<br />15A-01 GENERAL:
<br />A. ALL PLUMBING WORK SHALL CONFORM TO THE LANDLORD'S CRITERIA, THE
<br />STATE, COUNTY, CITY, LOCAL CODES AND ORDINANCES, SAFETY AND HEALTH
<br />CODES, NFPA CODES, ENERGY CODES AND ALL OTHER APPLICABLE CODES AND
<br />REQUIREMENTS. INCORPORATE ALL REQUIREMENTS WITH THIS WORK, WHETHER
<br />SPECIFICALLY INDICATED ON PLANS OR NOT. ADVISE ARCHITECT IF REQUIREMENTS
<br />ARE CONTRARY TO THESE PLANS. IT IS INTENDED THAT THE CONTRACTOR SHALL
<br />PROVIDE A COMPLETE AND FUNCTIONAL SYSTEM.
<br />B. THIS CONTRACTOR SHALL OBTAIN AND PAY FOR ALL LICENSES, PERMITS,
<br />INSPECTIONS AND FEES REQUIRED OR RELATED TO HIS WORK.
<br />C. CONTRACTOR SHALL DETERMINE THE LOCATION OF EXISTING WATER SUPPLY
<br />AND DRAIN LINES AND MAKE PROPER CONNECTION THERETO, INCLUDING VENTS.
<br />CONTRACTOR SHALL VERIFY INVERTS AND NOTIFY ARCHITECT IF INVERTS ARE
<br />INSUFFICIENT FOR A GRAVITY FALL WASTE SYSTEM.
<br />D. UNLESS DRAWINGS EXPLICITLY CALL TO SERVICE AND REUSE SPECIFIC EXISTING
<br />EQUIPMENT, ALL MATERIALS SHALL BE NEW AND SHALL FIT THE SPACE AVAILABLE.
<br />VERIFY ALL DIMENSIONS AT THE SITE.
<br />E. ALL VALVES, CLEANOUTS, ETC., SHALL BE SO LOCATED AND INSTALLED TO
<br />PERMIT ACCESS FOR SERVICE WITHOUT DAMAGE TO BUILDING OR FINISHED
<br />MATERIAL.
<br />F. ALL PLUMBING EQUIPMENT AND WORK SHALL BE GUARANTEED FOR ONE YEAR
<br />AFTER FINAL ACCEPTANCE BY LANDLORD AND TENANT.
<br />G. CONTRACTOR SHALL WALK SITE PRIOR TO BID TO VERIFY LOCATION OF GREASE
<br />INTERCEPTOR SHOWN ON PLANS WILL WORK. (RESTAURANTS ONLY) NOTIFY
<br />ARCHITECT IF LOCATION IS NOT APPROPRIATE. IF GREASE INTERCEPTOR MUST GO
<br />IN A DRIVE AISLE, THEN A VEHICLE LOAD -RATED INTERCEPTOR WILL BE REQUIRED.
<br />GREASE INTERCEPTOR PAVEMENT CUT AND PATCH SHALL BE RECTANGULAR AND
<br />REINSTALLED TO PREVENT SETTLING. CONTRACTOR SHALL BE RESPONSIBLE FOR
<br />RECOMPACTING AND PATCHING PAVEMENT IF SAGGING OR CRACKING IN PAVEMENT
<br />IS FOUND DURING 12-MONTHS FOLLOWING INSTALL.
<br />H. INSTALL LOW -FLOW FIXTURES, LOW -FLOW AERATORS, METERED FAUCETS, ETC.
<br />IF REQUIRED BY AHJ. LOW -FLOW FIXTURES SHALL BE OF SIMILAR APPEARANCE TO
<br />THOSE ON THE FIXTURE SCHEDULE.
<br />15A-02 MATERIALS
<br />A. REFER TO PLANS FOR SCHEDULES OF EQUIPMENT AND FIXTURES. AMERICAN
<br />STANDARD, KOHLER, TOTO AND CRANE ARE CONSIDERED ACCEPTABLE AS EQUALS.
<br />ALL PLUMBING EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE
<br />MANUFACTURER'S RECOMMENDATIONS.
