Laserfiche WebLink
SPRINKLER SYMBOL LEGEND <br />SYMBOL <br />SIZE <br />MFR <br />MAKE <br />S.I.N. <br />I FINISH <br />STYLE <br />TEMP <br />K-FACTOR <br />SYMBOL <br />DESCRIPTION <br />Q <br />1 " <br />TYCO <br />DS-C <br />TY3555 <br />WHITE <br />CONCEAL <br />200 <br />5.6 <br />Q <br />HYDRAULIC REFERENCE NODE POINT <br />VARIES <br />VARIES <br />VARIES <br />---- <br />gS <br />EXISTING <br />CAP <br />UPRIGHT <br />#; <br />VARIES <br />VARIES <br />VARIES <br />---- <br />CHROME <br />EXISTING <br />___ <br />___ <br />O <br />RISER NIPPLE/DROP NIPPLE <br />PENDENT <br />DEMO <br />VARIES <br />VARIES <br />---- <br />___ <br />EXISTING <br />SPRINKLER RISER <br />PENDENT <br />CONTRACTOR MAY SUBSTITUTE SPRINKLERS OF SAME SIZE, K-FACTOR AND <br />o- i- <br />INSPECTOR'S TEST/AUXILIARY DRAIN <br />TEMPERATURE CLASSIFICATION UNLESS PROHIBITED BY THE SPECIFICATIONS. <br />a i a <br />a 7 <br />Q i r <br />{ I I I I G <br />I 6 i I i <br />I I I I I I <br />I I I I I <br />I I I I <br />7-1 <br />CONTACT <br />INFORMATION <br />DOCUMENTS INCLUDE JURISDICTIONAL REQUIREMENTS <br />PROVIDED BY THE FOLLOWING CONTACTS: <br />FIRE SPRINKLER REVIEWING AUTHORITY: <br />VERNE RIGGALL, FIRE MARSHAL <br />(813) 780-0041 <br />APPLICABLE CODES <br />\ HANGER NFPA STANDARDS EDITION <br />NFPA 13 2007 <br />\\\ TRAPEZE HANGER PERPENDICULAR TO JOIST REFER TO SHEET Cl FOR APPLICABLE BUILDING CODES <br />\\\ TRAPEZE HANGER PARALLEL TO JOIST <br />NEW CONNECTION <br />I NEW SPRINKLER PIPE <br />- - EXISTING SPRINKLER PIPE <br />- ' - DEMO SPRINKLER PIPE <br />PROVIDE ADDITIONAL SPRINKLERS AS <br />REQUIRED PER NFPA 13 IN EXISTING <br />SPRINKLER CABINET FOR ANY NEW <br />SPRINKLERS INSTALLED. <br />a <br />i I <br />I , <br />I I I <br />I I i <br />yc a 1 <br />I I i <br />I ! � <br />I I I <br />i I I <br />-}------------ f------------ }--------- <br />0 <br />a <br />r; <br />I <br />1 1 1 1 1 1 1 I 1 <br />I I 1 I I I I I f I I i I <br />Ll <br />,, I I I G.5 <br />IrI <br />5 5 <br />B ;? S "'ems :,-•.-., --^'',u'^ 1. <br />� 1 <br />1 1 1 1 1 P F i 1 I II I i F.5 <br />4 I I I <br />Y I i I I I 1 I FP2 I 1 <br />I I I I I I I I f I <br />iE 1 1 1 1 1 1 v 1 I -_-_-_- _.__- l --------_--1! ._-_-_-----_- <br />_-_-_ <br />-__�--___- <br />r 7 -`_-_`�F <br />5 I I 5 I I 5 s I O <br />FP3 € FP3 i I FP3 I I <br />----------- - - - - r� _ __ I _ _-.---------------- --.---_----�---------- ----,----------------- - - - - - - - - - - - ----------.-_ --- 1 _-_-.--_- - - - -.------------- -------------I .----- �---�--------- - -�---- <br />i ®I I <br />I I I If <br />717, <br />1 t 1 1 I F i i 1 I 1 t j <br />5 <br />1 1 1 1 i I i 1 1 1 I <br />FP3 I I I <br />i 1 1 I I 1 I I 1 1 ^ I 1 <br />I I 5 I I 5 5 I i I II <br />I 2 6 I I FP3 { I FP3 I FP3 I I I I I <br />I FP2 FP2 I i( ®1 i (® 1 I I ( 1 <br />®1 <br />+I � 1 1 i -I I I v► E i I - <br />1 <br />A t { i I I B '::.a.d•,"iic:4 ""'-"""..