Laserfiche WebLink
3 ROWS OF 2" <br />VERTICAL MESH TAPE <br />WITH 1" OVERLAP OVER <br />4" VERTICAL BUILDING <br />TAPE ON ALL VERTICAL <br />CORNERS FULL HEIGHT <br />2" HORIZONTAL MESH <br />TAPE OVER BUILDING <br />TAPE WITH 112" OVERLAP <br />9" BUILDING TAPE <br />OVER GLASS -MAT <br />BACKER MATERIAL <br />GLASS -MAT <br />BACKER MATERIAL <br />3 ROWS OF 2" <br />VERTICAL MESH TAPE <br />WITH 1" OVERLAP OVER <br />4" VERTICAL BUILDING <br />TAPE ON ALL VERTICAL <br />CORNERS FULL HEIGHT <br />JSTEEL <br />TRACK —' <br />�"� <br />1/2" OVERLAP <br />6"H GLASS -MAT <br />1/2" OVERLAP <br />INSIDE CORNER <br />BACKER MATERIAL <br />OUTSIDE CORNER <br />GLASS -MAT <br />BACKER MATERIAL <br />TO 12" AFF <br />WALL TILE <br />1/2" GYPSUM BOARD <br />AS <br />UNO <br />SCHEDULED <br />2" SELF-ADHESIVE FIBERGLASS <br />CONTINUOUS <br />MESH TAPE OVER BUILDING TAPE <br />SEALANT <br />°' <br />w <br />BUILDING TAPE <br />.BASE <br />REF SPECS <br />REF FINISH SCHEDULE <br />O <br />6" HIGH GLASS -MAT <br />4" H GLASS -MAT <br />iv <br />BACKER MATERIAL <br />BACKER MATERIAL <br />SANITARY COVE BASE <br />O <br />CONTINUOUS <br />z <br />w <br />TRIM HORIZONTAL EXTENDED FLANGE <br />SEALANT <br />j <br />f- <br />OF BUILDING TAPE TO 1" WIDE <br />m <br />PRIOR TO INSTALLATION OF BASE <br />NON PREP AREA SECTION <br />PREP AREA <br />WALL DETAIL <br />w <br />LL <br />z <br />o' <br />CV <br />LOCATE MINIMUM 10' FROM <br />ANY FRESH AIR INLETS <br />Y <br />1 2 0o <br />REFER TO MEP SHEETS c wjo m w <br />FOR PIPING AND M m� Q p <br />s MIN <br />VENTING INFORMATION <br />1 <br />CLEANSTAR TANK HAS _ <br />TWO INDEPENDENT VENTS THAT HAVE TO BE ! <br />INSTALLED AS REF. IN <br />PLUMBING DTL. DO NOT <br />w <br />FI <br />MANIFOLD OR CAP. <br />i <br />L <br />0 <br />(2)-45° ELBOWS <br />ALONG W/ (2)-2" <br />_ <br />PIPE NIPPLES TO BE <br />O <br />INSTALLED AT END <br />6 <br />OF EVACUATION PIPE j <br />MAX <br />a <br />0 <br />D <br />D <br />i <br />z <br />s <br />t- <br />i <br />O <br />LLO <br />I <br />..........--.... _.............. ... <br />4 <br />~ I <br />........... .... . -----_._...__........_- <br />PREFERRED VENT PIPING <br />WALL TILE <br />REF SHEET A7 FOR SIZE AND COLOR <br />TILE THINSET <br />2" SELF-ADHESIVE \, <br />FIBERGLASS MESH <br />TAPE OVER BUILDING <br />TAPE <br />INSTALL WALL TILE ON <br />TOP OF 6"H GLASS -MAT <br />BACKER MATERIAL <br />METAL STUD <br />BOTTOM STUD <br />WALL TRACK <br />6" HIGH GLASS -MAT <br />BACKER MATERIAL <br />ADHESIVE AT BACK <br />AND BOTTOM OF <br />BASE PER <br />MANUFACTURERS <br />INSTRUCTURES <br />SANITARY COVE BASE AT CERAMIC TILE <br />SANITARY COVE BASE DETAILS (QT <br />ADD (4) 3/8" X 3" SIMPSON <br />TITEN HD ANCHORS TO <br />FLANGES AT BASE IN ALL <br />SEISMIC CATAGORIES <br />GLASS -MAT. <br />BACKER MATERIAL <br />8" H SANITARY COVE BASE <br />REF SPECIFICATIONS <br />QUARRY TILE <br />REF PLANS FOR <br />LOCATIONS <br />BUILDING TAPE (9") <br />REF SPEC SECTION 09655 <br />FACE OF <br />EXTERIOR WALL <br />1 <br />CLEAN >- <br />I STAR <br />TANK I U <br />4" DIAMETER <br />PIPE BOLLARD <br />TYPICAL BOLLARD LOCATIONS <br />BOLLARD DETAILS <br />1/2" = 1'-0" <br />SANITARY COVE BASE OVER NRP/FRP/SS STEEL <br />AAT BACKER M, <br />/COOLER PAN <br />NISH AS SCHEI <br />JITARY COVE B <br />:CIFICATIONS <br />(TILE <br />INS FOR LOCA' <br />MUD <br />ITRACK <br />G TAPE (4") <br />:C SECTION 091,.,., <br />SANITARY COVE BASE OVER FREEZER/COOLER PANEL <br />ROUND OFF TOP <br />4" DIAMETER PIPE BOLLARD, <br />FILL WITH CONCRETE. CORE <br />DRILL FLOOR SLAB THEN <br />HAND AUGER THERAFTER. <br />BOLLARDS TO BE INSTALLED <br />AFTER TANK IS INSTALLED <br />ADD PLASTIC YELLOW <br />BOLLARD COVER. REF <br />SPECS <br />CONCRETE FLOOR SLAB <br />8" DIAMETER CORE DRILL <br />CONCRETE FILL <br />SECTION <br />NOTES: <br />1. CONDITIONS SHOWN ARE FOR NEW CONSTRUCTION. PARTITION AND SUBSTRATE ABOVE 12" AFF MAY VARY AT EXISTING PARTITIONS. <br />2. TRIM EXCESS BUILDING TAPE FROM PROJECTING HORIZONTAL FLAP PRIOR TO INSTALLATION OF BASE. <br />3. REF 3- GA2FOR ADDITIONAL INFORMATION AT INSIDE AND OUTSIDE CORNERS. <br />4. GC TO PROVIDE MECHANICAL FASTENERS PER MANUFACTURERS WRITTEN INSTRUCTIONS. <br />5. USE ACCESSORIES PROVIDED AND INSTALL SANITARY COVE BASE PER MANUFACTURERS INSTRUCTIONS. <br />SANITARY COVE BASE SURFACE <br />PREPARATION REQUIREMENTS <br />1. REMOVE EXISTING WALL BASE. AT EXISTING WALL CONDITIONS, REMOVE <br />ALL GYPSUM BOARD BELOW 12"AFF AND REPLACE WITH GLASS -MAT <br />BACKER OF SAME THICKNESS. IF FRP IS IN GOOD CONDITION REPLACE <br />DAMAGED BASE WITH NEW BASE. <br />2. REMOVE AND REPLACE WALL FINISH TO NEAREST JOINT AS REQUIRED T <br />PERFORM GLASS -MAT BACKER INSTALLATION. <br />3. CUT BACK EXISTING QUARRY TILE FLOORING AS REQUIRED TO PROVIDE <br />1" CLEAR FROM FINISHED SURFACE TO EDGE OF TILE. <br />4. REMOVE ALL DEBRIS AND ANY REMAINING GROUT, CLEAN SURFACES AS <br />REQUIRED FOR PROPER INSTALLATION OF CONSTRUCTION MATERIAL <br />AND FINISHES. <br />5. INSTALL BUILDING TAPE AND FIBERGLASS MESH TAPE AS INDICATED. <br />SEAL TO <br />WALL <br />PAPER <br />TOWEL SOAP <br />DISPENSER DISP <br />I <br />� E <br />'j HANDI <br />c SINK p :- <br />co I j` <br />SEAL TO BACK OF <br />REFRIGERATED CASE <br />TOP OF REF ERATED CASE OR WALL <br />j SOAP <br />+ DISPENSER <br />z PAPER <br />TOWEL <br />DISPENSER,_..._# <br />a 2" MIND :HAND <br />SINK <br />-v <br />TYPICAL (WALL MOUNTED) AT REAR OF REFRIGERATED CASE OR WALL <br />HAND SINK ELEVATION <br />1 /2" = 1'-0" <br />PREFABRICATED INSIDE <br />AND OUTSIDE CORNERS; <br />REF SPECS <br />SANITARY COVE BASE <br />REF SPECS TYP <br />SPLICER <br />REF SPECS <br />SANITARY COVE BAS <br />ACCESSORY DETAILS <br />END CAP <br />REF SPECS <br />TAB (TYP) <br />L <br />U <br />v <br />o� <br />B <br />M <br />U <br />�m <br />of <br />w° .awKbFo <br />F wWu.g <br />D <br />w <br />t;I_wwZ Kozo <br />!r <br />=OLLWT WT�LL6gUO <br />gEl"SUM <br />-am <br />0,OX . <br />O <br />3�w arn�°ZWy�`Z�ZZZ <br />~ <br />ZupF�sy<UO Q <br />Z F <br />ssv oa�p��=� <br />�w(~j �� 00u0u��03 <br />wco <br />a. <br />~ <br />NYU <br />'56°w'c'�'w5i <br />UGa VJHO �- <br />W <br />F_ <br />z <br />0 <br />V <br />0 O <br />O <br />f-- <br />O <br />w <br />a <br />C� c� <br />LJL <br />o <br />0 O <br />w <br />VJ <br />w <br />w <br />J <br />O <br />C7 <br />Gig <br />O <br />Z <br />w <br />o <br />= <br />vV <br />CL <br />W <br />N <br />6 <br />w <br />m <br />2 <br />D <br />z <br />in <br />O <br />ISSUE BLOCK <br />CHECKED BY: J r <br />Ad <br />DRAWN BY: <br />— <br />TAP <br />PROTO: <br />192 SC <br />PROTO CYCLE: <br />112213 <br />DOCUMENT DATE: <br />01/30/14 <br />GROCERY <br />DETAILS <br />SHEET: <br />GA2 <br />3" = 1'-0" <br />