<br />B. SANITARY PIPING
<br />1. WASTE, DRAIN AND VENT PIPING SHALL BE SCHEDULE 40 PVC PIPE, EXCEPT
<br />AT ROOF PENETRATION WHICH SHALL BE COPPER, FOR AT LEAST 12" ABOVE AND
<br />BELOW ROOF PENETRATION. TRANSITIONS SHALL BE COMPRESSION TYPE,
<br />SHARKBITE OR EQUAL.
<br />2. WHERE WASTE WILL BE SUBJECT TO DISCHARGE OF 1207 OR HIGHER, PIPING
<br />SHOULD BE ABS TYPE PLASTIC PIPE.
<br />3. INSULATE ALL HORIZONTAL RUNS OF PIPING LOCATED IN CEILING SPACES OF
<br />TENANTS IN SPACES BELOW WHEN APPLICABLE. INSULATION TO BE AS SPECIFIED
<br />FOR WATER PIPING.
<br />4. CONDENSATE PIPING SHALL BE SCHEDULE 40 PVC PIPE.
<br />5. INSTALL COPPER TYPE M IN LIEU OF CONDENSATE WASTE PVC IN SPACES
<br />DETERMINED BY THE MECHANICAL OR PLUMBING INSPECTOR AS PLENUMS UNLESS
<br />PLENUM RATED PVC IS AVAILABLE AND APPROVED BY INSPECTOR. VERIFY PRIOR
<br />TO INSTALL.
<br />C. POTABLE WATER PIPING
<br />1. BELOW GRADE: PEX PIPING.
<br />2. ALL OTHER: PEX PIPING, UNLESS NOTED ON PLANS OTHERWISE (IMMEDIATE
<br />VICINITY OF HOOD).
<br />3. DO NOT USE PEX OUTDOORS OR WHERE EXPOSED TO UV ENVIRONMENTS
<br />(SUNLIGHT).
<br />4. SOME JURISDICTIONS HAVE NOT YET APPROVED PEX TUBING. CONFIRM WITH
<br />LOCAL PLUMBING INSPECTIONS DEPARTMENT PRIOR TO BID THAT PEX AND ALL
<br />OTHER PROPOSED MATERIALS AND PRODUCTS ARE APPROVED IN SAID JURISDICTION,
<br />AND OBTAIN WRITTEN APPROVAL PRIOR TO INSTALLATION.
<br />5. INSTALL PEX PER ASTM F 1807 AND ASTM F 1960.
<br />6. PEX PIPE SHALL BE NSF RATED FOR POTABLE USE.
<br />7. MAX PEX TEMPERATURE SHALL BE 140• F, EVEN IF RATED FOR 180' F TO 200-
<br />F.
<br />8. USE SMOKE DEVELOPED RATED PEX FOR PLENUM APPLICATIONS. ONLY WHERE
<br />ALLOWED BY AHJ.
<br />D. PIPING OF DISSIMILAR METALS MUST BE DI -ELECTRICALLY SEPARATED.
<br />E. INSULATE ALL HOT WATER, COLD WATER AND CONDENSATE PIPING WITH 1"
<br />THICK (K=0.23 ® 757) PIPE INSULATION WITH AN ALL SERVICE JACKET TO MEET
<br />LOCAL CODES AND UL FLAME SPREAD AND SMOKE DEVELOPED RATINGS.
<br />OWENS-CORNING OR EQUAL.
<br />1. INSULATE ALL EXPOSED PIPES IN CEILING PLENUM, EXISTING WALLS AND ALL
<br />EXPOSED HOT WATER LINES AT OR ABOVE THE WATER HEATER.
<br />F. INSULATE THE TRAP, SANITARY AND SUPPLY PIPES UNDER LAVATORY WITH
<br />1/2- ARMSTRONG "ARMAFLEX" PIPING INSULATION OR TRUEBRO MODEL 102W "HANDI
<br />LAV GUARD" INSULATION KIT.
<br />G. INSTALL AIR CHAMBER SHOCK ABSORBERS IN BOTH HOT AND COLD LINES OF
<br />PIPING SYSTEM TO PREVENT NOISE AND DAMAGE DUE TO WATER HAMMER. J.R.
<br />SMITH 5000 SERIES ALL STAINLESS STEEL "HYDROTROLS" OR EQUAL, INSTALLED IN
<br />AN UPRIGHT POSITION.
