Laserfiche WebLink
w <br />a <br />� Z <br />IL <br />HVAC DESIGN CRITERIA & CHECKLIST <br />� <br />~ <br />U_ m <br />z <br />D <br />a � <br />~ <br />U_ m <br />O <br />0� <br />0 <br />a w <br />U_ in � <br />O 0 a <br />0_ U <br />USE, REVIEW & COMPLETION IS <br />MANDATORY FOR ALL ROSS <br />PROJECTS. <br />CONTACT ROSS WITH ANY QUESTIONS. <br />1 <br />OUTSIDE AIR DESIGN <br />Architect <br />Engineer <br />Reviewer <br />1.A <br />SUMMER DRY BULB AND WET BULB TEMPERATURES: <br />1% ASHRAE DESIGN <br />MCG <br />MCH <br />1.13 <br />WINTER DRY BULB TEMPERATURE: 99% ASHRAE DESIGN <br />MCG <br />MCH <br />2 <br />ROOM DESIGN (NOT WITHSTANDING ANY OTHER CRITERIA THE HVAC SYSTEM <br />IS TO BE DESIGNED AND CONSTRUCTED TO MAINTAIN THESE TEMPERATURES) <br />Architect <br />Engineer <br />Reviewer <br />2.A <br />SUMMER 4 'F DRY BULB TEMPERATURE AND RELATIVE HUMIDITY <br />MCG <br />MCH <br />2.13 <br />WINTER: 70 'F DRY BULB TEMPERATURES <br />MCG <br />MCH <br />3 <br />PEOPLE DESIGN <br />3.A <br />QUANTITY <br />Architect <br />Engineer <br />Reviewer <br />3.A.1 <br />RETAIL SALES AREA, ENTRY: 75 SQ. FT. PERSON <br />MCG <br />MCH <br />3.A.2 <br />RETAIL SALES AREA GENERAL: 125 SQ. FT PERSON <br />MCG <br />MCH <br />3.A.3 <br />FITTING ROOM WOMEN S: 35 SQ FT. PERSON <br />MCG <br />MCH <br />3.A.4 <br />FITTING ROOM MEN S: 75 SQ. FT. PERSON <br />MCG <br />MCH <br />3.A.5 <br />FITTING ROOM FOYER: 50 SQ. FT. PERSON <br />MCG <br />MCH <br />3.A.6 <br />LOCKER ROOM: 50 SQ. FT. PERSON <br />MCG <br />MCH <br />3.A.7 <br />OFFICE: 75 SQ. FT. PERSON BUT NLT 3 PERSONS <br />MCG <br />MCH <br />3.A.8 <br />CORRIDOR: 200 SO. FT. PERSON <br />MCG <br />MCH <br />3.A.9 <br />TOILETS: 100 SQ. FT. PERSON <br />MCG <br />MCH <br />3.A.10 <br />PROCESSING ROOM: 250 SQ. FT. PERSON <br />MCG <br />MCH <br />3.A.11 <br />CASH ROOM: 150 SQ.FT. PERSON BUT NLT 1 PERSON <br />MCG <br />MCH <br />3.13 <br />HEAT GAIN <br />Architect <br />Engineer <br />Reviewer <br />3.13.1 <br />SENSIBLE HEAT: 240 BTUH PERSON <br />MCG <br />MCH <br />3.6.2 <br />LATENT: 210 BTUH PERSON <br />MCG <br />MCH <br />4 <br />VENTILATION DESIGN <br />4.A <br />OUTSIDE AIR <br />Architect <br />Engineer <br />Reviewer <br />4.A.1 <br />15 CFM/PERSON MIN PER ASHRAE RECOMMENDATION <br />OR AS REQUIRED BY APPLICABLE LOCAL CODES. <br />MCG <br />MCH <br />4.13 <br />INFILTRATION <br />Architect <br />Engineer <br />Reviewer <br />4.13.1 <br />RETAIL SALES AREA, ENTRY: 300 CFM 3 FT. DOOR. <br />MCG <br />MCH <br />4.13.2 <br />PROCESSING ROOM: 800 CFM FOR OVERHEAD LOADING DOCK DOOR USE <br />BETWEEN 8-10AM COOING HEATING LOAD ESTIMATE <br />MCG <br />MCH <br />4.0 <br />EXHAUST SYSTEMS <br />Architect <br />Engineer <br />Reviewer <br />4.C.1 <br />MECHANICAL EXHAUST: LOCKER ROOM, TOILETS, JANITOR, AND <br />EQUIPMENT CLOSET AT 6 AIR CHANGES PER HOUR. <br />MCG <br />MCH <br />4.C.2 <br />MECHANICAL EXHAUST (SEE SECTION 6.C.5) OR GRAVITY <br />VENTILATOR: ELECTRICAL ROOM. <br />MCG I <br />MCH <br />5 <br />ELECTRICAL DESIGN LOADS <br />5.A <br />LIGHTS: <br />Architect <br />Engineer <br />Reviewer <br />5.A.1 <br />USE ACTUAL LIGHTING DESIGN. <br />5.A.2 <br />LIGHTING GUIDELINE FOR USE IF ACTUAL DESIGN IS UNAVAILABLE AS <br />FOLLOWS: <br />MCG <br />MCH <br />5.A.2.A <br />RETAIL SALES AREA GENERAL: 1.3 WATT SQ.FT. <br />MCG <br />MCH <br />5.A.2.6 <br />RETAIL SALES AREA, VALANCE: 12 WATT LINEAR FT. ON PERIMETER <br />WALLS <br />MCG <br />MCH <br />5.A.2.0 <br />DRESSING ROOM WOMEN'S: 3.25 WATT SQ. FT. <br />MCG <br />MCH <br />5.A.2.D <br />DRESSING ROOM MEN S: 3.00 WATT SQ. FT. <br />MCG <br />MCH <br />5.A.2.E <br />DRESSING ROOM FOYER: 1.50 WATT SQ. FT. <br />MCG <br />MCH <br />5.A.25 <br />LOCKER ROOM OFFICE CASH PROCESSING ROOM TOILETS: 1.80 W SQ. FT. <br />mcG <br />Mc <br />5.A.2.G <br />CORRIDOR: 1.00 WATT SQ. FT. <br />MCG <br />MCH <br />5.13 <br />ELECTRICAL OUTLETS EQUIPMENT LOAD) <br />Architect <br />Engineer <br />Reviewer <br />5.13.1 <br />MANAGER OFFICE: 1000 WATTS <br />MCG <br />MCH <br />5.B.2 <br />CASH: 250 WATTS <br />MCG <br />MCH <br />5.13.3 <br />LOCKER ROOM: 1000 WATTS <br />MCG <br />MCH <br />5.13.4 <br />EQUIPMENT CLOSET: 1000 WATTS <br />MCG <br />MCH <br />0 <br />0 <br />0 <br />w <br />HVAC DESIGN CRITERIA & CHECKLIST <br />Q <br />USE, REVIEW &COMPLETION IS <br />w <br />I_ C1. <br />MANDATORY FOR ALL ROSS <br />LU <br />Q ~ <br />0 ~ <br />� 0 5i <br />Z <br />PROJECTS. <br />U_ m <br />U m <br />U_�< <br />a <br />CONTACT ROSS WITH ANY QUESTIONS. <br />z `n <br />° `n <br />UJ <br />z 0 a <br />of <br />U <br />6.E.4 <br />Y <br />DUCTWORK SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE <br />WITH SMACNA STANDARDS. <br />MCG <br />MCH <br />6.E.5 <br />Y <br />UNLESS A HIGHER LEVEL IS REQUIRED BY CODE, DUCTWORK <br />INSULATION SHALL BE 2" THICK ONE POUND DENSITY FIBERGLASS <br />INSULATION WITH A VAPOR BARRIER JACKET. SUPPLY AND RETURN <br />DUCTS WITHIN 15' OF HVAC UNITS SHALL HAVE 1" INTERIOR <br />ACOUSTIC INSULATION. <br />MCG <br />MCH <br />6.F <br />AIR DISTRIBUTION DESIGN <br />61.1 <br />SUPPLY AIR <br />Architect <br />Engineer <br />Reviewer <br />6.F.1.A <br />OUTLETS WITHIN LARGE AREAS SHALL BE LIMITED TO BOTH 1200 SQ. <br />FT. AREA SERVED, AND 800 CFM CAPACITY (THE MOST RESTRICTIVE <br />TO GOVERN.) <br />MCG <br />MCH <br />6.F.1.B <br />Y <br />OUTLETS SHALL BE STEEL WITH A WHITE FINISH PAINT VISIBLE INTERIOR FLAT <br />BLACK). WHEN COASTAL PACKAGE IS REQUIRED TO BE INSTALLED OUTLETS <br />ARE TO BE OF ALUMINUM WITH A WHITE FINISH RATHER THAN STEEL. <br />MCG <br />MCH <br />6.F.1.0 <br />Y <br />OUTLET OBD DAMPERS ARE NOT REQUIRED WHEN A BRANCH DUCT <br />BALANCE DAMPER IS PROVIDED <br />MCG <br />MCH <br />6.F.1.D <br />Y <br />OUTLET TYPES SHALL BE THE FOLLOWING NO EXCEPTIONS <br />Architect <br />Engineer <br />Reviewer <br />6.F.1.D.1 <br />Y <br />T- BAR CEILING: TITUS PCS <br />MCG <br />MCH <br />65.1.D.2 <br />Y <br />HARD CEILING: TITUS TDC <br />MCG <br />MCH <br />6.F.1.D.3 <br />Y <br />SIDE WALL: TITUS 272 RS NOT PERMITTED ON SALES FLOOR <br />MCG <br />MCH <br />6.F.1.D.4 <br />Y <br />LOCKER ROOM, MENS FITTING, FITTING FOYER, <br />AND CASH OFFICE: ACUTHERM THERMA-FUSER TYPE TF-HC <br />MCG <br />MCH <br />6.F.1.D.5 <br />Y <br />PROCESSING ROOM: TITUS TMRA MOUNTED 3 BELOW LIGHTS <br />MCG <br />MCH <br />MCG <br />MCH <br />6.F.1.E <br />Y <br />OUTLET SIZE SHALL BE SELECTED AT A MAXIMUM NC OF 35 OR LESS <br />AND A MAXIMUM NECK VELOCITY OF 800 FPM OR LESS. <br />MCG <br />MCH <br />6.F.1.F <br />Y <br />OUTLET DISTRIBUTION PATTERN AND SELECTED FOR A MAXIMUM <br />TERMINAL VELOCITY OF 100 FPM OR LESS. <br />MCG <br />MCH <br />6.F.1.G <br />Y <br />THE LOCATION AND DISTRIBUTION PATTERN FOR SUPPLY DIFFUSERS <br />INSTALLED IN "HARD" CEILING ROOMS SHALL BE SELECTED TO <br />PROVIDE CONTINUOUS FLOW BETWEEN THE SURFACE MOUNTED <br />LIGHTING FIXTURES. <br />MCG <br />MCH <br />65.1.1­1 <br />Y <br />SUPPLY AIR CFM SHALL BE BALANCED WITH RETURN AIR CFM. <br />OUTSIDE AIR CFM MUST BE INDICATED SEPARATE TO THE SUPPLY AIR <br />CFM ON THE HVAC EQUIPMENT SCHEDULE. <br />MCG <br />MCH <br />65.1.1 <br />Y <br />MANAGER OFFICE SUPPLY AIR SHALL NOT BE LESS THAN 300 CFM <br />MCG <br />MCH <br />61.2 <br />RETURN & EXHAUST AIR <br />Architect <br />Engineer <br />Reviewer <br />6.F.2.A <br />Y <br />THE RETURN AIR SYSTEM SHALL BE COMPLETELY DUCTED. RETURN <br />AIR CEILING PLENUMS ARE NOT ACCEPTABLE. <br />MCG <br />MCH <br />65.2.13 <br />Y <br />OUTLETS SHALL BE STEEL WITH WHITE FINISH. WHEN COASTAL PACKAGE IS <br />INSTALLED OUTLETS ARE TO