Q` 1rL1: WlL4uel L L .n i_i J . I.-, _ :i._j!: ! I G : A is l
<br />��_ � L.1..��.. � _�.. ��- -T • _ �'1 - - -- �� a �� �, ewe... ..-u , .ulluL�1 � . yl� _ _ - - - -
<br />MARK I QTYI PHASE I Manufacturer
<br />0.1 P lNew 1MaaiKitchn
<br />11
<br />12
<br />12.1
<br />12.2
<br />14
<br />19
<br />Ee
<br />1.1
<br />1.4
<br />2
<br />fenny Penn
<br />',rathco
<br />3un
<br />3un
<br />-abricated
<br />ce
<br />_ance�
<br />Model
<br />ao
<br />elocate abricated 4X10;
<br />ew advance Tabco DI-1-
<br />ew abricated 18X24
<br />><istin abricated -Cor
<br />EQUIPMENT SCHEDULE
<br />DESCRIPTION / MFGR
<br />FURN. BY
<br />INST. BY
<br />PLUMBING
<br />CONNECTIONS
<br />120,000 BTU
<br />wner
<br />C
<br />2 AT. GAS
<br />CONNECTION
<br />000 BTU 1 2 Gas Connection
<br />wner
<br />C
<br />2 AT. GAS
<br />CONNECTION
<br />0 000 BTU 1 2 G Connection
<br />wner
<br />C
<br />2 NAT. GAS
<br />CONNECTION
<br />Las I- r er I i
<br />as
<br />alk—In Cooler
<br />alk—In Freezer
<br />remix Bevera a Dispenser
<br />TB6
<br />utomatic Iced Tea Brewer
<br />ced Tea Urn
<br />ro —In Ice Bin
<br />rozen Carbonated Bevera a
<br />Free
<br />ce and Beverage Dispenser
<br />u et Ice Maker
<br />a in Box w Shelves and
<br />Lines
<br />arbonator
<br />0 lb. CO2 Tank
<br />wl
<br />all Mounted Knee Operated
<br />Han(
<br />wl
<br />all Mounted Knee Operated
<br />Han(
<br />-r,
<br />rnn—in CInL
<br />wner
<br />wner
<br />2..
<br />F.W.
<br />wner
<br />wner
<br />wner
<br />C
<br />1. W.
<br />er
<br />wner
<br />C
<br />2
<br />F.W.
<br />wner
<br />wner
<br />2
<br />F.W. 1 1. W.
<br />wner
<br />wner
<br />2
<br />F.W. 1 1. W.
<br />wner
<br />wner
<br />2
<br />F.W.
<br />wner
<br />wner
<br />wner
<br />wner
<br />Sink
<br />wner
<br />C
<br />2
<br />H.W.&C.W. 1-1
<br />2
<br />WAST
<br />Sink
<br />wner
<br />C
<br />2
<br />H.W.&C.W. 1-1
<br />2
<br />WAST
<br />wner
<br />C
<br />2
<br />H.W.&C.W. 1-1
<br />2
<br />WAST
<br />oucet
<br />wner
<br />C
<br />2
<br />H.W.&C.W. 1
<br />1-1
<br />2 I.'
<br />in Boards
<br />wner
<br />C
<br />2
<br />H.W.&C.W. 1
<br />1-1/2"
<br />I.'
<br />rovi
<br />'7.2
<br />ew
<br />&S Brass
<br />—0133-01-44H
<br />re —Rinse Faucet
<br />wner
<br />C
<br />r
<br />'7.1E
<br />xistin
<br />abricated
<br />—CompSink
<br />3 Com artment Sink w 2 Drain Boards
<br />wner
<br />C
<br />2 H.W.&C.W. 3 1-1/2" I.W.
<br />'10.1
<br />ew
<br />ixistinqabricated
<br />ver ure
<br />V9327-12
<br />ater Filtration System
<br />wner
<br />C
<br />4 C.W.
<br />111.1E
<br />OX16X12 Bowl
<br />o Sink and Faucet
<br />4 H.W.&C.W. 1-1 2 WASTE
<br />* THIS PROJECT DOES NOT HAVE A DISH MACHINE.*
<br />PLUMBING NOTES
<br />PLUMBING LEGEND
<br />A. HOT AND COLD WATER PIPING SHALL BE NEW UP TO THE CONNECTION TO THE EXISTING COLD
<br />FPWH
<br />FREEZE PROOF WALL HYDRANT
<br />WATER MAIN LINE.
<br />F.D.
<br />FLOOR DRAIN
<br />P.O.C.
