N
<br />m
<br />s
<br />a
<br />O�
<br />N
<br />N
<br />c
<br />E
<br />E
<br />STAINL� '
<br />CLAMP.
<br />PATE PI
<br />ALUM. B
<br />FLANGE
<br />MA5T1C
<br />DECK M
<br />MASTIC
<br />DECK IN
<br />ROOF D
<br />PIPE ROOF PENETRATION DETAIL
<br />SCALE: NONE
<br />3/4" TO AND
<br />FROM HW-I
<br />WATER HAMMER ARRESTOR,
<br />P.P.P. 5G SERIE5, PD.I. REF.
<br />AS INDICATED. 'A'
<br />'A'
<br />� \I
<br />3/4" i I GTX
<br />� � P
<br />116
<br />PATE PVG
<br />STEPPED
<br />PVC BOOT.
<br />BASE
<br />FLA5HIN6
<br />PIPE
<br />1 \ In" DRAIN DOWN
<br />I AN \ \ FROM TRAP RIMER
<br />\ VALVE - TYPICAL.
<br />3» \
<br />fiD.l \ \,Wl-'X' - 4'
<br />JANITOR'S \
<br />CLOSET \
<br />116 \
<br />�'AN `
<br />\
<br />\
<br />\
<br />WIND DATA
<br />II
<br />DESIGN OF MECHANICAL, ELECTRICAL AND PLUMBING EQUIPMENT RESTRAINT
<br />SYSTEMS FOR WIND FORCES SPECIFIC FOR THIS PROJECT LOCATION SHALL BE BY
<br />CODED NOTES: O
<br />MASON INDUSTRIES, INC. OR EQUAL MANUFACTURER AND AS REQUIRED FOR ALL
<br />I I
<br />APPLICABLE CODES.
<br />I.
<br />5WT OFF VALVE - TYPICAL 3/4"
<br />LAVATORY / LOCKER
<br />SHUT
<br />OFF VALVE
<br />2.
<br />CHECK VALVE - TYPICAL HW
<br />ROOM SINK - DOES
<br />NOT REFLECT ACTUAL
<br />WIND BASE SPEED = 130 MPH
<br />3.
<br />EXPANSION TANK AMTROL
<br />FIXTURE
<br />R15E OFF TOP TO
<br />NO. 5T-5 WITH UNION "
<br />MINIMIZE FOREIGN
<br />CONNECTION. 3/4 —
<br />MATERIAL FROM
<br />ENTERING TRAP
<br />GOLD WATER SUPPLY
<br />4.
<br />DIELECTRIC UNION - TYPICAL I
<br />TEMPERED HW SUPPLY
<br />PRIMER.
<br />II
<br />5.
<br />10
<br />WATER HEATER 2
<br />GW SUPPLY
<br />-�
<br />L-7------
<br />3/4" 3
<br />-�-� -------- ----
<br />6.
<br />2" DEEP GALVANIZED STEEL
<br />THERMOSTATIC TEMPERING
<br />----------------------- ----------------
<br />DRAIN PAN WITH SOLDERED 4
<br />VALVE, PONER5
<br />SEAMS AND TWO GOATS OF 1
<br />HYDRO6UARD 5MIE5
<br />RUST INHIBITED PAINT.
<br />5
<br />LM4g5, ASSE 1010
<br />1.
<br />T 4 P RELIEF VALVE WATT5
<br />NO. IOOXL-4-125.
<br />HW SUPPLY ° °
<br />TPV TRAP PRIMER VALVE WITH
<br />8.
<br />PIPE RELIEF DRAIN FULL
<br />I INTEGRAL VACUUM BREAKER.
<br />SIZE JANITOR'S SINK WITH
<br />PRECISION PLUMBING PRODUCTS
<br />2" AIR GAP
<br />STOP VALVE
<br />ORE60N #1. LOCATE ABOVE
<br />b
<br />FIN15H FLOOR
<br />AGGE561BLE GEILIN6.
<br />q.
<br />MOUNT ON I/4' STEEL
<br />EXTEND In' GW BACK INTO
<br />WALL WITH CHROME PLATED
<br />C EGKERED PLATE WITH q
<br />ESCUTCHEONS AND ROUTE
<br />2-In" x 2-I/2' x In' ANGLE
<br />NOTE:
<br />BELOW FLOOR TO DRAIN TRAPS
<br />IRON BRACKETS.
