VENDOR CONTACT REQUIREMENTS VER.8.14.07-6 <br />CONTRACTOR IS RESPONSIBLE, UPON AWARD, TO CONTACT AND VERIFY ALL DELIVERIES DATES/TIMES WITH EVERY <br />VENDOR FURNISHING EQUIPMENT OR SERVICES, OR TO CHANGE ANY DATES OR DELIVERIES, CONTRACTOR MUST CONTACT <br />WALMART CONSTRUCTION MANAGER LISTED BELOW. VENDOR CONTACT INFORMATION IS AVAILABLE IN THE GCC EQUIPMENT <br />PLATFORM AND IN THE PROJECT SPECIFICATIONS. THIS IS UNIQUE TO CAPITAL EXPENDITURES PROJECTS. <br />PROJECT VENDORS: <br />97 WALL FIXTURES <br />AES-CURB <br />AES-SALVAGE <br />HILL PHOENIX -CASES <br />HUSSMANN-CASES <br />KYSOR WARREN -CASES <br />KYSOR WARREN -SYSTEMS <br />LENNOX <br />MCCUE <br />NOVAR <br />PARKER HANNIFIN-SPORLAN <br />WALMART CONTACT LIST <br />CONTACT PHONE AND/OR EMAIL TITLE <br />WALMART SUPERCENTER #706 (813) 782-1957 STORE <br />CARA SHERWOOD (479) 365-0207 WALMART PROJECT MANAGER <br />cara.sherwood@walmart.com <br />PERMITTING CONTACT LIST <br />UPON NOTIFICATION OF CONTRACT AWARD, CONTRACTOR SHALL CONTACT THE ENGINEER OF RECORD'S PERMIT <br />COORDINATOR REGARDING BUILDING PERMIT STATUS. CONTRACTOR SHALL NOT CONTACT AHJ PRIOR TO CONTACTING <br />PERMIT COORDINATOR TO VERIFY BUILDING PERMIT STATUS. WHEN NECESSARY, THE CONTRACTOR SHALL DELIVER <br />PERMIT PLAN SETS AND PAY PERMIT FEES TO THE AHJ IN ORDER TO RECEIVE CONSTRUCTION PERMITS. UPON REVIEW <br />OF PROJECT SCOPE THE AHJ MAY REQUIRE THE CONTRACTOR TO COMPLETE ADDITIONAL PERMITTING REQUIREMENTS <br />FOR OR SUBMIT ADDITIONAL PLAN SETS FOR REVIEW TO ADDITIONAL LOCAL, COUNTY, STATE, AND/OR FEDERAL <br />AUTHORITIES WHICH MAY NOT BE LOCATED WITHIN THE LOCAL AHTS OFFICES. SUBMIT ANY PLAN REVIEW COMMENTS <br />OR QUESTIONS THROUGH THE WALMART APPROVED RFI PROCESS. CONTRACTOR SHALL OBTAIN PERMIT(S) THE GREATER <br />OF 10 WORKING DAYS OR 2 WEEKS PRIOR TO THE START OF CONSTRUCTION TO AVOID UNNECESSARY DELAYS AND <br />ADDITIONAL ENGINEERING FEES. CONTRACTOR SHALL PICK UP AND PAY FOR ANY REQUIRED PERMIT(S) AND ALL <br />ANCILLARY FEES. COST OF REQUIRED PERMIT(S) WILL BE DETERMINED AT THE TIME OF PERMIT ISSUANCE. EXACT <br />AMOUNT SHALL BE COORDINATED WITH THE WALMART CONSTRUCTION MANAGER. CONTRACTOR SHALL EMAIL A COPY OF <br />PERMIT(S) WHEN OBTAINED TO PERMIT COORDINATOR LISTED BELOW. CONTRACTOR SHALL UPLOAD A COPY OF <br />PERMIT(S) WHEN OBTAINED TO EVOCO WORKSPACE SUPPORT FOLDER. UPON COMPLETION OF THE PROJECT, <br />CONTRACTOR SHALL EMAIL APPROVED FINAL INSPECTION REPORT AND CERTIFICATE OF COMPLETION TO PERMIT <br />COORDINATOR LISTED BELOW. UPON COMPLETION OF THE PROJECT, CONTRACTOR SHALL UPLOAD APPROVED FINAL <br />INSPECTION REPORT AND CERTIFICATE OF COMPLETION TO EVOCO WORKSPACE SUPPORT FOLDER. <br />CONTACT EMAIL PHONE <br />APRIL NUZZO april.nuzzo@hendersonengineers.com (913) 