Laserfiche WebLink
Q` 1rL1: WlL4uel L L .n i_i J . I.-, _ :i._j!: ! I G : A is l <br />��_ � L.1..��.. � _�.. ��- -T • _ �'1 - - -- �� a �� �, ewe... ..-u , .ulluL�1 � . yl� _ _ - - - - <br />MARK I QTYI PHASE I Manufacturer <br />0.1 P lNew 1MaaiKitchn <br />11 <br />12 <br />12.1 <br />12.2 <br />14 <br />19 <br />Ee <br />1.1 <br />1.4 <br />2 <br />fenny Penn <br />',rathco <br />3un <br />3un <br />-abricated <br />ce <br />_ance� <br />Model <br />ao <br />elocate abricated 4X10; <br />ew advance Tabco DI-1- <br />ew abricated 18X24 <br />><istin abricated -Cor <br />EQUIPMENT SCHEDULE <br />DESCRIPTION / MFGR <br />FURN. BY <br />INST. BY <br />PLUMBING <br />CONNECTIONS <br />120,000 BTU <br />wner <br />C <br />2 AT. GAS <br />CONNECTION <br />000 BTU 1 2 Gas Connection <br />wner <br />C <br />2 AT. GAS <br />CONNECTION <br />0 000 BTU 1 2 G Connection <br />wner <br />C <br />2 NAT. GAS <br />CONNECTION <br />Las I- r er I i <br />as <br />alk—In Cooler <br />alk—In Freezer <br />remix Bevera a Dispenser <br />TB6 <br />utomatic Iced Tea Brewer <br />ced Tea Urn <br />ro —In Ice Bin <br />rozen Carbonated Bevera a <br />Free <br />ce and Beverage Dispenser <br />u et Ice Maker <br />a in Box w Shelves and <br />Lines <br />arbonator <br />0 lb. CO2 Tank <br />wl <br />all Mounted Knee Operated <br />Han( <br />wl <br />all Mounted Knee Operated <br />Han( <br />-r, <br />rnn—in CInL <br />wner <br />wner <br />2.. <br />F.W. <br />wner <br />wner <br />wner <br />C <br />1. W. <br />er <br />wner <br />C <br />2 <br />F.W. <br />wner <br />wner <br />2 <br />F.W. 1 1. W. <br />wner <br />wner <br />2 <br />F.W. 1 1. W. <br />wner <br />wner <br />2 <br />F.W. <br />wner <br />wner <br />wner <br />wner <br />Sink <br />wner <br />C <br />2 <br />H.W.&C.W. 1-1 <br />2 <br />WAST <br />Sink <br />wner <br />C <br />2 <br />H.W.&C.W. 1-1 <br />2 <br />WAST <br />wner <br />C <br />2 <br />H.W.&C.W. 1-1 <br />2 <br />WAST <br />oucet <br />wner <br />C <br />2 <br />H.W.&C.W. 1 <br />1-1 <br />2 I.' <br />in Boards <br />wner <br />C <br />2 <br />H.W.&C.W. 1 <br />1-1/2" <br />I.' <br />rovi <br />'7.2 <br />ew <br />&S Brass <br />—0133-01-44H <br />re —Rinse Faucet <br />wner <br />C <br />r <br />'7.1E <br />xistin <br />abricated <br />—CompSink <br />3 Com artment Sink w 2 Drain Boards <br />wner <br />C <br />2 H.W.&C.W. 3 1-1/2" I.W. <br />'10.1 <br />ew <br />ixistinqabricated <br />ver ure <br />V9327-12 <br />ater Filtration System <br />wner <br />C <br />4 C.W. <br />111.1E <br />OX16X12 Bowl <br />o Sink and Faucet <br />4 H.W.&C.W. 1-1 2 WASTE <br />* THIS PROJECT DOES NOT HAVE A DISH MACHINE.