.
<br />A. PREPARE SUBSTRATE RECEIVE PANELS:
<br />J. SAND BETWEEN COATS ON INTERIOR WOOD AND METAL SURFACES.
<br />2. MATERIAL: GALVANIZED STEEL.UC
<br />B. APPLY FLOORING IN ACCORDANCE WITH MANUFACTURER'S INSTRTIONS TO
<br />I. REMOVE HIGH SPOTS.
<br />.
<br />K MATCH FINAL COAT TO APPROVED COLOR SAMPLES.
<br />PART 3 EXECUTION
<br />3. RUNNERS: 1-1/2 INCHES HIGH, 15/16 INCH EXPOSED WIDTH, FLUSH SLOTTED
<br />MINIMUM THICKNESS OF 1/4 INCH.
<br />2. FILL LOW SPOTS WITH PATCHING COMPOUNDt SAND SMOOTH.
<br />L. WHERE CLEAR FINISHES ARE SPECIFIED, TINT FILLERS TO MATCH WOOD. WORK
<br />3.1 INSTALLATION
<br />PROFILE.
<br />C. APPLY FIRST COAT OF BINDER RESIN AND ALLOW TO DRY.
<br />3. REMOVE LOOSE AND FOREIGN MATTER THAT COULD IMPAIR ADHESION.
<br />FILLERS INTO GRAIN BEFORE SET. WIPE EXCESS FROM SURFACE.
<br />A INSTALL IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
<br />4. PERIMETER MOLDING: ANGLE SHAPE.
<br />D. WHILE BINDER IS STILL WET, UNIFORMLY BROADCAST AGG�GATE OVER WET
<br />32 INSTALLATION
<br />M. PRIME CONGEALED SURFACES OF EXTERIOR WOOD AND INTERIOR WOOD iN
<br />B. SET PLUMB, LEVEL, SQUARE, AND RIGID.
<br />5. FINISH: FACTORY APPLIED ENAMEL PAINT, SPRAYED AND BAKED, WHITE.
<br />BINDER
<br />A. INSTALL IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
<br />CONTACT WITH MASONRY OR CEMENTITIOUS MATERiALSIb WITH ONE COAT PRIMER
<br />6. ACCESSORIES: STABILIZER BARS, CLIPS AND SPLICES.
<br />E. AFTER FIRST COAT HAS CURED, APPLY SECOND COAT USING SAME TECHNIQUES AS
<br />B. INSTALL TRiM:
<br />PAINT.
<br />G. INSTALL WIRING BETWEEN POUTER SUPPLY AND ACCESSORIES.
<br />FIRST COAT.
<br />1. PANEL -TO -PANEL JOINTS: DIVISION BAR
<br />N. MECHANICAL AND ELECTRICAL COMPONENTS:
<br />32 SCHEDULE
<br />B. ACOUSTICAL PANELS (PUBLIC AREAS) :
<br />F. FINISH TO SMOOTH LEVEL SURFACE.
<br />2. INTERNAL AND EXTERNAL GO1.NtERS.
<br />1. PAINT FACTORY PRIMED EQUIPMENT.
<br />A BATHROOM HARDWARE (SEE NATIONAL ACCOUNT SOURCE INFO FOR PACKAGE
<br />1. SIZE: 24 X 24 INCHES X 3/4 INCH THICK
<br />G. AFTER SECOND COAT HAS CURED, APPLY TOP COAT.
<br />3. EXPOSED EDGES: J MOLDING.
<br />2. REMOVE UNFINISHED AND PRIMED LOUVERS, GRILLES, COVERS, AND ACCESS
<br />ORDERING INFORMATION)
<br />2. EDGE CONFIGURATION: BEVELED.
<br />H. COVE FLOORING At VERTICAL SURFACES t0 A HEIGHT OF 6 INCHES.
<br />4. SECURE TO SUBSTRATE.
<br />PANELS( PAINT SEPARATELY.
<br />FE
<br />RER t0 RES'TROOI'1 EQUIPMENTS SCHEDULE ON SHEET.
<br />3. PERFORMANCE REQUIREMENTS: TESTED IN ACCORDANCE WITH ASTM E1264.
<br />3APROTECTION
<br />C. CUT PANELS TO FIT AT PERIMETER AND AROUND PENETRATIONS. ENSURE THAT TRIM
<br />3. PAINT EXPOSED AND INSULATED PIPES, CONDUIT, BOXES, DUCTS, HANGERS,
<br />BRACKETS, COLLARS, AND SUPPORTS UNLESS FACTORY FINISHED.
<br />B. KITCHEN AND STORAGE HARDWARE
<br />a. NRG: 055.
<br />A PROW151T TRAFFIC ON FLOOR FINISH FOR 48 HOURS AFTER INSTALLATION.
<br />WiLL COMPLETELY COVER CUT EDGES.
<br />b. GAG: 35.
<br />B. BARRICADE AREA TO PROTECT FLOORING UNTIL CURED.
<br />D. MAINTAIN 1/8 TO 3/16 INCH EXPANSION SPACE AT PERIMETER AND AROUND
<br />4, DO NOT PAINT NAME TAGS OR IDENTIFYING MARKINGS.
<br />REFER to KITCHEN EQUIPMENTS SCHEDULE ON SHEET.
<br />c. LIGHT REFLECTANCE: LR-0.85.
<br />PENETRATIONS.
<br />5. PAINT EXPOSED CONDUIT AND ELECTRICAL EQUIPMENT IN FINISHED AREAS.
<br />E. ADHERE PANELS TO SUBSTRATE WITH FULL BED OF ADHESIVE•
<br />6. PAINT DUCT WORK BEHIND LOUVERS, GRILLS, AND DIFFUSERS FLAT BLACK TO
<br />C. ACOUSTICAL PANELS (KITCHEN, SERVICE LINE AND FOOD AREAS);
<br />SECTION OS1200
<br />F. INSTALL CONTINUOUS BEAD OF JOiNT SEALER BETWEEN PANELS AND TRIM AND
<br />MINIMUM OF 18 INCHES OR BEYOND SIGHT LiNE.
