My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7631 Gall Blvd (21)
Zephyrhills
>
Building Department
>
Building Plans
>
7631 Gall Blvd (21)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2025 9:43:28 AM
Creation date
2/25/2025 4:19:13 PM
Metadata
Fields
Template:
Building Plans
Street #
7631
Location
Gall Blvd
Contractor
AAA Plumb and Septic
Building Plans - Permit #
3261
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HVAC NOTES <br />HVAC NOTES (CONTINUED) <br />A. DUCTWORK SHALL BE RUN ABOVE CEILING AS HIGH AS POSSIBLE IN GENERAL LOCATIONS SHOWN, <br />BUT SHALL CONFORM TO ALL STRUCTURAL AND FINISH CONDITIONS OF BUILDINGS. COORDINATE <br />WITH STRUCTURAL AND ARCHITECTURAL DRAWINGS PRIOR TO ANY INSTALLATION. <br />B. LOCATE EQUIPMENT AND FIXTURES APPROXIMATELY AS SHOWN CONFORMING TO ALL <br />ARCHITECTURAL AND STRUCTURAL ITEMS. PROVIDE ALL SUPPORTS, HANGERS AND OPENINGS AS <br />REQUIRED FOR A COMPLETE INSTALLATION. CONTRACTOR SHALL COORDINATE WITH ALL TRADES FOR <br />CLEARANCES, AND EXACT LOCATIONS OF EQUIPMENT. ALL EQUIPMENT AND FIXTURES SHALL BE <br />INSTALLED PER MANUFACTURER'S RECOMMENDATIONS AND IN FULL ACCORDANCE WITH ALL <br />APPLICABLE CODES HAVING JURISDICTION. <br />C. CEILING MOUNTED AIR DEVICES SHALL BE APPROXIMATELY AS SHOWN. ALL CEILING DIFFUSERS TO BE <br />4-WAY UNLESS NOTED OTHERWISE BY AIRFLOW ARROWS, ON FLOOR PLAN. EXTEND FLEX DUCTWORK <br />FROM DIFFUSERS. INSTALL STRAIGHT AS POSSIBLE WITH LONG RADIUS BENDS AND CLAMPS TO BE <br />USED AT BOTH ENDS. <br />D. DUCTWORK WITH TURNING VANES INSTALLED IN ALL ELBOWS OF SUPPLY AIR DUCTS, AIR <br />EXTRACTORS AT ALL RECTANGULAR TAKE -OFFS, AND TWIST -IN TAP WITH MANUAL VOLUME DAMPER <br />AT ALL ROUND BRANCH TAKE -OFFS TO AIR DEVICES. <br />E. OVEN TYPE 1 HOOD: ALL GREASE EXHAUST DUCT SHALL BE WELDED SMOOTH AND THE DUCTWORK <br />SHALL PASS A LIGHT TEST. SUBSEQUENTLY THE DUCTWORK SHALL BE WRAPPED WITH TWO LAYERS <br />OF A UL APPROVED FIRE -BARRIER PRODUCT FOR A ZERO DISTANCE TO COMBUSTIBLE FIRE RATED <br />BARRIER. PROVIDE ACCESS DOORS AS REQUIRED FOR INSPECTION AND CLEANING. <br />F. PROVIDE ELECTRONIC PROGRAMMABLE THERMOSTAT WITH SUB -BASE AS NOTED ON PLAN. <br />TRANSFORMERS AND 24 VOLT CONTROL WIRING. ELECTRICAL CONTRACTOR SHALL PROVIDE POWER <br />WIRING. THERMOSTATS SHALL BE MOUNTED 48" A.F.F. AND SET POINT SHALL BE AS FOLLOWS: <br />COOLING IN DINING ROOM: 747; KITCHEN 787; HEATING 687 FOR ALL. VERIFY FINAL THERMOSTAT <br />LOCATIONS WITH OWNER. <br />G. BUILDING AIR SYSTEMS SHALL BE BALANCED PER DATA INCLUDED ON THE DRAWINGS TO ACHIEVE <br />RELATIVE AIR VOLUMES AS INDICATED ON THE DRAWINGS AND SCHEDULED HEREIN. <br />H. ALL DUCT SIZES INDICATED ON DRAWINGS ARE CLEAR INTERNAL DIMENSIONS. <br />I. WHERE SHOWN ON THE DRAWINGS, PROVIDE VOLUME DAMPERS WITH LOCKING QUADRANTS OR <br />SPUTTERS WITH HINGE AND ROD THRU SIDE OF DUCT WITH SET