<br />H. ALL BRANCH PIPING SYSTEMS SHALL HAVE ACCESSIBLE SERVICE VALVE.
<br />PROVIDE SHUT OFF VALVES IN THE SUPPLY PIPING TO EVERY FIXTURE. PROVIDE
<br />ACCESS DOORS WHERE NECESSARY.
<br />I. INSTALL ALL NECESSARY PIPE HANGERS, SADDLES AND CARRIERS TO
<br />PROPERLY SUPPORT ALL PIPING AND FIXTURES. HANGERS SHALL SUIT TYPE OF
<br />PIPING AND SEISMIC BRACING WHERE REQUIRED BY CODES.
<br />J. STERILIZE WATER SYSTEM IN ACCORDANCE WITH LOCAL CODES.
<br />K. CLEAN -OUTS AND FLOOR DRAINS SHALL BE INSTALLED PER LOCAL CODES.
<br />L. ESCUTCHEONS SHALL BE CHROME PLATED, SIZE AS REQUIRED AND PLACE AT
<br />ALL PIPE PENETRATIONS AT WALL, FLOORS AND CEILINGS IN FINISHED AREAS.
<br />M. LEAKAGE TESTS SHALL BE PER LOCAL CODES.
<br />N. FLASHING SHALL BE SEALED WATERTIGHT AND PERFORMED IN ACCORDANCE TO
<br />THE LANDLORD'S CRITERIA. USE LANDLORD APPROVED ROOFING CONTRACTOR
<br />WHERE REQUIRED.
<br />0. PROVIDE WATER METER AND REMOTE READER PER LANDLORD'S CRITERIA OR
<br />LOCAL UTILITIES REQUIREMENTS IF APPLICABLE.
<br />P. GAS PIPING
<br />1. PROVIDE A COMPLETE GAS PIPING SYSTEM IF APPLICABLE. REFER TO PLANS
<br />TO DETERMINE IF A GAS SYSTEM IS REQUIRED.
<br />2. GAS LINES SHALL BE BLACK STEEL, SCHEDULE 40, ASTM A-120, WITH
<br />MALLEABLE THREADED FITTINGS FOR 2" AND SMALLER, AND WITH WELDED JOINTS
<br />FOR 2 1/2- AND LARGER.
<br />3. PROVIDE A GAS COCK, DIRT LEG, UNION CONNECTION, AND REINFORCED
<br />BRAIDED FLEX CONNECTOR TO EACH PIECE OF EQUIPMENT.
<br />4. PITCH PIPING AT A UNIFORM GRADE OF 1/4" IN 15 FEET UPWARD IN
<br />DIRECTION OF FLOOR. SUPPORT PIPING EVERY 5 FEET. SUPPORT AS REQUIRED BY
<br />LANDLORD CRITERIA, AS DETAILED ON DRAWINGS, OR BY STANDARD INDUSTRY
<br />PRACTICE, WHICHEVER IS MORE STRINGENT.
<br />5. GAS PIPING EXPOSED ON ROOF MUST BE PAINTED WITH RUST -INHIBITING
<br />PAINT. PAINT YELLOW IF REQUIRED BY AHJ. DO NOT RUN PIPING PARALLEL TO
<br />BUILDING EDGE WITHIN 10'-0" OF EDGE OF BUILDING UNLESS PARAPET IS 42" OR
<br />TALLER.
<br />6. GAS PIPING INSTALLED IN RETURN AIR PLENUMS SHALL BE SLEEVED AND
<br />VENTED OR WELDED IN ACCORDANCE WITH THE LOCAL GAS COMPANY, LOCAL CODE
<br />AND APPLICABLE NFPA 54 CODES.
<br />7. TESTING AND PURGING OF GAS PIPING SHALL BE DONE PER THE
<br />REQUIREMENTS OF THE LOCAL GAS COMPANY, LOCAL CODES AND APPLICABLE NFPA
<br />54 CODES.
<br />8. CONTACT AND COORDINATION GAS SERVICE AND METER REQUIREMENTS WITH
<br />THE LOCAL GAS COMPANY AND THE MALL'S OPERATIONS MANAGER PRIOR TO BID.
<br />INCLUDE INSTALLATION OF GAS METER COSTS IN BID.