<br />SECTION 10 1313
<br />BETWEEN TRIM AND ADJACENT CONSTRUCTION.
<br />O. DO NOT PANT:
<br />FABRIC AWNINGS
<br />i. SIZE: 24 X 48 INCHES X 5/8 INCH THICK
<br />WALL COVERINGS
<br />1. SURFACES INDICATED ON DRAWINGS OR SPECIFIED TO BE UNPAINTED OR
<br />PART I GENERAL
<br />2. EDGE CONFIGURATION: SQUARE.
<br />PART 1 GENERAL
<br />UNFINISHED.
<br />iJ SUMMARY
<br />3. PERFORMANCE REQUIREMENTS: TESTED IN ACCORDANCE WITH ASTM E1264.
<br />1.1 SUMMARY
<br />SECTION 09 9100
<br />2. SURFACES WITH FACTORY APPLIED FINISH COAT OR INTEGRAL FINISH.
<br />A. SECTION INCLUDES:
<br />a. NRC: NIA
<br />A SECTION INCLUDES:
<br />PAINTING
<br />3. ARCHITECTURAL METALS, INCLUDING BRASS, BRONZE, STAINLESS STEEL, AND
<br />1, ALUMINUM FRAMED FABRIC AWNINGS.
<br />D. RECYCLED CONTENT:
<br />1. VINYL WALL COVERINGS.
<br />CHROME PLATING.
<br />i. CEILING TILES CONTAIN 23% - 55% RECYCLED CONTENT.
<br />12 SUBMITTALS
<br />PART 1 GENERAL
<br />3AADJUST(NG
<br />12 SYSTEM DESCRIPTION
<br />2. SUSPENSION SYSTEMS CONTAIN 30% RECYCLED CONTENT - 23%
<br />A SUSTAINABLE DESIGN SUBMITTALS:
<br />1.1 SUMMARY
<br />A. TOUCH UP OR REFINISH DISFIGURED SURFACES,
<br />A DESIGN REQUIREMENTS: DESIGN AWNINGS WITHSTAND:
<br />POST -CONSUMER, 1%PRE-CONSUMER
<br />1. RECYCLED CONTENT.
<br />A. SECTION( INCLUDES:
<br />35GLEANiNG
<br />I, LiVE AND DEAD LOADS IN ACCORDANCC E WiTH ASCE1 AND/OR APPLICABLE
<br />23 ACCESSORIES
<br />2. REGIONAL MATERIALS.
<br />i. TEXTURING OF GYPSUM BOARD.
<br />A. REMOVE PANT FROM ADJACENT SURFACES.
<br />BUILDING CODE.
<br />A SUPPORT CHANNELS: GALVANIZED STEELt SIZE AND TYPE TO SUiT APPLICATION
<br />3. LOW -EMITTING MATERIALS.
<br />2, SURFACE PREPARATION AND FIELD APPLICATION OF PAINTS.
<br />31b NEW BUILDING -EXTERIOR FINISH SCHEDULE
<br />2. MOVEMENT CAUSED BY AN AMBIENT TEMPERATURE RANGE OF 120 DEGREES F
<br />AND A SURFACE TEMPERATURE RANGE OF 160 DEGREES F.
<br />B. HANGER WIRE:
<br />13 QUALITY ASSURANCE
<br />12 SUBMITTALS
<br />A DOORS AND TRIM
<br />13 SUBMITTALS
<br />i. ASTM A641, MINIMUM 12 GAGE GALVANIZED STEEL.
<br />A INSTALLER QUALIFICATIONS: MINIMUM 5 YEARS' EXPERIENCE IN WORK OF THIS
<br />A SUSTAINABLE DESIGN SUBMITTALS:
<br />1. BACK DOOR
<br />A SUSTAINABLE DESIGN SUBMITTALS:
<br />C. TOUCH-UP PAINT: COLOR TO MATCH ACOUSTICAL PANELS AND SUSPENSION GRID.
<br />SECTION,
<br />1. REGIONAL MATERIALS.
<br />GALVANIZED IRON, NEW
<br />1. RECYCLED CONTENT.
<br />1.4 DELIVERY, STORAGE AND HANDLING
<br />2. LOW -EMITTING MATERIALS.
<br />PRIMER PRO INDUSTRIAL PRO-GRYL MVERSAL PRIMER 866-310 SERIES,
<br />2. REGIONAL MATERIALS.
<br />PART 3 EXECUTION
<br />A. STORE MATERIALS IN GLEAN, DRY STORAGE AREA AT MINIMUM 40 DEGREES F AND
<br />13 DELIVERY, STORAGE AND HANDLING
<br />�100 G/L VOC
<br />1.4 QUALITY ASSURANCE
<br />3.1 INSTALLATION
<br />NORMAL HUMIDITY.
<br />A PAINT MATERIALS: STORE AT AMBIENT TEMPERATURE FROM 45 TO W DEGREES F
<br />IST COAT: PRO INDUSTRIAL ZERO VOC ACRYLIC SEMI -GLOSS, B66-650 SERIES,
<br />A, FABRICATOR AND INSTALLER QUALIFICATIONS: MINIMUM 3 YEARS DOCIA11ENTED
<br />A. INSTALL CEILINGS IN ACCORDANCE WITH ASTM G636 AND GtSCA HANDBOOIr..
<br />B. DO NOT STORE ROLLS IN UPRIGHT POSITION.
<br />IN VENTILATED AREA, OR AS REQUIRED BY MANUFACTURER'S INSTRUCTIONS.