* <br />PLUMBING NOTES <br />PLUMBING LEGEND <br />A. HOT AND COLD WATER PIPING SHALL BE NEW UP TO THE CONNECTION TO THE EXISTING COLD <br />FPWH <br />FREEZE PROOF WALL HYDRANT <br />WATER MAIN LINE. <br />F.D. <br />FLOOR DRAIN <br />P.O.C. <br />POINT OF CONNECTION <br />B. CONTRACTOR SHALL FURNISH AND INSTALL HANGER SUPPORTS AND ACCESSORIES REQUIRED FOR <br />F.S. <br />FLOOR SINK <br />THE PROPER INSTALLATION AND OPERATION OF THE PLUMBING SYSTEM AS REQUIRED BY CODE. <br />M.S. <br />MOP SINK <br />LAV. <br />LAVATORY <br />C. CONTRACTOR SHALL FURNISH AND INSTALL SHUT-OFF VALVES AT HOT AND COLD WATER <br />UR. <br />URINAL <br />CONNECTIONS. <br />WC <br />WATER CLOSET <br />E.W.0 <br />ELECTRIC WATER COOLER <br />D. THE CONTRACTOR SHALL COORDINATE ALL NEW WORK WITH EXISTING FIELD CONDITIONS AND ALL <br />G.I. <br />GREASE INTERCEPTOR <br />OTHER TRADES INVOLVED. <br />H.S. <br />HAND SINK <br />D.W. <br />DISHWASHER <br />E. HOT AND COLD WATER PIPING AND INSTALLATION SHALL COMPLY WITH LOCAL CODE <br />I.M. <br />ICE MACHINE <br />REQUIREMENTS. <br />A.F.F. <br />ABOVE FINISHED FLOOR <br />B.F.F. <br />BELOW FINISHED FLOOR <br />F. HOT AND COLD WATER PIPING AND INSTALLATION SHALL BE TESTED, INSPECTED AND APPROVED <br />M❑ <br />WATER METER (M) <br />BEFORE BEING COVERED AND CONCEALED AS REQUIRED. <br />® <br />REMOTE READOUT FOR METER <br />EWH <br />ELECTRIC WATER HEATER <br />G. CONTRACTOR SHALL FURNISH AND INSTALL THE NECESSARY FITTINGS FOR THE CONNECTION OF <br />FCO <br />FLOOR CLEANOUT <br />THE NEW EQUIPMENT AND FIXTURES INCLUDING VACUUM BREAKERS AND BACK FLOW PREVENTERS <br />WCO <br />WALL CLEANOUT <br />AS REQUIRED BY CODE. <br />GCO <br />GRADE CLEANOUT <br />TWCO <br />TWO WAY CLEANOUT <br />H. COLD, HOT, AND TEMPERED WATER PIPING SHALL BE INSULATED. <br />V.T.R. <br />VENT THRU ROOF <br />C.D. <br />CONDENSATE DRAIN <br />I. CONDENSATE AND OVERFLOW PIPING SHALL BE INSULATED. <br />O.F.D. <br />OVER FLOW DRAIN <br />SS <br />SANITARY SEWER LINE <br />J. INTERIOR OR PERIMETER STRUCTURAL GRADE BEAMS MAY NOT BE CUT, IF PRESENT. <br />GW <br />GREASE WASTE <br />— VENT LINE <br />K. WATER LINES IN EXTERIOR BUILDING WALLS SHALL BE ON WARM (CONDITIONED) SIDE OF BUILDING <br />GAS LINE <br />INSULATION. ALL PIPING SHALL BE CONCEALED FROM VIEW. <br />- <br />COLD WATER LINE <br />�--- <br />HOT WATER LINE (140•F.) <br />L. HEAT TRACE ALL PIPING IN EXTERIOR WALLS, AND AREAS SUBJECT TO FREEZING CONDITIONS. <br />— ' ' — ' <br />' — TEMPERED WATER LINE (110•F.) <br />HOT WATER RETURN LINE <br />M. FURR OUT WALLS FOR ELECTRICAL AND PLUMBING AS NEEDED, OR AS REQUIRED BY LANDLORD <br />Vv <br />SHUT-OFF VALVE <br />FOR ELECTRICAL AND PLUMBING CONNECTIONS. <br />V��- <br />BACKFLOW PREVENTER <br />N. PROVIDE ADDITIONAL CUTOFFS ABOVE CEILING IF REQUIRED BY LOCAL CODE. <br />® <br />KEYED NOTE <br />0. IF DESIGN CALLS FOR NEW FLOOR DRAIN IN A RESTROOM THAT IS EXISTING AND