w
<br />a
<br />� Z
<br />IL
<br />HVAC DESIGN CRITERIA & CHECKLIST
<br />�
<br />~
<br />U_ m
<br />z
<br />D
<br />a �
<br />~
<br />U_ m
<br />O
<br />0�
<br />0
<br />a w
<br />U_ in �
<br />O 0 a
<br />0_ U
<br />USE, REVIEW & COMPLETION IS
<br />MANDATORY FOR ALL ROSS
<br />PROJECTS.
<br />CONTACT ROSS WITH ANY QUESTIONS.
<br />1
<br />OUTSIDE AIR DESIGN
<br />Architect
<br />Engineer
<br />Reviewer
<br />1.A
<br />SUMMER DRY BULB AND WET BULB TEMPERATURES:
<br />1% ASHRAE DESIGN
<br />MCG
<br />MCH
<br />1.13
<br />WINTER DRY BULB TEMPERATURE: 99% ASHRAE DESIGN
<br />MCG
<br />MCH
<br />2
<br />ROOM DESIGN (NOT WITHSTANDING ANY OTHER CRITERIA THE HVAC SYSTEM
<br />IS TO BE DESIGNED AND CONSTRUCTED TO MAINTAIN THESE TEMPERATURES)
<br />Architect
<br />Engineer
<br />Reviewer
<br />2.A
<br />SUMMER 4 'F DRY BULB TEMPERATURE AND RELATIVE HUMIDITY
<br />MCG
<br />MCH
<br />2.13
<br />WINTER: 70 'F DRY BULB TEMPERATURES
<br />MCG
<br />MCH
<br />3
<br />PEOPLE DESIGN
<br />3.A
<br />QUANTITY
<br />Architect
<br />Engineer
<br />Reviewer
<br />3.A.1
<br />RETAIL SALES AREA, ENTRY: 75 SQ. FT. PERSON
<br />MCG
<br />MCH
<br />3.A.2
<br />RETAIL SALES AREA GENERAL: 125 SQ. FT PERSON
<br />MCG
<br />MCH
<br />3.A.3
<br />FITTING ROOM WOMEN S: 35 SQ FT. PERSON
<br />MCG
<br />MCH
<br />3.A.4
<br />FITTING ROOM MEN S: 75 SQ. FT. PERSON
<br />MCG
<br />MCH
<br />3.A.5
<br />FITTING ROOM FOYER: 50 SQ. FT. PERSON
<br />MCG
<br />MCH
<br />3.A.6
<br />LOCKER ROOM: 50 SQ. FT. PERSON
<br />MCG
<br />MCH
<br />3.A.7
<br />OFFICE: 75 SQ. FT. PERSON BUT NLT 3 PERSONS
<br />MCG
<br />MCH
<br />3.A.8
<br />CORRIDOR: 200 SO. FT. PERSON
<br />MCG
<br />MCH
<br />3.A.9
<br />TOILETS: 100 SQ. FT. PERSON
<br />MCG
<br />MCH
<br />3.A.10
<br />PROCESSING ROOM: 250 SQ. FT. PERSON
<br />MCG
<br />MCH
<br />3.A.11
<br />CASH ROOM: 150 SQ.FT. PERSON BUT NLT 1 PERSON
<br />MCG
<br />MCH
<br />3.13
<br />HEAT GAIN
<br />Architect
<br />Engineer
<br />Reviewer
<br />3.13.1
<br />SENSIBLE HEAT: 240 BTUH PERSON
<br />MCG
<br />MCH
<br />3.6.2
<br />LATENT: 210 BTUH PERSON
<br />MCG
<br />MCH
<br />4
<br />VENTILATION DESIGN
<br />4.A
<br />OUTSIDE AIR
<br />Architect
<br />Engineer
<br />Reviewer
<br />4.A.1
<br />15 CFM/PERSON MIN PER ASHRAE RECOMMENDATION
<br />OR AS REQUIRED BY APPLICABLE LOCAL CODES.
<br />MCG
<br />MCH
<br />4.13
<br />INFILTRATION
<br />Architect
<br />Engineer
<br />Reviewer
<br />4.13.1
<br />RETAIL SALES AREA, ENTRY: 300 CFM 3 FT. DOOR.
<br />MCG
<br />MCH
<br />4.13.2
<br />PROCESSING ROOM: 800 CFM FOR OVERHEAD LOADING DOCK DOOR USE
<br />BETWEEN 8-10AM COOING HEATING LOAD ESTIMATE
<br />MCG
<br />MCH
<br />4.0
<br />EXHAUST SYSTEMS
<br />Architect
<br />Engineer
<br />Reviewer
<br />4.C.1
<br />MECHANICAL EXHAUST: LOCKER ROOM, TOILETS, JANITOR, AND
<br />EQUIPMENT CLOSET AT 6 AIR CHANGES PER HOUR.
<br />MCG
<br />MCH
<br />4.C.2
<br />MECHANICAL EXHAUST (SEE SECTION 6.C.5) OR GRAVITY
<br />VENTILATOR: ELECTRICAL ROOM.
<br />MCG I
<br />MCH
<br />5
<br />ELECTRICAL DESIGN LOADS
<br />5.A
<br />LIGHTS:
<br />Architect
<br />Engineer
<br />Reviewer
<br />5.A.1
<br />USE ACTUAL LIGHTING DESIGN.
<br />5.A.2
<br />LIGHTING GUIDELINE FOR USE IF ACTUAL DESIGN IS UNAVAILABLE AS
<br />FOLLOWS:
<br />MCG
<br />MCH
<br />5.A.2.A
<br />RETAIL SALES AREA GENERAL: 1.3 WATT SQ.FT.
<br />MCG
<br />MCH
<br />5.A.2.6
<br />RETAIL SALES AREA, VALANCE: 12 WATT LINEAR FT. ON PERIMETER
<br />WALLS
<br />MCG
<br />MCH
<br />5.A.2.0
<br />DRESSING ROOM WOMEN'S: 3.25 WATT SQ. FT.
<br />MCG
<br />MCH
<br />5.A.2.D
<br />DRESSING ROOM MEN S: 3.00 WATT SQ. FT.
<br />MCG
<br />MCH
<br />5.A.2.E
<br />DRESSING ROOM FOYER: 1.50 WATT SQ. FT.
<br />MCG
<br />MCH
<br />5.A.25
<br />LOCKER ROOM OFFICE CASH PROCESSING ROOM TOILETS: 1.80 W SQ. FT.