<br />0 G/L VOC
<br />EXPERIENCE IN WORK OF THIS SECTION.
<br />B. MINIMIZE PANELS LESS THAN ONE HALF SIZE.
<br />15 PROJECT CONDITIONS
<br />1.4 PROJECT CONDITIONS
<br />2ND COAT: PRO INDUSTRIAL ZERO VOC ACRYLIC SEMI -GLOSS, 566-650 SERIES,
<br />15 WARRANTIES
<br />AN
<br />C. INSTALL MOLDING AROUND PERIMETERS AND ABUTTING SURFACES. MITER MOLDING
<br />A- MAINTAIN MINIMUM TEMPERATURE OF 50 DEGREES F IN AREAS TO RECEIVE WALL
<br />COVERING FOR THREE DAYS PRIOR TO, DURING, AND AFTER INSTALLATION.
<br />A. DO NOT APPLY MATERIALS WHEN SURFACE AND AMBIENT TEMPERATURES OR
<br />RELATIVE HUMIDITY ARE OUTSIDE RANGES REQUIRED BY PAINT MANUFACTURER
<br />0 G/L VOC
<br />2. ALUMINUM TRIM
<br />A PROVIDE MANUFACTURER'S WARRANTY (SEE NATIONAL ACCOUNTS) PROVIDING
<br />At EXTERIOR GORNERSt CUT FLANGES AND BEND WEB 70 FORM INTERIOR
<br />COVERAGE AGAINST FADING AND LOSS OF STRENGTH DUE TO EXPOSURE TO
<br />FRS,
<br />Ib MAINTENANCE
<br />B. MAINTAIN AMBIENT AND SUBSTRATE TEMPERATURES ABOVE MANUFACTURER'S
<br />PRIME COAT: S-W DTM WASH PRIMER 511Y1 (3A MILS. WET, 0.1 MILS. DRY)
<br />ULTRAVIOLET, MILDEW, AND ATMOSPHERIC CHEMICALS.
<br />D. SPACE HANGER WIRES MAXIMUM 48 INCHES ON CENTER INSTALL ADDITIONAL
<br />A EXTRA MATERIALS: 5 PERCENT OF EACH COLOR AND PATTERN.
<br />MINIMUM REQUIREMENTS FOR 24 HOURS BEFORE, DURING AND AFTER PAINT
<br />APPLICATION.
<br />IST COAT: PRO INDUSTRIAL ZERO VOC ACRYLIC SEMI -GLOSS, 866-650 SERIES
<br />HANGERS WHERE REQUIRED 70 SUPPORT LIGHT FIXTURES AND CEILING
<br />C. DO NOT APPLY MATERIALS WHEN RELATIVE HUMIDITY IS ABOVE 85 PERCENT OR
<br />0 G/L VOC
<br />PART 2 PRODUCTS
<br />SUPPORTED EQUIPMENT.
<br />PART 2 PRODUCTS
<br />WHEN DEW POINT IS LESS THAN 5 DEGREES F DIFFERENT THAN AMBIENT OR
<br />2ND COAT: PRO INDUSTRIAL ZERO VOC ACRYLIC SEMI -GLOSS 566-650 SERIES
<br />2.1 MANUFACTURERS
<br />E. DO N07 SUSPEND HANGERS DIRECTLY FROM METAL DECK ATTACH STEEL
<br />2J MANUFACTURERS
<br />SURFACE TEMPERATURE.
<br />0 G/L VOC
<br />A. ACCEPTABLE MANUFACTURERS - FABRIC:
<br />CHANNEL HORIZONTALLY TO ADJACENT FRAMING MEMBERS( PLACE HANGER AT
<br />REGULAR SPAGIW-s.
<br />A ACCEPTABLE MANUFACTURERS:
<br />D. PROVIDE LIGHTING LEVEL OF 30 FOOTCANDLES AT SUBSTRATE SURFACE.
<br />3.1 NEW BUILDING -INTERIOR FINISH SCHEDULE
<br />1. ARLON CORPORATION (WWW.ARL ON COM)
<br />F. HANG SUSPENSION SYSTEM INDEPENDENT OF WALLS, COLUMNS, DUCTS, PIPES, AND
<br />i. DL COUCH (HTTP://WIUI.OLCOUCH.COM/)
<br />15 MAINTENANCE
<br />A DOORS AND TRIM
<br />GALVANIZED IRON, NEW
<br />2. 3M (IWJW.3M.COM)
<br />CONDUIT.
<br />2. WOLF GORDON(HTTP:/AUWW.WOLFGORDON.COMNIALLCOVERING.HTML)
<br />A EXTRA MATERIALS: I GALLON OF EACH COLOR AND SHEEN.
<br />B. SUBSTITUTIONS: NOT PER!"1fTTED.
<br />SEMI -GLOSS FINISH
<br />G. WHERE DUCTS OR OTHER EQUIPMENT PREVENT REGULAR SPACING OF HANGERS:
<br />B. SUBSTITUTIONS: NOT PERMITTED.
<br />PRIMER PRO INDUSTRIAL PRO-GRYL UNIVERSAL PRIMER 566-310 SERIES,
<br />22 MATERIALS
<br />1. REINFORCE NEAREST RELATED HANGERS TO SPAN EXTRA DISTANCE, OR
<br />22 MATERIALS
<br />PART 2 PRODUCTS
<br />V00 G/L VOC
<br />A. FABRIC:
<br />2. SUSPEND STEEL CHANNEL HORIZONTALLY BENEATH DUCT OR EQUIPMENT'
<br />A VINYL WALL COVERING:
<br />2J MANUFACTURERS
<br />IST COAT: PRO INDUSTRIAL ZERO VOC ACRYLIC SEMI -GLOSS, 866-650 SERIES
<br />1. TYPE: SEE NATIONAL ACCOUNTS.
<br />PLACE HANGER AT REGULAR SPACING.
