SPRINKLER SYMBOL LEGEND
<br />SYMBOL
<br />SIZE
<br />MFR
<br />MAKE
<br />S.I.N.
<br />I FINISH
<br />STYLE
<br />TEMP
<br />K-FACTOR
<br />SYMBOL
<br />DESCRIPTION
<br />Q
<br />1 "
<br />TYCO
<br />DS-C
<br />TY3555
<br />WHITE
<br />CONCEAL
<br />200
<br />5.6
<br />Q
<br />HYDRAULIC REFERENCE NODE POINT
<br />VARIES
<br />VARIES
<br />VARIES
<br />----
<br />gS
<br />EXISTING
<br />CAP
<br />UPRIGHT
<br />#;
<br />VARIES
<br />VARIES
<br />VARIES
<br />----
<br />CHROME
<br />EXISTING
<br />___
<br />___
<br />O
<br />RISER NIPPLE/DROP NIPPLE
<br />PENDENT
<br />DEMO
<br />VARIES
<br />VARIES
<br />----
<br />___
<br />EXISTING
<br />SPRINKLER RISER
<br />PENDENT
<br />CONTRACTOR MAY SUBSTITUTE SPRINKLERS OF SAME SIZE, K-FACTOR AND
<br />o- i-
<br />INSPECTOR'S TEST/AUXILIARY DRAIN
<br />TEMPERATURE CLASSIFICATION UNLESS PROHIBITED BY THE SPECIFICATIONS.
<br />a i a
<br />a 7
<br />Q i r
<br />{ I I I I G
<br />I 6 i I i
<br />I I I I I I
<br />I I I I I
<br />I I I I
<br />7-1
<br />CONTACT
<br />INFORMATION
<br />DOCUMENTS INCLUDE JURISDICTIONAL REQUIREMENTS
<br />PROVIDED BY THE FOLLOWING CONTACTS:
<br />FIRE SPRINKLER REVIEWING AUTHORITY:
<br />VERNE RIGGALL, FIRE MARSHAL
<br />(813) 780-0041
<br />APPLICABLE CODES
<br />\ HANGER NFPA STANDARDS EDITION
<br />NFPA 13 2007
<br />\\\ TRAPEZE HANGER PERPENDICULAR TO JOIST REFER TO SHEET Cl FOR APPLICABLE BUILDING CODES
<br />\\\ TRAPEZE HANGER PARALLEL TO JOIST
<br />NEW CONNECTION
<br />I NEW SPRINKLER PIPE
<br />- - EXISTING SPRINKLER PIPE
<br />- ' - DEMO SPRINKLER PIPE
<br />PROVIDE ADDITIONAL SPRINKLERS AS
<br />REQUIRED PER NFPA 13 IN EXISTING
<br />SPRINKLER CABINET FOR ANY NEW
<br />SPRINKLERS INSTALLED.
<br />a
<br />i I
<br />I ,
<br />I I I
<br />I I i
<br />yc a 1
<br />I I i
<br />I ! �
<br />I I I
<br />i I I
<br />-}------------ f------------ }---------
<br />0
<br />a
<br />r;
<br />I
<br />1 1 1 1 1 1 1 I 1
<br />I I 1 I I I I I f I I i I
<br />Ll
<br />,, I I I G.5
<br />IrI
<br />5 5
<br />B ;? S "'ems :,-•.-., --^'',u'^ 1.