BE MADE OF ALUMINUM NOT STEEL. <br />MCG <br />MCH <br />6.F.2.0 <br />Y <br />OUTLET OBD DAMPERS ARE NOT REQUIRED WHEN A BRANCH DUCT <br />BALANCE DAMPER IS PROVIDED. <br />MCG <br />MCH <br />6.F.2.D <br />Y <br />OUTLET TYPES SHALL BE AS FOLLOWS: <br />Architect <br />Engineer <br />Reviewer <br />6.F.2.D.1 <br />Y <br />T-BAR CEILING: TITUS PAR <br />MCG <br />MCH <br />6.F.2.D.2 <br />Y <br />HARD CEILING: TITUS 30 RL <br />MCG <br />MCH <br />6.F.2.D.3 <br />Y <br />SIDE WALL: TITUS 30 RL <br />MCG <br />MCH <br />6.F.2.E <br />Y <br />OUTLET SIZE SHALL BE SELECTED AT A MAXIMUM NECK VELOCITY OF <br />600 FPM AND A MAXIMUM FACE VELOCITY OF 400 FPM OR LESS. <br />MCG <br />MCH <br />6.F.2.F <br />Y <br />LOCKER ROOM: SHOW EXHAUST ONLY NO RETURN AIR. <br />MCG <br />MCH <br />MCG <br />MCH <br />7 <br />Y <br />ADDITIONAL REQUIREMENTS <br />7.A <br />Y <br />COORDINATION <br />Architect <br />Engineer <br />Reviewer <br />7.A.1 <br />Y <br />THE MECHANICAL CONTRACTOR SHALL PROVIDE SERVICES FOR THE <br />EMS CONTRACTOR AS SPECIFIED IN THE EMS NOTES, SHEET E2.0, <br />DETAIL 1 NOTE B. THIS DOCUMENT IS ESSENTIAL. <br />MCG <br />MCH <br />w <br />HVAC DESIGN CRITERIA & CHECKLIST <br />0- <br />a. <br />� < <br />< <br />w <br />USE, REVIEW & COMPLETION IS <br />� r. <br />MANDATORY FOR ALL ROSS <br />~ <br />~ <br />z <br />D Z <br />PROJECTS. <br />U_ m <br />LL m <br />U_ U <br />Q <br />CONTACT ROSS WITH ANY QUESTIONS. <br />O Cn <br />z0� <br />o co <br />O o <br />�a <br />Zx00 <br />ZtYU <br />� O <br />(nLL <br />co U_ <br />cn L_ Q <br />6 <br />HVAC SYSTEM DESIGN <br />Architect <br />Engineer <br />Reviewer <br />6.A <br />ZONING IS MANDATORY PER PROTOTYPICAL HVAC DESIGN LAYOUT <br />PLAN MCG MCH <br />6.A.1 <br />AC-1 PROCESSING ROOM ONLY. <br />MCG <br />MCH <br />6.A.1.A <br />AC-1: CONTROL TEMPERATURE SENSOR SHALL BE LOCATED ABOVE <br />THE DOOR 0+93" AFF. <br />MCG <br />MCH <br />6.A.2 <br />AC-2 OFFICES, RESTROOMS AND REAR RETAIL SALES. <br />MCG <br />MCH <br />6.A.2.A. <br />AC-2 UNIT PONTROL TEMPERATURE SENSOR TO BE LOCATED IN THE MANAGER <br />OFFICE +54 AFF AND A MONITORING ONLY SENSOR IN THE CASH OFFICE. <br />MCG <br />MCH <br />6.A.2.B <br />AC-2 THE LOCKER BREAKROOM & CASH OFFICE SHALL HAVE TEMPERATURE <br />CONTROL SUB -ZONES PROVIDED BY SELF CONTAINED VAV CHANGEOVER <br />TYPE CONTROLLED CEILING SUPPLY DIFFUSERS "THERMAFUSER TYPE TF-HC. <br />MCG <br />MCH <br />6.A.2.0 <br />AC-2 DO NOT PROVIDE RETURN AIR FROM THE LOCKER ROOM. <br />MCG <br />MCH <br />6.A.3 <br />AC-3 RETAIL SALES FLOOR EXTERIOR PERIMETER WALL AREA, LEFT <br />SIDE AS VIEWED FROM STORE ENTRY. <br />6.A.4 <br />AC-4: MEN'S AND WOMEN'S FITTING ROOMS, FOYER, REAR RETAIL SALES <br />FLOOR AT FOYER ENTRY. <br />MCG <br />MCH <br />6.A.4.A. <br />AC-4 UNIT CONTROL TEMPERATURE SENSORS SHALL BE LOCATED WITHIN THE <br />WOMEN'S FITTING ROOM CORRIDOR 0+93" AFF. <br />MCG <br />MCH <br />6.A.4.B <br />AC-4 THE FOYER AND MEN'S FITTING ROOM SHALL HAVE TEMPERATURE <br />CONTROL SUB -ZONES PROVIDED BY SELF CONTAINED VAV CHANGEOVER <br />TYPE CONTROLLED CEILING SUPPLY DIFFUSERS "THERMAFUSER TYPE TF-HC. <br />MCG <br />MCH <br />6.A.5 <br />AC-5: RETAIL SALES FLOOR INTERIOR AREA <br />Mc <br />6.A.6 <br />AC-6: RETAIL SALES FLOOR INTERIOR AREA. <br />RIGHT SIDE AS VIEWED FROM STORE ENTRY. <br />MCG <br />MCH <br />6.A.7 <br />AC-7: RETAIL SALES FLOOR ENTRY AREA WIDTH OF ENTRY GLASS. <br />MCG <br />MCH <br />6.A.8 <br />REMODEL & TAKEOVER PROJECTS SHALL HAVE EQUIVALENT <br />TEMPERATURE CONTROL ZONES, NUMBERED AND SIZED ACCORDING <br />TO THE PROTOTYPICAL ZONES DESCRIBED. <br />MCG <br />MCH <br />6.13 <br />Y <br />AIR CONDITIONING UNIT <br />6.13.1 <br />Y <br />NATIONAL ACCOUNT INFORMATION <br />Architect <br />En ineer <br />I Reviewer <br />6.B.1.A <br />Y <br />ROSS DRESS FOR LESS HAS A NATIONAL ACCOUNT AGREEMENT <br />WITH LENNOX INDUSTRIES TO SUPPLY HVAC PRODUCTS FOR ALL <br />LOCATIONS. NO SUBSTITUTIONS WITHOUT SPECIAL CONDITIONS AND <br />THE APPROVAL OF ROSS' V.P. OF CONSTRUCTION. <br />MCG <br />MCH <br />6.13.1.13 <br />Y <br />LENNOX INDUSTRIES INC. SHALL BE PROVIDED WITH THE UNIT <br />SPECIFICATIONS AND SCHEDULE BY THE G.C. PRIOR TO BID DATE <br />FOR PRODUCTION SCHEDULING AND FOR PREPARATION OF THEIR <br />QUOTATION TO BIDDERS. <br />MCG <br />MCH <br />6.B.1.0 <br />Y <br />HVAC CONTRACTORS ARE DIRECTED TO CALL CORY HICKEN, LENNOX <br />NATIONAL ACCOUNT REPRESENTATIVE FOR EQUIPMENT INFORMATION <br />SEE CONTACT LIST SHEET AO.0 <br />MCG <br />MCH <br />6.B.1.D <br />Y <br />EQUIPMENT WARRANTY - LENNOX INDUSTRIES SHALL PROVIDE A <br />NON -PRORATED WARRANTY OF 5 YEARS FOR THE COMPRESSORS <br />AND 10 YEARS FOR THE HEAT EXCHANGERS. <br />MCG <br />MCH <br />6.6.2 <br />Y <br />TYPE <br />Architect <br />Engineer <br />Reviewer <br />6.B.2.A <br />Y <br />FURNISH AND INSTALL LENNOX "L" SERIES HIGH EFFICIENCY, <br />PACKAGED ROOF MOUNTED, GAS HEATING, ELECTRIC COOLING <br />UNITS WITH TYPE R410-A REFRIGERANT. <br />MCG I <br />MCH <br />6.13.2.13 <br />Y <br />USE OF ELECTRIC HEATING OR HEAT PUMPS REQUIRES SPECIAL <br />CONDITIONS AND THE APPROVAL OF ROSS' V.P. OF CONSTRUCTION. <br />MCG <br />MCH <br />6.6.2.13 <br />Y <br />VERTICAL DOWN -FLOW TYPE UNITS ARE STANDARD. <br />MCG <br />MCH <br />6.13.3 <br />Y <br />FACTORY OR FIELD INSTALLED ITEMS <br />Architect <br />Engineer <br />Reviewer <br />6.B.3.A <br />Y <br />LENNOX TO SUPPLY FACTORY INSTALLED AND FACTORY TESTED BACNET <br />ENABLED PRODIGY BOARDS FOR ALL NEW UNITS. EMS SUBCONTRACTOR <br />TO SUPPLY NEW COMPATIBLE EMS CONTROLS ON EXISTING UNITS (WHERE <br />APPROVED FOR REUSE) MECH'L SUBCONTRACTOR TO PROVIDE CONVENTIONAL <br />THERMOSTAT INTERFACE IN EXISTING UNITS FOR EMS CONTROLS. <br />MCG <br />MCH <br />� <br />0 <br />LU <br />0 <br />w <br />HVAC DESIGN CRITERIA & CHECKLIST <br />Q <br />1 <br />Q <br />w <br />USE, REVIEW & COMPLETION IS <br />r. <br />MANDATORY FOR ALL ROSS <br />W <br />O ~ <br />LU <br />O ~ <br />W <br />� 0 2 <br />Z <br />PROJECTS. <br />m <br />U m <br />U_ v, � <br />CONTACT BOSS WITH ANY QUESTIONS. <br />O U) <br />O co <br />O o UJ <br />2i a <br />Z Ly <br />Z o <br />Z of U <br />� O <br />Cl) U_ <br />cn U_ <br />co U_ Q <br />7.A.2 <br />Y <br />AIR CONDITIONING UNIT MANUFACTURER: LENNOX INDUSTRIES INC. <br />MCG <br />MCH <br />7.A.2.A <br />Y <br />MECHANICAL CONTRACTOR SHALL PROVIDE AN EQUIPMENT <br />OPERATIONAL CHECK AFTER THE HVAC INSTALLATION AND STARTUP <br />IS COMPLETED PER MANUFACTURER INSTRUCTIONS. LENNOX <br />AUTHORIZED PERSONNEL SHALL THEN INSPECT THE EQUIPMENT <br />INSTALLATION AND THE SYSTEM OPERATION. <br />EOC DOCUMENTATION SHALL BE PROVIDED TO THE ROSS <br />CONSTRUCTION REPRESENTATIVE. <br />MCG <br />MCH <br />7.A.2.B <br />Y <br />LENNOX NATIONAL ACCOUNTS WILL PROMPT THE COMMUNICATION FOR <br />AN EOC, WHICH WILL BE SCHEDULED IN COORDINATION WITH THE <br />MECHANICAL CONTRACTOR. <br />MCG <br />MCH <br />7.A.2.0 <br />Y <br />PRIOR TO SCHEDULING THE EOC, THE HVAC SUBCONTRACTOR SHALL <br />VERIFY THAT; THE SHIPPING BLOCKS HAVE BEEN REMOVED, ALL OF <br />THE AIR CONDITIONING UNITS ARE OPERATIONAL, DUCTWORK, GAS <br />PIPING, CONDENSATE PIPING, POWER WIRING AND CONTROL WIRING <br />HAVE BEEN INSTALLED. <br />MCG <br />MCH <br />7.A.2.D <br />Y <br />THE HVAC SUBCONTRACTOR SHALL PROVIDE AT THEIR COST A <br />QUALIFIED SERVICE TECHNICIAN TO BE PRESENT DURING THE <br />EQUIPMENT OPERATION CHECK. <br />MCG <br />MCH <br />7.A.2.E <br />Y <br />LENNOX INDUSTRIES, INC. SHALL PROVIDE A WRITTEN COPY OF THE <br />EOC REPORT TO THE ASSIGNED ROSS CONSTRUCTION REP, <br />THE HVAC