<br />OVERVIEW
<br />1. THE NIGHT BY NIGHT PHASING PLAN IS INTENDED TO BE A GUIDE AND MAY NOT OCCUR IN CONSECUTIVE NIGHTS W
<br />> >o �wo-�
<br />DEPENDING ON AHJ AVAILABILITY TO INSPECT. THIS PROJECT CAN ONLY TAKE 6-7 DAYS TO COMPLETE AND MUST BE W W W o
<br />PHASED SO PHARMACY IS OPERATIONAL EACH MORNING AND PHARMACIST IS ONLY REQUIRED 4-5 NIGHTS. w W z o z Cl
<br />C0 C HOKFWUa F-
<br />2. IT IS CRITICAL THAT THE PHARMACY IS SECURE AND OPERATIONAL EACH MORNING. � W N w, W w.- W 3 � o
<br />3. TRADES WILL NEED TO REVISIT AS EACH PHASE IS BEING DEMOED OR CONSTRUCTED. cr a. a 3 a 3 w a w a 0 o w
<br />4. PARTIAL TEMPORARY DUST WALLS WILL BE NEEDED PER PLANS. TEMPORARY DUST DRAPES WILL BE REQUIRED ir Uy a C a >.z z ¢ m l cWi i a >
<br />TO PROTECT PHARMACY AND SALES MERCHANDISE. THE DUST DRAPES MUST BE REMOVED EVERY MORNING SO O a o ¢ a W LL W
<br />THAT THE PHARMACY AND SALES AREAS ARE OPERATIONAL. O � �S Z N go i a W E o o
<br />mpzo
<br />PHARMACY PHASING GENERAL NOTES g NJw`LLN�� W
<br />¢ 2 r2 Z J c J W W p o a'
<br />acf) Loan
<br />�zw��-Bzm�=g
<br />SwWoQ.OLL WUWW W
<br />(REFER TO N1 AND SPECIFICATION SECTION 01700 FOR ADDITIONAL REQUIREMENTS.) DN a 00 0-0 ¢ _ w m ¢
<br />GENERAL REQUIREMENTS:
<br />1. FEDERAL AND STATE LAWS AND REGULATIONS REQUIRE EXCEPTIONAL EXECUTION AND COMPLIANCE WHEN
<br />PERFORMING CONSTRUCTION ON MEDICAL PHARMACY FACILITIES. OPERATIONAL CONSIDERATIONS FOR EXISTING AFTER
<br />WALMART REQUIRE THAT THE STRUCTURAL, MILLWORK, EQUIPMENT INSTALLATION AND PHARMACY SECURITY
<br />MODIFICATIONS OF EACH PHASE IS TO BE COMPLETED IN A SINGLE NIGHT. THE PHARMACY MUST BE
<br />OPERATIONAL BY NEXT MORNING OPENING. THE NEW INTERIOR AND FRONT WALL DOOR PASSAGE TO THE
<br />PHARMACY OPERATION MUST BE INSTALLED AND SECURE PRIOR TO MORNING OPENING. INTERIOR FINISHES OF
<br />THE HEALTH TREATMENT ROOM MAY BE COMPLETED ON THE SECOND NIGHT. DUE TO THOSE STRINGENT
<br />REQUIREMENTS, SPECIFIC REQUIREMENTS AND RECOMMENDATIONS ARE OFFERED IN THIS DOCUMENT TO
<br />FACILITATE UNDERSTANDING AND THE AVOIDANCE OF WORK TRADE CONFLICTS POTENTIALLY IMPACTING
<br />SUCCESS WITHIN THE RESTRICTIVE TIMELINE.
<br />2. COMPLY WITH WALMART CONSTRUCTION MANAGER AND WALMART STORE PLANING FIELD PROJECT MANAGER
<br />REQUIREMENTS FOR WORK WITHIN THE BUILDING. SPECIFIC REQUIREMENTS WILL BE DISCUSSED BY THE
<br />WALMART CONSTRUCTION MANAGER AND WALMART STORE PLANING FIELD PROJECT MANAGER AT THE PRE -
<br />CONSTRUCTION CONFERENCE.