�^:' d t i <br />" <br />I I <br />---L------------ L--------L`J <br />I <br />IN <br />fin^ <br />1 5 <br />FP2 FP2 I ! I I ! I I I <br />I 1 1 1 I 1 e i 1 1 I t <br />I 1 : <br />I 1 E <br />1 <br />I .-I I I I Ir <br />. I I I I <br />r <br />A.�_ `T-L:.� <br />i I 1 f <br />1� �6 7� O 10 11 12 13 3.6 14 15 <br />901VA 0 N all I m 9 1:4 W&W Sol 1,63 1 0 0 �AN .. • • <br />GENERAL PIPING <br />AND DEMOLITION NOTES <br />GENERAL NOTES <br />1. CONTRACTOR MUST VISIT THE BUILDING TO <br />1. <br />THE DESIGN SHOWN ON THESE CONTRACT <br />DETERMINE THE FULL EXTENT OF THE EXISTING FIRE <br />DOCUMENTS HAS BEEN PREPARED FOR APPROVAL BY <br />PROTECTION WORK AND THE EXISTING CONDITIONS, <br />THE AUTHORITY HAVING JURISDICTION AND TO <br />BECOME TOTALLY FAMILIAR WITH DISCONNECTIONS, <br />PROVIDE GUIDANCE FOR BIDDING. THE CONTRACTOR <br />REMOVALS, RELOCATIONS AND/OR RECONNECTIONS <br />SHALL SUBMIT COMPLETE FIRE SPRINKLER SHOP <br />OF EXISTING FIRE PROTECTION EQUIPMENT REQUIRED, <br />DRAWINGS AS REQUIRED BY SPECIFICATION SECTION <br />AND CONDITIONS IN THE PROPOSAL FOR THIS <br />01330. CONTRACTOR SHALL BASE SHOP DRAWING <br />PROJECT. NO EXTRA COMPENSATION WILL BE PAID <br />DESIGN ON THE FIRE PROTECTION DRAWINGS AND <br />FOR LACK OF SUCH DETERMINATION, FAMILIARIZATION, <br />SPECIFICATIONS. SPRINKLER SHOP DRAWINGS SHALL <br />AND/OR ALLOWANCE. <br />INCLUDE ALL NECESSARY ELEVATIONS, HANGER <br />LOCATIONS, PIPE LENGTHS, DIMENSIONS, FABRICATION <br />2. UNLESS NOTED OTHERWISE, DISCONNECT AND REMOVE <br />METHODS/NOTES, MATERIAL DATA, AND ANY OTHER <br />ALL EXISTING FIRE PROTECTION COMPONENTS NOT <br />INFORMATION NECESSARY TO CLARIFY THE INTENT OF <br />INTENDED TO BE REUSED. <br />INSTALLATION. CONTRACTOR SHALL PROVIDE PIPE <br />SIZES, SPRINKLER SPACING, AND ALL SYSTEM <br />3. REMOVE ALL DEMOLITION MATERIALS AND DEBRIS TO <br />CONFIGURATIONS AS SHOWN. ANY ALTERNATES IN <br />AN APPROVED DUMPING SITE AND CLEAN ALL FIRE <br />DESIGN OF THE SYSTEM OR IN MATERIALS OR <br />PROTECTION WORK PRIOR TO PROJECT COMPLETION. <br />EQUIPMENT USED MUST BE APPROVED IN WRITING VIA <br />THE REQUEST FOR INFORMATION PROCESS BY THE <br />4. PERFORM ALL WORK ACCORDING TO THE PROJECT <br />FIRE PROTECTION ENGINEER OF RECORD PRIOR TO <br />PHASING SCHEDULE INFORMATION FOR THIS PROJECT. <br />ANY BIDDING, FABRICATION, OR INSTALLATION. <br />PROVIDE ALL NECESSARY FIRE PROTECTION WORK, <br />TEMPORARY AND/OR OTHERWISE, AND USE WHATEVER <br />2• <br />CONTRACTOR SHALL COORDINATE LOCATIONS OF FIRE <br />MEANS NECESSARY, TO CONFORM TO THE REQUIRED <br />PROTECTION COMPONENTS INCLUDING PIPING, ALARMS, <br />CONSTRUCTION PHASING OF THE PROJECT. <br />DRAINS, TEST POINTS, ETC., WITH ALL <br />ARCHITECTURAL, STRUCTURAL, MECHANICAL, AND <br />5. CONTRACTOR IS RESPONSIBLE FOR REPAIRING OR <br />ELECTRICAL COMPONENTS. OBSTRUCTIONS TO <br />REPLACING ITEMS DAMAGED DURING DEMOLITION AND <br />SPRINKLER DISCHARGE MUST BE CONSIDERED DURING <br />CONSTRUCTION. <br />SHOP DRAWING PRODUCTION AND INSTALLATION. <br />EXTRA SPRINKLERS MAY BE REQUIRED AT NO <br />6. CONTRACTOR SHALL PATCH ALL HOLES TO MATCH <br />ADDITIONAL COST TO WAL-MART. REFER TO <br />ADJACENT SURFACES LEFT UNUSED AFTER EXISTING <br />SPECIFICATION FOR ADDITIONAL REQUIREMENTS. <br />SPRINKLER PIPING OR EQUIPMENT IS REMOVED AND <br />VACATED FROM THESE HOLES. <br />3. <br />SUBMIT A REQUEST FOR INFORMATION (RFI), FOR <br />QUESTIONS RELATED TO THE FIRE PROTEC1ON <br />7. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND <br />DOCUMENTS. <br />MAINTAINING FIRE DEPARTMENT ACCESS ROADS <br />THROUGHOUT THE PROJECT. <br />4. <br />ROUTE ALL SPRINKLER MAINS ABOVE THE BOTTOM <br />CHORD OF THE BAR JOISTS. <br />8. SPRINKLER SYSTEMS NOT ASSOCIATED WITH THE <br />DEMOLITION SHALL BE LEFT IN SERVICE. <br />5. <br />PROVIDE FIRE PROTECTION AS REQUIRED BY CODE <br />FOR ANY TEMPORARY STRUCTURES BUILT DURING <br />9. ALL WORK SHALL BE PERFORMED SO AS TO NOT <br />CONSTRUCTION. <br />INTERRUPT SERVICE. THE CONTRACTOR SHALL <br />PROPERLY NOTIFY THE LANDLORD, THE LESSOR AND <br />6. <br />SPRINKLER SYSTEMS ARE MONITORED BY AN <br />ADJACENT TENANTS A MINIMUM OF 48 HOURS IN <br />OFF -SITE CENTRAL STATION INCLUDING TAMPER <br />ADVANCE BEFORE PROCEEDING WITH THIS WORK. <br />SWITCHES ON ALL CONTROL VALVES AND FLOW <br />ALL WORK SHALL BE SCHEDULED IN ADVANCE. <br />SWITCHES. <br />10. ALL SYSTEMS TO BE LEFT IN SERVICE PRIOR TO THE <br />7. <br />IF APPLICABLE, THE CONTRACTOR SHALL ASSUME <br />END OF EACH WORKDAY. <br />THAT ANY CURTAIN BOARDS OR DRAFT CURTAINS <br />WILL BE INSTALLED PRIOR TO THE SPRINKLER PIPING. <br />11. ONLY THE POR11ONS OF THE BUILDING AFFECTED BY <br />CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER <br />THE SCOPE OF THE PROJECT HAVE BEEN SHOWN. <br />PENETRATIONS OF THE CURTAIN BOARDS OR DRAFT <br />INFORMATION SHOWN AS EXISTING TO REMAIN IS NOT <br />CURTAINS AND SEALING WITH APPROVED FIRE <br />BEING MODIFIED AS A PART OF THIS PROJECT. <br />CAULKING. <br />12. SPRINKLER CONTRACTOR TO SUBMIT AND RECEIVE <br />8. <br />PENETRATIONS OF RATED WALLS OR ASSEMBLIES <br />APPROVAL OF FULL SHOP DRAWINGS TO HENDERSON <br />SHALL BE "FIRE CAULKED" WITH APPROVED CAULKING <br />ENGINEERS PRIOR TO FABRICATION AND <br />PER METHODS REQUIRED BY THE AUTHORITY HAVING <br />INSTALLATION. <br />9. <br />JURSDICTION, AND PROJECT SPECIFICATIONS. <br />THE FIRE PROTECTION ENGINEER OF RECORD WILL <br />NOT BE RESPONSIBLE FOR THE CONTRACTOR'S <br />FAILURE TO CARRY OUT THE CONSTRUCTION WORK IN <br />ACCORDANCE WITH THE CONTRACT DOCUMENTS, NOR <br />SHALL THEY BE REQUIRED TO SUPERVISE THE <br />CONDUCT OF THE WORK, THE CONSTRUCTION <br />PROCEDURES AS SET FORTH BY THE GENERAL <br />CONTRACTOR, SUB -CONTRACTORS, THEIR RESPECTIVE <br />EMPLOYEES, OR ANY OTHER PERSON AT THE JOBSITE <br />OTHER THAN THE ENGINEERING FIRM'S OWN <br />EMPLOYEES. <br />10. <br />SPRINKLER PROTECTION IS REQUIRED ABOVE THE <br />ELECTRICAL ROOMS. NO MAIN PIPING SHALL <br />PENETRATE OR PASS ABOVE THE