<br />� 1
<br />1 1 1 1 1 P F i 1 I II I i F.5
<br />4 I I I
<br />Y I i I I I 1 I FP2 I 1
<br />I I I I I I I I f I
<br />iE 1 1 1 1 1 1 v 1 I -_-_-_- _.__- l --------_--1! ._-_-_-----_-
<br />_-_-_
<br />-__�--___-
<br />r 7 -`_-_`�F
<br />5 I I 5 I I 5 s I O
<br />FP3 € FP3 i I FP3 I I
<br />----------- - - - - r� _ __ I _ _-.---------------- --.---_----�---------- ----,----------------- - - - - - - - - - - - ----------.-_ --- 1 _-_-.--_- - - - -.------------- -------------I .----- �---�--------- - -�----
<br />i ®I I
<br />I I I If
<br />717,
<br />1 t 1 1 I F i i 1 I 1 t j
<br />5
<br />1 1 1 1 i I i 1 1 1 I
<br />FP3 I I I
<br />i 1 1 I I 1 I I 1 1 ^ I 1
<br />I I 5 I I 5 5 I i I II
<br />I 2 6 I I FP3 { I FP3 I FP3 I I I I I
<br />I FP2 FP2 I i( ®1 i (® 1 I I ( 1
<br />®1
<br />+I � 1 1 i -I I I v► E i I -
<br />1
<br />A t { i I I B '::.a.d•,"iic:4 ""'-"""..�^:' d t i
<br />"
<br />I I
<br />---L------------ L--------L`J
<br />I
<br />IN
<br />fin^
<br />1 5
<br />FP2 FP2 I ! I I ! I I I
<br />I 1 1 1 I 1 e i 1 1 I t
<br />I 1 :
<br />I 1 E
<br />1
<br />I .-I I I I Ir
<br />. I I I I
<br />r
<br />A.�_ `T-L:.�
<br />i I 1 f
<br />1� �6 7� O 10 11 12 13 3.6 14 15
<br />901VA 0 N all I m 9 1:4 W&W Sol 1,63 1 0 0 �AN .. • •
<br />GENERAL PIPING
<br />AND DEMOLITION NOTES
<br />GENERAL NOTES
<br />1. CONTRACTOR MUST VISIT THE BUILDING TO
<br />1.
<br />THE DESIGN SHOWN ON THESE CONTRACT
<br />DETERMINE THE FULL EXTENT OF THE EXISTING FIRE
<br />DOCUMENTS HAS BEEN PREPARED FOR APPROVAL BY
<br />PROTECTION WORK AND THE EXISTING CONDITIONS,
<br />THE AUTHORITY HAVING JURISDICTION AND TO
<br />BECOME TOTALLY FAMILIAR WITH DISCONNECTIONS,
<br />PROVIDE GUIDANCE FOR BIDDING. THE CONTRACTOR
<br />REMOVALS, RELOCATIONS AND/OR RECONNECTIONS
<br />SHALL SUBMIT COMPLETE FIRE SPRINKLER SHOP
<br />OF EXISTING FIRE PROTECTION EQUIPMENT REQUIRED,
<br />DRAWINGS AS REQUIRED BY SPECIFICATION SECTION
<br />AND CONDITIONS IN THE PROPOSAL FOR THIS
<br />01330. CONTRACTOR SHALL BASE SHOP DRAWING
<br />PROJECT. NO EXTRA COMPENSATION WILL BE PAID
<br />DESIGN ON THE FIRE PROTECTION DRAWINGS AND
<br />FOR LACK OF SUCH DETERMINATION, FAMILIARIZATION,
<br />SPECIFICATIONS. SPRINKLER SHOP DRAWINGS SHALL
<br />AND/OR ALLOWANCE.
<br />INCLUDE ALL NECESSARY ELEVATIONS, HANGER
<br />LOCATIONS, PIPE LENGTHS, DIMENSIONS, FABRICATION
<br />2. UNLESS NOTED OTHERWISE, DISCONNECT AND REMOVE
<br />METHODS/NOTES, MATERIAL DATA, AND ANY OTHER
<br />ALL EXISTING FIRE PROTECTION COMPONENTS NOT
<br />INFORMATION NECESSARY TO CLARIFY THE INTENT OF
<br />INTENDED TO BE REUSED.