<br />1. MANUFACTURER SEE SECTION 2.1,
<br />A ACCEPTABLE MANUFACTURERS:
<br />0 G/L VOC
<br />2. FIRE RESISTANT, TESTED TO NFPA 101 UNDER LAIRGE AND SMALL SCALE TESTS.
<br />H. INSTALL MAIN TEES AT MAXIMUM 48 INCHES ON CENTER
<br />2. PATTERN AND COLOR SEE NATIONAL ACCOUNTS SOURCE INFORMATION.
<br />1. SHERWIN WILLIAMS. CWWW.SHEsWIN-WiLLIAMS.COM)
<br />2ND COAT: PRO INDUSTRIAL ZERO VOC ACRYLIC SEMi-GLOSS, 866-650 SERIES
<br />3. COLOR SEE DRAWINGS
<br />1. INSTALL CROSS TEES TO FORM 24 X 48 INCH MODULES. LOCK CROSS TEES 70 MAIN
<br />23 ACCESSORIES
<br />B. SUBSTITUTIONS: NOT PERMITTED.
<br />0 G/L VOC
<br />B FRAt„11NG.
<br />TEES.
<br />SEALER TYPE RECOMMENDED BY WALL COVERING MANUFACTURER
<br />22 MATERIALS
<br />WOOD, NEW
<br />1. ALUMINUM TUBING, ASTM 5221, MINIMUM 0.125 INCH THICK
<br />J. SUPPORT ENDS OF TEES ON FLANGE OF PERIMETER MOLDING.
<br />B_ ADHESIVE:
<br />13.
<br />A. PAINTS:
<br />USE THREE SEALANT GOATS OF SHERWiN WILLIAMS •A68 SERIES WATERBORNE
<br />23 FABRICATION OF FRAMING
<br />K PLACE ACOUSTICAL PANELS WiTH EDGES RESTING FLAT ON SUSPENSION GRID.
<br />i. TYPE RECOMMENDED BY WALL COVERING MANUFAGTURERt WATER BASED,
<br />1. AS SCHEDULED AT END OF SECTION, OR APPROVED SUBSTITUTE.
<br />POLYURETHANE SEMI -GLOSS OR GLOSS
<br />A. SHOP ASSEMBLE IN LARGEST PRACTICAL SIZES FOR SHIPMENT.
<br />L, CUTTING ACOUSTIC UNITS:
<br />MILDEW RESISTANT.
<br />2, FREE FROM ALL FORMS OF LEAD AND MERCURY.
<br />OVER SHERWIN WILLIAMS +SWlBW "BRIGHTON WALNUT" CUSTOM DD STAIN MiX.
<br />B. MAKE BENDS UNIFORM, WITHOUT WRINKLES OR BUCKLES.
<br />i. CUT TO FIT IRREGULAR GRID AND PERIMETER EDGE TRIM AND AROUND
<br />2. MAXIMUM VOLATILE ORGANIC COMPOUND (VOC) CONTENT: 50 GRAMS PER
<br />3. ALL PAINTS USED IN EITHER FOOD PREPARATION, SALES OR STORAGE AREAS
<br />B. WALLS IN SALES AREA (WHERE WALL COVERING IS NOT USED)
<br />G. MITER AND FIT INTERSECTIONS AND CONTINUOUSLY WIELD.
<br />PENETRATIONS
<br />LITER
<br />MUST BE NON -TOXIC TO FOODS.
<br />EG-SHEL FINISH -- LOW ODOR ZERO VOC SYSTEM
<br />2. LOCATE CUTS TO BE CONGEALED.
<br />C. PATCHING COMPOUND: WHITE LATEX TYPE.
<br />23 ACCESSORIES
<br />PRIMER PROMAR 200 ZERO VOC INTERIOR LATEX PRIMER 5280600
<br />i. WELDING to CONFORM TO AWS DIJ.
<br />3. CUT AND FIELD PAINT EXPOSED EDGES OF WEAL EDGE UNITS TO MATCH
<br />A. ACCESSORY MATERIALS: PAINT THINNERS AND OTHER MATERIALS REQUIRED t0
<br />0 G/L VoC
<br />2. GRIND EXPOSED WELDS AND JOINTS FLUSH AND SMOOTH.
<br />FACTORY EDGE
<br />PART 3 EXECUTION
<br />ACHIEVE SPECIFIED FINISHES' COMMERCIAL QUALITY.
<br />IST COAT: PROMAR 200 ZERO VOC EG-SHEL 826-2600 SERIES, 0 G/L VOC
<br />D. LOCATE EXPOSED FASTENERS UNOBTRUSIVELY.
<br />M. INSTALLATION TOLERANCES: CEILINGS LEVEL TO 1/8 INCH IN 12 FEET MEASURED IN
<br />3J PREPARATION
<br />B. PATCHING MATERIALS: LATEX FILLER
<br />2ND COAT. F'ROMAR 200 ZERO VOC EG-SHEL 526-2600 SERIES, 0 G/L VOC
<br />E. PROVIDE ANCHORS AND BRACKETS REQUIRED FOR ATTACHMENT OF FRAMING, OF
<br />ANY DIRECTION.
<br />A PREPARE SUBSTRATE TO RECEIVE WALL COVERING:
<br />C. FASTENER HEAD COVER MATERIALS: LATEX FILLER
<br />C. SOFFITS, CEILINGS AT RESTROOM, DRIVE-THRU, VESTIBULE
<br />SAME MATERIAL AND FINISH AS FRAMING.
<br />32 ADJUSTING2.4
<br />1. REMOVE HIGH SPOTS.
<br />23 MIXES
<br />EG-SHEL FINISH -- LOW ODOR ZERO VOC SYSTEM
<br />FABRICATION OF FABRIC
<br />A. TOUCH UP MINOR SCRATCHES AND ABRASIONS TO MATCH FACTORY FINISH.