ELECTRICAL ROOMS. <br />11. <br />THE CONTRACTOR MUST REVIEW ALL CONSTRUCTION <br />DOCUMENTS PRIOR TO BID. SHOULD MODIFICATION TO <br />THESE PLANS BECOME NECESSARY TO PROPERLY <br />COORDINATE THE SYSTEM WITH, OTHER TRADES, IT <br />WILL BE THE CONTRACTOR'S RESPONSIBILITY TO <br />OBTAIN APPROVAL OF THESE CHANGES BY THE AHJ, <br />AND THE FIRE PROTECTION ENGINEER OF RECORD. IN <br />ADDITION TO OBTAINING THE NECESSARY APPROVALS, <br />THE CONTRACTOR MUST MAKE NOTE OF ALL FIELD <br />OR COORDINATION CHANGES ON THE INSTALLATION <br />DRAWINGS. ONCE COMPLETE, THE CONTRACTOR SHALL <br />SUPPLY ONE COPY OF AS -BUILT DRAWINGS TO THE <br />FIRE PROTECTION ENGINEER OF RECORD FOR THEIR <br />USE. <br />12. <br />THE CONTRACTOR SHALL DIVERT ALL DRAIN AND <br />INSPECTORS TEST CONNEC1ON DISCHARGE AWAY <br />FROM FINISHED SURFACES AND PIPE TO APPROVED <br />DRAIN LOCATIONS. THE CONTRACTOR WILL BE <br />BACKCHARGED FOR ANY REPAIR, REPLACEMENT, OR <br />CLEANING OF RUST STAINS ON PAVEMENT/CONCRETE <br />DUE TO WATER DISCHARGE FROM SPRINKLER SYSTEM <br />DRAIN DOWNS. <br />SHEET INDEX <br />FP1 OVERALL FIRE SPRINKLER PLAN <br />FP2 ENLARGED FIRE SPRINKLER PLAN <br />FP3 FIRE PROTECTION DETAILS <br />FP4 STOCKROOM HYDRAULIC PLACARD INFORMATION <br />m m� <br />I <br />L <br />� <br />U <br />a8 <br />�2wo <br />c ui Z <br />w LL ly'ZF <br />U. <br />0 3 <br />g g0�O°yoo(*o()zN. <br />d oie !NMv ��002 <br />a�<u�j �c5�0 w(.)Lu <br />Zcog <br />H <br />o <br />S.o <br />N <br />WW <br />�01 <br />za <br />Q <br />Z <br />=_ <br />Ln <br />.r <br />o. <br />z <br />U <br />00 <br />J <br />W <br />0 <br />0 O <br />LL <br />♦) <br />VJ <br />z <br />w <br />o <br />0 <br />z <br />60 <br />,. <br />W <br />0 <br />r <br />0 <br />� <br />cl) <br />I..LI <br />N <br />W <br />m <br />11) <br />D <br />z <br />m <br />0 <br />ISSUE BLOCK <br />CHECKED BY: <br />SRD/JEC <br />DRAWN BY: <br />OAF <br />PROTO: <br />192 SC <br />PROTO CYCLE: <br />122013 <br />DOCUMENT DATE: <br />01/30/14 <br />DARRELL E. STEIN <br />LICENSE # 58463 <br />i <br />Nor "483 <br />STATE OF ) i <br />OVERALL <br />FIRE <br />SPRINKLER <br />PLAN <br />w <br />V) <br />w <br />J <br />J <br />w <br />it <br />a <br />0 <br />EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING <br />DRAWINGS AND MAY NOT REFLECT EXACT A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND <br />"AS -BUILT" CONDITIONS. CONTRACTOR SHALL FIELD SPECIFICATIONS IN THEIR RELATED FIELD. THE <br />VERIFY ALL EXISTING CONDITIONS PRIOR TO FAILURE TO ACQUAINT THEMSELF WITH THIS <br />SUBMITTING FINAL BIDS. CONTRACTOR SHALL KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY <br />CAREFULLY COORDINATE NEW WORK AND DEMOLITION OF PERFORMING THE WORK PROPERLY. NO <br />WITH ALL OTHER DISCIPLINES AND EXISTING ADDITIONAL COMPENSATION SHALL BE ALLOWED <br />CONDITIONS. BECAUSE OF CONDITIONS THAT OCCUR DUE <br />TO FAILURE TO FAMILIARIZE WORKERS WITH THIS <br />KNOWLEDGE. <br />SHEET: <br />FP1 <br />