<br />3. MAINTAIN A SAFE ENVIRONMENT FOR CUSTOMERS AT ALL TIMES. THE ADJACENT SALES AREA SHALL REMAIN IN
<br />SERVICE DURING DEMOLITION/CONSTRUCTION.
<br />4. DUST AND DEBRIS SHALL NOT BE TRACKED INTO SALES AREA. SHOULD SUCH AN INCIDENT OCCUR, CLEAN
<br />IMMEDIATELY, USING APPROPRIATE METHODS AND FORCES. MEDICATION MUST BE PROTECTED FROM DUST AND
<br />DEBRIS AT ALL TIMES.
<br />5. THE PHARMACY MUST BE FULLY CLEANED AND OPERATIONAL FOR NORMAL BUSINESS BY Gam EACH DAY. THE
<br />PHARMACIST MUST BE PRESENT FOR ALL ACTIVITIES WITHIN THE PHARMACY, ACCESS TO THE PHARMACIST WILL
<br />BE LIMITED AND MUST BE PRE ARRANGED THROUGH WM CONSTRUCTION MANAGER AND STORE PLANNING.
<br />DEMOLITION REQUIREMENTS:
<br />1. THE CONTRACTOR SHALL FIELD VERIFY THE EXTENT OF DEMOLITION. THE WORK INCLUDES, BUT IS NOT
<br />LIMITED TO, THE DEMOLITION AND REMOVAL OF WALLS, DOORS, FIXTURES, PLUMBING, SPRINKLERS,
<br />MECHANICAL AND ELECTRICAL ITEMS INCLUDING CONDUITS AND DUCTWORK SHOWN ON JOB OR AS REQUIRED
<br />FOR THE INSTALLATION OF THE NEW WORK FOR A COMPLETE JOB.
<br />2. DURING DEMOLITION AND RECONSTRUCTION, COORDINATE WITH THE WALMART CONSTRUCTION MANAGER
<br />AND WALMART STORE PLANNING FIELD PROJECT MANAGER LOCATIONS OF ANY NECESSARY TRAFFIC SAFETY
<br />BARRIERS OR BARRICADES AND DUST DRAPES WITH THE SCOPE AND PHASING OF THE WORK.
<br />3. WHEN REMOVING EXISTING STRUCTURAL ITEMS, IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE
<br />ADEQUATE SHORING, BRACING, AND SUPPORT SYSTEMS TO KEEP THE EXISTING STRUCTURE INTACT AND IN A o�
<br />SAFE CONDITION. REFER TO SECTION 02023 AND 02251.
<br />041
<br />PRE -CONSTRUCTION MOBILIZATION REQUIREMENTS
<br />1. UPON AWARD OF CONTRACT AND NOTICE TO PROCEED (NTP) MOBILIZATION ACTIVITIES WILL COMMENCE.
<br />WORK TO BE SCHEDULED AS FAR IN ADVANCED AS POSSIBLE, WITH SUFFICIENT FLEXIBILITY, TO ALL ADJUSTMENT
<br />TO MEET UNFORESEEN CIRCUMSTANCES.
<br />ISSUE BLOCK
<br />2. PRE -CONSTRUCTION ACTIVITIES SHOULD PROCEED A MINIMUM OF A WEEK PRIOR TO START OF •�„
<br />CONSTRUCTION.
<br />�v
<br />GENERAL CONTRACTOR RESPONSIBILITY
<br />LOGISTICS
<br />A. SCHEDULING
<br />1. COORDINATE THE UNIQUE ASPECTS OF THIS CONSTRUCTION AND PHASING WITH THE LOCAL JURISDICTION
<br />BUILDING AND ELECTRICAL INSPECTORS TO ASCERTAIN ANY REQUIREMENTS POTENTIALLY IMPACTING THE
<br />OVERNIGHT CONSTRUCTION, LOW VOLTAGE, CABLING AND ELECTRICAL REVISIONS.
<br />2. THOROUGHLY BRIEF ALL BIDDING TRADE SUB -CONTRACTORS ON ALL ASPECTS OF THE PHARMACY PRE -WORK,
<br />AND THE "OVERNIGHT COMPLETION" REQUIREMENT FOR BOTH OPERATION & NEXT DAY SECURITY.