<br />INSTALLATION. CONTRACTOR SHALL PROVIDE PIPE
<br />SIZES, SPRINKLER SPACING, AND ALL SYSTEM
<br />3. REMOVE ALL DEMOLITION MATERIALS AND DEBRIS TO
<br />CONFIGURATIONS AS SHOWN. ANY ALTERNATES IN
<br />AN APPROVED DUMPING SITE AND CLEAN ALL FIRE
<br />DESIGN OF THE SYSTEM OR IN MATERIALS OR
<br />PROTECTION WORK PRIOR TO PROJECT COMPLETION.
<br />EQUIPMENT USED MUST BE APPROVED IN WRITING VIA
<br />THE REQUEST FOR INFORMATION PROCESS BY THE
<br />4. PERFORM ALL WORK ACCORDING TO THE PROJECT
<br />FIRE PROTECTION ENGINEER OF RECORD PRIOR TO
<br />PHASING SCHEDULE INFORMATION FOR THIS PROJECT.
<br />ANY BIDDING, FABRICATION, OR INSTALLATION.
<br />PROVIDE ALL NECESSARY FIRE PROTECTION WORK,
<br />TEMPORARY AND/OR OTHERWISE, AND USE WHATEVER
<br />2•
<br />CONTRACTOR SHALL COORDINATE LOCATIONS OF FIRE
<br />MEANS NECESSARY, TO CONFORM TO THE REQUIRED
<br />PROTECTION COMPONENTS INCLUDING PIPING, ALARMS,
<br />CONSTRUCTION PHASING OF THE PROJECT.
<br />DRAINS, TEST POINTS, ETC., WITH ALL
<br />ARCHITECTURAL, STRUCTURAL, MECHANICAL, AND
<br />5. CONTRACTOR IS RESPONSIBLE FOR REPAIRING OR
<br />ELECTRICAL COMPONENTS. OBSTRUCTIONS TO
<br />REPLACING ITEMS DAMAGED DURING DEMOLITION AND
<br />SPRINKLER DISCHARGE MUST BE CONSIDERED DURING
<br />CONSTRUCTION.
<br />SHOP DRAWING PRODUCTION AND INSTALLATION.
<br />EXTRA SPRINKLERS MAY BE REQUIRED AT NO
<br />6. CONTRACTOR SHALL PATCH ALL HOLES TO MATCH
<br />ADDITIONAL COST TO WAL-MART. REFER TO
<br />ADJACENT SURFACES LEFT UNUSED AFTER EXISTING
<br />SPECIFICATION FOR ADDITIONAL REQUIREMENTS.
<br />SPRINKLER PIPING OR EQUIPMENT IS REMOVED AND
<br />VACATED FROM THESE HOLES.
<br />3.
<br />SUBMIT A REQUEST FOR INFORMATION (RFI), FOR
<br />QUESTIONS RELATED TO THE FIRE PROTEC1ON
<br />7. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND
<br />DOCUMENTS.
<br />MAINTAINING FIRE DEPARTMENT ACCESS ROADS
<br />THROUGHOUT THE PROJECT.
<br />4.
<br />ROUTE ALL SPRINKLER MAINS ABOVE THE BOTTOM
<br />CHORD OF THE BAR JOISTS.
<br />8. SPRINKLER SYSTEMS NOT ASSOCIATED WITH THE
<br />DEMOLITION SHALL BE LEFT IN SERVICE.
<br />5.
<br />PROVIDE FIRE PROTECTION AS REQUIRED BY CODE
<br />FOR ANY TEMPORARY STRUCTURES BUILT DURING
<br />9. ALL WORK SHALL BE PERFORMED SO AS TO NOT
<br />CONSTRUCTION.
<br />INTERRUPT SERVICE. THE CONTRACTOR SHALL
<br />PROPERLY NOTIFY THE LANDLORD, THE LESSOR AND
<br />6.