742-5853 <br />NOTICE OF SPECIAL INSPECTIONS REQUIREMENT <br />CONTRACTOR SHALL CONTACT PRE -APPROVED TESTING FIRM LISTED BELOW PRIOR TO CONSTRUCTION AND <br />COORDINATE INSPECTION DATE(S). SPECIAL INSPECTIONS TESTING FIRM IS PROVIDED AND PAID BY OWNER. <br />RE: SPECIFICATIONS SECTION 01457 AND APPENDIX B - TESTING, INSPECTION, AND OBSERVATION BY OWNER <br />CONTRACTOR SHALL MAKE ALL TESTING AGENCY RECOMMENDED CORRECTIONS IMMEDIATELY UPON RECEIPT <br />OF DEFICIENT TESTING REPORTS. CONTRACTOR SHALL NOTIFY STRUCTURAL ENGINEER OF RECORD WHEN <br />DEFICIENCIES ARE CORRECTED AND METHOD OF CORRECTION. STRUCTURAL ENGINEER OF RECORD SHALL <br />APPROVE CORRECTIONS AND/OR DETERMINE IF ADDITIONAL TESTING IS REQUIRED. CONTRACTOR SHALL <br />ENSURE THAT ALL TESTING AGENCY OBSERVATION/TEST REPORTS ARE SENT IMMEDIATELY UPON INSPECTION <br />COMPLETION TO: <br />JOHNSTON BURKHOLDER ASSOCIATES AND HENDERSON ENGINEERS INCORPORATED <br />ATTN: TREVOR WRIGHT Qba-hei@jbaengr.com) ATTN: TYLER DANFORTH (tyler.danforth@hendersonengineers.com) <br />REFER TO STRUCTURAL SHEET(S) FOR ADDITIONAL INFORMATION <br />TESTING FIRM CONTACT <br />ECS MID -ATLANTIC LLC <br />MICHAEL GALLI mgalli@ecslimited.com (757) 229-6677 <br />AIRFLOW BALANCING NOTE <br />THE SCOPE OF WORK OF THIS PROJECT REQUIRES AIR FLOW BALANCING LIMITED TO THE AIR DISTRIBUTION DEVICES <br />AND OUTSIDE AIR DAMPERS ON EQUIPMENT TO SPECIFIED AIR FLOWS INDICATED ON THE MECHANICAL PLANS. ALL OTHER <br />TESTING, BALANCING AND STARTUP PROCEDURES FOR NEW RTU AND AHU EQUIPMENT INCLUDING SCHEDULED OUTSIDE <br />AIR SHALL BE PERFORMED BY THE MANUFACTURER'S STARTUP/COMMISSIONING TECHNICIAN AND COORDINATED BY THE <br />AWARDED CONTRACTOR. THE AWARDED CONTRACTOR SHALL CONTACT THE TEST & BALANCE FIRM LISTED BELOW TO <br />SCHEDULE WHEN THE TEST & BALANCE FIRM IS TO ARRIVE ONSITE. THE PROPOSED DATE WILL BE COMMUNICATED TO <br />THE WALMART CONSTRUCTION MANAGER DURING THE PRE -CONSTRUCTION MEETING. REPORTS SHALL BE SENT TO THE <br />WALMART CONSTRUCTION MANAGER, WALMART PROJECT MANAGER AND THE EOR. FOR CONTACT INFORMATION IS <br />TYLER DANFORTH (tyler.danforth@hendersonengineers.com) (913) 742-5369. <br />REFERENCE SPECIFICATIONS SECTIONS 01455 AND APPENDIX B FOR ADDITIONAL AIR FLOW BALANCING INFORMATION. <br />TEST AND BALANCE COMPANY NAME <br />TEST AND BALANCE COMPANY (TABC) <br />JOHN SKIPPER jskipper@tabconline.com (678) 393-9401 <br />SCOPE OF WORK SUMMARY <br />NOTE: THE INTENT OF THIS SUMMARY IS TO ASSIST VENDORS IN <br />IDENTIFYING EQUIPMENT NEEDS. IT IS NOT INTENDED FOR USE BY <br />CONTRACTOR TO CAPTURE ALL SCOPE ISSUES. REFER TO PLANS <br />AND SPECIFICATIONS (WHERE APPLICABLE) FOR ADDITIONAL <br />INFORMATION. <br />THIS IS A CAP-X COMBO PROJECT. REFER TO <br />SPECIFICATIONS SECTION 1500 FOR