Laserfiche WebLink
SHEET NOTES <br />1. THIS SHEET FOR REFERENCE ONLY, REFER <br />TO CONSTRUCTION DOCUMENTS FOR THE <br />COMPLETE SCOPE OF WORK <br />architecture <br />+engineering <br />2809 Ajax Avenue Suite 100 <br />Rogers Arkansas 72758 <br />Phone: 479.636.3545 <br />Fax: 479.636.1209 <br />OVERVIEW <br />1. THE NIGHT BY NIGHT PHASING PLAN IS INTENDED TO BE A GUIDE AND MAY NOT OCCUR IN CONSECUTIVE NIGHTS W <br />> >o �wo-� <br />DEPENDING ON AHJ AVAILABILITY TO INSPECT. THIS PROJECT CAN ONLY TAKE 6-7 DAYS TO COMPLETE AND MUST BE W W W o <br />PHASED SO PHARMACY IS OPERATIONAL EACH MORNING AND PHARMACIST IS ONLY REQUIRED 4-5 NIGHTS. w W z o z Cl <br />C0 C HOKFWUa F- <br />2. IT IS CRITICAL THAT THE PHARMACY IS SECURE AND OPERATIONAL EACH MORNING. � W N w, W w.- W 3 � o <br />3. TRADES WILL NEED TO REVISIT AS EACH PHASE IS BEING DEMOED OR CONSTRUCTED. cr a. a 3 a 3 w a w a 0 o w <br />4. PARTIAL TEMPORARY DUST WALLS WILL BE NEEDED PER PLANS. TEMPORARY DUST DRAPES WILL BE REQUIRED ir Uy a C a >.z z ¢ m l cWi i a > <br />TO PROTECT PHARMACY AND SALES MERCHANDISE. THE DUST DRAPES MUST BE REMOVED EVERY MORNING SO O a o ¢ a W LL W <br />THAT THE PHARMACY AND SALES AREAS ARE OPERATIONAL. O � �S Z N go i a W E o o <br />mpzo <br />PHARMACY PHASING GENERAL NOTES g NJw`LLN�� W <br />¢ 2 r2 Z J c J W W p o a' <br />acf) Loan <br />�zw��-Bzm�=g <br />SwWoQ.OLL WUWW W <br />(REFER TO N1 AND SPECIFICATION SECTION 01700 FOR ADDITIONAL REQUIREMENTS.) DN a 00 0-0 ¢ _ w m ¢ <br />GENERAL REQUIREMENTS: <br />1. FEDERAL AND STATE LAWS AND REGULATIONS REQUIRE EXCEPTIONAL EXECUTION AND COMPLIANCE WHEN <br />PERFORMING CONSTRUCTION ON MEDICAL PHARMACY FACILITIES. OPERATIONAL CONSIDERATIONS FOR EXISTING AFTER <br />WALMART REQUIRE THAT THE STRUCTURAL, MILLWORK, EQUIPMENT INSTALLATION AND PHARMACY SECURITY <br />MODIFICATIONS OF EACH PHASE IS TO BE COMPLETED IN A SINGLE NIGHT. THE PHARMACY MUST BE <br />OPERATIONAL BY NEXT MORNING OPENING. THE NEW INTERIOR AND FRONT WALL DOOR PASSAGE TO THE <br />PHARMACY OPERATION MUST BE INSTALLED AND SECURE PRIOR TO MORNING OPENING. INTERIOR FINISHES OF <br />THE HEALTH TREATMENT ROOM MAY BE COMPLETED ON THE SECOND NIGHT. DUE TO THOSE STRINGENT <br />REQUIREMENTS, SPECIFIC REQUIREMENTS AND RECOMMENDATIONS ARE OFFERED IN THIS DOCUMENT TO <br />FACILITATE UNDERSTANDING AND THE AVOIDANCE OF WORK TRADE CONFLICTS POTENTIALLY IMPACTING <br />SUCCESS WITHIN THE RESTRICTIVE TIMELINE. <br />2. COMPLY WITH WALMART CONSTRUCTION MANAGER AND WALMART STORE PLANING FIELD PROJECT MANAGER <br />REQUIREMENTS FOR WORK WITHIN THE BUILDING. SPECIFIC