Laserfiche WebLink
AND <br />SHALL BE <br />AND INSTALLED BY <br />ANY REFERENCES IN THE <br />TERIALS <br />CUMENT <br />PLUMBING SPECIFICATIONS (TAoLL ITEMSEQUIPMENT PROVIDED YAOTHERS SHALL BE IGNOREDDUNLESS THIS REFERENCE IS ONOTHE ARCHITECTURAL RESPONSIBILT IESO SCHEDULE.T ) <br />SECTION 15-A - PLUMBING <br />15A-01 GENERAL: <br />A. ALL PLUMBING WORK SHALL CONFORM TO THE LANDLORD'S CRITERIA, THE <br />STATE, COUNTY, CITY, LOCAL CODES AND ORDINANCES, SAFETY AND HEALTH <br />CODES, NFPA CODES, ENERGY CODES AND ALL OTHER APPLICABLE CODES AND <br />REQUIREMENTS. INCORPORATE ALL REQUIREMENTS WITH THIS WORK, WHETHER <br />SPECIFICALLY INDICATED ON PLANS OR NOT. ADVISE ARCHITECT IF REQUIREMENTS <br />ARE CONTRARY TO THESE PLANS. IT IS INTENDED THAT THE CONTRACTOR SHALL <br />PROVIDE A COMPLETE AND FUNCTIONAL SYSTEM. <br />B. THIS CONTRACTOR SHALL OBTAIN AND PAY FOR ALL LICENSES, PERMITS, <br />INSPECTIONS AND FEES REQUIRED OR RELATED TO HIS WORK. <br />C. CONTRACTOR SHALL DETERMINE THE LOCATION OF EXISTING WATER SUPPLY <br />AND DRAIN LINES AND MAKE PROPER CONNECTION THERETO, INCLUDING VENTS. <br />CONTRACTOR SHALL VERIFY INVERTS AND NOTIFY ARCHITECT IF INVERTS ARE <br />INSUFFICIENT FOR A GRAVITY FALL WASTE SYSTEM. <br />D. UNLESS DRAWINGS EXPLICITLY CALL TO SERVICE AND REUSE SPECIFIC EXISTING <br />EQUIPMENT, ALL MATERIALS SHALL BE NEW AND SHALL FIT THE SPACE AVAILABLE. <br />VERIFY ALL DIMENSIONS AT THE SITE. <br />E. ALL VALVES, CLEANOUTS, ETC., SHALL BE SO LOCATED AND INSTALLED TO <br />PERMIT ACCESS FOR SERVICE WITHOUT DAMAGE TO BUILDING OR FINISHED <br />MATERIAL. <br />F. ALL PLUMBING EQUIPMENT AND WORK SHALL BE GUARANTEED FOR ONE YEAR <br />AFTER FINAL ACCEPTANCE BY LANDLORD AND TENANT. <br />G. CONTRACTOR SHALL WALK SITE PRIOR TO BID TO VERIFY LOCATION OF GREASE <br />INTERCEPTOR SHOWN ON PLANS WILL WORK. (RESTAURANTS ONLY) NOTIFY <br />ARCHITECT IF LOCATION IS NOT APPROPRIATE. IF GREASE INTERCEPTOR MUST GO <br />IN A DRIVE AISLE, THEN A VEHICLE LOAD -RATED INTERCEPTOR WILL BE REQUIRED. <br />GREASE INTERCEPTOR PAVEMENT CUT AND PATCH SHALL BE RECTANGULAR AND <br />REINSTALLED TO PREVENT SETTLING. CONTRACTOR SHALL BE RESPONSIBLE FOR <br />RECOMPACTING AND PATCHING PAVEMENT IF SAGGING OR CRACKING IN PAVEMENT <br />IS FOUND DURING 12-MONTHS FOLLOWING INSTALL. <br />H. INSTALL LOW -FLOW FIXTURES, LOW -FLOW AERATORS, METERED FAUCETS, ETC. <br />IF REQUIRED BY AHJ. LOW -FLOW FIXTURES SHALL BE OF SIMILAR APPEARANCE TO <br />THOSE ON THE FIXTURE SCHEDULE. <br />15A-02 MATERIALS <br />A. REFER TO PLANS FOR SCHEDULES OF EQUIPMENT AND FIXTURES. AMERICAN <br />STANDARD, KOHLER, TOTO AND CRANE ARE CONSIDERED ACCEPTABLE AS EQUALS. <br />ALL PLUMBING EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE <br />MANUFACTURER'S RECOMMENDATIONS. <br />B. SANITARY PIPING <br />1. WASTE, DRAIN AND VENT PIPING SHALL BE SCHEDULE 40 PVC PIPE, EXCEPT <br />AT ROOF PENETRATION WHICH SHALL BE COPPER, FOR AT LEAST 12" ABOVE AND <br />BELOW ROOF PENETRATION. TRANSITIONS SHALL BE COMPRESSION TYPE, <br />SHARKBITE OR EQUAL. <br />2. WHERE WASTE WILL BE SUBJECT TO DISCHARGE OF 1207 OR HIGHER, PIPING <br />SHOULD BE ABS TYPE PLASTIC PIPE. <br />3. INSULATE ALL HORIZONTAL RUNS OF PIPING LOCATED IN CEILING SPACES OF <br />TENANTS IN SPACES BELOW WHEN APPLICABLE. INSULATION TO BE AS SPECIFIED <br />FOR WATER PIPING. <br />4. CONDENSATE PIPING SHALL BE SCHEDULE 40 PVC PIPE. <br />5. INSTALL COPPER TYPE M IN LIEU OF CONDENSATE WASTE PVC IN SPACES <br />DETERMINED BY THE MECHANICAL OR PLUMBING INSPECTOR AS PLENUMS UNLESS <br />PLENUM RATED PVC IS AVAILABLE AND APPROVED BY INSPECTOR. VERIFY PRIOR <br />TO INSTALL. <br />C. POTABLE WATER PIPING <br />1. BELOW GRADE: PEX PIPING. <br />2. ALL OTHER: PEX PIPING, UNLESS NOTED ON PLANS OTHERWISE (IMMEDIATE <br />VICINITY OF HOOD). <br />3. DO NOT USE PEX OUTDOORS OR WHERE EXPOSED TO UV ENVIRONMENTS <br />(SUNLIGHT). <br />4. SOME JURISDICTIONS HAVE NOT YET APPROVED PEX TUBING. CONFIRM WITH <br />LOCAL PLUMBING INSPECTIONS DEPARTMENT PRIOR TO BID THAT PEX AND ALL <br />OTHER PROPOSED MATERIALS AND PRODUCTS ARE APPROVED IN SAID JURISDICTION, <br />AND OBTAIN WRITTEN APPROVAL PRIOR TO INSTALLATION. <br />5. INSTALL PEX PER ASTM F 1807 AND ASTM F 1960. <br />6. PEX PIPE SHALL BE NSF RATED FOR POTABLE USE. <br />7. MAX PEX TEMPERATURE SHALL BE 140• F, EVEN IF RATED FOR 180' F TO 200- <br />F. <br />8. USE SMOKE DEVELOPED RATED PEX FOR PLENUM APPLICATIONS. ONLY WHERE <br />ALLOWED BY AHJ. <br />D. PIPING OF DISSIMILAR METALS MUST BE DI -ELECTRICALLY SEPARATED. <br />E. INSULATE ALL HOT WATER, COLD WATER AND CONDENSATE PIPING WITH 1" <br />THICK (K=0.23 ® 757) PIPE INSULATION WITH AN ALL SERVICE JACKET TO MEET <br />LOCAL CODES AND UL FLAME SPREAD AND SMOKE DEVELOPED RATINGS. <br />OWENS-CORNING OR EQUAL. <br />1. INSULATE ALL EXPOSED PIPES IN CEILING PLENUM, EXISTING WALLS AND ALL <br />EXPOSED HOT WATER LINES AT OR ABOVE THE WATER HEATER. <br />F. INSULATE THE TRAP, SANITARY AND SUPPLY PIPES UNDER LAVATORY WITH <br />1/2- ARMSTRONG "ARMAFLEX" PIPING INSULATION OR TRUEBRO MODEL 102W "HANDI <br />LAV GUARD" INSULATION KIT. <br />G. INSTALL AIR CHAMBER SHOCK ABSORBERS IN BOTH HOT AND COLD LINES OF <br />PIPING SYSTEM TO PREVENT NOISE AND DAMAGE DUE TO WATER HAMMER. J.R. <br />SMITH 5000 SERIES ALL STAINLESS STEEL "HYDROTROLS" OR EQUAL, INSTALLED IN <br />AN UPRIGHT POSITION. <br />H. ALL BRANCH PIPING SYSTEMS SHALL HAVE ACCESSIBLE SERVICE VALVE. <br />PROVIDE SHUT OFF VALVES IN THE SUPPLY PIPING TO EVERY FIXTURE. PROVIDE <br />ACCESS DOORS WHERE NECESSARY. <br />I. INSTALL ALL NECESSARY PIPE HANGERS, SADDLES AND CARRIERS TO <br />PROPERLY SUPPORT ALL PIPING AND FIXTURES. HANGERS SHALL SUIT TYPE OF <br />PIPING AND SEISMIC BRACING WHERE REQUIRED BY CODES. <br />J. STERILIZE WATER SYSTEM IN ACCORDANCE WITH LOCAL CODES. <br />K. CLEAN -OUTS AND FLOOR DRAINS SHALL BE INSTALLED PER LOCAL CODES. <br />L. ESCUTCHEONS SHALL BE CHROME PLATED, SIZE AS REQUIRED AND PLACE AT <br />ALL PIPE PENETRATIONS AT WALL, FLOORS AND CEILINGS IN FINISHED AREAS. <br />M. LEAKAGE TESTS SHALL BE PER LOCAL CODES. <br />N. FLASHING SHALL BE SEALED WATERTIGHT AND PERFORMED IN ACCORDANCE TO <br />THE LANDLORD'S CRITERIA. USE LANDLORD APPROVED ROOFING CONTRACTOR <br />WHERE REQUIRED. <br />0. PROVIDE WATER METER AND REMOTE READER PER LANDLORD'S CRITERIA OR <br />LOCAL UTILITIES REQUIREMENTS IF APPLICABLE. <br />P. GAS PIPING <br />1. PROVIDE A COMPLETE GAS PIPING SYSTEM IF APPLICABLE. REFER TO PLANS <br />TO DETERMINE IF A GAS SYSTEM IS REQUIRED. <br />2. GAS LINES SHALL BE BLACK STEEL, SCHEDULE 40, ASTM A-120, WITH <br />MALLEABLE THREADED FITTINGS FOR 2" AND SMALLER, AND WITH WELDED JOINTS <br />FOR 2 1/2- AND LARGER. <br />3. PROVIDE A GAS COCK, DIRT LEG, UNION CONNECTION, AND REINFORCED <br />BRAIDED FLEX CONNECTOR TO EACH PIECE OF EQUIPMENT. <br />4. PITCH PIPING AT A UNIFORM GRADE OF 1/4" IN 15 FEET UPWARD IN <br />DIRECTION OF FLOOR. SUPPORT PIPING EVERY 5 FEET. SUPPORT AS REQUIRED BY <br />LANDLORD CRITERIA, AS DETAILED ON DRAWINGS, OR BY STANDARD INDUSTRY <br />PRACTICE, WHICHEVER IS MORE STRINGENT. <br />5. GAS PIPING EXPOSED ON ROOF MUST BE PAINTED WITH RUST -INHIBITING <br />PAINT. PAINT YELLOW IF REQUIRED BY AHJ. DO NOT RUN PIPING PARALLEL TO <br />BUILDING EDGE WITHIN 10'-0" OF EDGE OF BUILDING UNLESS PARAPET IS 42" OR <br />TALLER. <br />6. GAS PIPING INSTALLED IN RETURN AIR PLENUMS SHALL BE SLEEVED AND <br />VENTED OR WELDED IN ACCORDANCE WITH THE LOCAL GAS COMPANY, LOCAL CODE <br />AND APPLICABLE NFPA 54 CODES. <br />7. TESTING AND PURGING OF GAS PIPING SHALL BE DONE PER THE <br />REQUIREMENTS OF THE LOCAL GAS COMPANY, LOCAL CODES AND APPLICABLE NFPA <br />54 CODES. <br />8. CONTACT AND COORDINATION GAS SERVICE AND METER REQUIREMENTS WITH <br />THE LOCAL GAS COMPANY