SCREW. VOLUME DAMPER HANDLES <br />SHALL BE INSTALLED ON THE BOTTOM OF THE SPIN -IN FITTING AND SHALL HAVE RING SET IN FULL <br />OPEN POSITION. <br />J. PROVIDE 3RD PARTY T&B REPORT TO OWNER PRIOR TO COMPLETION OF MECHANICAL WORK. <br />PAYMENT FOR MECHANICAL WORK WILL NOT BE RELEASED UNTIL HVAC SYSTEM IS BALANCED AND <br />FULLY OPERATIONAL. T&B REPORT MUST SHOW EXHAUST AND OUTSIDE AIR QUANTITIES, AS THESE <br />ARE CRITICAL IN EVALUATING IF INSTALLATION IS CORRECT AND MANAGING HUMIDITY WITHIN SPACE. <br />K. THE LAST 5 FEET OF DUCTWORK SHALL BE FLEXIBLE DUCTWORK TO ENABLE FITTING OF DIFFUSER <br />TO GRID. <br />L. IT IS ACCEPTABLE TO USE ROUND TRUNK DUCTWORK IN LIEU OF THE RECTANGULAR DUCTWORK <br />SHOWN, PROVIDED THAT THE DUCT HAS THE SAME INTERIOR CROSS -SECTIONAL AREA. <br />M. FLATTEN DUCTWORK AS NEEDED TO FIT UNDER BEAMS, ETC. NO FLATTER THAN 4:1 (WIDE: TALL), <br />MAINTAIN X-SECTIONAL AREA. <br />N. ALL ROOF PENETRATIONS SHALL BE BY LANDLORD'S ROOFING CONTRACTOR. <br />0. G.C. VERIFY THAT PLACEMENT OF HVAC EQUIPMENT ON ROOF HAS BEEN APPROVED BY A <br />STRUCTURAL ENGINEER, OR PLACED IN AN APPROVED HVAC EQUIPMENT ZONE SUITABLE FOR LOAD <br />PRIOR TO INSTALLING NEW RTUS/ANUS. ADJUST ROUTING OF DUCTWORK AS NECESSARY IF <br />STRUCTURAL REQUIRES UNIT TO BE CLOSER TO BEAMS/MAIN JOISTS. COORDINATE EXACT <br />PLACEMENT TO MISS JOISTS/TRUSSES BELOW PRIOR TO CUTTING ROOF DECK. DO NOT SHARE JOISTS <br />WITH OTHER RTUS UNLESS EXPLICITLY APPROVED BY STRUCTURAL ENGINEER, PROVIDE NEW FACTORY <br />CURB. <br />P. MEP DRAWINGS ARE NOT STRUCTURAL ENGINEERING DRAWINGS. OBTAIN STRUCTURAL APPROVAL <br />PRIOR TO SETTING ANY NEW EQUIPMENT ON ROOF, AND PRIOR TO HANGING ANYTHING TO <br />STRUCTURE THAT MAY IMPACT THE STRUCTURAL INTEGRITY OF THE SPACE. <br />Q. PROVIDE DUCT SMOKE DETECTORS AS INDICATED. <br />R. BASIS OF DESIGN IS FOR ALL NEW EQUIPMENT. IF OWNER INTENDS TO REUSE HVAC, CONTRACTOR <br />SHALL ENSURE THAT MECHANICAL EQUIPMENT TO REMAIN FOR RE -USE IS THOROUGHLY CLEANED, <br />LUBRICATED, SERVICED AND/OR REFURBISHED TO BRING AS CLOSE TO NEW CONDITION AS POSSIBLE. <br />IF EQUIPMENT IS IN TOO POOR SHAPE TO RECONDITION, NOTIFY OWNER. <br />S. WHERE SPLIT SYSTEMS ARE USED, EACH AHU SHALL BE EQUIPPED WITH FULL-SIZE ECONOMIZER, <br />WHERE REQUIRED BY ENERGY CODE, VERIFY EXACT REQUIREMENTS WITH LOCAL INSPECTOR PRIOR TO <br />ORDERING UNITS, <br />T. WHERE NEW ROOF TOP HVAC UNITS (RTUS) ARE TO BE INSTALLED, ORDER THE UNITS WITH <br />ECONOMIZERS. <br />U. FINAL PLACEMENT OF T-STATS TO BE SELECTED BY OWNER'S REPRESENTATIVE/CONSTRUCTION <br />MANAGER AND MAY NEED TO BE DIFFERENT THAN SHOWN ON PLANS DUE TO FIELD/CONSTRUCTION <br />CONDITIONS. <br />V. THE MEP DRAWING ARE NOT STRUCTURAL ENGINEERING DRAWINGS. RTU AND W.I.C.U. LOCATIONS <br />SHALL BE APPROVED BY A STRUCTURAL ENGINEER. <br />W. FLEX DUCT RUNS SHALL BE LIMITED TO 5' AND SHALL