DOES NOT HAVE <br />NEW TO EXISTING <br />A DRAIN AND IS NOT REQUIRED BY A.H.J. TO HAVE A FLOOR DRAIN, THEN THE PLUMBER CAN <br />FOR EQUIP. INFORMATION REFER TO PLUMBING <br />SKIP INSTALLING IT IN THAT ROOM. <br />P. BASE BID TO ASSUME THAT THE JURISDICTION REQUIRES CONTAINMENT BACK FLOW PREVENTION. <br />FIXTURE SCHEDULE. NOTE BY SYMBOL <br />INFORMATION REFER TO KEYED NOTES. <br />P.C. SHALL CONFIRM WITH PLUMBING INSPECTOR IF BUILDING HAS MAIN RPZBFP AND DOES NOT <br />REQUIRE ADDITIONAL BFP IN SPACE, THE PLUMBER MAY OMIT BFP. IF JURISDICTION REQUIRES <br />ISOLATION BFP, THE PLUMBING CONTRACTOR SHALL OMIT THE RPZ BFP NEAR THE MOP SINK AND <br />INSTEAD SHALL. PROVIDE A POINT OF USE BFP AT THE WATER BAR, AT THE DRINKING FOUNTAIN. <br />AS APPLICABLE/AS REQUIRED AND ELSEWHERE AS DETERMINED BY THE PLUMBING INSPECTOR. <br />Q. WHERE NEW BELOW SLAB PLUMBING MODIFICATIONS ARE PROPOSED, TENANT SHALL REPLACE <br />ANY BASE MATERIAL AND COMPACT TO MATCH EXISTING. MATCH FLOOR SLAB THICKNESS AND <br />FINISH WITH 3,000 PSI CONCRETE. - TENANT SHALL FIRST DO TEST DEMOLITION OF SLAB OF NO <br />MORE THAN 5 SF TO CONFIRM THAT THE EXISTING SLAB CONDITION IS NOT A STRUCTURAL <br />SLAB. IF THE EXISTING SLAB CONDITION IS A STRUCTURAL SLAB, TENANT SHALL IMMEDIATELY <br />REMARKS <br />nq to Nemaln <br />nq to Remain <br />led in EauiDment Paz <br />Neq. as neeaea, per <br />o Remain, Verify Ind. <br />Req. as needed, per <br />o Remain. Verify Ind. <br />PLUMBING MATERIALS TABLE: <br />1. ALL HOT AND COLD WATER SUPPLY PIPING, <br />WHERE ALLOWED BY A.H.J. AND OWNER SHALL <br />BE CPVC OR PEX. <br />2. ROOF -TOP CONDENSATE SHALL BE TYPE "L" <br />OR TYPE "M" COPPER ABOVE ROOF (APPROX <br />2'-0"), THEN PVC BELOW. <br />3. TRANSITIONS BETWEEN COPPER AND PEX/PVC <br />PIPING SHALL BE MADE BY SHARKBITE TYPE <br />FITTINGS, INSTALLED PER MANUFACTURER'S <br />INSTRUCTIONS. <br />4. INSULATE (1" MINIMUM, R-5) ALL EXPOSED <br />PIPES IN CLG SPACE, EXT. WALLS & ALL <br />EXPOSED HOT WATERLINES AT OR ABOUT <br />THE WATER HEATER. <br />5. UNDERSLAB DRAIN PIPING SHALL BE <br />SCHEDULE 40 PVC. <br />6. VENT PIPING SHALL BE SCHEDULE 40 PVC. <br />7. GAS PIPING SHALL BE SCHEDULE 40 METAL <br />PIPE (BLACK STEEL). <br />8. SANITARY PIPING: <br />A) WASTE, DRAIN AND VENT PIPING SHALL <br />BE PVC PIPE. <br />B) CONDENSATE PIPING SHALL BE PVC PIPE. <br />"THIS MATERIALS LIST REPRESENTS THE MINIMUM <br />SPECIFICATIONS SET FORTH BY THE MEP <br />ENGINEER. CONTACT LANDLORD'S <br />REPRESENTATIVE PRIOR TO BEGINNING <br />CONSTRUCTION TO VERIFY IF THERE ARE ANY <br />ADDITIONAL OR MORE STRINGENT REQUIREMENTS <br />BEYOND THESE. <br />NOTES BY SYMBOL 11 <br />O1 POINT OF CONNECTION TO EXISTING GREASE WASTE <br />LINE (DIAGRAMMATIC). CONTRACTOR SHALL FIELD <br />VERIFY EXACT