AND THE MALL'S OPERATIONS MANAGER PRIOR TO BID. <br />INCLUDE INSTALLATION OF GAS METER COSTS IN BID. <br />Q. TEST PRESSURE ON SITE AND NOTIFY ARCHITECT IF STATIC PRESSURE IS LESS <br />THAN 45 PSI OR DYNAMIC PRESSURE AT 3 GPM FLOW IS LESS THAN 35 PSI. <br />R. PROVIDE BACK FLOW PROTECTION PER LOCAL CODE REQUIREMENTS. <br />S. PROVIDE MIXING VALVES (MASTER AND/OR POINT OF USE) PER LOCAL CODE <br />REQUIREMENTS, ASSE 1069 AND ASSE 1070. <br />PLUMBING GENERAL NOTES: <br />1. THE CONTRACTOR FOR THIS DIVISION OF WORK IS REQUIRED TO READ THE <br />SPECIFICATIONS AND REVIEW DRAWINGS FOR ALL DIVISIONS OF WORK AND IS <br />RESPONSIBLE FOR THE COORDINATION OF THIS WORK AND THE WORK OF ALL <br />SUBCONTRACTORS WITH ALL DIVISION OF WORK. IT IS THIS CONTRACTORS <br />RESPONSIBILITY TO PROVIDE ALL SUBCONTRACTORS WITH A COMPLETE SET OF BID <br />DOCUMENTS. <br />2 ALL ROOF CUTTING, PATCHING AND FLASHING REQUIRED TO INSTALL THE <br />MECHANICAL SYSTEMS SHALL BE BY A LANDLORD APPROVED ROOFING CONTRACTOR <br />AT THIS CONTRACTORS EXPENSE. COORDINATE ROOF PENETRATIONS WITH <br />LANDLORD AND GENERAL CONTRACTOR. <br />3. UNLESS OTHERWISE SPECIFIED, CONTRACTOR SHALL PROVIDE ALL NECESSARY <br />EQUIPMENT, MATERIAL, LABOR AND SUPERVISION NECESSARY TO COMPLETE THE <br />PLUMBING WORK IN ACCORDANCE WITH THE SPECIFICATIONS AND STANDARDS. <br />4. PRIOR TO BID, FILED VERIFY EXACT SIZE, ELEVATION AND LOCATION OF <br />EXISTING PLUMBING UTILITY CONNECTIONS. INCLUDE ALL COSTS IN BID TO EXTEND <br />TO EXISTING BASE BUILDING CONNECTIONS. <br />5. ALL MATERIAL SHALL BE NEW AND OF COMMERCIAL GRADE, AND BEAR N.S.F. <br />AND/OR UNDERWRITERS LABORATORIES LABELS WHERE SUCH LABELING APPLIES. <br />6. PLUMBING CONTRACTOR IS TO PROVIDE AND INSTALL FIRE -RATED PIPE <br />SLEEVES AND SEALS ON ALL EXISTING OR NEW PIPING THAT PENETRATES <br />FIRE -RATED PARTITIONS. <br />7. PLUMBING CONTRACTOR SHALL VISIT JOB SITE AND BE FAMILIAR WITH <br />LANDLORD'S REQUIREMENTS. NO ALLOWANCE WILL BE MADE FOR EXTRAS DUE TO <br />CONTRACTOR'S FAILURE TO VISIT THE JOB SITE AND/OR FAILURE TO PREDETERMINE <br />ALL CONDITIONS IMPOSED BY THE LANDLORD OR OTHER AUTHORITIES. <br />8. PLUMBING CONTRACTOR TO FIELD VERIFY PROPER SLOPE OF EXISTING SEWER <br />TO MAIN SEWER PRIOR TO ANY NEW PLUMBING INSTALLATION. <br />9. SANITARY PIPING 2 1/2" AND SMALLER SHALL BE SLOPED A MINIMUM OF 1/4" <br />PER FOOT OF RUN. SANITARY PIPING 3" AND LARGER SHALL BE SLOPED A <br />MINIMUM OF 1 /8" PER FOOT OF RUN. <br />10. ALL WATER AND VENT PIPING TO BE CONCEALED IN WALL SPACE WHEN <br />POSSIBLE. <br />11. ALL PLUMBING FIXTURES SHALL