BE INSTALLED PER SMACNA STANDARDS FOR <br />FLEXIBLE DUCTWORK. WITH SADDLE SUPPORTS OR SIMILAR TO PREVENT KINKING OF FLEX DUCT. <br />X. ADJUST LOCATION OF HVAC SYSTEM COMPONENTS AS NEEDED TO ACCOMMODATE SPRINKLER PIPING. <br />MAINTAIN SPRINKLER COVERAGE DURING CONSTRUCTION, INCLUDING TEMPORARY HEAD LAYOUT AS <br />NEEDED. <br />Y. HVAC DROP LOCATIONS ARE DIAGRAMMATIC. CONTRACTOR SHALL FIELD -VERIFY EXACT DROP <br />CONFIGURATION ON BOTTOM OF RTU, AND EXISTING BEAM, COLUMN AND JOIST LOCATIONS AND <br />MODIFY DUCT LAYOUT NEAR RTU AS FIELD CONDITIONS REQUIRE. MAINTAIN CROSS SECTIONAL AREA <br />AS INDICATED. <br />Z. HVAC CONTRACTOR TO COORDINATE INSTALLATION WITH ALL TRADES. <br />AA. CONTRACTOR TO COORDINATE IN THE FIELD FOR EXACT LOCATION OF RTU AND ALL REQUIREMENTS. <br />AB. ALL THREAD FOR DUCT WORK SUPPORTS ARE TO BE FASTENED TO SOLID BLOCKING ABOVE <br />DRYWALL. <br />AC. DUCTWORK SHALL BE RUN ABOVE CEILING AS HIGH AS POSSIBLE IN GENERAL LOCATIONS SHOWN, <br />BUT SHALL CONFORM TO ALL STRUCTURAL AND FINISH CONDITIONS OF BUILDINGS. COORDINATE WITH <br />ARCHITECTURAL DRAWINGS PRIOR TO ANY INSTALLATION. <br />AD. LOCATE EQUIPMENT AND FIXTURES APPROXIMATELY AS SHOWN CONFORMING TO ALL ARCHITECTURAL <br />AND STRUCTURAL ITEMS. PROVIDE ALL SUPPORTS, HANGERS AND OPENINGS AS REQUIRED FOR A <br />COMPLETE INSTALLATION. CONTRACTOR SHALL COORDINATE WITH ALL TRADES FOR CLEARANCES, AND <br />EXACT LOCATIONS OF EQUIPMENT. ALL EQUIPMENT AND FIXTURES SHALL BE INSTALLED PER <br />MANUFACTURER'S RECOMMENDATIONS AND IN FULL ACCORDANCE WITH ALL APPLICABLE CODES. <br />AE. CEILING MOUNTED AIR DEVICES SHALL BE APPROXIMATELY AS SHOWN. FOR EXACT LOCATION AND <br />FRAME MOUNTING TYPES, REFER TO ARCHITECTURAL REFLECTED CEILING PLAN. ALL CEILING <br />DIFFUSERS TO BE 4-WAY UNLESS NOTED OTHERWISE BY AIRFLOW ARROWS, ON FLOOR PLAN. <br />EXTEND FLEX DUCTWORK FROM DIFFUSERS. INSTALL STRAIGHT AS POSSIBLE WITH LONG RADIUS <br />BENDS AND CLAMPS TO BE USED AT BOTH ENDS. <br />AF. DUCTWORK WITH TURNING VANES INSTALLED IN ALL ELBOWS OF SUPPLY AIR DUCTS, AIR <br />EXTRACTORS AT ALL RECTANGULAR TAKE -OFFS, AND TWIST -IN TAP WITH MANUAL VOLUME DAMPER <br />AT ALL ROUND BRANCH TAKE -OFFS TO AIR DEVICES. <br />AH. DUCT SMOKE DETECTORS REQUIRED IN UNIT RETURN AIR PLENUM SHALL BE IONIZATION TYPE AND <br />SHALL BE APPROVED AND LISTED BY UL OR FM FOR DUCT INSTALLATION. ACTIVATION OF A DUCT <br />DETECTOR SHALL CAUSE SHUTDOWN OF RTU. CONTROL AND INTERLOCK WIRING SHALL RUN IN <br />CONDUIT WHICH SHALL BE SIZED TO SUIT THE NUMBER, TYPE AND SIZE OF CONDUCTORS AND <br />SHALL BE PROVIDED BY THE MECHANICAL CONTRACTOR. CONTROL AND INTERLOCK WIRING SHALL BE <br />IN SEPARATE CONDUIT FROM POWER WIRING PER NEC. ALL WIRING SHALL BE IN ACCORDANCE WITH <br />NEC. PROVIDE ALL APPROPRIATE ACCESS PANELS. ENSURE ALARM TIE-IN COMPATIBILITY WITH <br />BASE -BUILDING F.A. SYSTEM