REQUIREMENTS WILL BE DISCUSSED BY THE <br />WALMART CONSTRUCTION MANAGER AND WALMART STORE PLANING FIELD PROJECT MANAGER AT THE PRE - <br />CONSTRUCTION CONFERENCE. <br />3. MAINTAIN A SAFE ENVIRONMENT FOR CUSTOMERS AT ALL TIMES. THE ADJACENT SALES AREA SHALL REMAIN IN <br />SERVICE DURING DEMOLITION/CONSTRUCTION. <br />4. DUST AND DEBRIS SHALL NOT BE TRACKED INTO SALES AREA. SHOULD SUCH AN INCIDENT OCCUR, CLEAN <br />IMMEDIATELY, USING APPROPRIATE METHODS AND FORCES. MEDICATION MUST BE PROTECTED FROM DUST AND <br />DEBRIS AT ALL TIMES. <br />5. THE PHARMACY MUST BE FULLY CLEANED AND OPERATIONAL FOR NORMAL BUSINESS BY Gam EACH DAY. THE <br />PHARMACIST MUST BE PRESENT FOR ALL ACTIVITIES WITHIN THE PHARMACY, ACCESS TO THE PHARMACIST WILL <br />BE LIMITED AND MUST BE PRE ARRANGED THROUGH WM CONSTRUCTION MANAGER AND STORE PLANNING. <br />DEMOLITION REQUIREMENTS: <br />1. THE CONTRACTOR SHALL FIELD VERIFY THE EXTENT OF DEMOLITION. THE WORK INCLUDES, BUT IS NOT <br />LIMITED TO, THE DEMOLITION AND REMOVAL OF WALLS, DOORS, FIXTURES, PLUMBING, SPRINKLERS, <br />MECHANICAL AND ELECTRICAL ITEMS INCLUDING CONDUITS AND DUCTWORK SHOWN ON JOB OR AS REQUIRED <br />FOR THE INSTALLATION OF THE NEW WORK FOR A COMPLETE JOB. <br />2. DURING DEMOLITION AND RECONSTRUCTION, COORDINATE WITH THE WALMART CONSTRUCTION MANAGER <br />AND WALMART STORE PLANNING FIELD PROJECT MANAGER LOCATIONS OF ANY NECESSARY TRAFFIC SAFETY <br />BARRIERS OR BARRICADES AND DUST DRAPES WITH THE SCOPE AND PHASING OF THE WORK. <br />3. WHEN REMOVING EXISTING STRUCTURAL ITEMS, IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE <br />ADEQUATE SHORING, BRACING, AND SUPPORT SYSTEMS TO KEEP THE EXISTING STRUCTURE INTACT AND IN A o� <br />SAFE CONDITION. REFER TO SECTION 02023 AND 02251. <br />041 <br />PRE -CONSTRUCTION MOBILIZATION REQUIREMENTS <br />1. UPON AWARD OF CONTRACT AND NOTICE TO PROCEED (NTP) MOBILIZATION ACTIVITIES WILL COMMENCE. <br />WORK TO BE SCHEDULED AS FAR IN ADVANCED AS POSSIBLE, WITH SUFFICIENT FLEXIBILITY, TO ALL ADJUSTMENT <br />TO MEET UNFORESEEN CIRCUMSTANCES. <br />ISSUE BLOCK <br />2. PRE -CONSTRUCTION ACTIVITIES SHOULD PROCEED A MINIMUM OF A WEEK PRIOR TO START OF •�„ <br />CONSTRUCTION. <br />�v <br />GENERAL CONTRACTOR RESPONSIBILITY <br />LOGISTICS <br />A. SCHEDULING <br />1. COORDINATE THE UNIQUE ASPECTS OF THIS CONSTRUCTION AND PHASING WITH THE LOCAL JURISDICTION <br />BUILDING AND ELECTRICAL INSPECTORS TO ASCERTAIN ANY REQUIREMENTS POTENTIALLY IMPACTING THE <br />OVERNIGHT CONSTRUCTION, LOW VOLTAGE, CABLING AND ELECTRICAL REVISIONS. <br />2. THOROUGHLY BRIEF ALL BIDDING TRADE SUB -CONTRACTORS ON ALL ASPECTS OF THE PHARMACY PRE -WORK, <br />AND THE "OVERNIGHT COMPLETION" REQUIREMENT FOR BOTH OPERATION & NEXT DAY SECURITY. <br />3. GC TO HAVE A PRE -CONSTRUCTION CONFERENCE, AT THE JOBSITE WITH ALL STAKEHOLDERS, THREE WEEKS <br />PRIOR TO THE START OF PHARMACY CONSTRUCTION DATE. <br />4. COORDINATE WITH PHARMACIST FOR A ONE HOUR AFTER CLOSING OPPORTUNITY FOR EACH TRADE TO <br />EXAMINE THE INTERIOR OF THE PHARMACY TO SCOPE AND PLAN THEIR WORK AS A CONSTRUCTION TEAM. <br />5. IF DATA CABLE & ELECTRICAL TRADESMEN DETERMINE A NEED TO PERFORM PRE -INSTALLATION OF WIRING TO <br />MEET THE OVERNIGHT REQUIREMENT; COORDINATE WITH PHARMACIST FOR A TWO HOUR PERIOD AFTER <br />CLOSING TO PERFORM ROUGH INSTALLATION & STAGING OF WIRING. <br />6. COORDINATE WITH STORE PLANNING THE GONDOLA MOVE OF ANY MERCHANDISE FIXTURES NECESSARY TO <br />CONSTRUCT WALLS. <br />7. SCHEDULE RELOCATION OF AP PANEL WITH WALMART AP TEAM. <br />8. CHECK IN MODULAR COMPONENTS. <br />9. COORDINATE WITH STORE PLANNING THAT ALL EQUIPMENT AND RACKS ARE CERTIFIED AND ONSITE. <br />B. STAGING <br />1. VERIFY AVAILABLE STAGING AREA, INSIDE OF THE STORE, FOR CONSTRUCTION AND CONFIRM LAYOUT OF DUST <br />PARTITIONS AND DUST DRAPE. <br />2. VERIFY AVAILABLE STAGING AREA, INSIDE OF THE STORE, FOR MODULAR COUNTERS, WALLS, EQUIPMENT AND <br />RACKS. <br />3. MARK LOCATION OF WALLS, FRONT COUNTERS AND ALL PRIVACY WALLS ON THE FLOOR TO BE READY FOR <br />NEW CONSTRUCTION, SPRAY WITH CLEAR COAT. <br />4. SCOPE ROUTE OF ASSEMBLY MOVEMENT OF UNITS FROM STAGING TO PHARMACY INSTALL LOCATION AND <br />COORDINATE REMOVAL OF ANY OBSTACLES WITH STORE PLANNING FIELD PROJECT MANAGER. <br />FIELD VERIFICATION <br />1. VERIFY ABOVE CEILING AND CONFIRM IF THERE ARE WALLS TO DECK OR CEILING JOISTS AND WIRE MESH. <br />2. VERIFY OPENING DIMENSIONS WHERE FRONT COUNTERS WILL INSTALL. <br />3. VERIFY LOCATION OF AP PANEL, TYPICALLY IN CEILING NEAR RESTROOM. <br />STORE PLANNING RESPONSIBILITY J <br />Z <br />1. COORDINATE WITH GC ANY EQUIPMENT OR RACK RELOCATION & SUPPORT REQUIRED FOR THE OVERNIGHT O <br />PHASING OF THE PROJECT. W <br />2. ARRANGE FOR OVERNIGHT PHARMACIST PRESENCE. U <br />Z <br />DATA CABLING AND ASSET PROTECTION (AP) RESPONSIBILITY LU <br />1. SURVEY SCOPE OF WORK AND DEVELOP PLAN FOR PRE -ROUGH -IN INSTALLATION FROM REGISTER EQUIPMENT w <br />RACK ROOM AND STAGING OF CABLE ABOVE CEILING GRID. �- <br />2. INSURE ALL COMPONENTS ARE ORDERED IN A TIMELY MANNER AND SECURED ON -SITE. Uj <br />I..L <br />ELECTRICIAN RESPONSIBILITY 0 <br />LL <br />� 1. REVIEW PLANS AND SCOPE WORK EARLY TO DETERMINE REQUIREMENTS PARTICULAR TO WORK PREVIOUSLY <br />A DONE ON SPECIFIC PROJECT. <br />of 2. DETERMINE IF J-BOX INSTALLATION IS PERMITTED FOR RELOCATING SWITCH OR POWER RECEPTACLES. <br />cv 3. VERIFY WITH INSPECTOR WHAT INSPECTIONS WILL BE REQUIRED BASED ON SCOPE OF WORK. DEFINE <br />SCHEDULE FOR INSPECTIONS. <br />4. WILL INSPECTOR (FOR A FEE) COME ON CALL DURING THE NIGHT TO APPROVE ELECTRICAL REVISIONS IF NOT, <br />�- IS IT POSSIBLE TO POWER Existing LIGHTS AND NEW REGISTERS WITHOUT AN INSPECTION UNTIL THE FOLLOWING <br />a DAY(s) <br />n 5. VERIFICATION OF KEY ELECTRICAL COMPONENTS AND ROUTING PRIOR TO NIGHT ONE, LOCATE ELECTRICAL <br />LL PANEL AND ANY COMPONENTS CURRENTLY ROUTED UNDER SLAB. <br />cn 6. THE PHARMACY FREEZERS AND REFRIGERATORS MUST REMAIN ON AT ALL TIMES. IF POWER TO THE PANEL <br />MUST BE TURNED OFF, PROVISIONS MUST BE MADE TO PROVIDE POWER TO THE UNITS <br />7. VERIFY LOCATION OF ALL ELECTRICAL PANELS USED FOR PHARMACY POWER PHASING <br />w <br />N1 PLANS (FOR <br />0 <br />REFERENCE <br />C ONLY) <br />C <br />E <br />U <br />O <br />t <br />N <br />.N- <br />N <br />C <br />d <br />Cz SHEET: <br />a) <br />PHM5 <br />U <br />PRE -CONSTRUCTION <br />NIGHT 1 <br />NIGHT 2 <br />NIGHT 3 <br />NIGHT 4 <br />NIGHT 5 <br />NIGHT 6 AND 7 <br />(WEEK PRIOR) <br />• GC TO COORDINATE WITH ALL <br />WORK WILL BE DONE ON THE <br />"NO WORK" <br />THE GOAL IS TO COMPLETE AS <br />INSTALL THE FRONT COUNTER <br />COMPLETE ALL WORK ON THE INSIDE <br />FINAL FINISHES AND COMPLETE <br />TRADES AND VENDORS ON <br />EXTERIOR AND INTERIOR OF THE <br />MUCH WORK DONE ON THE <br />INCLUDING MODULAR WALLS AND <br />OF THE PHARMACY, INCLUDING ALL <br />PROJECT. <br />NIGHT 2 IS RESERVED FOR JOIST <br />SCHEDULING, STAGING AND FIELD <br />PHARMACY. <br />INTERIOR OF THE PHARMACY AS <br />COUNTERTOP. WORK MUST BE <br />REMAINING FINISHES, FINAL <br />VERIFICATION, PRIOR TO <br />EXTENSIONS. <br />POSSIBLE PRIOR TO OTHER TRADES <br />DONE BY 3AM FOR CABLING TO <br />EQUIPMENT, AND PILL BAYS <br />PAINT EXTERIOR OF PHARMACY. <br />CONSTRUCTION START COMPLETE <br />CABLING AND ALARM TEAMS TO <br />NEEDING ACCESS, FOR EXAMPLE, <br />CONTINUE. <br />INSTALLATION, AS NEEDED. THIS IS <br />AS MUCH AS IS POSSIBLE. <br />PRE -PULL AND STAGE ABOVE <br />DEMO THE BULKHEAD AND EXTEND <br />REMOVE CARPET, REMOVE AND <br />THE LAST NIGHT A PHARMACIST IS <br />FINISH INSIDE OF HEALTH SERVICES <br />CEILING <br />THE JOISTS. <br />REINSTALL PILL BAYS AND FILL <br />INSTALL MODULAR PANELS AND <br />AVAILABLE FOR WORK ON THE <br />ROOM. <br />• GC TO CHECK IN ALL MODULAR <br />PODS, REPLACE CARPET AND PAINT. <br />DOORS REQUIRED TO SECURE <br />INSIDE OF THE PHARMACY. <br />COMPONENTS AND VERIFY ALL <br />PRE -PULL ELECTRICAL FOR <br />COMPLETE AS MUCH AS IS <br />PHARMACY <br />EQUIPMENT AND RACKS ARE ONSITE <br />FOLLOWING EVENINGS <br />POSSIBLE TO PREP FOR NIGHT 3 <br />INSTALL HSR MODULAR WALLS, <br />PRIOR TO START OF CONSTRUCTION <br />WORK, FOR EXAMPLE, LAYOUT <br />IT IS CRITICAL THAT THE NEW <br />MODULAR CEILING, EQUIPMENT AND <br />• COMPLETE AS MUCH AS IS <br />EXTENTS OF MODULAR WALLS ON <br />EQUIPMENT AT THE FRONT <br />ANY REMAINING POWER, <br />• GC TO COORDINATE WITH STORE <br />POSSIBLE TO PREP FOR FOLLOWING <br />FLOOR TO BE SURE THERE ARE NO <br />COUNTER WORK STATIONS AND <br />MECHANICAL, FIRE, AND DATA. <br />PLANNING THE RELOCATION OF <br />NIGHT WORK, FOR EXAMPLE, <br />ISSUES, SPRAY WITH CLEAR COAT <br />PHARMACISTS BENCH ARE <br />SALES FLOOR RACKS. <br />LAYOUT EXTENTS OF MODULAR <br />TO KEEP FOR INSTALLATION ON <br />OPERATIONAL BY OPENING OF <br />PREP EXTERIOR OF PHARMACY FOR <br />WALLS ON FLOOR TO BE SURE <br />NIGHT 3. <br />BUSINESS IN THE MORNING. <br />PAINT. <br />• GC TO COORDINATE RELOCATION <br />THERE ARE NO ISSUES, SPRAY WITH <br />OF SALES FLOOR LIGHTING <br />CLEAR COAT TO KEEP FOR <br />PRESTAGE AS MUCH TRADE WORK <br />INSTALL CEILING TILE, LIGHTS AND <br />PHARMACY MUST BE SECURABLE <br />AFFECTED BY DEMO AND NEW <br />INSTALLATION <br />ON THE INTERIOR OF THE <br />MECHANICAL SYSTEMS. <br />WITH OUT A PHARMACIST PRESENCE <br />CONSTRUCTION. <br />PHARMACY AS POSSIBLE <br />INCLUDING LOCKS AND ALARMS. <br />• COORDINATE PHARMACY CLEAN UP, <br />COORDINATE INSPECTION ON <br />RESTROOM MUST BE KEPT <br />EXISTING WALL IN HEALTH SERVICE <br />ACCESSIBLE FOR DATA AND <br />ROOM WHERE BLOCKING, <br />ELECTRICAL BOXES, STORE NOW <br />ELECTRICAL, DATA IS ADDED <br />SECURE ITEMS SUCH AS PRINTER <br />PAPER OUTSIDE OF PHARMACY. <br />ACCESS TO PHARMACY WILL BE LIMITED, <br />NO PHARMACIST OR ACCESS TO <br />A PHARMACIST MUST BE PRESENT <br />PHARMACY WILL BE AVAILABLE <br />rn <br />0 O <br />n � <br />0 <br />O <br />o <br />IL <br />m N <br />Co <br />J ro <br />�.J <br />V J <br />Q O <br />Co <br />J <br />Ur Z <br />o <br />_ <br />w <br />Ch � <br />Co <br />CO <br />� <br />0 <br />Nw <br />m <br />Z <br />m <br />2021 CSP <br />� <br />CHECKED BY: <br />Checker <br />DRAWN BY: <br />Author <br />PROTO: <br />192 <br />PROTO CYCLE: <br />8-27-21 <br />DOCUMENT DATE: <br />10-1-21 <br />