<br />3. GC TO HAVE A PRE -CONSTRUCTION CONFERENCE, AT THE JOBSITE WITH ALL STAKEHOLDERS, THREE WEEKS
<br />PRIOR TO THE START OF PHARMACY CONSTRUCTION DATE.
<br />4. COORDINATE WITH PHARMACIST FOR A ONE HOUR AFTER CLOSING OPPORTUNITY FOR EACH TRADE TO
<br />EXAMINE THE INTERIOR OF THE PHARMACY TO SCOPE AND PLAN THEIR WORK AS A CONSTRUCTION TEAM.
<br />5. IF DATA CABLE & ELECTRICAL TRADESMEN DETERMINE A NEED TO PERFORM PRE -INSTALLATION OF WIRING TO
<br />MEET THE OVERNIGHT REQUIREMENT; COORDINATE WITH PHARMACIST FOR A TWO HOUR PERIOD AFTER
<br />CLOSING TO PERFORM ROUGH INSTALLATION & STAGING OF WIRING.
<br />6. COORDINATE WITH STORE PLANNING THE GONDOLA MOVE OF ANY MERCHANDISE FIXTURES NECESSARY TO
<br />CONSTRUCT WALLS.
<br />7. SCHEDULE RELOCATION OF AP PANEL WITH WALMART AP TEAM.
<br />8. CHECK IN MODULAR COMPONENTS.
<br />9. COORDINATE WITH STORE PLANNING THAT ALL EQUIPMENT AND RACKS ARE CERTIFIED AND ONSITE.
<br />B. STAGING
<br />1. VERIFY AVAILABLE STAGING AREA, INSIDE OF THE STORE, FOR CONSTRUCTION AND CONFIRM LAYOUT OF DUST
<br />PARTITIONS AND DUST DRAPE.
<br />2. VERIFY AVAILABLE STAGING AREA, INSIDE OF THE STORE, FOR MODULAR COUNTERS, WALLS, EQUIPMENT AND
<br />RACKS.
<br />3. MARK LOCATION OF WALLS, FRONT COUNTERS AND ALL PRIVACY WALLS ON THE FLOOR TO BE READY FOR
<br />NEW CONSTRUCTION, SPRAY WITH CLEAR COAT.
<br />4. SCOPE ROUTE OF ASSEMBLY MOVEMENT OF UNITS FROM STAGING TO PHARMACY INSTALL LOCATION AND
<br />COORDINATE REMOVAL OF ANY OBSTACLES WITH STORE PLANNING FIELD PROJECT MANAGER.
<br />FIELD VERIFICATION
<br />1. VERIFY ABOVE CEILING AND CONFIRM IF THERE ARE WALLS TO DECK OR CEILING JOISTS AND WIRE MESH.
<br />2. VERIFY OPENING DIMENSIONS WHERE FRONT COUNTERS WILL INSTALL.
<br />3. VERIFY LOCATION OF AP PANEL, TYPICALLY IN CEILING NEAR RESTROOM.
<br />STORE PLANNING RESPONSIBILITY J
<br />Z
<br />1. COORDINATE WITH GC ANY EQUIPMENT OR RACK RELOCATION & SUPPORT REQUIRED FOR THE OVERNIGHT O
<br />PHASING OF THE PROJECT. W
<br />2. ARRANGE FOR OVERNIGHT PHARMACIST PRESENCE. U
<br />Z
<br />DATA CABLING AND ASSET PROTECTION (AP) RESPONSIBILITY LU
<br />1. SURVEY SCOPE OF WORK AND DEVELOP PLAN FOR PRE -ROUGH -IN INSTALLATION FROM REGISTER EQUIPMENT w
<br />RACK ROOM AND STAGING OF CABLE ABOVE CEILING GRID. �-
<br />2. INSURE ALL COMPONENTS ARE ORDERED IN A TIMELY MANNER AND SECURED ON -SITE. Uj
<br />I..L
<br />ELECTRICIAN RESPONSIBILITY 0
<br />LL
<br />� 1. REVIEW PLANS AND SCOPE WORK EARLY TO DETERMINE REQUIREMENTS PARTICULAR TO WORK PREVIOUSLY
<br />A DONE ON SPECIFIC PROJECT.
