Laserfiche WebLink
0 <br />N <br />COORDINATE WITH TRADES ANY WORK <br />THAT CAN BE PRE -STAGED ABOVE THE <br />CEILING, COIL ELECTRICAL CONDUITS AND <br />WHIPS, DATA AND TELEPHONE, AND <br />RELOCATE ANY PANELS OR UTILITIES <br />THAT WILL BE AFFECTED BY THE SCOPE <br />OF WORK <br />ALARM PANEL TO BE RELOCATED <br />---------- ----------- F---------- --------- T------� <br />I I irxa I ux•r I it xs I <br />0 0 E 0 0 9 a <br />)RE -PULL CABLE AND ALARM. GC TO PREPARE AS MUCH ITEMS AS <br />)OSSIBLE FOR FOLLOWING EVENINGS. <br />t I I I I I I I <br />ar.■r I s►w l I ■r■■► i 1 ■r■r I i se■x I <br />I I I I I I I 1 <br />I I I I I I i I <br />I II I 1 I I I 1 1I I IF II I I II I <br />I II I I II I I II I I II I 1++II I <br />III I III I III I IItl I lill I <br />III I III I III I I�11 I III I <br />I II I I II I I 11 I 1 II I 1 II 1 <br />11\\\UUU���HIII IIII I I I I I I I I I ! I I ! I I 1 I I I I <br />II__—______ II I 1 II {r <br />! I I wCNR■7VN I I Mo■Ut■7VN l l ro■IL■)VN I I I M I L■7VN �j I I I �I; *o■�■ <br />_..IL _--------- JLJ .1.------- <br />(RIGHT) NIGHT 1 <br />1/41' = 1'-0" <br />09:00 <br />CABLE TEAM <br />CONSTRUCTION START OR 1 HR AFTER <br />PHARMACY CLOSE. FIELD VERIFY WITH 21 <br />STORE PLANNING AND PHARMACY <br />MANAGER FOR NIGHTLY CLOSE TIME <br />21:00 - 03:00 <br />INSTALL AND STAGE <br />CABLING ABOVE GRID <br />22:00 23:00 <br />-- 09:00 <br />ASSET PROTECTION <br />ONSITE <br />01 <br />21:00 - 06:00 <br />AP, RELOCATE <br />ALARM PANEL <br />03:00 - 06:00 06L <br />TONE AND LABEL CABLING <br />OFFSITE <br />EXISTING CABLES I <br />21:00 00:00 04:00 06:00 06:00 <br />TIMELINE VALIDATION 1 TIMELINE VALIDATION 2 CRIT POINT 1 CRIT POINT 2 ASSET <br />PROTECTION <br />NIGHT 1 - PREP WORK OFFSITE <br />NIGHT #1 (AT LEAST ONE NIGHT PRIOR TO CONSTRUCTION BEGINNING ANY RX WORK): PHARMACIST REQUIRED <br />AP TECH TO RELOCATE ALARM PANEL <br />CABLE TEAM TO PRE -PULL ALL NEW DATA CABLE AND STAGE ABOVE CEILING <br />CABLE TEAM TO TONE AND LABEL EXISTING CABLING <br />JOTF TO CONTRACTOR- OMIT NIGHT 21 IF STORE DOES NOT HAVE CEILING JOIST <br />EXTEND JOISTS AND SECURITY MESH TO LINE OF PRE - <br />MANUFACTURED WALL PANEL LOCATIONS, FIELD <br />VERIFY ALL DIMENSIONS, COORDINATE THOROUGHLY <br />WITH MANUFACTURED WALL PANEL LOCATIONS <br />COVER ALL EQUIPMENT _ <br />EXPOSED TO DUST ON THE <br />FRONT COUNTER AND ALL <br />ADDITIONAL FIXTURES / <br />EQUIPMENT <br />II <br />I L <br />II <br />I <br />II <br />INSTALL DUST DRAPE FOR I <br />JOIST EXTENSION <br />0 <br />F---------- 7---------- 1----------- F--------- 7------ I <br />I----------+---------+---------+----------r------1 <br />vxt I wxr I w.w 1 axw 1 wxw i <br />0 0 0 0 <br />1:1 <br />PHARMACY ACCESS REQUIRED <br />FOR JOIST EXTENSION <br />I I I I <br />■/'xf► Y■■► s►■■r <br />I I I I <br />I II I I II I I 11 