BE INSTALLED WITH STOP VALVES TO ISOLATE <br />EACH FIXTURE. ALL KITCHEN EQUIPMENT SHALL BE INSTALLED WITH VALVES TO <br />ISOLATE EACH PIECE OF EQUIPMENT. ISOLATE EACH FIXTURE BY PROVIDING A CUT <br />OFF VALVE AT THE FIXTURE AND WHERE REQUIRED BY AHJ, PROVIDE AN ISOLATION <br />VALVE ABOVE CEILING. <br />12. FURNISH AND INSTALL WATER HAMMER ARRESTORS IN THE DOMESTIC COLD <br />AND HOT WATER PIPING. WATER HAMMER ARRESTORS TO BE LOCATED IN AN <br />ACCESSIBLE LOCATION. UNITS AS MANUFACTURED BY SIOUX OR PRECISION <br />PLUMBING PRODUCTS ARE ACCEPTABLE. <br />13. FURNISH AND INSTALL TRAP PRIMERS OR TRAP GUARDS TO ALL FLOOR <br />DRAINS AND HUB DRAINS. <br />14. PLUMBING CONTRACTOR TO MAKE ALL CONNECTIONS TO KITCHEN EQUIPMENT <br />AND MECHANICAL EQUIPMENT UNLESS NOTED OTHERWISE. <br />15. ALL DOMESTIC WATER PIPING INSTALLED IN EXTERNAL WALLS SHALL BE <br />INSTALLED IN THE CONDITIONED SIDE OF THE INSULATION. <br />16. COORDINATE ALL PIPING WITH DUCTWORK AND LIGHTING. <br />17. ALL PIPING DROPS IN CHASES AND WALLS ARE TO BE SECURED. <br />18. ALL SUSPENDED PIPING IS TO BE INSTALLED AS HIGH AS POSSIBLE. <br />19. THE SCOPE OF THE PLUMBING WORK SHALL INCLUDE FURNISHING, INSTALLING, <br />AND TESTING ALL PLUMBING SYSTEMS FOR A COMPLETE & FULLY OPERABLE <br />INSTALLATION. COMPLY WITH ALL APPLICABLE NATIONAL, STATE & LOCAL CODES. <br />20. LOCATIONS OF EXISTING PLUMBING SYSTEMS, EQUIPMENT, LINES, AND DEVICES <br />SHALL BE VERIFIED IN THE FIELD BY THE CONTRACTOR. <br />21. THE SCOPE OF THE PLUMBING WORK SHALL INCLUDE FURNISHING, INSTALLING <br />AND TESTING ALL PLUMBING SYSTEMS FOR A COMPLETE & FULLY OPERABLE <br />INSTALLATION, INCLUDING BUT NOT LIMITED TO: <br />A. CONCRETE CUTTING, REMOVAL, TRENCHING, BACK FILL COMPACTING AND <br />PATCHING; <br />B. ALL PIPING AND FITTINGS; <br />C. CUTTING AND PATCHING ROOF; <br />D. WEATHERPROOF ROOF PENETRATIONS. <br />22. GAS SERVICE: COORDINATE WITH LOCAL GAS COMPANY TO INSTALL GAS METER <br />AND PRESSURE REGULATOR AT DETERMINED METER LOCATION. VERIFY THAT <br />CAPACITY REQUIRED TO SERVE ALL EQUIPMENT IS AVAILABLE. <br />*UPSIZE EXISTING METER AS NEEDED. PROVIDE/UPSIZE PRESSURE REGULATORS AS <br />NEEDED. <br />23. PLUMBER TO PROVIDE SHUT OFF VALVES ON ALL WATER & GAS LINES. <br />24. PLUMBER TO PROVIDE BACK FLOW PREVENTER OR VACUUM BREAKERS ON ALL <br />EQUIPMENT RECEIVING COLD WATER OR AS REQUIRED BY LOCAL CODE. <br />25. THE PLUMBING SUBCONTRACTOR SHALL PROVIDE FAUCETS AND DRAINS FOR <br />MOP SINK AND RESTROOM SINKS, AND SHALL PROVIDE ALL CHROME -PLATED <br />VALVES AND TRIMS AS NECESSARY. <br />26. THE PLUMBING