LOCATION, DEPTH AND DIRECTION OF <br />FLOW. <br />O PIPING UNDER FLOOR. SLOPE 4" DRAIN PIPE AT 1 /8" <br />PER FOOT AND 3" DRAIN PIPE AT 1 /4" PER FOOT. <br />O3 OVERHEAD PIPING FOR COOLER/CHILLER CONDENSATE, <br />HEAT TRACE WHERE SUBJECT TO FREEZING <br />TEMPERATURES. MAINTAIN EXISTING WHERE POSSIBLE. <br />EXTEND OR REPAIR/REPLACE WHERE NEEDED. <br />O ROUTE INDIRECT DRAIN CONDENSATE FROM FREEZER <br />AND COOLER EVAPORATOR COILS TO RESPECTIVE HUB <br />DRAINS AND/OR FLOOR SINK. REUSE EXISTING WHERE <br />PRESENT. <br />O PROVIDE ALL TRAPS SUBJECT TO DRYING OUT WITH <br />TRAP PRIMER. <br />© ROUTE INDIRECT DRAIN LINES FROM CONDENSATE TO <br />F.P.C. APPROVED RECEPTOR. NO CHANGES TO <br />EXISTING SYSTEM ARE ANTICIPATED. <br />O7 ROUTE DISCHARGE FROM 3-COMPARTMENT SINK TO <br />FLOOR SINK VIA INDIRECT CONNECTION. 3-COMP <br />BASINS SHALL HAVE FLOW CONTROL LEVERS ON EACH. <br />PROVIDE 4" AIR GAP. <br />O COORDINATE ROUTING OF UNDERSLAB WASTE LINES IN <br />FIELD WITH STRUCTURAL ELEMENTS. <br />O INTERCEPT / REUSE EXISTING WASTE LINE CONNECTED <br />TO EXISTING FLOOR OR HAND SINK. 1.1 <br />r// <br />U-i <br />X <br />0 <br />to <br />STOP UNDER SLAB WORK AND PROVIDE SLAB PENETRATION/REMEDIATION DRAWINGS BY A <br />LICENSED STRUCTURAL ENGINEER, LICENSED IN THE STATE IN WHICH THE TENANT WORK IS i <br />TAKING PLACE. <br />R. CONTRACTOR TO USE LANDLORD/OWNER APPROVED ROOFING CONTRACTOR FOR ALL NEW TROUGH i / / \ \ n RE�oNN <br />ROOF PLUMBING VENT PENETRATIONS TO MAINTAIN ROOF WARRANTY. / \1 ` ♦ `EST T� <br />r <br />S. ALL FLOOR SINKS, FLOOR DRAINS, FLOOR CLEANOUTS, AND GREASE TRAP (WHERE APPLICABLE) i I 1 .01 <br />SHALL BE INSTALLED SO THAT TOPS ARE FLUSH WITH FLOOR FINISH TILE. � <br />� •R. <br />T. CONTRACTOR TO COORDINATE / VERIFY EXACT LOCATIONS FOR ALL FLOOR FIXTURES PRIOR TO <br />SAW -CUTTING. <br />U. COORDINATE WATER LINES WITH ELECTRICAL CONTRACTOR. NEW WATER PIPING SHALL NOT BE 1N (� (/Z 104 <br />ROUTED OVER ELECTRICAL PANEL GEAR. i� (/1 i i! (\ <br />V. ALL BACKFLOW PREVENTERS SHOULD BE INSTALLED ABOVE THE KITCHEN DROP CEILING OR FCO i�Il U "" <br />WITHIN MILLWORK WHENEVER POSSIBLE OR COMPLETELY OUT OF CUSTOMER VIEW IN THE BACK OF 1 EX, <br />THE KITCHEN. BFP SHOULD REMAIN ACCESSIBLE, AS DEFINED BY LOCAL INSPECTOR (VERIFY 1 FCO 4�Gyy I 1 FS <br />BEFORE INSTALLATION). BFP SHOULD NOT INTERFERE IN ANY WAY WITH THE OPERATION OF THE I 1 MS I I N <br />KITCHEN. IF AN EXISTING BACKFLOW PREVENTER IS IN A LOCATION OTHER THAN WHAT IS SHOWN 1 (EX) 1 1 <br />ON THESE DRAWINGS, CONTACT THE ARCHITECT IMMEDIATELY FOR DIRECTION ON HOW TO 3EX. FD " 3" PREP ( \ \ <br />PROCEED. FUS FS I �2� <br />W. ALL PLUMBING AND GAS LINES MUST BE RECESSED WITHIN WALL CAVITIES, UNLESS SPECIFICALLY 4h 1 \ <br />NOTED OTHERWISE. Gyy <br />3 � <br />X. THE CONTRACTOR