<br />2. FILL HOLES, CRACKS, AND DEPRESSIONS WITH PATCHING COMPOUNDt SAND
<br />A. DELIVER PAINTS PRE -MIXED AND PRE -TINTED.
<br />PRIMER: PROMAR 200 ZERO VOC INTERIOR LATEX PRIMER, B28W2600
<br />A. FABRICATE FABRIC t0 BE EASILY REMOVABLE.
<br />0 G/L VOC
<br />B. FABRICATE IN LARGEST PRACTICAL UNITS To MINIMIZE SEAMS.
<br />SMOOTH AND FLUSH.
<br />B. UNIFORMLY MIX TO THOROUGHLY DISPERSE PIGMENTS.
<br />IST COAT: PROMAR 200 ZERO VOC EG-SHEL 826-2600 SERIES, 0 G/L VOC
<br />G. ELECTRONICALLY HEAT SEAL SEAMS.
<br />SECTION 096123
<br />3. REMOVE LOOSE AND FOREIGN MATTER THAT COULD IMPAIR ADHESION.
<br />G. DO NOT THIN IN EXCESS OF MANUFACTURER'S RECOMMENDATIONS.
<br />2ND COAT: PROMAR 200 ZERO VOC EG-SHEL 826-2600 SERIES, 0 G/L VOC
<br />D. REINFORCE CORNERS WITH ADDITIONAL LAYER OF FABRIC.
<br />RESINOUS FLOORING
<br />4. APPLY SEALER AS RECOMMENDED BY WALL COVERING MANUFACTURER.
<br />D. IRE -MIX PAINT DURING APPLICATION' ENSURE COMPLETE DISPERSION OF SETTLED
<br />PIGMENT AND UNIFORMITY OF COLOR AND GLOSS.
<br />38 REMODELING SPECIFICATIONS - EXTERIOR FINISH SCHEDULE (PAINTING OVER
<br />E. PROVIDE STRAIGHT, EVEN SEAMS, WITHOUT WRINKLES, PUCKERS, AND OTHER
<br />B. REMOVE WALL COVERING FROM PACKAGING, PLACE IN INSTALLATION AREA, AND
<br />DEFECTS.
<br />PART 1 GENERAL
<br />ALLOW TO ACCLIMATIZE FOR MINIMUM 24 HOURS PRIOR TO INSTALLATION.
<br />METAL)
<br />1.1 SUMMARY
<br />32 INSTALLATION
<br />PART 2 EXECUTION
<br />A EXTERIOR METAL PANELS (OTAS)
<br />F. PROVIDE GROMMETS FOR FASTENING TO FRAMING At MAXIMUM 6 INCHES ON
<br />A. SECTION INCLUDES:
<br />A INSTALL IN ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS.
<br />IN
<br />3.1 EXAMATION
<br />ALUMINUM, REPAINT- REFER TO SHERWIN WILLIAMS APPLICATION BULLETIN 123
<br />CENTER
<br />25 FINISHESAID
<br />LIQUID APPLIED EPDXY AND AGGREGATE FLOOR FINISH.
<br />B. INSTALL PANELS VERTICALLY.
<br />A TEST SHOP APPLIED PRIMER FOR COMPATIBILITY WITH SUBSEQUENT COATINGS.
<br />121 FOR DETAILED INFORMATION1.
<br />SPOT PRIME: SW PRO-GRYL UNIVERSAL PRIMER AT AREAS WHiC4 HAVE
<br />A ALUMINUM: CHEMICALLY CLEAN AND APPLY MANUFACTURER'S STANDARD
<br />2. DIVIDER STRIPS.
<br />C. DO NOT LOCATE JOINTS WITHIN 6 INCHES OF GORNNERS. HORIZONTAL JOINTS NOT
<br />B. MEASURE MOISTURE CONTENT OF SURFACES USING ELECTRONIC MOISTURE METER
<br />SIGNS OF RUST
<br />POLYESTER POWDER COAT FINISH, SPRAYED AND BAKED, SEE NATIONAL
<br />13 SUBMITTALS
<br />PERMITTED.
<br />DO NOT APPLY COATINGS UNLESS MOISTURE CONTENT OF SURFACES ARE BELOW
<br />GOAT: S-W BOND-PLEX ACRYLIC COATING
<br />ACCOUNT SOURCE INFORMATION FOR COLOR
<br />A QUALITY CONTROL SUBMITTALS:
<br />D. SMOOTH WALL COVERING TO ELIMINATE BUBBLES AND ENSURE ADHESION. REMOVE
<br />FOLLOWING MAXIMUMS:
<br />1. CERTIFICATES OF COMPLIANCE: CERTIFICATION FROM AN INDEPENDENT TESTING
<br />EXCESS ADHESIVE FROM SEAMS IMMEDIATELY.
<br />i. GYPSUM BOARD AND PLASTER 12 PERCENT.
<br />2ND COAT: S-W BOND -PLED ACRYLIC COATING
<br />2ND
<br />PART 3 EXECUTION
<br />LABORATORY THAT FLOORING MEETS FiRE HAZARD CLASSIFICATION
<br />E. USE PANELS IN EXACT ORDER THEY ARE CUT FROM ROLL. REVERSE EVERY OTHER
<br />2. WOOD: 15 PERCENT, MEASURED TO ASTM 04442.
<br />B. BACK DOOR (NEW, REPAINTED OR WEATHERED)
<br />3J INSTALLATION
<br />REQUIREMENTS.
<br />PANEL OF NON -MATCHING PATTERNS.