SUBCONTRACTOR SHALL PROVIDE TEMPERATURE PRESSURE <br />SAFETY RELEASE VALVES, DRAIN PANS AND EXPANSION TANKS (AMTROL OR <br />EQUAL), SIZED PER MANUFACTURER'S TABLES, AS REQUIRED. <br />27. THE PLUMBING SUBCONTRACTOR SHALL SNAKE ALL DRAINS PRIOR TO <br />RECEIVING FINAL RETAINAGE. <br />28. SET ALL FLOOR SINKS SO THAT TOP RIM IS 1/2" ABOVE FINISHED FLOOR, IN <br />JURISDICTIONS THAT REQUIRE SUCH. <br />29. AT ACCESSIBLE WATER CLOSETS, FLUSH HANDLE SHALL BE LOCATED ON THE <br />WIDE SIDE OF THE FIXTURE. <br />30. NOT USED. <br />31. PLUMBING CONTRACTOR SHALL INSTALL FLOOR AND WALL CLEANOUTS AS <br />NECESSARY SO THAT THERE ARE NO SECTIONS OF PIPE EXCEEDING 45' BETWEEN <br />CLEANOUT ACCESS POINTS. <br />TESTING REQUIREMENTS: <br />TESTING REQUIREMENTS: NEW POTABLE WATER SYSTEMS ARE REQUIRED TO BE <br />DISINFECTED BY CHLORINATION. <br />PLUMBING CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE WITH ALL TRADES <br />AND VERIFY THAT ALL EQUIPMENT SHIPPED TO THE SITE IS COMPATIBLE WITH <br />MECHANICAL, ELECTRICAL AND PLUMBING SYSTEMS PRIOR TO INSTALLATION OF SAID <br />EQUIPMENT. IN THE EVENT OF ANY DISCREPANCIES, IMMEDIATELY CONTACT <br />DESIGNER BEFORE PROCEEDING. <br />PROVIDE LINE ITEM BID TO OFFER TYPE M COPPER AT EXPOSED WASTE PIPING <br />UNDER 3-COMPARTMENT/PREP TYPE SINKS DRAINING TO FLOOR SINKS, FOR <br />DURABILITY. <br />MEASURE OUT ON CONCRETE FLOOR LOCATIONS OF EQUIPMENT AND FLOOR <br />SINKS/FLOOR DRAINS AND FIELD ADJUST FLOOR SINK/DRAIN LOCATIONS AS NEEDED <br />AT NO ADDITIONAL COST TO OWNER, TO PREVENT TABLE LEGS FROM LINING UP <br />WITH FLOOR SINKS/DRAINS. <br />WHERE POSSIBLE, KEEP FLOOR CLEANOUTS IN BACK -OF -HOUSE, OR BENEATH <br />MOVABLE EQUIPMENT. MINIMIZE NUMBER OF FLOOR CLEANOUTS VISIBLE TO DINING <br />GUESTS. <br />COORDINATE UNDERSLAB ROUTING WITH UNDERSLAB STRUCTURE - GRADE BEAMS, <br />ETC. ALL SLAB CUTS SHALL BE X-RAYED AND APPROVED BY LANDLORD'S <br />REPRESENTATIVE PRIOR TO CUT. ANY DAMAGED CAUSED BY CUTTING STRUCTURAL <br />MEMBERS THROUGH UNAPPROVED CUTS SHALL BE REPAIRED AT THE SOLE EXPENSE <br />OF THE PLUMBING CONTRACTOR. <br />REFER TO ISOMETRIC RISER DIAGRAMS FOR ALL LINE SIZES. ALL FLOOR SINKS, <br />FLOOR DRAINS AND HUB SINKS/FLOOR FUNNEL DRAINS SHALL BE ORDERED WITH <br />TRAP PRIMERS. <br />-REFER TO PLUMBING LEGEND ON PLUMBING PLAN SHEET. <br />-REFER TO GENERAL PLUMBING NOTES. <br />-REFER TO FOOD SERVICE SHEETS IF AVAILABLE FOR ROUGH -IN DIMENSIONS. <br />-DRAWINGS ARE SCHEMATIC. <br />CONDENSATE DRAIN LINES FROM COOLER COILS SHALL BE RUN TO THE NEAREST <br />FLOOR DRAIN/SINK WITH A 1" INSULATED DRAIN