<br />POINT OF CONNECTION
<br />B. CONTRACTOR SHALL FURNISH AND INSTALL HANGER SUPPORTS AND ACCESSORIES REQUIRED FOR
<br />F.S.
<br />FLOOR SINK
<br />THE PROPER INSTALLATION AND OPERATION OF THE PLUMBING SYSTEM AS REQUIRED BY CODE.
<br />M.S.
<br />MOP SINK
<br />LAV.
<br />LAVATORY
<br />C. CONTRACTOR SHALL FURNISH AND INSTALL SHUT-OFF VALVES AT HOT AND COLD WATER
<br />UR.
<br />URINAL
<br />CONNECTIONS.
<br />WC
<br />WATER CLOSET
<br />E.W.0
<br />ELECTRIC WATER COOLER
<br />D. THE CONTRACTOR SHALL COORDINATE ALL NEW WORK WITH EXISTING FIELD CONDITIONS AND ALL
<br />G.I.
<br />GREASE INTERCEPTOR
<br />OTHER TRADES INVOLVED.
<br />H.S.
<br />HAND SINK
<br />D.W.
<br />DISHWASHER
<br />E. HOT AND COLD WATER PIPING AND INSTALLATION SHALL COMPLY WITH LOCAL CODE
<br />I.M.
<br />ICE MACHINE
<br />REQUIREMENTS.
<br />A.F.F.
<br />ABOVE FINISHED FLOOR
<br />B.F.F.
<br />BELOW FINISHED FLOOR
<br />F. HOT AND COLD WATER PIPING AND INSTALLATION SHALL BE TESTED, INSPECTED AND APPROVED
<br />M❑
<br />WATER METER (M)
<br />BEFORE BEING COVERED AND CONCEALED AS REQUIRED.
<br />®
<br />REMOTE READOUT FOR METER
<br />EWH
<br />ELECTRIC WATER HEATER
<br />G. CONTRACTOR SHALL FURNISH AND INSTALL THE NECESSARY FITTINGS FOR THE CONNECTION OF
<br />FCO
<br />FLOOR CLEANOUT
<br />THE NEW EQUIPMENT AND FIXTURES INCLUDING VACUUM BREAKERS AND BACK FLOW PREVENTERS
<br />WCO
<br />WALL CLEANOUT
<br />AS REQUIRED BY CODE.
<br />GCO
<br />GRADE CLEANOUT
<br />TWCO
<br />TWO WAY CLEANOUT
<br />H. COLD, HOT, AND TEMPERED WATER PIPING SHALL BE INSULATED.
<br />V.T.R.
<br />VENT THRU ROOF
<br />C.D.
<br />CONDENSATE DRAIN
<br />I. CONDENSATE AND OVERFLOW PIPING SHALL BE INSULATED.
<br />O.F.D.
<br />OVER FLOW DRAIN
<br />SS
<br />SANITARY SEWER LINE
<br />J. INTERIOR OR PERIMETER STRUCTURAL GRADE BEAMS MAY NOT BE CUT, IF PRESENT.
<br />GW
<br />GREASE WASTE
<br />— VENT LINE
<br />K. WATER LINES IN EXTERIOR BUILDING WALLS SHALL BE ON WARM (CONDITIONED) SIDE OF BUILDING
<br />GAS LINE
<br />INSULATION. ALL PIPING SHALL BE CONCEALED FROM VIEW.
<br />-
<br />COLD WATER LINE
<br />�---
<br />HOT WATER LINE (140•F.)
<br />L. HEAT TRACE ALL PIPING IN EXTERIOR WALLS, AND AREAS SUBJECT TO FREEZING CONDITIONS.
<br />— ' ' — '
<br />' — TEMPERED WATER LINE (110•F.)
<br />HOT WATER RETURN LINE
<br />M. FURR OUT WALLS FOR ELECTRICAL AND PLUMBING AS NEEDED, OR AS REQUIRED BY LANDLORD
<br />Vv
<br />SHUT-OFF VALVE
<br />FOR ELECTRICAL AND PLUMBING CONNECTIONS.
<br />V��-
<br />BACKFLOW PREVENTER
<br />N. PROVIDE ADDITIONAL CUTOFFS ABOVE CEILING IF REQUIRED BY LOCAL CODE.
<br />®
<br />KEYED NOTE
<br />0. IF DESIGN CALLS FOR NEW FLOOR DRAIN IN A RESTROOM THAT IS EXISTING AND DOES NOT HAVE
<br />NEW TO EXISTING
<br />A DRAIN AND IS NOT REQUIRED BY A.H.J. TO HAVE A FLOOR DRAIN, THEN THE PLUMBER CAN
<br />FOR EQUIP. INFORMATION REFER TO PLUMBING
<br />SKIP INSTALLING IT IN THAT ROOM.