<br />AS INDICATED ON PLANS.
<br />10.
<br />HEAT TRAP A5 REQUIRED BY
<br />A. INSULATE ALL EXP05ED WASTE AND
<br />LOCAL AUTHORITIES.
<br />SUPPLY PIPING UNDER LAVATORIES WITH
<br />THE HANDI-LAV GUARD INSULATION KIT BY
<br />II.
<br />RECIRCULATION PUMP, BY
<br />TRUE13RO OR EQUAL.
<br />P.G.
<br />WATER HEATER PIPING DIAGRAM
<br />SCALE: NONE
<br />RECIRCULATING
<br />PUMP, PP-1
<br />` 3/4'
<br />TRAP PRIMER
<br />VALVE. 3/4" •
<br />2' IN JOIST`
<br />SPACE
<br />.`
<br />LAVATORY / LOCKER ROOM SINK
<br />TEMPERING VALVE DETAIL
<br />SCALE: NOW
<br />I ��I
<br />I-In"� i •
<br />I �>
<br />.� � I -In• I � i
<br />LOCKER
<br />ROOM
<br />109
<br />clo'
<br />.11, \ 4» 2 1-1/2' 1-In„
<br />I 3' 11 �.14" VTR
<br />I 1-In' I I `>` I` "�F
<br />' 4" I yi I
<br />CO.� 4'
<br />4 WOMEN'S I 2'
<br />S "I GTX I 3' 2» P' RESTROOM
<br />3" / 12. 2' 114 I
<br />4" MEN'S 1
<br />RESTROOM 1 4" p,
<br />,X - 4' 5 j 1 1-In° SAN
<br />GTX Y' ( �
<br />i „G-I� 4
<br />sqH 11»
<br />TOILET
<br />HALL
<br />�J' 111
<br />/
<br />/
<br />/
<br />/
<br />SANITARY STACK DIAGRAM
<br />SCALE: NONE
<br />,A, ,A, LOCKER
<br />ROOM
<br />I in" F109
<br />TEMPERING VALVE
<br />UNDER SINK,
<br />In" REFER TO DETAIL
<br />ON THIS DRAWING
<br />I-1/4' ( In. 1-1/2"
<br />,A, �A' 3/4'
<br />,A, I-I/4' P'
<br />,A, p, 3/4" 1-In
<br />1/22 I» In" /
<br />In'
<br />TEMPERING VALVE �/ 'A'
<br />UNDER LAV. - TYP. I 3/41 0000 1-In'
<br />�5 DRAWING P I v� In' TO DETAIL I P- 3/4" A
<br />P ( // WOMEN'S
<br />ME P I RESTROOM RESTROOM 115 P.3 1 In. 114 i
<br />,A, 3
<br />/ p,l
<br />SHUT-OFF VALVE INSTALL IN
<br />» I AGGES51BLE GEILING SPACE,
<br />SLOAN MOLL VBF-12-A In PROVIDE AGGE55 PANELS A5
<br />FLUSH VALVE TRAP PRIMER, REQUIRED - TYP.
<br />WITH In" DRAIN TO FLOOR 11{
<br />DRAIN, TYPICAL OF 2.
<br />IN GEILING TOILET
<br />.E HALL
<br />111
<br />H & CW PIPING DIAGRAM
<br />SCALE: NOW
<br />TRAP PRIMER VALVE DETAIL
<br />SCALE: NOW
<br />G0NDEN5ATE PIPING
<br />RECOMMENDED SUPPORT 5PAGIN62
<br />FOR SCHEDULE 40 PIPE
<br />PIPE 51ZE
<br />015TAZE BETVEEN
<br />(IN)
<br />SUPPORTS (FT)
<br />In-1
<br />5
<br />1-1/4 -1-1/2
<br />6
<br />2
<br />6-1n
<br />3
<br />l-In
<br />4
<br />8
<br />6
<br />q-1/2
<br />8
<br />10
<br />NATURAL GA5 PIPING
<br />RECOMMENDED 9PPORT 5PAGIN6
<br />FOR BLACK STEEL PIPE
<br />PIPE 51ZE
<br />D15TANGE BETWEEN
<br />(IN)
<br />SUPPORTS (FT)
<br />1/2
<br />6
<br />3/4-1
<br />8
<br />1-1/4 TO 2-In
<br />10
<br />3 d LARGER
<br />12
<br />ROOF PIPE SUPPORT AS MANUFACTURED BY MIRO
<br />INU6TRIE5, "PILLOW BLOCK" PIPE 5TAND. MODEL #3-R
<br />STAND WILL AGGOMODATE PIPE UP TO 3" IN DIAMETER:
<br />MODEL #4-RAH, ROLLER TYPE, FOR SIZES TO 4".