<br />SPRINKLER SYSTEMS ARE MONITORED BY AN
<br />ADJACENT TENANTS A MINIMUM OF 48 HOURS IN
<br />OFF -SITE CENTRAL STATION INCLUDING TAMPER
<br />ADVANCE BEFORE PROCEEDING WITH THIS WORK.
<br />SWITCHES ON ALL CONTROL VALVES AND FLOW
<br />ALL WORK SHALL BE SCHEDULED IN ADVANCE.
<br />SWITCHES.
<br />10. ALL SYSTEMS TO BE LEFT IN SERVICE PRIOR TO THE
<br />7.
<br />IF APPLICABLE, THE CONTRACTOR SHALL ASSUME
<br />END OF EACH WORKDAY.
<br />THAT ANY CURTAIN BOARDS OR DRAFT CURTAINS
<br />WILL BE INSTALLED PRIOR TO THE SPRINKLER PIPING.
<br />11. ONLY THE POR11ONS OF THE BUILDING AFFECTED BY
<br />CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER
<br />THE SCOPE OF THE PROJECT HAVE BEEN SHOWN.
<br />PENETRATIONS OF THE CURTAIN BOARDS OR DRAFT
<br />INFORMATION SHOWN AS EXISTING TO REMAIN IS NOT
<br />CURTAINS AND SEALING WITH APPROVED FIRE
<br />BEING MODIFIED AS A PART OF THIS PROJECT.
<br />CAULKING.
<br />12. SPRINKLER CONTRACTOR TO SUBMIT AND RECEIVE
<br />8.
<br />PENETRATIONS OF RATED WALLS OR ASSEMBLIES
<br />APPROVAL OF FULL SHOP DRAWINGS TO HENDERSON
<br />SHALL BE "FIRE CAULKED" WITH APPROVED CAULKING
<br />ENGINEERS PRIOR TO FABRICATION AND
<br />PER METHODS REQUIRED BY THE AUTHORITY HAVING
<br />INSTALLATION.
<br />9.
<br />JURSDICTION, AND PROJECT SPECIFICATIONS.
<br />THE FIRE PROTECTION ENGINEER OF RECORD WILL
<br />NOT BE RESPONSIBLE FOR THE CONTRACTOR'S
<br />FAILURE TO CARRY OUT THE CONSTRUCTION WORK IN
<br />ACCORDANCE WITH THE CONTRACT DOCUMENTS, NOR
<br />SHALL THEY BE REQUIRED TO SUPERVISE THE
<br />CONDUCT OF THE WORK, THE CONSTRUCTION
<br />PROCEDURES AS SET FORTH BY THE GENERAL
<br />CONTRACTOR, SUB -CONTRACTORS, THEIR RESPECTIVE
<br />EMPLOYEES, OR ANY OTHER PERSON AT THE JOBSITE
<br />OTHER THAN THE ENGINEERING FIRM'S OWN
<br />EMPLOYEES.
<br />10.
<br />SPRINKLER PROTECTION IS REQUIRED ABOVE THE
<br />ELECTRICAL ROOMS. NO MAIN PIPING SHALL
<br />PENETRATE OR PASS ABOVE THE ELECTRICAL ROOMS.
<br />11.
<br />THE CONTRACTOR MUST REVIEW ALL CONSTRUCTION
<br />DOCUMENTS PRIOR TO BID. SHOULD MODIFICATION TO
<br />THESE PLANS BECOME NECESSARY TO PROPERLY
<br />COORDINATE THE SYSTEM WITH, OTHER TRADES, IT
<br />WILL BE THE CONTRACTOR'S RESPONSIBILITY TO
<br />OBTAIN APPROVAL OF THESE CHANGES BY THE AHJ,
<br />AND THE FIRE PROTECTION ENGINEER OF RECORD. IN
<br />ADDITION TO OBTAINING THE NECESSARY APPROVALS,
<br />THE CONTRACTOR MUST MAKE NOTE OF ALL FIELD
<br />OR COORDINATION CHANGES ON THE INSTALLATION
<br />DRAWINGS. ONCE COMPLETE, THE CONTRACTOR SHALL
<br />SUPPLY ONE COPY OF AS -BUILT DRAWINGS TO THE
<br />FIRE PROTECTION ENGINEER OF RECORD FOR THEIR
<br />USE.