<br />mcG
<br />Mc
<br />5.A.2.G
<br />CORRIDOR: 1.00 WATT SQ. FT.
<br />MCG
<br />MCH
<br />5.13
<br />ELECTRICAL OUTLETS EQUIPMENT LOAD)
<br />Architect
<br />Engineer
<br />Reviewer
<br />5.13.1
<br />MANAGER OFFICE: 1000 WATTS
<br />MCG
<br />MCH
<br />5.B.2
<br />CASH: 250 WATTS
<br />MCG
<br />MCH
<br />5.13.3
<br />LOCKER ROOM: 1000 WATTS
<br />MCG
<br />MCH
<br />5.13.4
<br />EQUIPMENT CLOSET: 1000 WATTS
<br />MCG
<br />MCH
<br />0
<br />0
<br />0
<br />w
<br />HVAC DESIGN CRITERIA & CHECKLIST
<br />Q
<br />USE, REVIEW &COMPLETION IS
<br />w
<br />I_ C1.
<br />MANDATORY FOR ALL ROSS
<br />LU
<br />Q ~
<br />0 ~
<br />� 0 5i
<br />Z
<br />PROJECTS.
<br />U_ m
<br />U m
<br />U_�<
<br />a
<br />CONTACT ROSS WITH ANY QUESTIONS.
<br />z `n
<br />° `n
<br />UJ
<br />z 0 a
<br />of
<br />U
<br />6.E.4
<br />Y
<br />DUCTWORK SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE
<br />WITH SMACNA STANDARDS.
<br />MCG
<br />MCH
<br />6.E.5
<br />Y
<br />UNLESS A HIGHER LEVEL IS REQUIRED BY CODE, DUCTWORK
<br />INSULATION SHALL BE 2" THICK ONE POUND DENSITY FIBERGLASS
<br />INSULATION WITH A VAPOR BARRIER JACKET. SUPPLY AND RETURN
<br />DUCTS WITHIN 15' OF HVAC UNITS SHALL HAVE 1" INTERIOR
<br />ACOUSTIC INSULATION.
<br />MCG
<br />MCH
<br />6.F
<br />AIR DISTRIBUTION DESIGN
<br />61.1
<br />SUPPLY AIR
<br />Architect
<br />Engineer
<br />Reviewer
<br />6.F.1.A
<br />OUTLETS WITHIN LARGE AREAS SHALL BE LIMITED TO BOTH 1200 SQ.
<br />FT. AREA SERVED, AND 800 CFM CAPACITY (THE MOST RESTRICTIVE
<br />TO GOVERN.)
<br />MCG
<br />MCH
<br />6.F.1.B
<br />Y
<br />OUTLETS SHALL BE STEEL WITH A WHITE FINISH PAINT VISIBLE INTERIOR FLAT
<br />BLACK). WHEN COASTAL PACKAGE IS REQUIRED TO BE INSTALLED OUTLETS
<br />ARE TO BE OF ALUMINUM WITH A WHITE FINISH RATHER THAN STEEL.
<br />MCG
<br />MCH
<br />6.F.1.0
<br />Y
<br />OUTLET OBD DAMPERS ARE NOT REQUIRED WHEN A BRANCH DUCT
<br />BALANCE DAMPER IS PROVIDED
<br />MCG
<br />MCH
<br />6.F.1.D
<br />Y
<br />OUTLET TYPES SHALL BE THE FOLLOWING NO EXCEPTIONS
<br />Architect
<br />Engineer
<br />Reviewer
<br />6.F.1.D.1
<br />Y
<br />T- BAR CEILING: TITUS PCS
<br />MCG
<br />MCH
<br />65.1.D.2
<br />Y
<br />HARD CEILING: TITUS TDC
<br />MCG
<br />MCH
<br />6.F.1.D.3
<br />Y
<br />SIDE WALL: TITUS 272 RS NOT PERMITTED ON SALES FLOOR
<br />MCG
<br />MCH
<br />6.F.1.D.4
<br />Y
<br />LOCKER ROOM, MENS FITTING, FITTING FOYER,
<br />AND CASH OFFICE: ACUTHERM THERMA-FUSER TYPE TF-HC
<br />MCG
<br />MCH
<br />6.F.1.D.5
<br />Y
<br />PROCESSING ROOM: TITUS TMRA MOUNTED 3 BELOW LIGHTS
<br />MCG
<br />MCH
<br />MCG
<br />MCH
<br />6.F.1.E
<br />Y
<br />OUTLET SIZE SHALL BE SELECTED AT A MAXIMUM NC OF 35 OR LESS
<br />AND A MAXIMUM NECK VELOCITY OF 800 FPM OR LESS.
<br />MCG
<br />MCH
<br />6.F.1.F
<br />Y
<br />OUTLET DISTRIBUTION PATTERN AND SELECTED FOR A MAXIMUM
<br />TERMINAL VELOCITY OF 100 FPM OR LESS.
<br />MCG
<br />MCH
<br />6.F.1.G
<br />Y
<br />THE LOCATION AND DISTRIBUTION PATTERN FOR SUPPLY DIFFUSERS
<br />INSTALLED IN "HARD" CEILING ROOMS SHALL BE SELECTED TO
<br />PROVIDE CONTINUOUS FLOW BETWEEN THE SURFACE MOUNTED
<br />LIGHTING FIXTURES.
<br />MCG
<br />MCH
<br />65.1.11
<br />Y
<br />SUPPLY AIR CFM SHALL BE BALANCED WITH RETURN AIR CFM.
<br />OUTSIDE AIR CFM MUST BE INDICATED SEPARATE TO THE SUPPLY AIR
<br />CFM ON THE HVAC EQUIPMENT SCHEDULE.
<br />MCG
<br />MCH
<br />65.1.1
<br />Y
<br />MANAGER OFFICE SUPPLY AIR SHALL NOT BE LESS THAN 300 CFM
<br />MCG
<br />MCH
<br />61.2
<br />RETURN & EXHAUST AIR
<br />Architect
<br />Engineer
<br />Reviewer
<br />6.F.2.A
<br />Y
<br />THE RETURN AIR SYSTEM SHALL BE COMPLETELY DUCTED. RETURN
<br />AIR CEILING PLENUMS ARE NOT ACCEPTABLE.
<br />MCG
<br />MCH
<br />65.2.13
<br />Y
<br />OUTLETS SHALL BE STEEL WITH WHITE FINISH. WHEN COASTAL PACKAGE IS
<br />INSTALLED OUTLETS ARE TO BE MADE OF ALUMINUM NOT STEEL.