SUBCONTRACTOR PRESENT AT THE CHECK AND CCBAC. <br />MCG <br />MCH <br />7.A.2.F <br />Y <br />ANY AND ALL DEFECTS IN THE AIR CONDITIONING UNITS, <br />INSTALLATION AND SYSTEM OPERATION SHALL BE CORRECTED BY <br />THE HVAC SUBCONTRACTOR WITHIN 30 DAYS AFTER THE <br />DISTRIBUTION OF THE EOC REPORT. FAILURE TO IDENTIFY A DEFECT <br />DURING THE EOC DOES NOT RELIEVE THE LANDLORD AND THE HVAC <br />SUB -CONTRACTOR OF THE RESPONSIBILITY TO CORRECT <br />SUBSEQUENTLY IDENTIFIED DEFECTS. <br />MCG <br />MCH <br />7.A.3 <br />Y <br />ALL EQUIPMENT, INSTALLATION, DESIGN AND OPERATION DEFECTS <br />DISCOVERED DURING THE INSTALLATION, CHECK, BALANCE AND <br />OPERATION OF THE HVAC SYSTEM THAT REQUIRE A CHANGE IN THE <br />DESIGN AND SPECIFICATION OF THE HVAC SYSTEM OR ITS <br />COMPONENTS MUST BE PROPERLY INCORPORATED BY CHANGE <br />ORDER IN THE PROJECT CONSTRUCTION DOCUMENTS AND THAT <br />CHANGE -ORDER REVIEWED AND APPROVED BY BOTH THE LANDLORD <br />AND THE ROSS CONSTRUCTION REPRESENTATIVE. <br />MCG <br />MCH <br />7.13 <br />Y <br />AIR BALANCING <br />7.13.1 <br />Y <br />QUALIFICATIONS <br />Architect <br />Engineer <br />Reviewer <br />7.B.1.A <br />Y <br />THE AIR BALANCING SHALL BE DONE BY AN INDEPENDENT AABC OR <br />NEBB CERTIFIED FIRM AT THE COST OF THE GENERAL CONTRACTOR. <br />MCG <br />MCH <br />7.13.2 <br />Y <br />SUBMITTALS <br />Architect <br />Engineer <br />Reviewer <br />7.B.2.A <br />Y <br />WITHIN 30 DAYS AFTER THE CONTRACT IS AWARDED PROVIDE THE <br />NAME AND QUALIFICATIONS OF THE BALANCING SUBCONTRACTOR <br />AND SAMPLE TEST FORMS TO BE USED FOR THE BALANCING REPORT. <br />MCG I <br />MCH <br />7.13.2.13 <br />Y <br />AFTER THE BALANCING HAS BEEN COMPLETED, PROVIDE A WRITTEN <br />COPY OF THE BALANCING REPORT TO <br />1 THE ROSS CONSTRUCTION REPRESENTATIVE, <br />2 THE HVAC SUB -CONTRACTOR, AND <br />3 C&C BUILDING AUTOMATION. SEE 6 D.2.6 <br />MCG <br />MCH <br />7.13.3 <br />Y <br />EXECUTION <br />Architect <br />Engineer <br />Reviewer <br />7.B.3.A <br />Y <br />PRIOR TO COMMENCING WITH THE BALANCING WORK THE <br />BALANCING SUBCONTRACTOR SHALL INSPECT THE DUCTWORK <br />INSTALLATION TO DETERMINE IF ALL REQUIRED BALANCING <br />DAMPERS AND ACCESS DOORS/PANELS HAVE BEEN INSTALLED. <br />DO NOT USE OUTLET OBD FOR BALANCING. I <br />MCG <br />MCH <br />0 <br />0 <br />0 <br />w <br />HVAC DESIGN CRITERIA & CHECKLIST <br />a <br />a < <br />a < <br />USE, REVIEW & COMPLETION IS <br />� r. <br />MANDATORY FOR ALL ROSS <br />tz UJ <br />11 0 � <br />Z) Z <br />PROJECTS. <br />U_ m <br />U_ m <br />U_ W� <br />J <br />CONTACT ROSS WITH ANY QUESTIONS. <br />O co <br />o Cn <br />O 0 a- <br />2Ea_ <br />zQY <br />Zi <br />ZIrU <br />6.13.3.13 <br />Y <br />ECONOMIZERS TO BE GEAR DRIVEN AND FACTORY INSTALLED ON ALL <br />UNITS 5-TONS AND ABOVE. GLOBAL ENTHALPY CONTROLS ARE TO BE <br />USED FOR THE CONTROL OPTION ON THE ECONOMIZER. <br />ECONOMIZER TO BE SUPPLIED WITH OUTDOOR AIR HOOD. TWO <br />CLEANABLE ALUMINUM MESH FRESH AIR FILTERS TO BE FURNISHED <br />BY LENNOX. <br />MCG <br />MCH <br />6.B.3.0 <br />Y <br />25% OUTSIDE AIR INTAKE HOODS WITH BALANCE DAMPER AND BIRD <br />SCREEN SHALL BE FACTORY INSTALLED ON UNITS WITHOUT AN <br />ECONOMIZER. <br />MCG <br />MCH <br />6.B.3.D <br />Y <br />POWER EXHAUST FANS SHALL BE FACTORY INSTALLED ON 6-TON <br />AND LARGER UNITS WITH AN ECONOMIZER HAVING A HIGH (GREATER <br />THAN 0.25" SP) DESIGN RETURN AIR PRESSURE LOSS. <br />MCG <br />MCH <br />6.B.3.E <br />Y <br />SUPPLY AND RETURN SMOKE DETECTORS TO BE PROVIDED AND <br />FACTORY INSTALLED BY LENNOX. IF LOCAL CODE REQUIREMENTS <br />DO NOT ALLOW FACTORY INSTALLATION, LENNOX WILL PROVIDE <br />SMOKE DETECTORS TO BE FIELD INSTALLED BY THE HVAC <br />CONTRACTOR AND ELECTRICAL CONTRACTOR SHALL FIELD WIRE <br />DETECTORS TO UNIT AS