PRIOR TO ORDERING ANY SYSTEM COMPONENTS THAT ARE TO <br />INTERFACE WITH THE BASE BUILDING FIRE ALARM SYSTEM. MAKE ADJUSTMENTS AS NEEDED TO <br />ENSURE SYSTEM COMPATIBILITY. <br />Al. PROVIDE ELECTRONIC PROGRAMMABLE THERMOSTAT WITH SUB -BASE AS NOTED ON PLAN. <br />TRANSFORMERS AND 24 VOLT CONTROL WIRING. ELECTRICAL CONTRACTOR SHALL PROVIDE POWER <br />WIRING. THERMOSTATS SHALL BE MOUNTED 48" A.F.F. AND SET POINT SHALL BE AS FOLLOWS: <br />COOLING IN DINING 74'F; ALL OTHERS 78'F; HEATING 687 FOR ALL. VERIFY FINAL LOCATION WITH <br />OWNER. <br />AJ. BUILDING AIR SYSTEMS SHALL BE BALANCED PER DATA ON THE DRAWINGS TO ACHIEVE RELATIVE <br />AIR VOLUMES AS INDICATED ON THE DRAWINGS AS SCHEDULED HEREIN. 11. ALL DUCT SIZES <br />INDICATED ON DRAWINGS ARE CLEAR INTERNAL DIMENSIONS. <br />AK. KITCHEN EXHAUST HOODS: EXTEND EXHAUST DUCT AS SHOWN AND TRANSITION AS REQUIRED TO <br />HOOD TAPS. SLOPE EXHAUST DUCTS BACK TO KITCHEN EXHAUST HOOD. PROVIDE ACCESS DOORS <br />AS REQUIRED FOR INSPECTION AND CLEANING. ENCLOSE KITCHEN EXHAUST DUCT IN FIRE BARRIER <br />15A FIRE RETARDANT DUCT WRAP AS REQUIRED BY CODE. REFER TO ARCHITECTURAL DRAWINGS FOR <br />ADDITIONAL REQUIREMENTS. HEIGHT TO FAN OUTLET: 40" ABOVE ROOF. KITCHEN HOOD SUPPLY AND <br />EXHAUST FANS SHALL BE INTERLOCKED WITH THE FIRE SUPPRESSION SYSTEM. <br />AL. COORDINATE LOCATIONS OF EXHAUST FAN, AND RTU'S WITH EXISTING STEEL BEAMS AND JOIST. <br />COORDINATE WITH FIELD CONDITIONS. <br />AM. ALL EXHAUST OUTLETS WILL BE A MINIMUM OF 10'-0" FROM ANY AIR INTAKE. <br />CEP_ <br />ENG� <br />CONSULTING <br />SERVICES <br />Peter A. Leptuch, P.E. <br />300 N. Carroll Blvd. #20 <br />Denton, TX 76201 <br />(940) 735-5127 <br />StudioRG <br />MAIN OFFICE: <br />1 HUNTINGTON QUADRANGLE <br />SUITE 2CO3 <br />MELVILLE, NY 11747 <br />P:631.226-7700 F: 631.226.7175 <br />©Copyright 2018: RGBK, INC. <br />I <br />Landry <br />_ GREG LANDR'( <br />ARCH)TECTURE PLANNING INTERIOR DESIGN <br />1202 Richardson Dr #106 Tel 214.631 6141 <br />Richardson, Texas 75060 Fax: 214.634-1814 <br />Seal: <br />GAF/, . �• <br />��. No 72679. . <br />Q-. <br />4.t <br />Owner: <br />George Morkos <br />2520 Colony Reed Lane <br />Clearwater, FL33763 <br />It is the responsibility of the Construction <br />Manager/General Contractor and all <br />Sub -Contractors to verify all dimensions and <br />accept conditions of prior work by related <br />trades before proceeding with any work. <br />Date <br />07-22-2020 <br />Drawn By Check By <br />MRP TN <br />Scale <br />AS SHOWN <br />Issued: <br />No/ Dew lion Date 1 <br />Project Title <br />Charleys <br />Zephyrhills <br />WM706 <br />Project Address <br />7631 Gall Blvd, <br />Zephyrhills, FL 33541 <br />Project Number <br />WM706 <br />Drawing Title and Number <br />MECHANICAL NOTES <br />& CALCULATIONS <br />M2.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.