I <br />I 11 I I II I I II I <br />I II I All I IIll I <br />III 1 III 1 III I <br />I !I I I II 1 I II I <br />III I III I III I <br />I II wn■Rnvn II tro■R■� JI II <br />I I <br />1 I <br />NeM i <br />i ■I'Of <br />I I <br />L�J <br />I I <br />L�J <br />I I I Iit <br />I II 1 <br />I � II I <br />I II I <br />I 11 I <br />I 11 I <br />I II I <br />I 11 I <br />I II I <br />I <br />-------- <br />11 I <br />II I I --- _-- I <br />I II I <br />I II <br />INSTALL PLASTIC DUST BARRIER OVER PHARMACY THE PHARMACY MUST BE CLEAN, SECURE, AND <br />AND SALES MERCHANDISE. REMOVE EACH MORNING OPERATIONAL AND ALL NECESSARY ITEMS READY <br />SO PHARMACY CAN BE OPERATIONAL FOR INSPECTION <br />NIGHT 2 (JOISTS <br />1 /4" = 1'-0" <br />20:00 <br />GC CONSTRUCTION <br />INSTALL START <br />BEGIN INSTALLING DUST <br />WALL 21:00 <br />GC LOCATE LINE OF NEW <br />FRONT WALL, BEGIN DEMO <br />OF EXISTING BULKHEAD <br />m <br />00 23:00 00:00 01 <br />02:00 03: <br />FRIDAY NIGHT CONSTRUCTION START OR 21:00 - 07:00 <br />1 HR AFTER PHARMACY CLOSE. FIELD GC BULKHEAD DEMOLITION AND <br />VERIFY WITH STORE PLANNING AND EXTENDED JOIST INSTALLED <br />PHARMACY MANAGER FOR NIGHTLY <br />CLOSE TIME NIGHT 2 - FRIDAY <br />NIGHT #2: PHARMACIST REQUIRED, PHARMACY IS NO LONGER SECURE <br />GC TO DEMOLISH BULKHEAD AS REQUIRED FOR JOIST EXTENSION <br />GC TO EXTEND BULKHEAD <br />NOTE TO CONTRACTOR: NIGHT 93 OMITTED- RESERVED FOR NEW PILLBAYS AND FILL PODS IF APPLICABLE <br />ALL CONSTRUCTION DEBRIS <br />AND MATERIALS TO BE <br />REMOVED AND CLEANED UP <br />CLEANING <br />COMPLETI <br />COMPLETE SATURDAY <br />MORNING PHARMACY <br />OPEN <br />parcb2 <br />hitecture <br />gineering <br />2809 Ajax Avenue Suite 100 <br />Rogers Arkansas 72758 <br />Phone: 479.636.3545 <br />Fax: 479.636.1209 <br />w aim I'- o <br />� F-p0 Ww�o� <br />W 0 vi0�iii-aOZOU <br />� w tzw��waz3l-z <br />LL w LL w <br />B a EDWHT3,2" <br />w 3 ¢g'�` am¢mpm <br />RWQ�Zp QirKUq�-K <br />Oa65C Oa 6'.-0- LL� <br />�VOO w wp <br />Z 3UU. w-:)OzUtp Z� <br />w 3Q <br />0 <br />O c9 OKK w p Z <br />~ zU)-JJ0dLLCO <Uap <br />a=izp�pQv� wo��� <br />d OO¢w=a5i2wos <br />� LU cf w'LCO SNUO .0 <br />N <br />a) <br />%0 <br />C: D n Q <br />Q <br />O <br />o <br />LLJ>r-0 <br />m a <br />a <br />�J <br />J o <br />m <br />o <br />J <br />J <br />0 z <br />r <br />W <br />M p <br />N <br />tD <br />�/ <br />F- <br />� cn <br />O� <br />N <br />W <br />m <br />z <br />m <br />2021 CSP <br />ISSUE BLOCK <br />CHECKED BY: <br />Checker <br />DRAWN BY: <br />Author <br />PROTO: <br />192 <br />PROTO CYCLE: <br />8-27-21 <br />DOCUMENT DATE: <br />10-1-21 <br />J <br />Z <br />O <br />rLLI <br />V <br />Z <br />L1J <br />w <br />U_ <br />LU <br />w <br />w <br />O <br />LL <br />PHASING <br />PLANS (FOR <br />REFERENCE <br />ONLY) <br />SHEET: <br />PHM5.1 <br />