<br />P. BASE BID TO ASSUME THAT THE JURISDICTION REQUIRES CONTAINMENT BACK FLOW PREVENTION.
<br />FIXTURE SCHEDULE. NOTE BY SYMBOL
<br />INFORMATION REFER TO KEYED NOTES.
<br />P.C. SHALL CONFIRM WITH PLUMBING INSPECTOR IF BUILDING HAS MAIN RPZBFP AND DOES NOT
<br />REQUIRE ADDITIONAL BFP IN SPACE, THE PLUMBER MAY OMIT BFP. IF JURISDICTION REQUIRES
<br />ISOLATION BFP, THE PLUMBING CONTRACTOR SHALL OMIT THE RPZ BFP NEAR THE MOP SINK AND
<br />INSTEAD SHALL. PROVIDE A POINT OF USE BFP AT THE WATER BAR, AT THE DRINKING FOUNTAIN.
<br />AS APPLICABLE/AS REQUIRED AND ELSEWHERE AS DETERMINED BY THE PLUMBING INSPECTOR.
<br />Q. WHERE NEW BELOW SLAB PLUMBING MODIFICATIONS ARE PROPOSED, TENANT SHALL REPLACE
<br />ANY BASE MATERIAL AND COMPACT TO MATCH EXISTING. MATCH FLOOR SLAB THICKNESS AND
<br />FINISH WITH 3,000 PSI CONCRETE. - TENANT SHALL FIRST DO TEST DEMOLITION OF SLAB OF NO
<br />MORE THAN 5 SF TO CONFIRM THAT THE EXISTING SLAB CONDITION IS NOT A STRUCTURAL
<br />SLAB. IF THE EXISTING SLAB CONDITION IS A STRUCTURAL SLAB, TENANT SHALL IMMEDIATELY
<br />REMARKS
<br />nq to Nemaln
<br />nq to Remain
<br />led in EauiDment Paz
<br />Neq. as neeaea, per
<br />o Remain, Verify Ind.
<br />Req. as needed, per
<br />o Remain. Verify Ind.
<br />PLUMBING MATERIALS TABLE:
<br />1. ALL HOT AND COLD WATER SUPPLY PIPING,
<br />WHERE ALLOWED BY A.H.J. AND OWNER SHALL
<br />BE CPVC OR PEX.
<br />2. ROOF -TOP CONDENSATE SHALL BE TYPE "L"
<br />OR TYPE "M" COPPER ABOVE ROOF (APPROX
<br />2'-0"), THEN PVC BELOW.
<br />3. TRANSITIONS BETWEEN COPPER AND PEX/PVC
<br />PIPING SHALL BE MADE BY SHARKBITE TYPE
<br />FITTINGS, INSTALLED PER MANUFACTURER'S
<br />INSTRUCTIONS.
<br />4. INSULATE (1" MINIMUM, R-5) ALL EXPOSED
<br />PIPES IN CLG SPACE, EXT. WALLS & ALL
<br />EXPOSED HOT WATERLINES AT OR ABOUT
<br />THE WATER HEATER.
<br />5. UNDERSLAB DRAIN PIPING SHALL BE
<br />SCHEDULE 40 PVC.
<br />6. VENT PIPING SHALL BE SCHEDULE 40 PVC.
<br />7. GAS PIPING SHALL BE SCHEDULE 40 METAL
<br />PIPE (BLACK STEEL).
<br />8. SANITARY PIPING:
<br />A) WASTE, DRAIN AND VENT PIPING SHALL
<br />BE PVC PIPE.
<br />B) CONDENSATE PIPING SHALL BE PVC PIPE.
<br />"THIS MATERIALS LIST REPRESENTS THE MINIMUM
<br />SPECIFICATIONS SET FORTH BY THE MEP
<br />ENGINEER. CONTACT LANDLORD'S
<br />REPRESENTATIVE PRIOR TO BEGINNING
<br />CONSTRUCTION TO VERIFY IF THERE ARE ANY
<br />ADDITIONAL OR MORE STRINGENT REQUIREMENTS
<br />BEYOND THESE.
<br />NOTES BY SYMBOL 11
<br />O1 POINT OF CONNECTION TO EXISTING GREASE WASTE
<br />LINE (DIAGRAMMATIC). CONTRACTOR SHALL FIELD
<br />VERIFY EXACT LOCATION, DEPTH AND DIRECTION OF
<br />FLOW.