<br />Q. TEST PRESSURE ON SITE AND NOTIFY ARCHITECT IF STATIC PRESSURE IS LESS
<br />THAN 45 PSI OR DYNAMIC PRESSURE AT 3 GPM FLOW IS LESS THAN 35 PSI.
<br />R. PROVIDE BACK FLOW PROTECTION PER LOCAL CODE REQUIREMENTS.
<br />S. PROVIDE MIXING VALVES (MASTER AND/OR POINT OF USE) PER LOCAL CODE
<br />REQUIREMENTS, ASSE 1069 AND ASSE 1070.
<br />PLUMBING GENERAL NOTES:
<br />1. THE CONTRACTOR FOR THIS DIVISION OF WORK IS REQUIRED TO READ THE
<br />SPECIFICATIONS AND REVIEW DRAWINGS FOR ALL DIVISIONS OF WORK AND IS
<br />RESPONSIBLE FOR THE COORDINATION OF THIS WORK AND THE WORK OF ALL
<br />SUBCONTRACTORS WITH ALL DIVISION OF WORK. IT IS THIS CONTRACTORS
<br />RESPONSIBILITY TO PROVIDE ALL SUBCONTRACTORS WITH A COMPLETE SET OF BID
<br />DOCUMENTS.
<br />2 ALL ROOF CUTTING, PATCHING AND FLASHING REQUIRED TO INSTALL THE
<br />MECHANICAL SYSTEMS SHALL BE BY A LANDLORD APPROVED ROOFING CONTRACTOR
<br />AT THIS CONTRACTORS EXPENSE. COORDINATE ROOF PENETRATIONS WITH
<br />LANDLORD AND GENERAL CONTRACTOR.
<br />3. UNLESS OTHERWISE SPECIFIED, CONTRACTOR SHALL PROVIDE ALL NECESSARY
<br />EQUIPMENT, MATERIAL, LABOR AND SUPERVISION NECESSARY TO COMPLETE THE
<br />PLUMBING WORK IN ACCORDANCE WITH THE SPECIFICATIONS AND STANDARDS.
<br />4. PRIOR TO BID, FILED VERIFY EXACT SIZE, ELEVATION AND LOCATION OF
<br />EXISTING PLUMBING UTILITY CONNECTIONS. INCLUDE ALL COSTS IN BID TO EXTEND
<br />TO EXISTING BASE BUILDING CONNECTIONS.
<br />5. ALL MATERIAL SHALL BE NEW AND OF COMMERCIAL GRADE, AND BEAR N.S.F.
<br />AND/OR UNDERWRITERS LABORATORIES LABELS WHERE SUCH LABELING APPLIES.
<br />6. PLUMBING CONTRACTOR IS TO PROVIDE AND INSTALL FIRE -RATED PIPE
<br />SLEEVES AND SEALS ON ALL EXISTING OR NEW PIPING THAT PENETRATES
<br />FIRE -RATED PARTITIONS.
<br />7. PLUMBING CONTRACTOR SHALL VISIT JOB SITE AND BE FAMILIAR WITH
<br />LANDLORD'S REQUIREMENTS. NO ALLOWANCE WILL BE MADE FOR EXTRAS DUE TO
<br />CONTRACTOR'S FAILURE TO VISIT THE JOB SITE AND/OR FAILURE TO PREDETERMINE
<br />ALL CONDITIONS IMPOSED BY THE LANDLORD OR OTHER AUTHORITIES.
<br />8. PLUMBING CONTRACTOR TO FIELD VERIFY PROPER SLOPE OF EXISTING SEWER
<br />TO MAIN SEWER PRIOR TO ANY NEW PLUMBING INSTALLATION.
<br />9. SANITARY PIPING 2 1/2" AND SMALLER SHALL BE SLOPED A MINIMUM OF 1/4"
<br />PER FOOT OF RUN. SANITARY PIPING 3" AND LARGER SHALL BE SLOPED A
<br />MINIMUM OF 1 /8" PER FOOT OF RUN.
<br />10. ALL WATER AND VENT PIPING TO BE CONCEALED IN WALL SPACE WHEN
<br />POSSIBLE.