<br />32 PREPARATION
<br />PRIMER PRO INDUSTRIAL PRO-GRYL UNIVERSAL PRIMER 566-310 SERIES,
<br />B. SUSTAINABLE DESIGN SUBMITTALS:
<br />F. FiLL IN ABOVE AND BELOW OPENINGS WITH PANELS CUT IN CONSECUTIVE ORDER
<br />A GENERAL:
<br />V00 G/L vOC
<br />A INSTALL IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND APPROVED
<br />SHOP DRAWINGS.
<br />1. REGIONAL MATERIALS.
<br />FROM ROLL.
<br />IST COAT: PRO INDUSTRIAL ZERO VOC ACRYLIC SEMI -GLOSS, 566-650 SERIES,
<br />1.4 QUALITY ASSURANCE
<br />G. INSTALL WALL COVERING FREE FROM BUBBLES, WRINKLES, OPEN OR LOOSE SEAMS,
<br />1, PROTECT ADJACENT AND UNDERLYING SURFACES.
<br />0 G/L voC
<br />B. ACCURATELY POSITION FRAMES WITH HORIZONTAL LINES LEVEL, FREE FROM
<br />DISTORTION.
<br />AND OTHER VISIBLE DEFECTS.
<br />2. REMOVE OR MASK ELECTRICAL PLATES, HARDWARE, LIGHT FIXTURE TRIM,
<br />2ND COAT: PRO INDUSTRIAL ZERO VOC ACRYLIC SEMI -GLOSS, 866-650 SERIES,
<br />A INSTALLER QUALIFICATIONS:
<br />ESCUTCHEONS, AND FITTINGS PRIOR TO PREPARING SURFACES OR FINISHING.
<br />0 G/L VOC
<br />C. SECURE IN PLACE USING ANCHORS BEST SUITED To SUBSTRATE.
<br />1. APPROVED BY FLOORING MANUFACTURER
<br />3. CORRECT DEFECTS AND GLEAN SURFACES CAPABLE OF AFFECTING WORK OF
<br />C. EXTERIOR WALLS
<br />D. STRETCH FABRIC TAUT, WITHOUT WRINKLES OR FOLDS, AND ATTACH TO FRAMING.
<br />B. STATIC COEFFICIENT OF FRICTION: MINIMUM 0b0, TESTED TO ASTM C1028 IN DRY
<br />THiS SECTION.
<br />CMU (STANDARD)
<br />32 ADJUSTING
<br />CONDITION!.
<br />SECTION 091133
<br />4. SEAL MARKS THAT MAY BLEED THROUGH SURFACE FINISHES WITH SHELLAC.
<br />IST GOAT: S-W PREPRITE BLOCK FILLER B25UII25 (15-125 SQ FT/GAL)
<br />A. CLEAN AND TOUCH UP SCRATCHES AND ABRASIONS IN FINISH COAT WITH SAME
<br />15 DELIVERY, STORAGE AND HANDLING
<br />SANITARY WALL PANELS
<br />B. IMPERVIOUS SURFACES- REMOVE MILDEW BY SCRUBBING WITH SOLUTION OF
<br />2ND COAL: S-W A-100 EXTERIOR LATEX GLOSS, AS SERIES
<br />FINISH AS ORIGINALLY APPLIED.
<br />A MAINTAIN MINIMUM TEMPERATURE OF 55 DEGREES F IN STORAGE AREA UNLESS
<br />PART i GENERAL
<br />TRISODIUM PHOSPHATE AND BLEACH. RINSE WITH CLEAN WATER AND ALLOW TO
<br />OTHERWISE INSTRUCTED BY MANUFACTURER
<br />1.1 SUMMARY
<br />DRY.
<br />3RO COAT: S-W A-100 EXTERIOR LATEX GLOSS, AS SERIES (4 MILS WET, 1.4 MILS
<br />SECTION 12 2413
<br />B. STORE MATERIALS IN INSTALLATION AREA FOR 3 DAYS PRIOR TO INSTALLATION
<br />A. SECTION INCLUDES:
<br />C. GYPSUM BOARD:
<br />DRY PER COAT)
<br />ROLLER WINDOW SHADES
<br />TO ACHIEVE TEMPERATURE STABILITY.
<br />i, PREFINISHED SANITARY WALL PANELS.
<br />1. FILL MINOR DEFECTS WITH FILLER COMPOUND. SPOT PRIME DEFECTS AFTER
<br />3.S REMODELING SPECIFICATIONS - INTERIOR FINISH SCHEDULE (REFER TO SECTION
<br />1.6 PROJECT CONDITIONS
<br />REPAIR
<br />3* FOR ALL WALLS, SOFFITS, CEILINGS, DOORS AND TRIMS NOT LISTED BELOW)
<br />A MAINTAIN AMBIENT TEMPERATURE REQUIRED BY MANUFACTURER 3 DAYS PRIOR
<br />2. TRIM.
<br />12 SUBMITTALS
<br />D. PLASTER
<br />A DOORS AND TRIMS
<br />PART I GENERAL
<br />TO, DURING, AND FOR 24 HOURS AFTER INSTALLATION OF MATERIALS.
<br />1. FILL HAIRLINE CRACKS, SMALL HOLES, AND IMPERFECTIONS WITH LATEX
<br />WOOD, REPAINT
<br />iJ SUMMARY
<br />B. FRYER AREAS AND RACK WASH AREAS RECEIVE A DIFFERENT STONHARD FINISH
<br />A SUSTAINABLE DESIGN SUBMITTALS:
<br />PATCHING PLASTER FINISH SMOOTH AND FLUSH WiTH ADJACENT SURFACES.
<br />PRIMER HARMONY ZERO VOC WALL PRIMER, 511WI500, 0 G/L VOC
<br />A SECTION INCLUDES -
<br />THAN THE KITCHEN AND OTHER GENERAL FLOORING AREAS - REFER TO NATIONAL
<br />THAN
<br />REGIONAL MATERIALS.
<br />2. WASH AND NEUTRALIZE HIGH ALKALI SURFACES.