<br />of 2. DETERMINE IF J-BOX INSTALLATION IS PERMITTED FOR RELOCATING SWITCH OR POWER RECEPTACLES.
<br />cv 3. VERIFY WITH INSPECTOR WHAT INSPECTIONS WILL BE REQUIRED BASED ON SCOPE OF WORK. DEFINE
<br />SCHEDULE FOR INSPECTIONS.
<br />4. WILL INSPECTOR (FOR A FEE) COME ON CALL DURING THE NIGHT TO APPROVE ELECTRICAL REVISIONS IF NOT,
<br />�- IS IT POSSIBLE TO POWER Existing LIGHTS AND NEW REGISTERS WITHOUT AN INSPECTION UNTIL THE FOLLOWING
<br />a DAY(s)
<br />n 5. VERIFICATION OF KEY ELECTRICAL COMPONENTS AND ROUTING PRIOR TO NIGHT ONE, LOCATE ELECTRICAL
<br />LL PANEL AND ANY COMPONENTS CURRENTLY ROUTED UNDER SLAB.
<br />cn 6. THE PHARMACY FREEZERS AND REFRIGERATORS MUST REMAIN ON AT ALL TIMES. IF POWER TO THE PANEL
<br />MUST BE TURNED OFF, PROVISIONS MUST BE MADE TO PROVIDE POWER TO THE UNITS
<br />7. VERIFY LOCATION OF ALL ELECTRICAL PANELS USED FOR PHARMACY POWER PHASING
<br />w
<br />N1 PLANS (FOR
<br />0
<br />REFERENCE
<br />C ONLY)
<br />C
<br />E
<br />U
<br />O
<br />t
<br />N
<br />.N-
<br />N
<br />C
<br />d
<br />Cz SHEET:
<br />a)
<br />PHM5
<br />U
<br />PRE -CONSTRUCTION
<br />NIGHT 1
<br />NIGHT 2
<br />NIGHT 3
<br />NIGHT 4
<br />NIGHT 5
<br />NIGHT 6 AND 7
<br />(WEEK PRIOR)
<br />• GC TO COORDINATE WITH ALL
<br />WORK WILL BE DONE ON THE
<br />"NO WORK"
<br />THE GOAL IS TO COMPLETE AS
<br />INSTALL THE FRONT COUNTER
<br />COMPLETE ALL WORK ON THE INSIDE
<br />FINAL FINISHES AND COMPLETE
<br />TRADES AND VENDORS ON
<br />EXTERIOR AND INTERIOR OF THE
<br />MUCH WORK DONE ON THE
<br />INCLUDING MODULAR WALLS AND
<br />OF THE PHARMACY, INCLUDING ALL
<br />PROJECT.
<br />NIGHT 2 IS RESERVED FOR JOIST
<br />SCHEDULING, STAGING AND FIELD
<br />PHARMACY.
<br />INTERIOR OF THE PHARMACY AS
<br />COUNTERTOP. WORK MUST BE
<br />REMAINING FINISHES, FINAL
<br />VERIFICATION, PRIOR TO
<br />EXTENSIONS.
<br />POSSIBLE PRIOR TO OTHER TRADES
<br />DONE BY 3AM FOR CABLING TO
<br />EQUIPMENT, AND PILL BAYS
<br />PAINT EXTERIOR OF PHARMACY.
<br />CONSTRUCTION START COMPLETE
<br />CABLING AND ALARM TEAMS TO
<br />NEEDING ACCESS, FOR EXAMPLE,
<br />CONTINUE.
<br />INSTALLATION, AS NEEDED. THIS IS
<br />AS MUCH AS IS POSSIBLE.
<br />PRE -PULL AND STAGE ABOVE
<br />DEMO THE BULKHEAD AND EXTEND
<br />REMOVE CARPET, REMOVE AND
<br />THE LAST NIGHT A PHARMACIST IS
<br />FINISH INSIDE OF HEALTH SERVICES
<br />CEILING
<br />THE JOISTS.
<br />REINSTALL PILL BAYS AND FILL
<br />INSTALL MODULAR PANELS AND
<br />AVAILABLE FOR WORK ON THE
<br />ROOM.
<br />• GC TO CHECK IN ALL MODULAR
<br />PODS, REPLACE CARPET AND PAINT.