<br />MODEL #b-RAH FOR PIPES UP TO b" DIAMETER. FOR
<br />INFO: 1-800-1b8-bgl8.
<br />PIPE CLAMP, CONNECT TO
<br />SUPPORT WITH In' x 10
<br />5TAINLE55 STEEL SCREWS,
<br />OVER51ZE CLAMP TO ALU
<br />PIPE TO EXPAND AND GON
<br />6A5 PIPE, PAINT WITH TWO
<br />OF RUST INHIBITING PAINT.
<br />NYLON FRICTION A55ORBII
<br />ROLLER.
<br />PROVIDE EXTRA LAYER Ol
<br />ROOFING MATERIAL BELOP
<br />SUPPORT.
<br />ROOF PIPE SUPPORT DETAIL
<br />SCALE: NONE
<br />2-1/2' ON UNION - �'
<br />ROOF AG 16g
<br />r 5 MBH
<br />a
<br />65
<br />2 I 2-InMBH " DIRT LE6 -�
<br />TM
<br />I'
<br />65
<br />4 MBH 67A5 51-K1T OFF
<br />b5 AG �I �% VALVE - TYP.
<br />a Ibq
<br />jr, 3 MBH
<br />2-1/2" 6A5 v
<br />ON EXTERIOR
<br />WALL
<br />2' EXTERIOR BARE STEEL GAS PIPE
<br />SHALL BE PAINTED WITH TWO GOATS
<br />OF RU5T INHIBITIVE PAINT. -
<br />TYPIGAL.
<br />GAS
<br />WATER HAMMER ARRESTOR, METER
<br />P.P.P. SG 5ERIE5, PD.I. REF.
<br />A5 INDICATED.
<br />GAS PIPING DIAGRAM
<br />SCALE: NONE
<br />NOTE:
<br />A. R055 G.G. SHALL BE RESPONSIBLE TO INSTALL ALL
<br />REQUIRED &A5 PIPING TO EXISTING RTU'S INSTALLED
<br />BY THE LANDLORD. CONNECTION INCLUDES 6AS
<br />METER, AND GONNEGTION TO ALL RTU'S FOR PROPER
<br />OPERATION.
<br />PLUMBING DETAILS AND DIAGRAMS SCALE
<br />AS NOTED
<br />1-1/4'
<br />Ibq
<br />MBH b
<br />Em
<br />CONTRACTOR MUST VERIFY
<br />ALL GLEARANGE5 AND
<br />DIMEN51ON5 IN FIELD
<br />McHENRY & ASSOCIATES, INC.
<br />CONSULTING ENGINEERS
<br />25001 EMERY ROAD, SUITE #200
<br />WARRENSVILLE HEIGHTS, OHIO 44128
<br />PHONE: 216-292-4696
<br />FAX: 216-292-5874
<br />1 Email: MAIL®MCHENRYASSOCIATES.COM
<br />FLORIDA BUSINESS #0005282
<br />mcg architecture
<br />T 216.5l0.10 m 216.E0.1687
<br />7100 E PboN Paley N, &ft 3A CbM&K OH 44131
<br />Seal:
<br />4`Y{09/91/,��Pt
<br />0 ®® Q
<br />co
<br />*— @ J
<br />0
<br />®®
<br />z
<br />t-
<br />U)ft
<br />B®6
<br />1119990
<br />A Project for:
<br />Client:
<br />ROSS STORES, INC.
<br />4440 ROSEWOOD DRIVE
<br />PLEASANTON, CA 94588
<br />Revisions:
<br />BID/PERMIT 02-14-13
<br />No. Description Date
<br />Project No.: 11.594.01
<br />Drawn By: SLH
<br />Reviewed By: MAB
<br />Scale: AS NOTED
<br />Date: 01-28-2013
<br />Filename:
<br />Sheet Title:
<br />PLUMBING DETAILS
<br />AND DIAGRAMS
<br />Sheet #:
<br />P3
<br />QQ MCG ARCHITECTS 2013 ALL RIGHTS RESERVED
<br />
|