<br />MCG
<br />MCH
<br />6.F.2.0
<br />Y
<br />OUTLET OBD DAMPERS ARE NOT REQUIRED WHEN A BRANCH DUCT
<br />BALANCE DAMPER IS PROVIDED.
<br />MCG
<br />MCH
<br />6.F.2.D
<br />Y
<br />OUTLET TYPES SHALL BE AS FOLLOWS:
<br />Architect
<br />Engineer
<br />Reviewer
<br />6.F.2.D.1
<br />Y
<br />T-BAR CEILING: TITUS PAR
<br />MCG
<br />MCH
<br />6.F.2.D.2
<br />Y
<br />HARD CEILING: TITUS 30 RL
<br />MCG
<br />MCH
<br />6.F.2.D.3
<br />Y
<br />SIDE WALL: TITUS 30 RL
<br />MCG
<br />MCH
<br />6.F.2.E
<br />Y
<br />OUTLET SIZE SHALL BE SELECTED AT A MAXIMUM NECK VELOCITY OF
<br />600 FPM AND A MAXIMUM FACE VELOCITY OF 400 FPM OR LESS.
<br />MCG
<br />MCH
<br />6.F.2.F
<br />Y
<br />LOCKER ROOM: SHOW EXHAUST ONLY NO RETURN AIR.
<br />MCG
<br />MCH
<br />MCG
<br />MCH
<br />7
<br />Y
<br />ADDITIONAL REQUIREMENTS
<br />7.A
<br />Y
<br />COORDINATION
<br />Architect
<br />Engineer
<br />Reviewer
<br />7.A.1
<br />Y
<br />THE MECHANICAL CONTRACTOR SHALL PROVIDE SERVICES FOR THE
<br />EMS CONTRACTOR AS SPECIFIED IN THE EMS NOTES, SHEET E2.0,
<br />DETAIL 1 NOTE B. THIS DOCUMENT IS ESSENTIAL.
<br />MCG
<br />MCH
<br />w
<br />HVAC DESIGN CRITERIA & CHECKLIST
<br />0-
<br />a.
<br />� <
<br /><
<br />w
<br />USE, REVIEW & COMPLETION IS
<br />� r.
<br />MANDATORY FOR ALL ROSS
<br />~
<br />~
<br />z
<br />D Z
<br />PROJECTS.
<br />U_ m
<br />LL m
<br />U_ U
<br />Q
<br />CONTACT ROSS WITH ANY QUESTIONS.
<br />O Cn
<br />z0�
<br />o co
<br />O o
<br />�a
<br />Zx00
<br />ZtYU
<br />� O
<br />(nLL
<br />co U_
<br />cn L_ Q
<br />6
<br />HVAC SYSTEM DESIGN
<br />Architect
<br />Engineer
<br />Reviewer
<br />6.A
<br />ZONING IS MANDATORY PER PROTOTYPICAL HVAC DESIGN LAYOUT
<br />PLAN MCG MCH
<br />6.A.1
<br />AC-1 PROCESSING ROOM ONLY.
<br />MCG
<br />MCH
<br />6.A.1.A
<br />AC-1: CONTROL TEMPERATURE SENSOR SHALL BE LOCATED ABOVE
<br />THE DOOR 0+93" AFF.
<br />MCG
<br />MCH
<br />6.A.2
<br />AC-2 OFFICES, RESTROOMS AND REAR RETAIL SALES.
<br />MCG
<br />MCH
<br />6.A.2.A.
<br />AC-2 UNIT PONTROL TEMPERATURE SENSOR TO BE LOCATED IN THE MANAGER
<br />OFFICE +54 AFF AND A MONITORING ONLY SENSOR IN THE CASH OFFICE.
<br />MCG
<br />MCH
<br />6.A.2.B
<br />AC-2 THE LOCKER BREAKROOM & CASH OFFICE SHALL HAVE TEMPERATURE
<br />CONTROL SUB -ZONES PROVIDED BY SELF CONTAINED VAV CHANGEOVER
<br />TYPE CONTROLLED CEILING SUPPLY DIFFUSERS "THERMAFUSER TYPE TF-HC.
<br />MCG
<br />MCH
<br />6.A.2.0
<br />AC-2 DO NOT PROVIDE RETURN AIR FROM THE LOCKER ROOM.
<br />MCG
<br />MCH
<br />6.A.3
<br />AC-3 RETAIL SALES FLOOR EXTERIOR PERIMETER WALL AREA, LEFT
<br />SIDE AS VIEWED FROM STORE ENTRY.
<br />6.A.4
<br />AC-4: MEN'S AND WOMEN'S FITTING ROOMS, FOYER, REAR RETAIL SALES
<br />FLOOR AT FOYER ENTRY.
<br />MCG
<br />MCH
<br />6.A.4.A.
<br />AC-4 UNIT CONTROL TEMPERATURE SENSORS SHALL BE LOCATED WITHIN THE
<br />WOMEN'S FITTING ROOM CORRIDOR 0+93" AFF.
<br />MCG
<br />MCH
<br />6.A.4.B
<br />AC-4 THE FOYER AND MEN'S FITTING ROOM SHALL HAVE TEMPERATURE
<br />CONTROL SUB -ZONES PROVIDED BY SELF CONTAINED VAV CHANGEOVER
<br />TYPE CONTROLLED CEILING SUPPLY DIFFUSERS "THERMAFUSER TYPE TF-HC.
<br />MCG
<br />MCH
<br />6.A.5
<br />AC-5: RETAIL SALES FLOOR INTERIOR AREA
<br />Mc
<br />6.A.6
<br />AC-6: RETAIL SALES FLOOR INTERIOR AREA.
<br />RIGHT SIDE AS VIEWED FROM STORE ENTRY.
<br />MCG
<br />MCH
<br />6.A.7
<br />AC-7: RETAIL SALES FLOOR ENTRY AREA WIDTH OF ENTRY GLASS.
<br />MCG
<br />MCH
<br />6.A.8
<br />REMODEL & TAKEOVER PROJECTS SHALL HAVE EQUIVALENT
<br />TEMPERATURE CONTROL ZONES, NUMBERED AND SIZED ACCORDING
<br />TO THE PROTOTYPICAL ZONES DESCRIBED.