<br />11. ALL PLUMBING FIXTURES SHALL BE INSTALLED WITH STOP VALVES TO ISOLATE
<br />EACH FIXTURE. ALL KITCHEN EQUIPMENT SHALL BE INSTALLED WITH VALVES TO
<br />ISOLATE EACH PIECE OF EQUIPMENT. ISOLATE EACH FIXTURE BY PROVIDING A CUT
<br />OFF VALVE AT THE FIXTURE AND WHERE REQUIRED BY AHJ, PROVIDE AN ISOLATION
<br />VALVE ABOVE CEILING.
<br />12. FURNISH AND INSTALL WATER HAMMER ARRESTORS IN THE DOMESTIC COLD
<br />AND HOT WATER PIPING. WATER HAMMER ARRESTORS TO BE LOCATED IN AN
<br />ACCESSIBLE LOCATION. UNITS AS MANUFACTURED BY SIOUX OR PRECISION
<br />PLUMBING PRODUCTS ARE ACCEPTABLE.
<br />13. FURNISH AND INSTALL TRAP PRIMERS OR TRAP GUARDS TO ALL FLOOR
<br />DRAINS AND HUB DRAINS.
<br />14. PLUMBING CONTRACTOR TO MAKE ALL CONNECTIONS TO KITCHEN EQUIPMENT
<br />AND MECHANICAL EQUIPMENT UNLESS NOTED OTHERWISE.
<br />15. ALL DOMESTIC WATER PIPING INSTALLED IN EXTERNAL WALLS SHALL BE
<br />INSTALLED IN THE CONDITIONED SIDE OF THE INSULATION.
<br />16. COORDINATE ALL PIPING WITH DUCTWORK AND LIGHTING.
<br />17. ALL PIPING DROPS IN CHASES AND WALLS ARE TO BE SECURED.
<br />18. ALL SUSPENDED PIPING IS TO BE INSTALLED AS HIGH AS POSSIBLE.
<br />19. THE SCOPE OF THE PLUMBING WORK SHALL INCLUDE FURNISHING, INSTALLING,
<br />AND TESTING ALL PLUMBING SYSTEMS FOR A COMPLETE & FULLY OPERABLE
<br />INSTALLATION. COMPLY WITH ALL APPLICABLE NATIONAL, STATE & LOCAL CODES.
<br />20. LOCATIONS OF EXISTING PLUMBING SYSTEMS, EQUIPMENT, LINES, AND DEVICES
<br />SHALL BE VERIFIED IN THE FIELD BY THE CONTRACTOR.
<br />21. THE SCOPE OF THE PLUMBING WORK SHALL INCLUDE FURNISHING, INSTALLING
<br />AND TESTING ALL PLUMBING SYSTEMS FOR A COMPLETE & FULLY OPERABLE
<br />INSTALLATION, INCLUDING BUT NOT LIMITED TO:
<br />A. CONCRETE CUTTING, REMOVAL, TRENCHING, BACK FILL COMPACTING AND
<br />PATCHING;
<br />B. ALL PIPING AND FITTINGS;
<br />C. CUTTING AND PATCHING ROOF;
<br />D. WEATHERPROOF ROOF PENETRATIONS.
<br />22. GAS SERVICE: COORDINATE WITH LOCAL GAS COMPANY TO INSTALL GAS METER
<br />AND PRESSURE REGULATOR AT DETERMINED METER LOCATION. VERIFY THAT
<br />CAPACITY REQUIRED TO SERVE ALL EQUIPMENT IS AVAILABLE.
<br />*UPSIZE EXISTING METER AS NEEDED. PROVIDE/UPSIZE PRESSURE REGULATORS AS
<br />NEEDED.
<br />23. PLUMBER TO PROVIDE SHUT OFF VALVES ON ALL WATER & GAS LINES.
<br />24. PLUMBER TO PROVIDE BACK FLOW PREVENTER OR VACUUM BREAKERS ON ALL
<br />EQUIPMENT RECEIVING COLD WATER OR AS REQUIRED BY LOCAL CODE.
<br />25. THE PLUMBING SUBCONTRACTOR SHALL PROVIDE FAUCETS AND DRAINS FOR
<br />MOP SINK AND RESTROOM SINKS, AND SHALL PROVIDE ALL CHROME -PLATED
<br />VALVES AND TRIMS AS NECESSARY.