<br />12.
<br />THE CONTRACTOR SHALL DIVERT ALL DRAIN AND
<br />INSPECTORS TEST CONNEC1ON DISCHARGE AWAY
<br />FROM FINISHED SURFACES AND PIPE TO APPROVED
<br />DRAIN LOCATIONS. THE CONTRACTOR WILL BE
<br />BACKCHARGED FOR ANY REPAIR, REPLACEMENT, OR
<br />CLEANING OF RUST STAINS ON PAVEMENT/CONCRETE
<br />DUE TO WATER DISCHARGE FROM SPRINKLER SYSTEM
<br />DRAIN DOWNS.
<br />SHEET INDEX
<br />FP1 OVERALL FIRE SPRINKLER PLAN
<br />FP2 ENLARGED FIRE SPRINKLER PLAN
<br />FP3 FIRE PROTECTION DETAILS
<br />FP4 STOCKROOM HYDRAULIC PLACARD INFORMATION
<br />m m�
<br />I
<br />L
<br />�
<br />U
<br />a8
<br />�2wo
<br />c ui Z
<br />w LL ly'ZF
<br />U.
<br />0 3
<br />g g0�O°yoo(*o()zN.
<br />d oie !NMv ��002
<br />a�<u�j �c5�0 w(.)Lu
<br />Zcog
<br />H
<br />o
<br />S.o
<br />N
<br />WW
<br />�01
<br />za
<br />Q
<br />Z
<br />=_
<br />Ln
<br />.r
<br />o.
<br />z
<br />U
<br />00
<br />J
<br />W
<br />0
<br />0 O
<br />LL
<br />♦)
<br />VJ
<br />z
<br />w
<br />o
<br />0
<br />z
<br />60
<br />,.
<br />W
<br />0
<br />r
<br />0
<br />�
<br />cl)
<br />I..LI
<br />N
<br />W
<br />m
<br />11)
<br />D
<br />z
<br />m
<br />0
<br />ISSUE BLOCK
<br />CHECKED BY:
<br />SRD/JEC
<br />DRAWN BY:
<br />OAF
<br />PROTO:
<br />192 SC
<br />PROTO CYCLE:
<br />122013
<br />DOCUMENT DATE:
<br />01/30/14
<br />DARRELL E. STEIN
<br />LICENSE # 58463
<br />i
<br />Nor "483
<br />STATE OF ) i
<br />OVERALL
<br />FIRE
<br />SPRINKLER
<br />PLAN
<br />w
<br />V)
<br />w
<br />J
<br />J
<br />w
<br />it
<br />a
<br />0
<br />EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING
<br />DRAWINGS AND MAY NOT REFLECT EXACT A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND
<br />"AS -BUILT" CONDITIONS. CONTRACTOR SHALL FIELD SPECIFICATIONS IN THEIR RELATED FIELD. THE
<br />VERIFY ALL EXISTING CONDITIONS PRIOR TO FAILURE TO ACQUAINT THEMSELF WITH THIS
<br />SUBMITTING FINAL BIDS. CONTRACTOR SHALL KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY
<br />CAREFULLY COORDINATE NEW WORK AND DEMOLITION OF PERFORMING THE WORK PROPERLY. NO
<br />WITH ALL OTHER DISCIPLINES AND EXISTING ADDITIONAL COMPENSATION SHALL BE ALLOWED
<br />CONDITIONS. BECAUSE OF CONDITIONS THAT OCCUR DUE
<br />TO FAILURE TO FAMILIARIZE WORKERS WITH THIS
<br />KNOWLEDGE.
<br />SHEET:
<br />FP1
<br />
|