LINE, AND DISCHARGED THROUGH <br />3" MINIMUM AIR GAP. PROVIDE CONDENSATE PUMPS AS NEEDED WHERE GRAVITY <br />FALL PIPING IS NOT POSSIBLE. <br />ALL EXPOSED DRAIN PIPING FOR HAND SINKS AND RESTROOM LAVATORIES SHALL <br />BE CHROME. <br />CONDENSATE DRAIN LINES FROM ROOF TOP UNITS SHALL BE COLLECTED & RUN <br />TO ROOF DRAINS OR MOP SINK WITH 1 1/4" INSULATED DRAIN AND/OR AS <br />INDICATED ON THE MEP ROOF PLAN. <br />PRIOR TO BID, T.G.C. SHALL FIELD VERIFY LOCATION OF EXISTING SEWER MAIN & <br />REPORT FINDINGS TO DESIGNER IF OTHER THAN INDICATED HERE. <br />REMOVE ALL EXIST. PLBG. LINES LOCATED ABV. SLAB. CAP OR PLUG ALL EXIST. <br />WASTE & VENT LINES LOCATED BELOW FLOOR SLAB. <br />ALL WATER LINES TO BE LOCATED ABOVE CEILING & INSIDE OF WALLS. PROVIDE <br />VIBRATION ISOLATORS ON ALL LINES. <br />CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL CONDITIONS AND IS <br />ALSO RESPONSIBLE FOR REPORTING ANY CONFLICTS TO THE ARCHITECT PRIOR TO <br />THE START OF WORK. <br />IT IS THE RESPONSIBILITY OF THE PLUMBING CONTRACTOR TO VERIFY ALL <br />EQUIPMENT ROUGH -INS WITH THE APPROPRIATE SUPPLIER AND TO DETERMINE THE <br />MOST FEASIBLE AND ECONOMICAL LOCATION TO INSTALL THE NEW WASTE LINES <br />BELOW THE EXISTING SLAB, BASED ON CURRENT PLUMBING CONDITIONS. MINOR <br />MODIFICATIONS FROM WHAT ARE SHOWN ON THE PLUMBING PLAN SHEETS THAT <br />MAINTAIN THE INTENT SHOWN ON THE DRAWING SET AND WHICH ARE CODE <br />COMPLIANT AND APPROVED BY THE PLUMBING INSPECTOR ARE ACCEPTABLE. <br />CONTRACTOR TO PROVIDE AS BUILT DRAWINGS AT THE COMPLETION OF THE <br />PROJECT. <br />PIPES PASSING UNDER OR THROUGH FOUNDATION WALLS SHALL BE INSTALLED <br />THROUGH PIPE SLEEVES ONE SIZE LARGER THAN PIPE. SEAL AROUND PIPE. <br />GAS PIPING SHALL BE SCHEDULE 40 BLACK STEEL PIPE. <br />SPRINKLER SYSTEM: <br />THE FIRE SPRINKLER SYSTEM SHALL BE DESIGNED AND INSTALLED BY A <br />LICENSED FIRE SPRINKLER CONTRACTOR UNDER A SEPARATE PERMIT - <br />DESIGN BUILD. <br />THE COMCHECK REPORT IS CONSIDERED PART OF THE MEP DOCUMENT <br />;ET. CONTRACTOR SHALL COMPLY WITH ALL ENERGY CODE <br />tEQUIREMENTS. <br />PLUMBING NOTES <br />Peter A. Leptuch, P.E. <br />300 N. Carroll Blvd. #20 <br />Denton, TX 76201 <br />(940) 735-5127 <br />A. EACH PLUMBING VENT SHALL TERMINATE NOT LESS THAN TEN (10) FEET FROM OR AT <br />LEAST THREE (3) FEET ABOVE ANY WINDOW, DOOR, OPENING OR FRESH AIR INTAKE. <br />B. PROVIDE TRAP PRIMERS ON ALL FIXTURES WHOSE TRAP SEALS ARE SUBJECT TO DRYING <br />OUT. <br />C. SEE RESTAURANT EQUIPMENT SCHEDULE ON THE ARCHITECTURAL PLANS FOR EQUIPMENT <br />PROVIDED BY OTHERS. THIS