<br />MCG
<br />MCH
<br />6.13
<br />Y
<br />AIR CONDITIONING UNIT
<br />6.13.1
<br />Y
<br />NATIONAL ACCOUNT INFORMATION
<br />Architect
<br />En ineer
<br />I Reviewer
<br />6.B.1.A
<br />Y
<br />ROSS DRESS FOR LESS HAS A NATIONAL ACCOUNT AGREEMENT
<br />WITH LENNOX INDUSTRIES TO SUPPLY HVAC PRODUCTS FOR ALL
<br />LOCATIONS. NO SUBSTITUTIONS WITHOUT SPECIAL CONDITIONS AND
<br />THE APPROVAL OF ROSS' V.P. OF CONSTRUCTION.
<br />MCG
<br />MCH
<br />6.13.1.13
<br />Y
<br />LENNOX INDUSTRIES INC. SHALL BE PROVIDED WITH THE UNIT
<br />SPECIFICATIONS AND SCHEDULE BY THE G.C. PRIOR TO BID DATE
<br />FOR PRODUCTION SCHEDULING AND FOR PREPARATION OF THEIR
<br />QUOTATION TO BIDDERS.
<br />MCG
<br />MCH
<br />6.B.1.0
<br />Y
<br />HVAC CONTRACTORS ARE DIRECTED TO CALL CORY HICKEN, LENNOX
<br />NATIONAL ACCOUNT REPRESENTATIVE FOR EQUIPMENT INFORMATION
<br />SEE CONTACT LIST SHEET AO.0
<br />MCG
<br />MCH
<br />6.B.1.D
<br />Y
<br />EQUIPMENT WARRANTY - LENNOX INDUSTRIES SHALL PROVIDE A
<br />NON -PRORATED WARRANTY OF 5 YEARS FOR THE COMPRESSORS
<br />AND 10 YEARS FOR THE HEAT EXCHANGERS.
<br />MCG
<br />MCH
<br />6.6.2
<br />Y
<br />TYPE
<br />Architect
<br />Engineer
<br />Reviewer
<br />6.B.2.A
<br />Y
<br />FURNISH AND INSTALL LENNOX "L" SERIES HIGH EFFICIENCY,
<br />PACKAGED ROOF MOUNTED, GAS HEATING, ELECTRIC COOLING
<br />UNITS WITH TYPE R410-A REFRIGERANT.
<br />MCG I
<br />MCH
<br />6.13.2.13
<br />Y
<br />USE OF ELECTRIC HEATING OR HEAT PUMPS REQUIRES SPECIAL
<br />CONDITIONS AND THE APPROVAL OF ROSS' V.P. OF CONSTRUCTION.
<br />MCG
<br />MCH
<br />6.6.2.13
<br />Y
<br />VERTICAL DOWN -FLOW TYPE UNITS ARE STANDARD.
<br />MCG
<br />MCH
<br />6.13.3
<br />Y
<br />FACTORY OR FIELD INSTALLED ITEMS
<br />Architect
<br />Engineer
<br />Reviewer
<br />6.B.3.A
<br />Y
<br />LENNOX TO SUPPLY FACTORY INSTALLED AND FACTORY TESTED BACNET
<br />ENABLED PRODIGY BOARDS FOR ALL NEW UNITS. EMS SUBCONTRACTOR
<br />TO SUPPLY NEW COMPATIBLE EMS CONTROLS ON EXISTING UNITS (WHERE
<br />APPROVED FOR REUSE) MECH'L SUBCONTRACTOR TO PROVIDE CONVENTIONAL
<br />THERMOSTAT INTERFACE IN EXISTING UNITS FOR EMS CONTROLS.
<br />MCG
<br />MCH
<br />�
<br />0
<br />LU
<br />0
<br />w
<br />HVAC DESIGN CRITERIA & CHECKLIST
<br />Q
<br />1
<br />Q
<br />w
<br />USE, REVIEW & COMPLETION IS
<br />r.
<br />MANDATORY FOR ALL ROSS
<br />W
<br />O ~
<br />LU
<br />O ~
<br />W
<br />� 0 2
<br />Z
<br />PROJECTS.
<br />m
<br />U m
<br />U_ v, �
<br />CONTACT BOSS WITH ANY QUESTIONS.
<br />O U)
<br />O co
<br />O o UJ
<br />2i a
<br />Z Ly
<br />Z o
<br />Z of U
<br />� O
<br />Cl) U_
<br />cn U_
<br />co U_ Q
<br />7.A.2
<br />Y
<br />AIR CONDITIONING UNIT MANUFACTURER: LENNOX INDUSTRIES INC.
<br />MCG
<br />MCH
<br />7.A.2.A
<br />Y
<br />MECHANICAL CONTRACTOR SHALL PROVIDE AN EQUIPMENT
<br />OPERATIONAL CHECK AFTER THE HVAC INSTALLATION AND STARTUP
<br />IS COMPLETED PER MANUFACTURER INSTRUCTIONS. LENNOX
<br />AUTHORIZED PERSONNEL SHALL THEN INSPECT THE EQUIPMENT
<br />INSTALLATION AND THE SYSTEM OPERATION.
<br />EOC DOCUMENTATION SHALL BE PROVIDED TO THE ROSS
<br />CONSTRUCTION REPRESENTATIVE.
<br />MCG
<br />MCH
<br />7.A.2.B
<br />Y
<br />LENNOX NATIONAL ACCOUNTS WILL PROMPT THE COMMUNICATION FOR
<br />AN EOC, WHICH WILL BE SCHEDULED IN COORDINATION WITH THE
<br />MECHANICAL CONTRACTOR.
<br />MCG
<br />MCH
<br />7.A.2.0
<br />Y
<br />PRIOR TO SCHEDULING THE EOC, THE HVAC SUBCONTRACTOR SHALL
<br />VERIFY THAT; THE SHIPPING BLOCKS HAVE BEEN REMOVED, ALL OF
<br />THE AIR CONDITIONING UNITS ARE OPERATIONAL, DUCTWORK, GAS
<br />PIPING, CONDENSATE PIPING, POWER WIRING AND CONTROL WIRING
<br />HAVE BEEN INSTALLED.
<br />MCG
<br />MCH
<br />7.A.2.D
<br />Y
<br />THE HVAC SUBCONTRACTOR SHALL PROVIDE AT THEIR COST A
<br />QUALIFIED SERVICE TECHNICIAN TO BE PRESENT DURING THE
<br />EQUIPMENT OPERATION CHECK.
<br />MCG
<br />MCH
<br />7.A.2.E
<br />Y
<br />LENNOX INDUSTRIES, INC. SHALL PROVIDE A WRITTEN COPY OF THE
<br />EOC REPORT TO THE ASSIGNED ROSS CONSTRUCTION REP,
<br />THE HVAC SUBCONTRACTOR PRESENT AT THE CHECK AND CCBAC.