NECESSARY. <br />MCG <br />MCH <br />6.B.3.F <br />Y <br />HACR CIRCUIT BREAKERS TO BE FACTORY INSTALLED AND FACTORY <br />WIRED BY LENNOX ON ALL UNITS ABOVE 12.5-TONS. UNITS 12.5-TONS <br />AND BELOW WILL BE SUPPLIED WITH NON -FUSED SERVICE <br />DISCONNECT FACTORY INSTALLED AND FACTORY WIRED. <br />MCG <br />MCH <br />6.B.3.G <br />Y <br />SERVICE OUTLETS: LENNOX TO FACTORY INSTALL A DUAL 120-VOLT <br />GFCI TYPE SERVICE OUTLET. WIRING TO THE OUTLET SHALL BE <br />FIELD PROVIDED BY ELECTRICAL CONTRACTOR ON SITE. <br />MCG <br />MCH <br />6.B.3.H <br />Y <br />CURBS: USE ONLY LENNOX STANDARD CURBS OR ADAPTOR CURBS, <br />TO BE SUPPLIED BY LENNOX. <br />MCG <br />MCH <br />6.13.3.1 <br />Y <br />ROOFTOP HVAC UNITS SHALL BE SUPPLIED WITH LENNOX COASTAL PACKAGE <br />(TECHNICOAT) WHEN SITE IS LOCATED WITHIN 6 MILES OF THE COAST OR <br />FURTHER IF IN A CORROSIVE ENVIRONMENT. BOTH THE EVAPORATOR AND <br />CONDENSER COILS SHALL BE COATED. SYSTEM SUPPLY, RETURN & EXHAUST <br />AIR OUTLETS ARE TO BE ALUMINUM WHEN COASTAL PACKAGE IS INSTALLED. <br />MCG <br />MCH <br />6.6.4 <br />SIZE <br />Architect <br />Engineer <br />Reviewer <br />6.B.4.A <br />UNITS SHALL BE SELECTED BASED UPON CLOSEST SIZE THAT SHALL <br />PROVIDE THE CALCULATED CAPACITY (TONS/CFM) AT AN ENTERING <br />CONDENSER AIR TEMPERATURE 5 DEG. F HIGHER THAN THE ASHRAE <br />1 % DESIGN OUTDOOR AIR TEMPERATURE. ALL UNITS SPECIFIED <br />MUST MEET OR EXCEED ASHRAE 90.1 1999 MINIMUM REQUIREMENTS <br />MCG <br />MCH <br />6.13.4.13 <br />ACTUAL COOLING AND HEATING LOAD CALCULATIONS MUST BE <br />SUBMITTED FOR REVIEW AND APPROVAL TO THE ROSS STORES <br />ASSIGNED CONSTRUCTION REPRESENTATIVE WITH THE 100% DESIGN <br />SUBMITTAL (SEE 6.D.2). <br />MCG <br />MCH <br />6.B.4.0 <br />SIZING GUIDELINES HAVE BEEN CHECKED AGAINST THOSE PROVIDED <br />ON; <br />CHART 1 FOR AC-1,(ALWAYS DESIGNATED FOR PROCESSING ROOM) <br />CHART 2 FOR AC-3 THRU 6,(REFER TO M-1 FOR DESIGNATIONS) <br />CHART 3 FOR AC-7 ALWAYS DESIGNATED FOR STORE ENTRY <br />MCG <br />MCH <br />6.B.4.D <br />THE SQ. FT. ON SIZING DATA SHOWN IN TABLE 1 HAS BEEN BASED <br />ON THE FOLLOWING CRITERIA, WHICH THE BUILDING DESIGN MUST <br />MEET: <br />MCG <br />MCH <br />6.13A.D.1 <br />GLASS R-0.67 FACTOR <br />MCG <br />MCH <br />6.13A.D.2 <br />WALL R-19 FACTOR <br />MCG <br />MCH <br />6.13A.D.3 <br />ROOF R-38 FACTOR <br />MCG <br />MCH <br />6.13.4.13.4 <br />PEOPLE LOAD: PER SECTION 3 <br />MCG <br />MCH <br />6.13A.D.5 <br />LIGHTING LOAD: PER SECTION 5A. <br />MCG <br />MCH <br />6.13A.D.6 <br />ELECTRICAL CONVENIENCE OUTLET LOAD: PER SECTION 5B. <br />MCG <br />MCH <br />6.B.4.D.7 <br />VENTILATION: PER SECTION 4. <br />MCG <br />MCH <br />6.B.4.D.8 <br />SAFETY FACTOR: 10% <br />MCG <br />MCH <br />6.6.4.E <br />LENNOX WILL NOT RELEASE UNIT ORDERS UNTIL ROSS CRITERIA <br />CONDITIONS ARE SUBSTANTIALLY MET. <br />MCG <br />MCH <br />0 <br />0 <br />0 <br />w <br />HVAC DESIGN CRITERIA & CHECKLIST <br />a <br />USE, REVIEW & COMPLETION IS <br />� < <br />Q <br />w <br />� r. <br />MANDATORY FOR ALL ROSS <br />0 <br />� tz <br />E (D S� <br />� Z <br />PROJECTS. <br />U <br />L <br />O <br />U_ W <br />J <br />CONTACT ROSS WITH ANY QUESTIONS. <br />O �, <br />0 <br />O 0 0- <br />2Ea. <br />Z� <br />Z� <br />ZQ�U <br />�O <br />WU_ <br />cnU_ <br />cnUQ <br />7.13.3.13 <br />Y <br />BALANCE ALL FANS TO WITHIN +10% -5% OF DESIGN. REPLACE FAN <br />DRIVE IF REQUIRED TO OBTAIN THE DESIGN CAPACITY. <br />MCG <br />MCH <br />7.B.3.0 <br />Y <br />BALANCE OUTLETS AS FOLLOWS: <br />SMALL AREAS WITH 1 OR 2 OUTLETS:+/-5% OF DESIGN LARGE AREAS <br />WITH 3 OR MORE OUTLETS:+ -10% OF DESIGN. <br />MCG <br />MCH <br />7.B.3.D <br />Y <br />REPORT IN WRITING ALL DEFICIENCIES AND PROBLEMS DISCOVERED <br />TO <br />1 THE ROSS C.M., <br />2 C&C BUILDING