CONTRACTOR SHALL CONNECT WASTE, VENT, AND WATER TO <br />EQUIPMENT FURNISHED BY OTHERS AND THIS CONTRACTOR SHALL INSTALL FAUCETS AND <br />MISC. FITTINGS FOR A COMPLETE INSTALLATION. <br />D. CONNECT NEW DOMESTIC WATER TO EXISTING LINE. INSTALL BALL VALVE AS SHOWN AND <br />PROVIDE REDUCED PRESSURE BFP AT WATER SERVICE CONNECTION IF REQUIRED BY AHJ. <br />E. EXTEND PLUMBING VENT UP THRU ROOF TO APPROVED VENT TERMINATION. LOCATE <br />MINIMUM OF 10 FEET FROM ANY O.A. INTAKE AT THE ROOF -TOP UNITS. <br />F. ALL EXPOSED PIPING TO PLUMBING FIXTURES SHALL BE CHROME PLATED. STOPS SHALL <br />BE PROVIDED WITH REMOVABLE TYPE HANDLES. <br />G. WHERE APPLICABLE, THE PLUMBING CONTRACTOR SHALL SEE THAT THE PROPER NEW <br />(UPGRADE) GAS SERVICE, METER AND REGULATOR (IF REQUIRED) ARE INSTALLED BY THE <br />UTILITY CO. AND PAY FOR ANY NEW SERVICE AND ANY FEES CHARGED FOR THE <br />INSTALLATION OF THE METER AND SERVICE LINES. GAS LINES SHALL EXTEND FROM THE <br />METER TO ALL EQUIPMENT REQUIRING GAS. <br />H. GAS PIPING: SCREWED STANDARD WEIGHT SCHEDULE 40 BLACK STEEL CONFORMING TO <br />ASTM A53 SPECIFICATIONS FOR GAS PIPING. PROVIDE ALL WELDING OF PIPING AS <br />REQUIRED. PAINT ALL NEW GAS PIPING SAFETY YELLOW WITH TWO COATS OF MARINE <br />GRADE PAINT. <br />I. GAS PIPE SHALL BE PROVIDED WITH SUITABLE DRIP LEGS ON ALL MAINS AND RISERS AT <br />EQUIPMENT CONNECTIONS. ALL EQUIPMENT CONNECTIONS WILL BE PROVIDED WITH AN <br />AGA APPROVED BUTTERFLY VALVE. CAP WHERE REQUIRED. <br />StudioRG.,., <br />MAIN OFFICE: <br />1 HUNTINGTON QUADRANGLE <br />SUITE 2CO3 <br />MELVILLE, NY 11747 <br />P: 631.226-7700 F: 631.226.7175 <br />© Copyright 2018: RGBK, INC. <br />Seal: <br />Landry <br />_ GREC LANDRY <br />ARCHR OURE I' AWNG RYTBiK�R DS*N <br />1202 Richardson Dr. #106 Tel: 214.631.6941 <br />R;chardson, Texas 75060 Fox:.214.634.1814 <br />...c' <br />.�► <br />tV� <br />No 72u70 '• y <br />5TA'. OF <br />Owner: <br />George Morkos <br />2520 Colony Reed Lane <br />Clearwater, FL33763 <br />It is the responsibility of the Construction <br />Manager/General Contractor and all <br />Sub -Contractors to verify all dimensions and <br />accept conditions of prior work by related <br />trades before proceeding with any work. <br />Date <br />07-22-2020 <br />Drawn By Check By <br />MRP TN <br />Scale <br />AS SHOWN <br />Issued: <br />Project Title <br />Charleys <br />Zephyrhills <br />WM706 <br />Project Address <br />7631 Gall Blvd, <br />Zephyrhills, FL 33541 <br />Project Number <br />WM706 <br />Drawing Title and Number <br />PLUMBING <br />SPECIFICATIONS <br />P3.0 <br />