SHALL CONFIRM WASTE LINES FOUND IN FIELD AND SHALL VERIFY THAT THE EX. <br />SANITARY WASTE LINES ARE CONNECTED TO BUILDING SANITARY WASTE LINE, AND NOT INTO A HS <br />BUILDING COMMON GREASE WASTE LINE. <br />Y. PROVIDE MINIMUM 6" AIR GAP AT DISCHARGE OF A T&P AT WATER HEATER. I� \ 2+� , i <br />Z. ALL PLUMBING SUPPLY LINES SHALL BE 1 /2" UNLESS INDICATED OTHERWISE. <br />\r AA. ALL FIXTURES SHALL HAVE CLEANOUTS WHETHER GRAPHICALLY INDICATED ON DRAWINGS OR <br />NOT. ! i N <br />BB. PLUMBING CONTRACTOR SHALL MAKE ADJUSTMENTS WHERE NECESSARY TO KEEP PLUMBING I \1 <br />VENTS A MINIMUM OF 10'-0" AWAY FROM RTUS. WAIT FOR FINAL RTU LOCATIONS PRIOR TO <br />CUTTING ROOF PENETRATIONS. 1 <br />CC. REUSE SUPPLY DROPS TO EXISTING FIXTURES WHERE POSSIBLE. PROVIDE NEW SUPPLY DROPS 3" I 3 <br />DOWN TO NEW FIXTURES. FS 3" FD <br />DD. REUSE WASTE CONNECTIONS SERVING EXISTING WASTE FIXTURES THAT ARE TO REMAIN FOR HS FCO <br />REUSE REWORK WASTE CONNECTIONS WHERE REQUIRED BY AU PROVIDE NEW WASTE <br />CONNECTIONS AT NEW FIXTURES. % P L U M B I N G WAST <br />EE. THE PLUMBING CONTRACTOR SHALL VIDEO SCOPE AND RECORD VIDEO TO EVALUATE CONDITION <br />OF ALL EXISTING UNDERSLAB SANITARY AND GREASE WASTE LINES AND SHALL REPLACE AND SCALE: NOT TO SCALE. <br />DAMAGED PIPES. IF <br />E RISER <br />WALMART STORE <br />PLUMBING WASTE PLAN <br />SCALE: 1 /4" = 1'-0" <br />LEPT� <br />cy <br />E,� A <br />CoNSULTQ6 <br />SER ICES <br />Peter A. Leptuch, P.E. <br />300 N. Carroll Blvd. #200 <br />Denton, TX 76201 <br />(940) 735-5127 <br />VERIFY EXACT SEWER <br />AND GREASE WASTE <br />LINES ON SITE. <br />ADJUST POINT(S) OF <br />CONNECTION AS <br />NEEDED. <br />W <br />W <br />0 <br />0 <br />StudioRG.,., <br />MAIN OFFICE: <br />1 HUNTINGTON QUADRANGLE <br />SUITE 2CO3 <br />MELVILLE, NY 11747 <br />P: 631.226-7700 F: 631.226.7175 <br />© Copyright 2018: RGBK, INC. <br />Landry <br />GREG LANDRI` <br />ARCHITECTURE PLANNING INTEROR DESIGN <br />1202 Richardsm Dr. #E106 Te1:.214.631.041 <br />Richardson, Texas 75060 Fax: 214.634.1814 <br />Seal: <br />Owner: <br />George Morkos <br />2520 Colony Reed Lane <br />Clearwater, FL33763 <br />It is the responsibility of the Construction <br />Manager/General Contractor and all <br />Sub -Contractors to verify all dimensions and <br />accept conditions of prior work by related <br />trades before proceeding with any work. <br />Date <br />07-22-2020 <br />Drawn By Check By <br />MRP TN <br />Scale <br />AS SHOWN <br />Issued: <br />Project Title <br />Description <br />M <br />Charleys <br />Zephyrhills <br />WM706 <br />Project Address <br />7631 Gall Blvd, <br />Zephyrhills, FL 33541 <br />Project Number <br />WM706 <br />Drawing Title and Number <br />PLUMBING WASTE <br />PLAN <br />P2.0 <br />f:l <br />= mm <br />