<br />MCG
<br />MCH
<br />7.A.2.F
<br />Y
<br />ANY AND ALL DEFECTS IN THE AIR CONDITIONING UNITS,
<br />INSTALLATION AND SYSTEM OPERATION SHALL BE CORRECTED BY
<br />THE HVAC SUBCONTRACTOR WITHIN 30 DAYS AFTER THE
<br />DISTRIBUTION OF THE EOC REPORT. FAILURE TO IDENTIFY A DEFECT
<br />DURING THE EOC DOES NOT RELIEVE THE LANDLORD AND THE HVAC
<br />SUB -CONTRACTOR OF THE RESPONSIBILITY TO CORRECT
<br />SUBSEQUENTLY IDENTIFIED DEFECTS.
<br />MCG
<br />MCH
<br />7.A.3
<br />Y
<br />ALL EQUIPMENT, INSTALLATION, DESIGN AND OPERATION DEFECTS
<br />DISCOVERED DURING THE INSTALLATION, CHECK, BALANCE AND
<br />OPERATION OF THE HVAC SYSTEM THAT REQUIRE A CHANGE IN THE
<br />DESIGN AND SPECIFICATION OF THE HVAC SYSTEM OR ITS
<br />COMPONENTS MUST BE PROPERLY INCORPORATED BY CHANGE
<br />ORDER IN THE PROJECT CONSTRUCTION DOCUMENTS AND THAT
<br />CHANGE -ORDER REVIEWED AND APPROVED BY BOTH THE LANDLORD
<br />AND THE ROSS CONSTRUCTION REPRESENTATIVE.
<br />MCG
<br />MCH
<br />7.13
<br />Y
<br />AIR BALANCING
<br />7.13.1
<br />Y
<br />QUALIFICATIONS
<br />Architect
<br />Engineer
<br />Reviewer
<br />7.B.1.A
<br />Y
<br />THE AIR BALANCING SHALL BE DONE BY AN INDEPENDENT AABC OR
<br />NEBB CERTIFIED FIRM AT THE COST OF THE GENERAL CONTRACTOR.
<br />MCG
<br />MCH
<br />7.13.2
<br />Y
<br />SUBMITTALS
<br />Architect
<br />Engineer
<br />Reviewer
<br />7.B.2.A
<br />Y
<br />WITHIN 30 DAYS AFTER THE CONTRACT IS AWARDED PROVIDE THE
<br />NAME AND QUALIFICATIONS OF THE BALANCING SUBCONTRACTOR
<br />AND SAMPLE TEST FORMS TO BE USED FOR THE BALANCING REPORT.
<br />MCG I
<br />MCH
<br />7.13.2.13
<br />Y
<br />AFTER THE BALANCING HAS BEEN COMPLETED, PROVIDE A WRITTEN
<br />COPY OF THE BALANCING REPORT TO
<br />1 THE ROSS CONSTRUCTION REPRESENTATIVE,
<br />2 THE HVAC SUB -CONTRACTOR, AND
<br />3 C&C BUILDING AUTOMATION. SEE 6 D.2.6
<br />MCG
<br />MCH
<br />7.13.3
<br />Y
<br />EXECUTION
<br />Architect
<br />Engineer
<br />Reviewer
<br />7.B.3.A
<br />Y
<br />PRIOR TO COMMENCING WITH THE BALANCING WORK THE
<br />BALANCING SUBCONTRACTOR SHALL INSPECT THE DUCTWORK
<br />INSTALLATION TO DETERMINE IF ALL REQUIRED BALANCING
<br />DAMPERS AND ACCESS DOORS/PANELS HAVE BEEN INSTALLED.
<br />DO NOT USE OUTLET OBD FOR BALANCING. I
<br />MCG
<br />MCH
<br />0
<br />0
<br />0
<br />w
<br />HVAC DESIGN CRITERIA & CHECKLIST
<br />a
<br />a <
<br />a <
<br />USE, REVIEW & COMPLETION IS
<br />� r.
<br />MANDATORY FOR ALL ROSS
<br />tz UJ
<br />11 0 �
<br />Z) Z
<br />PROJECTS.
<br />U_ m
<br />U_ m
<br />U_ W�
<br />J
<br />CONTACT ROSS WITH ANY QUESTIONS.
<br />O co
<br />o Cn
<br />O 0 a-
<br />2Ea_
<br />zQY
<br />Zi
<br />ZIrU
<br />6.13.3.13
<br />Y
<br />ECONOMIZERS TO BE GEAR DRIVEN AND FACTORY INSTALLED ON ALL
<br />UNITS 5-TONS AND ABOVE. GLOBAL ENTHALPY CONTROLS ARE TO BE
<br />USED FOR THE CONTROL OPTION ON THE ECONOMIZER.
<br />ECONOMIZER TO BE SUPPLIED WITH OUTDOOR AIR HOOD. TWO
<br />CLEANABLE ALUMINUM MESH FRESH AIR FILTERS TO BE FURNISHED
<br />BY LENNOX.
<br />MCG
<br />MCH
<br />6.B.3.0
<br />Y
<br />25% OUTSIDE AIR INTAKE HOODS WITH BALANCE DAMPER AND BIRD
<br />SCREEN SHALL BE FACTORY INSTALLED ON UNITS WITHOUT AN
<br />ECONOMIZER.
<br />MCG
<br />MCH
<br />6.B.3.D
<br />Y
<br />POWER EXHAUST FANS SHALL BE FACTORY INSTALLED ON 6-TON
<br />AND LARGER UNITS WITH AN ECONOMIZER HAVING A HIGH (GREATER
<br />THAN 0.25" SP) DESIGN RETURN AIR PRESSURE LOSS.
<br />MCG
<br />MCH
<br />6.B.3.E
<br />Y
<br />SUPPLY AND RETURN SMOKE DETECTORS TO BE PROVIDED AND
<br />FACTORY INSTALLED BY LENNOX. IF LOCAL CODE REQUIREMENTS
<br />DO NOT ALLOW FACTORY INSTALLATION, LENNOX WILL PROVIDE
<br />SMOKE DETECTORS TO BE FIELD INSTALLED BY THE HVAC
<br />CONTRACTOR AND ELECTRICAL CONTRACTOR SHALL FIELD WIRE
<br />DETECTORS TO UNIT AS NECESSARY.