<br />IST COAT: PRO INDUSTRIAL ZERO VOC ACRYLIC SEMI -GLOSS, 566-650
<br />1. MANUALLY OPERATED WINDOW SHADES.
<br />ACCOUNT SOURCE INFORMATION FOR COMPLETE DETAILS.
<br />2. LOW -EMITTING MATERIALS.
<br />E. ALUMINUM: SSPC METHOD SPl - SOLVENT CLEANING.
<br />SERIES, 0 G/L vOC
<br />12 SUBMITTALS
<br />1.1 WARRANTIES
<br />13 QUALITY ASSURANCE
<br />F. (UNCOATED FERROUS METALS: SSPC METHOD SP2 -HAND TOOL GLEANING OR
<br />2ND COAT: PRO INDUSTRIAL ZERO VOC ACRYLIC SEMI -GLOSS, 866-650
<br />A SUBMITTALS FOR REVIEW:
<br />A. FURNISH MANUFACTURER'S AND APPLICATOR'S 2 YEAR WARRANTY PROVIDING
<br />A INSTALLER QUALIFICATIONS: MINIMUM 5 YEARS' EXPERIENCE IN WORK OF THIS
<br />METHOD SP3 - POWER TOOL GLEANING.
<br />SERIES' 0 G/L VOC
<br />1. PRODUCT DATA: INDICATE COMPONENTS, MATERIALS, FINISHES, ATTACHMENT,
<br />COVERAGE AGAINST FLOORING DELAMINATION FROM SUBSTRATE AND
<br />SECTION.
<br />G. SHOP PRIMED FERROUS METALS:
<br />AND OPERATION.
<br />DEGRADATION OF SURFACE FINISH.
<br />1.4 PROJECT CONDITIONS
<br />1. SSPC METHOD SP2 -HAND COOL GLEANING OR METHOD SP3 - POUTER TOOL
<br />2. SAMPLES:
<br />A DO NOT INSTALL PRODUCTS IF TEMPERATURE, HUMIDITY, AND VENTILATION
<br />CLEANING.
<br />SECTION 10 2813
<br />a. 12 X 12 INCH SHADE CLOTH SAMPLES IN EACH COLOR
<br />PART 2 PRODUCTS
<br />REQUIREMENTS ARE OUTSIDE LIMITS REC MMENOED BY MANUFACTURER.
<br />2. FEATHER EDGES TO MAKE PATCHES INCONSPICUOUS.
<br />TOILET AND KITCHEN ACCESSORIES
<br />b. SUBMIT WORKING HAND SAMPLE OR MOCK UP SHADE AS REQUIRED.
<br />2J MANUFACTURERS
<br />3. PRIME BARE STEEL SURFACES.
<br />PART I GENERAL
<br />3. WARRANTY: SAMPLE WARRANTY FORM.
<br />A. ACCEPTABLE MANUFACTURERS:
<br />PART 2 PRODUCTS
<br />H. INTERIOR WOOD:
<br />I.i SUMMARY
<br />13 PROJECT CONDITIONS
<br />1. StONHARD, INC. (WWW.STONHARD.COM)
<br />2.1 MANUFACTURERS
<br />i. WIPE OFF DUST AND GRIT.
<br />A SECTION INCLUDES:
<br />A VERIFY DIMENSIONS AT SITE PRIOR TO FABRICATION OF SHADES.
<br />22 MATERIALS
<br />A ACCEPTABLE MANUFACTURERS:
<br />2, SEAL KNOTS, PITCH STREAKS, AND SAPPY SECTIONS WITH SEALER
<br />1, TOILET ACCESSORIES.
<br />13. DO NOT INSTALL SHADES UNTIL PANTING AND FINISHING WORK IS COMPLETE AND
<br />A. RESINOUS FLOORING:
<br />i. CRANE COMPOSITES. (lW!<NILRANECOR'1POSITES.COM)
<br />SITE
<br />CRANEMARLITE. (WWWw1�
<br />3. FILL NAIL HOLES AND CRACKS AFTER PRIMER HAS DRIED& SAND BETWEEN
<br />2. KITCHEN ACCESSORIES
<br />AMBIENT TEMPERATURE AND HUMIDITY CONDITIONS ARE MAINTAINED At
<br />i. BINDER: 1OO PEI�G1°NlT SOLIDS EPDXY, COLORED WITH MINERAL FILLER REFER
<br />2. (U:II►Il .
<br />W - - • -
<br />COATS.
<br />1.2 SUBMITTALS
<br />OCCUPANCY LEVELS.
<br />TO FINISH SCHEDULE FOR COLOR
<br />B. SUBSTITUTIONS: NOT PERMITTED.
<br />I. EXISTING SURFACES:
<br />A SUSTAINABLE DESIGN SUBMITTALS.
<br />2. AGGREGATE: GRADED QUARTZ CHIPS, GRANULAR REFER to FINISH SCHEDULE
<br />22 MATERIALS
<br />1. REMOVE LOOSE, FLAKING, POWDERY, AND PEELING PAINTS.
<br />I. RECYCLED CONTENT.
<br />PART 2 PRODUCTS
<br />FOR COLOR
<br />3. TOP COAT: EPDXY, ALIPHATIC POLYURETHANE, CLEAR
<br />A. SANITARY WALL PANELS:
<br />2. LIGHTLY SAND GLOSSY PAINTED SURFACES.
<br />2. REGIONAL MATERIALS.
<br />2J MANUFACTURERS
<br />23 ACCESSORIES
<br />1. TYPE: GLASS FIBER REINFORCED PLASTIC, USDA APPROVED FOR INCIDENTAL
<br />3. FILL HOLES, CRACKS, DEPRESSIONS AND OTHER IMPERFECTIONS WITH PATCHING
<br />13 QUALITY ASSURANCE
<br />A. ACCEPTABLE MANUFACTURERS:
<br />A. COVE STRIPS: METAL AS RECOMMENDED BY FLOORING MANUFACTURER
<br />FOOD CONTACT.