AUTOMATION AND <br />3 THE HVAC SUBCONTRACTOR PRIOR TO COMPLETING THE <br />BALANCING WORK. THIS REPORT SHOULD INCLUDE THE "CAUSE" AND <br />SUGGESTED "SOLUTION" IF KNOWN. <br />MCG <br />MCH <br />7.B.3.E <br />Y <br />THE AIR CONDITIONING UNITS SHALL BE BALANCED IN THE MINIMUM <br />OUTSIDE AIR MODE. THE OUTSIDE AIR DAMPER "% MINIMUM OPEN <br />POSITION" AND THE "METHOD" USED SHALL BE INCLUDED IN THE <br />BALANCING REPORT. ALSO MEASURE AND REPORT THE FAN <br />OPERATING DATA FOR UNITS WITH ECONOMIZERS IN THE 100% <br />OUTSIDE AIR MODE. <br />MCG <br />MCH <br />7.13.4 <br />Y <br />FIELD VERIFICATION: UPON THE REQUEST OF THE ROSS STORES INC. <br />CONSTRUCTION REPRESENTATIVE,THE BALANCING SUBCONTRACTOR <br />SHALL MEASURE RANDOMLY SELECTED OUTLETS AS CHOSEN <br />BY THE CONSTRUCTION REPRESENTATIVE TO DEMONSTRATE THE <br />ACCURACY OF THE BALANCE REPORT MEASUREMENTS. WHEN <br />DEEMED NECESSARY BY THE CONSTRUCTION REPRESENTATIVE THE <br />BALANCING CONTRACTOR SHALL REBALANCE DEFICIENT SYSTEMS <br />WITHOUT ANY ADDITIONAL COST. <br />MCG <br />MCH <br />7.13.5 <br />Y <br />CORRECTION OF DEFECTS: REQUIRED WITHIN 30 DAYS OF THE <br />DISTRIBUTION OF THE BALANCING REPORT, SEE 7.A.3 FOR <br />RESPONSIBILITIES. <br />MCG <br />MCH <br />7.0 <br />Y <br />CONTROLS AND CONTROL WIRING: THE EMS AND/OR THE <br />ELECTRICAL SUBCONTRACTOR ARE RESPONSIBLE FOR THE AIR <br />CONDITIONING UNIT AND EXHAUST FAN FIELD SUPPLIED CONTROLS, <br />WIRING AND OPERATIONAL CHECKS THEREOF. <br />MCG <br />MCH <br />7.D <br />Y <br />SALES AREA TEMPERATURE SENSORS AND/OR ELECTRONIC <br />THERMOSTATS SHALL BE MOUNTED AT 7'-9" AFF. <br />MCG <br />MCH <br />7.E <br />Y <br />OPERATION AND MAINTENANCE MANUALS: <br />THREE (3) BOUND SETS OF THE OPERATION AND MAINTENANCE <br />MANUALS SHALL BE PROVIDED TO THE ROSS CONSTRUCTION <br />REPRESENTATIVE AT TURNOVER, AND ARE REQUIRED FOR FINAL <br />ACCEPTANCE. <br />MCG <br />MCH <br />71 <br />Y <br />AS -BUILT DRAWINGS: THE HVAC SUBCONTRACTOR SHALL <br />PROGRESSIVELY RECORD ALL HVAC DRAWING CHANGES WHICH <br />SHALL BE AVAILABLE AT ALL TIMES FOR REVIEW BY THE ROSS <br />STORES, INC. CONSTRUCTION REPRESENTATIVE. AN AUTOCAD COPY <br />OF THE FINAL AS -BUILT DRAWINGS SHALL BE PROVIDED TO THE ROSS <br />CONSTRUCTION REPRESENTATIVE AT TURNOVER. THIS AUTOCAD <br />AS -BUILT IS REQUIRED FOR FINAL ACCEPTANCE OF THE PROJECT. <br />MCG <br />MCH <br />7.G <br />Y <br />HVAC FILTERS ARE TO BE REPLACED AT STORE DELIVERY WITH 2" PLEATED <br />FILTERS <br />w <br />HVAC DESIGN CRITERIA & CHECKLIST <br />Z) <br />Z <br />CL a <br />a < <br />0 < <br />0 w <br />USE, REVIEW & COMPLETION IS <br />Q C1. <br />MANDATORY FOR ALL ROSS <br />W~ <br />W~ <br />Of 0 Si <br />D Z <br />PROJECTS. <br />L m <br />L m <br />U_ ui <br />a <br />CONTACT ROSS WITH ANY QUESTIONS. <br />W <br />q W <br />z a- <br />Er <br />� <br />�U <br />tO <br />(nnLL <br />cnLL <br />cnLLQ <br />6.0 <br />Y <br />EXHAUST FANS <br />Architect <br />Engineer <br />Reviewer <br />6.C.1 <br />Y <br />BELT DRIVEN CENTRIFUGAL ROOF EXHAUSTER (ACME, GREENHECK <br />OR EQUIVALENT). <br />MCG <br />MCH <br />6.C.2 <br />Y <br />COMPLETE WITH CURB, BACKDRAFT DAMPER AND DISCONNECT <br />SWITCH. <br />MCG <br />MCH <br />6.C.3 <br />Y <br />FAN SOUND RATING SHALL BE 5 SONES OR LESS. <br />MCG <br />MCH <br />6.C.4 <br />Y <br />RESTROOMS & JANITOR CLOSET EXHAUST FAN EF-1 SHALL BE CONTROLLED <br />BY THE ENERGY MANAGEMENT SYSTEM. LOCKER ROOM & EQUIPMENT CLOSET <br />EXHAUST FAN (EF-2) SHALL BE CONTROLLED BY THE ENERGY MANAGEMENT <br />SYSTEM & A LINE VOLTAGE THERMOSTAT IN PARALLEL (SEE DET 7/SHT E1). <br />LOCATE THERMOSTAT IN THE EQUIPMENT CLOSET 0+54" AFF AT SIDE WALL ON <br />HINGE SIDE OF DOOR. ELECTRICAL ROOM EXHAUST FAN (EF-3) SHALL BE <br />CONTROLLED BY A LINE VOLTAGE THERMOSTATE