<br />DOORS REQUIRED TO SECURE
<br />INSIDE OF THE PHARMACY.
<br />COMPONENTS AND VERIFY ALL
<br />PRE -PULL ELECTRICAL FOR
<br />COMPLETE AS MUCH AS IS
<br />PHARMACY
<br />EQUIPMENT AND RACKS ARE ONSITE
<br />FOLLOWING EVENINGS
<br />POSSIBLE TO PREP FOR NIGHT 3
<br />INSTALL HSR MODULAR WALLS,
<br />PRIOR TO START OF CONSTRUCTION
<br />WORK, FOR EXAMPLE, LAYOUT
<br />IT IS CRITICAL THAT THE NEW
<br />MODULAR CEILING, EQUIPMENT AND
<br />• COMPLETE AS MUCH AS IS
<br />EXTENTS OF MODULAR WALLS ON
<br />EQUIPMENT AT THE FRONT
<br />ANY REMAINING POWER,
<br />• GC TO COORDINATE WITH STORE
<br />POSSIBLE TO PREP FOR FOLLOWING
<br />FLOOR TO BE SURE THERE ARE NO
<br />COUNTER WORK STATIONS AND
<br />MECHANICAL, FIRE, AND DATA.
<br />PLANNING THE RELOCATION OF
<br />NIGHT WORK, FOR EXAMPLE,
<br />ISSUES, SPRAY WITH CLEAR COAT
<br />PHARMACISTS BENCH ARE
<br />SALES FLOOR RACKS.
<br />LAYOUT EXTENTS OF MODULAR
<br />TO KEEP FOR INSTALLATION ON
<br />OPERATIONAL BY OPENING OF
<br />PREP EXTERIOR OF PHARMACY FOR
<br />WALLS ON FLOOR TO BE SURE
<br />NIGHT 3.
<br />BUSINESS IN THE MORNING.
<br />PAINT.
<br />• GC TO COORDINATE RELOCATION
<br />THERE ARE NO ISSUES, SPRAY WITH
<br />OF SALES FLOOR LIGHTING
<br />CLEAR COAT TO KEEP FOR
<br />PRESTAGE AS MUCH TRADE WORK
<br />INSTALL CEILING TILE, LIGHTS AND
<br />PHARMACY MUST BE SECURABLE
<br />AFFECTED BY DEMO AND NEW
<br />INSTALLATION
<br />ON THE INTERIOR OF THE
<br />MECHANICAL SYSTEMS.
<br />WITH OUT A PHARMACIST PRESENCE
<br />CONSTRUCTION.
<br />PHARMACY AS POSSIBLE
<br />INCLUDING LOCKS AND ALARMS.
<br />• COORDINATE PHARMACY CLEAN UP,
<br />COORDINATE INSPECTION ON
<br />RESTROOM MUST BE KEPT
<br />EXISTING WALL IN HEALTH SERVICE
<br />ACCESSIBLE FOR DATA AND
<br />ROOM WHERE BLOCKING,
<br />ELECTRICAL BOXES, STORE NOW
<br />ELECTRICAL, DATA IS ADDED
<br />SECURE ITEMS SUCH AS PRINTER
<br />PAPER OUTSIDE OF PHARMACY.
<br />ACCESS TO PHARMACY WILL BE LIMITED,
<br />NO PHARMACIST OR ACCESS TO
<br />A PHARMACIST MUST BE PRESENT
<br />PHARMACY WILL BE AVAILABLE
<br />rn
<br />0 O
<br />n �
<br />0
<br />O
<br />o
<br />IL
<br />m N
<br />Co
<br />J ro
<br />�.J
<br />V J
<br />Q O
<br />Co
<br />J
<br />Ur Z
<br />o
<br />_
<br />w
<br />Ch �
<br />Co
<br />CO
<br />�
<br />0
<br />Nw
<br />m
<br />Z
<br />m
<br />2021 CSP
<br />�
<br />CHECKED BY:
<br />Checker
<br />DRAWN BY:
<br />Author
<br />PROTO:
<br />192
<br />PROTO CYCLE:
<br />8-27-21
<br />DOCUMENT DATE:
<br />10-1-21
<br />
|