<br />26. THE PLUMBING SUBCONTRACTOR SHALL PROVIDE TEMPERATURE PRESSURE
<br />SAFETY RELEASE VALVES, DRAIN PANS AND EXPANSION TANKS (AMTROL OR
<br />EQUAL), SIZED PER MANUFACTURER'S TABLES, AS REQUIRED.
<br />27. THE PLUMBING SUBCONTRACTOR SHALL SNAKE ALL DRAINS PRIOR TO
<br />RECEIVING FINAL RETAINAGE.
<br />28. SET ALL FLOOR SINKS SO THAT TOP RIM IS 1/2" ABOVE FINISHED FLOOR, IN
<br />JURISDICTIONS THAT REQUIRE SUCH.
<br />29. AT ACCESSIBLE WATER CLOSETS, FLUSH HANDLE SHALL BE LOCATED ON THE
<br />WIDE SIDE OF THE FIXTURE.
<br />30. NOT USED.
<br />31. PLUMBING CONTRACTOR SHALL INSTALL FLOOR AND WALL CLEANOUTS AS
<br />NECESSARY SO THAT THERE ARE NO SECTIONS OF PIPE EXCEEDING 45' BETWEEN
<br />CLEANOUT ACCESS POINTS.
<br />TESTING REQUIREMENTS:
<br />TESTING REQUIREMENTS: NEW POTABLE WATER SYSTEMS ARE REQUIRED TO BE
<br />DISINFECTED BY CHLORINATION.
<br />PLUMBING CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE WITH ALL TRADES
<br />AND VERIFY THAT ALL EQUIPMENT SHIPPED TO THE SITE IS COMPATIBLE WITH
<br />MECHANICAL, ELECTRICAL AND PLUMBING SYSTEMS PRIOR TO INSTALLATION OF SAID
<br />EQUIPMENT. IN THE EVENT OF ANY DISCREPANCIES, IMMEDIATELY CONTACT
<br />DESIGNER BEFORE PROCEEDING.
<br />PROVIDE LINE ITEM BID TO OFFER TYPE M COPPER AT EXPOSED WASTE PIPING
<br />UNDER 3-COMPARTMENT/PREP TYPE SINKS DRAINING TO FLOOR SINKS, FOR
<br />DURABILITY.
<br />MEASURE OUT ON CONCRETE FLOOR LOCATIONS OF EQUIPMENT AND FLOOR
<br />SINKS/FLOOR DRAINS AND FIELD ADJUST FLOOR SINK/DRAIN LOCATIONS AS NEEDED
<br />AT NO ADDITIONAL COST TO OWNER, TO PREVENT TABLE LEGS FROM LINING UP
<br />WITH FLOOR SINKS/DRAINS.
<br />WHERE POSSIBLE, KEEP FLOOR CLEANOUTS IN BACK -OF -HOUSE, OR BENEATH
<br />MOVABLE EQUIPMENT. MINIMIZE NUMBER OF FLOOR CLEANOUTS VISIBLE TO DINING
<br />GUESTS.
<br />COORDINATE UNDERSLAB ROUTING WITH UNDERSLAB STRUCTURE - GRADE BEAMS,
<br />ETC. ALL SLAB CUTS SHALL BE X-RAYED AND APPROVED BY LANDLORD'S
<br />REPRESENTATIVE PRIOR TO CUT. ANY DAMAGED CAUSED BY CUTTING STRUCTURAL
<br />MEMBERS THROUGH UNAPPROVED CUTS SHALL BE REPAIRED AT THE SOLE EXPENSE
<br />OF THE PLUMBING CONTRACTOR.
<br />REFER TO ISOMETRIC RISER DIAGRAMS FOR ALL LINE SIZES. ALL FLOOR SINKS,
<br />FLOOR DRAINS AND HUB SINKS/FLOOR FUNNEL DRAINS SHALL BE ORDERED WITH
<br />TRAP PRIMERS.
<br />-REFER TO PLUMBING LEGEND ON PLUMBING PLAN SHEET.
<br />-REFER TO GENERAL PLUMBING NOTES.
<br />-REFER TO FOOD SERVICE SHEETS IF AVAILABLE FOR ROUGH -IN DIMENSIONS.
<br />-DRAWINGS ARE SCHEMATIC.