LOCATED IN THE ELECTRICAL <br />ROOM AT 0+54" AFF NEXT TO DOOR. CLEARLY SPECIFY THAT THE LINE <br />VOLTAGE THERMOSTATS SHALL BE PROVIDED & INSTALLED BY THE MECHANICAL <br />CONTRACTOR; WIRED BY THE ELECTRICAL CONTRACTOR. <br />MCG <br />MCH <br />6.D <br />HVAC SYSTEM PLANS <br />Architect <br />Engineer <br />Reviewer <br />6.D.1 <br />PLANS SHALL BE COMPLETE INCLUDING THE FOLLOWING: <br />MCG <br />MCH <br />6.D.1.A <br />Y <br />A/C UNITS SCHEDULES <br />MCG <br />MCH <br />6.D.1.B <br />Y <br />EXHAUST FANS <br />MCG <br />MCH <br />6.D.1.0 <br />Y <br />SMOKE DETECTORS <br />MCG <br />MCH <br />6.D.1.D <br />Y <br />DUCT HEATERS IF APPLICABLE <br />MCG <br />MCH <br />6.D.1.E <br />Y <br />OUTLET TYPES AND SIZES <br />MCG <br />MCH <br />6.D.1.F <br />Y <br />DUCTWORK TYPE AND SIZE <br />MCG <br />MCH <br />6.DA.G <br />Y <br />INSULATION TYPE AND U FACTOR <br />MCG <br />MCH <br />6.D.1.H <br />Y <br />BALANCE DAMPERS, FIRE DAMPERS, TURNING VANES, EXTRACTORS, <br />ACCESS DOORS/PANELS AND OTHER ACCESSORY SHEET METAL <br />ITEMS <br />MCG <br />MCH <br />6.D.1.1 <br />Y <br />GAS PIPING TYPE AND SIZE <br />MCG <br />MCH <br />6.D.1.J <br />Y <br />CONDENSATE DRAIN PIPING TYPE AND SIZE <br />MCG <br />MCH <br />6.D.1.K <br />COMPLETE LOAD CALCULATIONS <br />MCG <br />MCH <br />MCG <br />MCH <br />6.D.2 <br />PLAN REVIEW: THE COMPLETE 100%) PLAN SET, PLUS LOAD <br />CALCULATIONS FOR EACH UNIT MUST BE SUBMITTED FOR REVIEW <br />TO: <br />MCG <br />MCH <br />6.D.2.A <br />THE ASSIGNED ROSS CONSTRUCTION REPRESENTATIVE <br />MCG <br />MCH <br />6.D.2.B <br />THE ROSS ENGINEERING CONSULTANTS: <br />C&C BUILDING AUTOMATION, ATTN: ENGINEERING DEPARTMENT <br />390 SWIFT AVE.# 22, SOUTH SAN FRANCISCO, CA 94080, <br />PHONE (650) 243-2455, EMAIL: ROSS®CCBAC.COM <br />MCG <br />MCH <br />6.D.2.0 <br />THE UNIT MANUFACTURER: <br />LENNOX INDUSTRIES, INC. ATTENTION CORY HICKEN, LENNOX <br />NATIONAL ACCOUNTS FOR ROSS STORES SEE CONTACT LIST ON AO.0. <br />MCG <br />MCH <br />6.D.3 <br />AS BUILT DRAWINGS: <br />A FULLY UPDATED AS -BUILT AUTOCAD MECHANICAL SET SHALL BE <br />PROVIDED TO ROSS STORES, INC. AT CONSTRUCTION TURNOVER <br />AND AS REQUIRED FOR FINAL ACCEPTANCE UNDER LEASE. <br />MCG <br />MCH <br />6.E <br />DUCTWORK DESIGN <br />Architect <br />En ineer <br />Reviewer <br />6.E.1 <br />SIZING: SUPPLY AT 0.10 100 , RETURN AT 0.08 100 AND BRANCH <br />CONNECTIONS TO OUTLETS AT 800 FPM (MAX). <br />MCG <br />MCH <br />6.E.2 <br />Y <br />ALL DUCTWORK SHALL BE GALVANIZED STEEL WITH TRANSVERSE <br />DUCT JOINTS SEALED WITH 4" WIDE HARDCAST TAPE. DUCT TAPE IS <br />NOT ACCEPTABLE. FIBERGLASS FLEXIBLE DUCTS WITH LINER MAY BE <br />USED FOR BRANCH DUCT CONNECTIONS TO OUTLETS WITH 10 FT. <br />MAXIMUM LENGTH. <br />MCG <br />MCH <br />6.E.3 <br />Y <br />ALL BRANCH DUCT CONNECTIONS TO OUTLETS SHALL INCLUDE A <br />MANUAL BALANCE DAMPER WITH LOCKING QUADRANT LOCATED AT <br />THE BRANCH DUCT CONNECTION TO THE HEADER DUCT. <br />MCG <br />MCH <br />mcg architecture <br />T 2IL54O.1551 © 2IU21LI567 <br />71M E Pleasant Valey Rd, Some 32% t2eMeland, OH 44131 <br />Seal: <br />ao®•®�eeoeea®o <br />o® <br />®� <br />® ' yxILL <br />`• <br />p <br />O <br />s 'J' <br />w ®�® <br />O. <br />O <br />F- <br />O a .J <br />z <br />* <br />rn � es <br />o <br />° <br />S <br />®eis <br />A Project for: <br />Client: <br />ROSS STORES, INC. <br />4440 ROSEWOOD DRIVE <br />PLEASANTON, CA 94588 <br />Revisions: <br />BID/PERMIT <br />02-14-13 <br />No. Description <br />Date <br />Project No.: <br />11.594.01 <br />Drawn By: <br />JPU <br />Reviewed By: <br />MAB <br />Scale: <br />AS NOTED <br />Date: <br />01-28-2013 <br />Filename: <br />Sheet Title: <br />PROTOTYPE <br />CHECKLIST <br />Sheet #: <br />M3 <br />© MCG ARCHITECTS 2013 ALL RIGHTS RESERVED <br />