<br />2. SIZE: 3/32 INCH THICK X 48 INCHES WIDE X MAXIMUM PRACTICAL LENGTH.
<br />COMPOUND& SAND FLUSH WITH SURFACE.
<br />4. REMOVE OIL, GREASE, AND WAX BY SCRAPING( SOLVENT WASH AND
<br />A CONFORM TO APPLICABLE ACCESSIBILITY CODE FOR LOCATING ACCESSORIES.
<br />1. INC.
<br />B. SUBFLOOR FILLER WHITE, PREMIXED, LATEX BASED, TYPE RECOMMENDED BY
<br />3. COLOR AS INDICATED ON DRAWINGS
<br />THOROUGHLY RINSE.
<br />IA WARRANTIES
<br />2. RROLL- A -SHADE (WWWUZOLLASHADECOM)
<br />ROLL-
<br />FLOORING MATERIAL MANUFACTURER
<br />B. SUBSTITUTIONS: NOT PERMITTED.
<br />4. SURFACE TEXTURE: LOW GLOSS, PEBBLED.
<br />5. REMOVE RUST BY WIRE BRUSHING t0 EXPOSE BASE METAL.
<br />C. PRIMERS, ADHESIVES, AND SEALERS: TYPES RECOMMENDED BY FLOORING
<br />33AFIPLICATION
<br />PART 2 PRODUCTS
<br />R MANUFACTURE
<br />23ACCESSORIES
<br />2.1 MANUFACTURERS
<br />(CONTINUED ON NEXT SHEET)
<br />A TRIM:
<br />A APPLY PAINTS IN ACCORDANCE WITH MPI PAINTING MANUAL, PREMIUM GRADE
<br />PART 3 EXECUTION
<br />I. ONE PIECE EXTRUDED PVC, MANUFACTURER'S STANDARD PROFILE.
<br />FINISH REQUIREMENTS.
<br />A ACCEPTABLE MANUFACTURERS-
<br />2. INSIDE AND OUTSIDE CORNERS, DIVISION BAR, AND J-MOLDING.
<br />B. APPLY PRIMER OR FIRST COAT CLOSELY FOLLOWING SURFACE PREPARATION TO
<br />1. AMERICAN SPECIALTIES, INC. (WLI AMERICANSPEC_IA TIESCOM)
<br />3.1 EXAMINATION
<br />PREVENT RECONTAMINATION.
<br />uu>I a asnr3RlPx
<br />2. 505RICK WASHROOM EQUIPMENT, INC. (WWW.5OBR.- COM)
<br />A VERIFY THAT CONCRETE FLOORS HAVE CURED A MINIMUM 28 DAYS AND DO NOT
<br />3. COLOR TO MATCH PANELS.
<br />C. DO NOT APPLY FINISHES TO SURFACES THAT ARE NOT DRY.
<br />3. KIMBERLY-CLAAK PROFESSIONAL (WWWJ<CPROFESSIONALZOMB
<br />EXHIBIT NEGATIVE ALKALINITY, CARBONIZATION, OR DUSTING.
<br />B. ADHESIVE:
<br />D, APPLY COATINGS TO MINIMUM DRY FILM THICKNESS RECOMMENDED BY
<br />4. KAY CHEMICAL COMPANY (UWIW.ECOLAB.GOM)
<br />32 PREPARATION
<br />I. COMPATIBLE WITH PANELS AND SUBSTRATE' RECOMMENDED BY PANEL
<br />MANUFACTURER
<br />A REMOVE SU3FLOOR RIDGES AND BUMPS. FILL LOW SPOTS, CRACKS, JOINTS, HOLES,
<br />MANUFACTURER
<br />E. APPLY EACH COAT OF PAINT SLIGHTLY DARKER THAN PRECEDING COAT UNLESS
<br />5. EXCEL DRYER INC. (Q)WEXCEL DR1-Er.+r- M
<br />AND OTHER DEFECTS WITH FILLER
<br />2. MAXIMUM VOLATILE ORGANIC COMPOUND (VOC) CONTENT: 10 GRAMS PER
<br />SPECIFIED OTHERWISE.
<br />6. PROCTOR AND GAMBLE (WWW.PG.COM)
<br />B. PREPARE CONCRETE SUBSTRATES TO RECEIVE FLOORING SYSTEM BY BROOM
<br />LITER
<br />B. SUBSTITUTIONS: NOT PERMITTED.
<br />:Iaj�Z'A e 1
<br />v
<br />00
<br />� Cn
<br />M N
<br />V J COD
<br />o F
<br />0•2� E
<br />CO 0N y
<br />N N
<br />a, [�
<br />o U
<br />O U • cm.�
<br />Q E N~
<br />0 � r-
<br />'Ei c
<br />5 0
<br />v `r 0.
<br />� o
<br />Q`OJ
<br />0.1
<br />ii:
<br />I
<br />�,
<br />CD
<br />'LL
<br />O d
<br />Q
<br />Q
<br />N
<br />0
<br />0
<br />- Q
<br />a
<br />O
<br />"7
<br />.0
<br />c
<br />"
<br />>>
<br />O
<br />0
<br />Z
<br />m
<br />y
<br />FA.0
<br />Cy.
<br />m°
<br />.�
<br />C
<br />L
<br />o
<br />v
<br />�
<br />a
<br />o
<br />t
<br />Q
<br />W
<br />N
<br />0
<br />to
<br />O
<br />CL
<br />L
<br />m
<br />C
<br />Date: 07. 26. 22
<br />Scale: AS NOTED
<br />Project Mgr. JDR
<br />Drawn: JDR
<br />Job: 21-202
<br />Sheet
<br />N6
<br />
|