<br />O PIPING UNDER FLOOR. SLOPE 4" DRAIN PIPE AT 1 /8"
<br />PER FOOT AND 3" DRAIN PIPE AT 1 /4" PER FOOT.
<br />O3 OVERHEAD PIPING FOR COOLER/CHILLER CONDENSATE,
<br />HEAT TRACE WHERE SUBJECT TO FREEZING
<br />TEMPERATURES. MAINTAIN EXISTING WHERE POSSIBLE.
<br />EXTEND OR REPAIR/REPLACE WHERE NEEDED.
<br />O ROUTE INDIRECT DRAIN CONDENSATE FROM FREEZER
<br />AND COOLER EVAPORATOR COILS TO RESPECTIVE HUB
<br />DRAINS AND/OR FLOOR SINK. REUSE EXISTING WHERE
<br />PRESENT.
<br />O PROVIDE ALL TRAPS SUBJECT TO DRYING OUT WITH
<br />TRAP PRIMER.
<br />© ROUTE INDIRECT DRAIN LINES FROM CONDENSATE TO
<br />F.P.C. APPROVED RECEPTOR. NO CHANGES TO
<br />EXISTING SYSTEM ARE ANTICIPATED.
<br />O7 ROUTE DISCHARGE FROM 3-COMPARTMENT SINK TO
<br />FLOOR SINK VIA INDIRECT CONNECTION. 3-COMP
<br />BASINS SHALL HAVE FLOW CONTROL LEVERS ON EACH.
<br />PROVIDE 4" AIR GAP.
<br />O COORDINATE ROUTING OF UNDERSLAB WASTE LINES IN
<br />FIELD WITH STRUCTURAL ELEMENTS.
<br />O INTERCEPT / REUSE EXISTING WASTE LINE CONNECTED
<br />TO EXISTING FLOOR OR HAND SINK. 1.1
<br />r//
<br />U-i
<br />X
<br />0
<br />to
<br />STOP UNDER SLAB WORK AND PROVIDE SLAB PENETRATION/REMEDIATION DRAWINGS BY A
<br />LICENSED STRUCTURAL ENGINEER, LICENSED IN THE STATE IN WHICH THE TENANT WORK IS i
<br />TAKING PLACE.
<br />R. CONTRACTOR TO USE LANDLORD/OWNER APPROVED ROOFING CONTRACTOR FOR ALL NEW TROUGH i / / \ \ n RE�oNN
<br />ROOF PLUMBING VENT PENETRATIONS TO MAINTAIN ROOF WARRANTY. / \1 ` ♦ `EST T�
<br />r
<br />S. ALL FLOOR SINKS, FLOOR DRAINS, FLOOR CLEANOUTS, AND GREASE TRAP (WHERE APPLICABLE) i I 1 .01
<br />SHALL BE INSTALLED SO THAT TOPS ARE FLUSH WITH FLOOR FINISH TILE. �
<br />� •R.
<br />T. CONTRACTOR TO COORDINATE / VERIFY EXACT LOCATIONS FOR ALL FLOOR FIXTURES PRIOR TO
<br />SAW -CUTTING.
<br />U. COORDINATE WATER LINES WITH ELECTRICAL CONTRACTOR. NEW WATER PIPING SHALL NOT BE 1N (� (/Z 104
<br />ROUTED OVER ELECTRICAL PANEL GEAR. i� (/1 i i! (\
<br />V. ALL BACKFLOW PREVENTERS SHOULD BE INSTALLED ABOVE THE KITCHEN DROP CEILING OR FCO i�Il U ""
<br />WITHIN MILLWORK WHENEVER POSSIBLE OR COMPLETELY OUT OF CUSTOMER VIEW IN THE BACK OF 1 EX,
<br />THE KITCHEN. BFP SHOULD REMAIN ACCESSIBLE, AS DEFINED BY LOCAL INSPECTOR (VERIFY 1 FCO 4�Gyy I 1 FS
<br />BEFORE INSTALLATION). BFP SHOULD NOT INTERFERE IN ANY WAY WITH THE OPERATION OF THE I 1 MS I I N
<br />KITCHEN. IF AN EXISTING BACKFLOW PREVENTER IS IN A LOCATION OTHER THAN WHAT IS SHOWN 1 (EX) 1 1
<br />ON THESE DRAWINGS, CONTACT THE ARCHITECT IMMEDIATELY FOR DIRECTION ON HOW TO 3EX. FD " 3" PREP ( \ \
<br />PROCEED. FUS FS I �2�
<br />W. ALL PLUMBING AND GAS LINES MUST BE RECESSED WITHIN WALL CAVITIES, UNLESS SPECIFICALLY 4h 1 \
<br />NOTED OTHERWISE. Gyy
<br />3 �
<br />X. THE CONTRACTOR SHALL CONFIRM WASTE LINES FOUND IN FIELD AND SHALL VERIFY THAT THE EX.