<br />MCG
<br />MCH
<br />6.B.3.F
<br />Y
<br />HACR CIRCUIT BREAKERS TO BE FACTORY INSTALLED AND FACTORY
<br />WIRED BY LENNOX ON ALL UNITS ABOVE 12.5-TONS. UNITS 12.5-TONS
<br />AND BELOW WILL BE SUPPLIED WITH NON -FUSED SERVICE
<br />DISCONNECT FACTORY INSTALLED AND FACTORY WIRED.
<br />MCG
<br />MCH
<br />6.B.3.G
<br />Y
<br />SERVICE OUTLETS: LENNOX TO FACTORY INSTALL A DUAL 120-VOLT
<br />GFCI TYPE SERVICE OUTLET. WIRING TO THE OUTLET SHALL BE
<br />FIELD PROVIDED BY ELECTRICAL CONTRACTOR ON SITE.
<br />MCG
<br />MCH
<br />6.B.3.H
<br />Y
<br />CURBS: USE ONLY LENNOX STANDARD CURBS OR ADAPTOR CURBS,
<br />TO BE SUPPLIED BY LENNOX.
<br />MCG
<br />MCH
<br />6.13.3.1
<br />Y
<br />ROOFTOP HVAC UNITS SHALL BE SUPPLIED WITH LENNOX COASTAL PACKAGE
<br />(TECHNICOAT) WHEN SITE IS LOCATED WITHIN 6 MILES OF THE COAST OR
<br />FURTHER IF IN A CORROSIVE ENVIRONMENT. BOTH THE EVAPORATOR AND
<br />CONDENSER COILS SHALL BE COATED. SYSTEM SUPPLY, RETURN & EXHAUST
<br />AIR OUTLETS ARE TO BE ALUMINUM WHEN COASTAL PACKAGE IS INSTALLED.
<br />MCG
<br />MCH
<br />6.6.4
<br />SIZE
<br />Architect
<br />Engineer
<br />Reviewer
<br />6.B.4.A
<br />UNITS SHALL BE SELECTED BASED UPON CLOSEST SIZE THAT SHALL
<br />PROVIDE THE CALCULATED CAPACITY (TONS/CFM) AT AN ENTERING
<br />CONDENSER AIR TEMPERATURE 5 DEG. F HIGHER THAN THE ASHRAE
<br />1 % DESIGN OUTDOOR AIR TEMPERATURE. ALL UNITS SPECIFIED
<br />MUST MEET OR EXCEED ASHRAE 90.1 1999 MINIMUM REQUIREMENTS
<br />MCG
<br />MCH
<br />6.13.4.13
<br />ACTUAL COOLING AND HEATING LOAD CALCULATIONS MUST BE
<br />SUBMITTED FOR REVIEW AND APPROVAL TO THE ROSS STORES
<br />ASSIGNED CONSTRUCTION REPRESENTATIVE WITH THE 100% DESIGN
<br />SUBMITTAL (SEE 6.D.2).
<br />MCG
<br />MCH
<br />6.B.4.0
<br />SIZING GUIDELINES HAVE BEEN CHECKED AGAINST THOSE PROVIDED
<br />ON;
<br />CHART 1 FOR AC-1,(ALWAYS DESIGNATED FOR PROCESSING ROOM)
<br />CHART 2 FOR AC-3 THRU 6,(REFER TO M-1 FOR DESIGNATIONS)
<br />CHART 3 FOR AC-7 ALWAYS DESIGNATED FOR STORE ENTRY
<br />MCG
<br />MCH
<br />6.B.4.D
<br />THE SQ. FT. ON SIZING DATA SHOWN IN TABLE 1 HAS BEEN BASED
<br />ON THE FOLLOWING CRITERIA, WHICH THE BUILDING DESIGN MUST
<br />MEET:
<br />MCG
<br />MCH
<br />6.13A.D.1
<br />GLASS R-0.67 FACTOR
<br />MCG
<br />MCH
<br />6.13A.D.2
<br />WALL R-19 FACTOR
<br />MCG
<br />MCH
<br />6.13A.D.3
<br />ROOF R-38 FACTOR
<br />MCG
<br />MCH
<br />6.13.4.13.4
<br />PEOPLE LOAD: PER SECTION 3
<br />MCG
<br />MCH
<br />6.13A.D.5
<br />LIGHTING LOAD: PER SECTION 5A.
<br />MCG
<br />MCH
<br />6.13A.D.6
<br />ELECTRICAL CONVENIENCE OUTLET LOAD: PER SECTION 5B.
<br />MCG
<br />MCH
<br />6.B.4.D.7
<br />VENTILATION: PER SECTION 4.
<br />MCG
<br />MCH
<br />6.B.4.D.8
<br />SAFETY FACTOR: 10%
<br />MCG
<br />MCH
<br />6.6.4.E
<br />LENNOX WILL NOT RELEASE UNIT ORDERS UNTIL ROSS CRITERIA
<br />CONDITIONS ARE SUBSTANTIALLY MET.
<br />MCG
<br />MCH
<br />0
<br />0
<br />0
<br />w
<br />HVAC DESIGN CRITERIA & CHECKLIST
<br />a
<br />USE, REVIEW & COMPLETION IS
<br />� <
<br />Q
<br />w
<br />� r.
<br />MANDATORY FOR ALL ROSS
<br />0
<br />� tz
<br />E (D S�
<br />� Z
<br />PROJECTS.
<br />U
<br />L
<br />O
<br />U_ W
<br />J
<br />CONTACT ROSS WITH ANY QUESTIONS.
<br />O �,
<br />0
<br />O 0 0-
<br />2Ea.
<br />Z�
<br />Z�
<br />ZQ�U
<br />�O
<br />WU_
<br />cnU_
<br />cnUQ
<br />7.13.3.13
<br />Y
<br />BALANCE ALL FANS TO WITHIN +10% -5% OF DESIGN. REPLACE FAN
<br />DRIVE IF REQUIRED TO OBTAIN THE DESIGN CAPACITY.
<br />MCG
<br />MCH
<br />7.B.3.0
<br />Y
<br />BALANCE OUTLETS AS FOLLOWS:
<br />SMALL AREAS WITH 1 OR 2 OUTLETS:+/-5% OF DESIGN LARGE AREAS
<br />WITH 3 OR MORE OUTLETS:+ -10% OF DESIGN.