<br />CONDENSATE DRAIN LINES FROM COOLER COILS SHALL BE RUN TO THE NEAREST
<br />FLOOR DRAIN/SINK WITH A 1" INSULATED DRAIN LINE, AND DISCHARGED THROUGH
<br />3" MINIMUM AIR GAP. PROVIDE CONDENSATE PUMPS AS NEEDED WHERE GRAVITY
<br />FALL PIPING IS NOT POSSIBLE.
<br />ALL EXPOSED DRAIN PIPING FOR HAND SINKS AND RESTROOM LAVATORIES SHALL
<br />BE CHROME.
<br />CONDENSATE DRAIN LINES FROM ROOF TOP UNITS SHALL BE COLLECTED & RUN
<br />TO ROOF DRAINS OR MOP SINK WITH 1 1/4" INSULATED DRAIN AND/OR AS
<br />INDICATED ON THE MEP ROOF PLAN.
<br />PRIOR TO BID, T.G.C. SHALL FIELD VERIFY LOCATION OF EXISTING SEWER MAIN &
<br />REPORT FINDINGS TO DESIGNER IF OTHER THAN INDICATED HERE.
<br />REMOVE ALL EXIST. PLBG. LINES LOCATED ABV. SLAB. CAP OR PLUG ALL EXIST.
<br />WASTE & VENT LINES LOCATED BELOW FLOOR SLAB.
<br />ALL WATER LINES TO BE LOCATED ABOVE CEILING & INSIDE OF WALLS. PROVIDE
<br />VIBRATION ISOLATORS ON ALL LINES.
<br />CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL CONDITIONS AND IS
<br />ALSO RESPONSIBLE FOR REPORTING ANY CONFLICTS TO THE ARCHITECT PRIOR TO
<br />THE START OF WORK.
<br />IT IS THE RESPONSIBILITY OF THE PLUMBING CONTRACTOR TO VERIFY ALL
<br />EQUIPMENT ROUGH -INS WITH THE APPROPRIATE SUPPLIER AND TO DETERMINE THE
<br />MOST FEASIBLE AND ECONOMICAL LOCATION TO INSTALL THE NEW WASTE LINES
<br />BELOW THE EXISTING SLAB, BASED ON CURRENT PLUMBING CONDITIONS. MINOR
<br />MODIFICATIONS FROM WHAT ARE SHOWN ON THE PLUMBING PLAN SHEETS THAT
<br />MAINTAIN THE INTENT SHOWN ON THE DRAWING SET AND WHICH ARE CODE
<br />COMPLIANT AND APPROVED BY THE PLUMBING INSPECTOR ARE ACCEPTABLE.
<br />CONTRACTOR TO PROVIDE AS BUILT DRAWINGS AT THE COMPLETION OF THE
<br />PROJECT.
<br />PIPES PASSING UNDER OR THROUGH FOUNDATION WALLS SHALL BE INSTALLED
<br />THROUGH PIPE SLEEVES ONE SIZE LARGER THAN PIPE. SEAL AROUND PIPE.
<br />GAS PIPING SHALL BE SCHEDULE 40 BLACK STEEL PIPE.
<br />SPRINKLER SYSTEM:
<br />THE FIRE SPRINKLER SYSTEM SHALL BE DESIGNED AND INSTALLED BY A
<br />LICENSED FIRE SPRINKLER CONTRACTOR UNDER A SEPARATE PERMIT -
<br />DESIGN BUILD.
<br />THE COMCHECK REPORT IS CONSIDERED PART OF THE MEP DOCUMENT
<br />;ET. CONTRACTOR SHALL COMPLY WITH ALL ENERGY CODE
<br />tEQUIREMENTS.
<br />PLUMBING NOTES
<br />Peter A. Leptuch, P.E.
<br />300 N. Carroll Blvd. #20
<br />Denton, TX 76201
<br />(940) 735-5127
<br />A. EACH PLUMBING VENT SHALL TERMINATE NOT LESS THAN TEN (10) FEET FROM OR AT
<br />LEAST THREE (3) FEET ABOVE ANY WINDOW, DOOR, OPENING OR FRESH AIR INTAKE.
<br />B. PROVIDE TRAP PRIMERS ON ALL FIXTURES WHOSE TRAP SEALS ARE SUBJECT TO DRYING
<br />OUT.