<br />SANITARY WASTE LINES ARE CONNECTED TO BUILDING SANITARY WASTE LINE, AND NOT INTO A HS
<br />BUILDING COMMON GREASE WASTE LINE.
<br />Y. PROVIDE MINIMUM 6" AIR GAP AT DISCHARGE OF A T&P AT WATER HEATER. I� \ 2+� , i
<br />Z. ALL PLUMBING SUPPLY LINES SHALL BE 1 /2" UNLESS INDICATED OTHERWISE.
<br />\r AA. ALL FIXTURES SHALL HAVE CLEANOUTS WHETHER GRAPHICALLY INDICATED ON DRAWINGS OR
<br />NOT. ! i N
<br />BB. PLUMBING CONTRACTOR SHALL MAKE ADJUSTMENTS WHERE NECESSARY TO KEEP PLUMBING I \1
<br />VENTS A MINIMUM OF 10'-0" AWAY FROM RTUS. WAIT FOR FINAL RTU LOCATIONS PRIOR TO
<br />CUTTING ROOF PENETRATIONS. 1
<br />CC. REUSE SUPPLY DROPS TO EXISTING FIXTURES WHERE POSSIBLE. PROVIDE NEW SUPPLY DROPS 3" I 3
<br />DOWN TO NEW FIXTURES. FS 3" FD
<br />DD. REUSE WASTE CONNECTIONS SERVING EXISTING WASTE FIXTURES THAT ARE TO REMAIN FOR HS FCO
<br />REUSE REWORK WASTE CONNECTIONS WHERE REQUIRED BY AU PROVIDE NEW WASTE
<br />CONNECTIONS AT NEW FIXTURES. % P L U M B I N G WAST
<br />EE. THE PLUMBING CONTRACTOR SHALL VIDEO SCOPE AND RECORD VIDEO TO EVALUATE CONDITION
<br />OF ALL EXISTING UNDERSLAB SANITARY AND GREASE WASTE LINES AND SHALL REPLACE AND SCALE: NOT TO SCALE.
<br />DAMAGED PIPES. IF
<br />E RISER
<br />WALMART STORE
<br />PLUMBING WASTE PLAN
<br />SCALE: 1 /4" = 1'-0"
<br />LEPT�
<br />cy
<br />E,� A
<br />CoNSULTQ6
<br />SER ICES
<br />Peter A. Leptuch, P.E.
<br />300 N. Carroll Blvd. #200
<br />Denton, TX 76201
<br />(940) 735-5127
<br />VERIFY EXACT SEWER
<br />AND GREASE WASTE
<br />LINES ON SITE.
<br />ADJUST POINT(S) OF
<br />CONNECTION AS
<br />NEEDED.
<br />W
<br />W
<br />0
<br />0
<br />StudioRG.,.,
<br />MAIN OFFICE:
<br />1 HUNTINGTON QUADRANGLE
<br />SUITE 2CO3
<br />MELVILLE, NY 11747
<br />P: 631.226-7700 F: 631.226.7175
<br />© Copyright 2018: RGBK, INC.
<br />Landry
<br />GREG LANDRI`
<br />ARCHITECTURE PLANNING INTEROR DESIGN
<br />1202 Richardsm Dr. #E106 Te1:.214.631.041
<br />Richardson, Texas 75060 Fax: 214.634.1814
<br />Seal:
<br />Owner:
<br />George Morkos
<br />2520 Colony Reed Lane
<br />Clearwater, FL33763
<br />It is the responsibility of the Construction
<br />Manager/General Contractor and all
<br />Sub -Contractors to verify all dimensions and
<br />accept conditions of prior work by related
<br />trades before proceeding with any work.
<br />Date
<br />07-22-2020
<br />Drawn By Check By
<br />MRP TN
<br />Scale
<br />AS SHOWN
<br />Issued:
<br />Project Title
<br />Description
<br />M
<br />Charleys
<br />Zephyrhills
<br />WM706
<br />Project Address
<br />7631 Gall Blvd,
<br />Zephyrhills, FL 33541
<br />Project Number
<br />WM706
<br />Drawing Title and Number
<br />PLUMBING WASTE
<br />PLAN
<br />P2.0
<br />f:l
<br />= mm
<br />
|