<br />MCG
<br />MCH
<br />7.B.3.D
<br />Y
<br />REPORT IN WRITING ALL DEFICIENCIES AND PROBLEMS DISCOVERED
<br />TO
<br />1 THE ROSS C.M.,
<br />2 C&C BUILDING AUTOMATION AND
<br />3 THE HVAC SUBCONTRACTOR PRIOR TO COMPLETING THE
<br />BALANCING WORK. THIS REPORT SHOULD INCLUDE THE "CAUSE" AND
<br />SUGGESTED "SOLUTION" IF KNOWN.
<br />MCG
<br />MCH
<br />7.B.3.E
<br />Y
<br />THE AIR CONDITIONING UNITS SHALL BE BALANCED IN THE MINIMUM
<br />OUTSIDE AIR MODE. THE OUTSIDE AIR DAMPER "% MINIMUM OPEN
<br />POSITION" AND THE "METHOD" USED SHALL BE INCLUDED IN THE
<br />BALANCING REPORT. ALSO MEASURE AND REPORT THE FAN
<br />OPERATING DATA FOR UNITS WITH ECONOMIZERS IN THE 100%
<br />OUTSIDE AIR MODE.
<br />MCG
<br />MCH
<br />7.13.4
<br />Y
<br />FIELD VERIFICATION: UPON THE REQUEST OF THE ROSS STORES INC.
<br />CONSTRUCTION REPRESENTATIVE,THE BALANCING SUBCONTRACTOR
<br />SHALL MEASURE RANDOMLY SELECTED OUTLETS AS CHOSEN
<br />BY THE CONSTRUCTION REPRESENTATIVE TO DEMONSTRATE THE
<br />ACCURACY OF THE BALANCE REPORT MEASUREMENTS. WHEN
<br />DEEMED NECESSARY BY THE CONSTRUCTION REPRESENTATIVE THE
<br />BALANCING CONTRACTOR SHALL REBALANCE DEFICIENT SYSTEMS
<br />WITHOUT ANY ADDITIONAL COST.
<br />MCG
<br />MCH
<br />7.13.5
<br />Y
<br />CORRECTION OF DEFECTS: REQUIRED WITHIN 30 DAYS OF THE
<br />DISTRIBUTION OF THE BALANCING REPORT, SEE 7.A.3 FOR
<br />RESPONSIBILITIES.
<br />MCG
<br />MCH
<br />7.0
<br />Y
<br />CONTROLS AND CONTROL WIRING: THE EMS AND/OR THE
<br />ELECTRICAL SUBCONTRACTOR ARE RESPONSIBLE FOR THE AIR
<br />CONDITIONING UNIT AND EXHAUST FAN FIELD SUPPLIED CONTROLS,
<br />WIRING AND OPERATIONAL CHECKS THEREOF.
<br />MCG
<br />MCH
<br />7.D
<br />Y
<br />SALES AREA TEMPERATURE SENSORS AND/OR ELECTRONIC
<br />THERMOSTATS SHALL BE MOUNTED AT 7'-9" AFF.
<br />MCG
<br />MCH
<br />7.E
<br />Y
<br />OPERATION AND MAINTENANCE MANUALS:
<br />THREE (3) BOUND SETS OF THE OPERATION AND MAINTENANCE
<br />MANUALS SHALL BE PROVIDED TO THE ROSS CONSTRUCTION
<br />REPRESENTATIVE AT TURNOVER, AND ARE REQUIRED FOR FINAL
<br />ACCEPTANCE.
<br />MCG
<br />MCH
<br />71
<br />Y
<br />AS -BUILT DRAWINGS: THE HVAC SUBCONTRACTOR SHALL
<br />PROGRESSIVELY RECORD ALL HVAC DRAWING CHANGES WHICH
<br />SHALL BE AVAILABLE AT ALL TIMES FOR REVIEW BY THE ROSS
<br />STORES, INC. CONSTRUCTION REPRESENTATIVE. AN AUTOCAD COPY
<br />OF THE FINAL AS -BUILT DRAWINGS SHALL BE PROVIDED TO THE ROSS
<br />CONSTRUCTION REPRESENTATIVE AT TURNOVER. THIS AUTOCAD
<br />AS -BUILT IS REQUIRED FOR FINAL ACCEPTANCE OF THE PROJECT.
<br />MCG
<br />MCH
<br />7.G
<br />Y
<br />HVAC FILTERS ARE TO BE REPLACED AT STORE DELIVERY WITH 2" PLEATED
<br />FILTERS
<br />w
<br />HVAC DESIGN CRITERIA & CHECKLIST
<br />Z)
<br />Z
<br />CL a
<br />a <
<br />0 <
<br />0 w
<br />USE, REVIEW & COMPLETION IS
<br />Q C1.
<br />MANDATORY FOR ALL ROSS
<br />W~
<br />W~
<br />Of 0 Si
<br />D Z
<br />PROJECTS.
<br />L m
<br />L m
<br />U_ ui
<br />a
<br />CONTACT ROSS WITH ANY QUESTIONS.
<br />W
<br />q W
<br />z a-
<br />Er
<br />�
<br />�U
<br />tO
<br />(nnLL
<br />cnLL
<br />cnLLQ
<br />6.0
<br />Y
<br />EXHAUST FANS
<br />Architect
<br />Engineer
<br />Reviewer
<br />6.C.1
<br />Y
<br />BELT DRIVEN CENTRIFUGAL ROOF EXHAUSTER (ACME, GREENHECK
<br />OR EQUIVALENT).
<br />MCG
<br />MCH
<br />6.C.2
<br />Y
<br />COMPLETE WITH CURB, BACKDRAFT DAMPER AND DISCONNECT
<br />SWITCH.
<br />MCG
<br />MCH
<br />6.C.3
<br />Y
<br />FAN SOUND RATING SHALL BE 5 SONES OR LESS.
<br />MCG
<br />MCH
<br />6.C.4
<br />Y
<br />RESTROOMS & JANITOR CLOSET EXHAUST FAN EF-1 SHALL BE CONTROLLED
<br />BY THE ENERGY MANAGEMENT SYSTEM. LOCKER ROOM & EQUIPMENT CLOSET
<br />EXHAUST FAN (EF-2) SHALL BE CONTROLLED BY THE ENERGY MANAGEMENT
<br />SYSTEM & A LINE VOLTAGE THERMOSTAT IN PARALLEL (SEE DET 7/SHT E1).