<br />C. SEE RESTAURANT EQUIPMENT SCHEDULE ON THE ARCHITECTURAL PLANS FOR EQUIPMENT
<br />PROVIDED BY OTHERS. THIS CONTRACTOR SHALL CONNECT WASTE, VENT, AND WATER TO
<br />EQUIPMENT FURNISHED BY OTHERS AND THIS CONTRACTOR SHALL INSTALL FAUCETS AND
<br />MISC. FITTINGS FOR A COMPLETE INSTALLATION.
<br />D. CONNECT NEW DOMESTIC WATER TO EXISTING LINE. INSTALL BALL VALVE AS SHOWN AND
<br />PROVIDE REDUCED PRESSURE BFP AT WATER SERVICE CONNECTION IF REQUIRED BY AHJ.
<br />E. EXTEND PLUMBING VENT UP THRU ROOF TO APPROVED VENT TERMINATION. LOCATE
<br />MINIMUM OF 10 FEET FROM ANY O.A. INTAKE AT THE ROOF -TOP UNITS.
<br />F. ALL EXPOSED PIPING TO PLUMBING FIXTURES SHALL BE CHROME PLATED. STOPS SHALL
<br />BE PROVIDED WITH REMOVABLE TYPE HANDLES.
<br />G. WHERE APPLICABLE, THE PLUMBING CONTRACTOR SHALL SEE THAT THE PROPER NEW
<br />(UPGRADE) GAS SERVICE, METER AND REGULATOR (IF REQUIRED) ARE INSTALLED BY THE
<br />UTILITY CO. AND PAY FOR ANY NEW SERVICE AND ANY FEES CHARGED FOR THE
<br />INSTALLATION OF THE METER AND SERVICE LINES. GAS LINES SHALL EXTEND FROM THE
<br />METER TO ALL EQUIPMENT REQUIRING GAS.
<br />H. GAS PIPING: SCREWED STANDARD WEIGHT SCHEDULE 40 BLACK STEEL CONFORMING TO
<br />ASTM A53 SPECIFICATIONS FOR GAS PIPING. PROVIDE ALL WELDING OF PIPING AS
<br />REQUIRED. PAINT ALL NEW GAS PIPING SAFETY YELLOW WITH TWO COATS OF MARINE
<br />GRADE PAINT.
<br />I. GAS PIPE SHALL BE PROVIDED WITH SUITABLE DRIP LEGS ON ALL MAINS AND RISERS AT
<br />EQUIPMENT CONNECTIONS. ALL EQUIPMENT CONNECTIONS WILL BE PROVIDED WITH AN
<br />AGA APPROVED BUTTERFLY VALVE. CAP WHERE REQUIRED.
<br />StudioRG.,.,
<br />MAIN OFFICE:
<br />1 HUNTINGTON QUADRANGLE
<br />SUITE 2CO3
<br />MELVILLE, NY 11747
<br />P: 631.226-7700 F: 631.226.7175
<br />© Copyright 2018: RGBK, INC.
<br />Seal:
<br />Landry
<br />_ GREC LANDRY
<br />ARCHR OURE I' AWNG RYTBiK�R DS*N
<br />1202 Richardson Dr. #106 Tel: 214.631.6941
<br />R;chardson, Texas 75060 Fox:.214.634.1814
<br />...c'
<br />.�►
<br />tV�
<br />No 72u70 '• y
<br />5TA'. OF
<br />Owner:
<br />George Morkos
<br />2520 Colony Reed Lane
<br />Clearwater, FL33763
<br />It is the responsibility of the Construction
<br />Manager/General Contractor and all
<br />Sub -Contractors to verify all dimensions and
<br />accept conditions of prior work by related
<br />trades before proceeding with any work.
<br />Date
<br />07-22-2020
<br />Drawn By Check By
<br />MRP TN
<br />Scale
<br />AS SHOWN
<br />Issued:
<br />Project Title
<br />Charleys
<br />Zephyrhills
<br />WM706
<br />Project Address
<br />7631 Gall Blvd,
<br />Zephyrhills, FL 33541
<br />Project Number
<br />WM706
<br />Drawing Title and Number
<br />PLUMBING
<br />SPECIFICATIONS
<br />P3.0
<br />
|