<br />LOCATE THERMOSTAT IN THE EQUIPMENT CLOSET 0+54" AFF AT SIDE WALL ON
<br />HINGE SIDE OF DOOR. ELECTRICAL ROOM EXHAUST FAN (EF-3) SHALL BE
<br />CONTROLLED BY A LINE VOLTAGE THERMOSTATE LOCATED IN THE ELECTRICAL
<br />ROOM AT 0+54" AFF NEXT TO DOOR. CLEARLY SPECIFY THAT THE LINE
<br />VOLTAGE THERMOSTATS SHALL BE PROVIDED & INSTALLED BY THE MECHANICAL
<br />CONTRACTOR; WIRED BY THE ELECTRICAL CONTRACTOR.
<br />MCG
<br />MCH
<br />6.D
<br />HVAC SYSTEM PLANS
<br />Architect
<br />Engineer
<br />Reviewer
<br />6.D.1
<br />PLANS SHALL BE COMPLETE INCLUDING THE FOLLOWING:
<br />MCG
<br />MCH
<br />6.D.1.A
<br />Y
<br />A/C UNITS SCHEDULES
<br />MCG
<br />MCH
<br />6.D.1.B
<br />Y
<br />EXHAUST FANS
<br />MCG
<br />MCH
<br />6.D.1.0
<br />Y
<br />SMOKE DETECTORS
<br />MCG
<br />MCH
<br />6.D.1.D
<br />Y
<br />DUCT HEATERS IF APPLICABLE
<br />MCG
<br />MCH
<br />6.D.1.E
<br />Y
<br />OUTLET TYPES AND SIZES
<br />MCG
<br />MCH
<br />6.D.1.F
<br />Y
<br />DUCTWORK TYPE AND SIZE
<br />MCG
<br />MCH
<br />6.DA.G
<br />Y
<br />INSULATION TYPE AND U FACTOR
<br />MCG
<br />MCH
<br />6.D.1.H
<br />Y
<br />BALANCE DAMPERS, FIRE DAMPERS, TURNING VANES, EXTRACTORS,
<br />ACCESS DOORS/PANELS AND OTHER ACCESSORY SHEET METAL
<br />ITEMS
<br />MCG
<br />MCH
<br />6.D.1.1
<br />Y
<br />GAS PIPING TYPE AND SIZE
<br />MCG
<br />MCH
<br />6.D.1.J
<br />Y
<br />CONDENSATE DRAIN PIPING TYPE AND SIZE
<br />MCG
<br />MCH
<br />6.D.1.K
<br />COMPLETE LOAD CALCULATIONS
<br />MCG
<br />MCH
<br />MCG
<br />MCH
<br />6.D.2
<br />PLAN REVIEW: THE COMPLETE 100%) PLAN SET, PLUS LOAD
<br />CALCULATIONS FOR EACH UNIT MUST BE SUBMITTED FOR REVIEW
<br />TO:
<br />MCG
<br />MCH
<br />6.D.2.A
<br />THE ASSIGNED ROSS CONSTRUCTION REPRESENTATIVE
<br />MCG
<br />MCH
<br />6.D.2.B
<br />THE ROSS ENGINEERING CONSULTANTS:
<br />C&C BUILDING AUTOMATION, ATTN: ENGINEERING DEPARTMENT
<br />390 SWIFT AVE.# 22, SOUTH SAN FRANCISCO, CA 94080,
<br />PHONE (650) 243-2455, EMAIL: ROSS®CCBAC.COM
<br />MCG
<br />MCH
<br />6.D.2.0
<br />THE UNIT MANUFACTURER:
<br />LENNOX INDUSTRIES, INC. ATTENTION CORY HICKEN, LENNOX
<br />NATIONAL ACCOUNTS FOR ROSS STORES SEE CONTACT LIST ON AO.0.
<br />MCG
<br />MCH
<br />6.D.3
<br />AS BUILT DRAWINGS:
<br />A FULLY UPDATED AS -BUILT AUTOCAD MECHANICAL SET SHALL BE
<br />PROVIDED TO ROSS STORES, INC. AT CONSTRUCTION TURNOVER
<br />AND AS REQUIRED FOR FINAL ACCEPTANCE UNDER LEASE.
<br />MCG
<br />MCH
<br />6.E
<br />DUCTWORK DESIGN
<br />Architect
<br />En ineer
<br />Reviewer
<br />6.E.1
<br />SIZING: SUPPLY AT 0.10 100 , RETURN AT 0.08 100 AND BRANCH
<br />CONNECTIONS TO OUTLETS AT 800 FPM (MAX).
<br />MCG
<br />MCH
<br />6.E.2
<br />Y
<br />ALL DUCTWORK SHALL BE GALVANIZED STEEL WITH TRANSVERSE
<br />DUCT JOINTS SEALED WITH 4" WIDE HARDCAST TAPE. DUCT TAPE IS
<br />NOT ACCEPTABLE. FIBERGLASS FLEXIBLE DUCTS WITH LINER MAY BE
<br />USED FOR BRANCH DUCT CONNECTIONS TO OUTLETS WITH 10 FT.
<br />MAXIMUM LENGTH.
<br />MCG
<br />MCH
<br />6.E.3
<br />Y
<br />ALL BRANCH DUCT CONNECTIONS TO OUTLETS SHALL INCLUDE A
<br />MANUAL BALANCE DAMPER WITH LOCKING QUADRANT LOCATED AT
<br />THE BRANCH DUCT CONNECTION TO THE HEADER DUCT.
<br />MCG
<br />MCH
<br />mcg architecture
<br />T 2IL54O.1551 © 2IU21LI567
<br />71M E Pleasant Valey Rd, Some 32% t2eMeland, OH 44131
<br />Seal:
<br />ao®•®�eeoeea®o
<br />o®
<br />®�
<br />® ' yxILL
<br />`•
<br />p
<br />O
<br />s 'J'
<br />w ®�®
<br />O.
<br />O
<br />F-
<br />O a .J
<br />z
<br />*
<br />rn � es
<br />o
<br />°
<br />S
<br />®eis
<br />A Project for:
<br />Client:
<br />ROSS STORES, INC.
<br />4440 ROSEWOOD DRIVE
<br />PLEASANTON, CA 94588
<br />Revisions:
<br />BID/PERMIT
<br />02-14-13
<br />No. Description
<br />Date
<br />Project No.:
<br />11.594.01
<br />Drawn By:
<br />JPU
<br />Reviewed By:
<br />MAB
<br />Scale:
<br />AS NOTED
<br />Date:
<br />01-28-2013
<br />Filename:
<br />Sheet Title:
<br />PROTOTYPE
<br />CHECKLIST
<br />Sheet #:
<br />M3
<br />© MCG ARCHITECTS 2013 ALL RIGHTS RESERVED
<br />
|