ADDITIONAL INFORMATION <br />REGARDING REQUIRED JOB SITE TEMPORARY FACILITIES AND <br />STORMWATER RUNOFF CONTROL. <br />REPLACE BUNKER ISLAND CASES WITH LIDS <br />REPLACE 3-DECK CAKE CASES <br />REPLACE MULTI -DECK BEER CASES <br />REPLACE MULTI -DECK DAIRY CASES WITH DOORS <br />REPLACE MULTI -DECK REAR -LOAD DAIRY CASES WITH DOORS <br />REPLACE MULTI -DECK DELI CASES <br />REPLACE MULTI -DECK DELI CASES WITH DOORS <br />REPLACE MULTI -DECK MEAT CASES <br />REPLACE REACH -IN FROZEN FOOD CASES <br />REPLACE REACH -IN FROZEN SEAFOOD CASES <br />REPLACE REACH -IN ICE CREAM CASES <br />REPLACE SELF-SERV SEAFOOD CASE <br />REPLACE DELI PROMO ISLAND <br />REPLACE (2) 20 TON RTUs: 14,19 <br />REPLACE (1) 10 TON RTUs: 1 <br />REPLACE (9) 5 TON RTUs: 2,7,9,11,12,15,27,29,32 <br />REPLACE (7) 3 TON RTUs: 4,5,6,8,13,31,33 <br />REFURBISH RTUS (TURNKEY BY OWNER'S CONTRACTOR) <br />(9) 20 TON RTUs - 16-18,22-26,35 <br />(5) 10 TON RTUs - 3,10,20,28,34 <br />(2) 5 TON RTUs - 21.30 <br />CODE COMPLIANCE <br />ALL DRAWINGS ARE IN COMPLIANCE WITH THE FOLLOWING CODES: <br />THE FLORIDA BUILDING CODE, 2020 EDITION <br />THE FLORIDA FIRE CODE, 2020 EDITION <br />THE FLORIDA MECHANICAL CODE, 2020 EDITION <br />THE FLORIDA PLUMBING CODE, 2020 EDITION <br />THE NATIONAL ELECTRICAL CODE, 2017 EDITION <br />THE FLORIDA ENERGY CODE, 2020 EDITION <br />1 y 1 �� <br />D1.1 F1.1 BASR1 RD1.1 <br />1 1 <br />R1.1 RE1.1 <br />PROJECT <br />SITE ADDRESS <br />STREET: <br />7631 GALL BLVD <br />CITY: <br />ZEPHYRHILLS <br />STATE/ZIP: <br />FLORIDA/32707 <br />COUNTY: <br />PASCO <br />tillaimart:;: <br />REFRIGERATION HVAC/CAP=X COMBO <br />REFERENCE <br />T1 TITLE SHEET <br />N1 RESPONSIBILITY MATRICES <br />FIXTURE <br />D1 <br />DEMOLITION PLAN <br />D1.1 <br />REAR DEMOLITION PLAN <br />F1 <br />FIXTURE PLAN AND SCHEDULES <br />F1.1 <br />REAR FIXTURE PLAN <br />F2 <br />FIXTURE DETAILS <br />USMV=041403 <br />ZEPHYRHILLS, FL <br />STORE # 706=1 001 <br />INDEX OF DRAWINGS <br />STRUCTURAL <br />S1 GENERAL NOTES AND EQUIPMENT REPLACEMENT DETAILS <br />S2 ROOF FRAMING PLAN <br />MECHANICAL <br />M1 OVERALL MECHANICAL PLAN <br />M1.1 ENLARGED MECHANICAL PLANS <br />M1.2 ENLARGED MECHANICAL PLANS <br />M2 MECHANICAL DETAILS <br />M3 MECHANICAL SCHEDULES <br />BAS1 HVAC BUILDING AUTOMATION SYSTEM PLAN <br />BAS2 HVAC PARTIAL ONE -LINE DIAGRAM AND DETAILS <br />BAS3 SEQUENCES OF OPERATIONS <br />REFRIGERATION <br />BASR1 REFRIGERATION BUILDING AUTOMATION SYSTEM PLAN <br />BASR2 REFRIGERATION BUILDING AUTOMATION SYSTEM DETAILS <br />BASR3 BUILDING AUTOMATION SYSTEM SCHEDULES <br />RD1 FRONT REFRIGERATION DEMOLITION PLAN <br />RD1.1 REAR REFRIGERATION DEMOLITION PLAN <br />R1 FRONT REFRIGERATION PLAN <br />R1.1 REAR REFRIGERATION PLAN <br />R2 REFRIGERATION DETAILS <br />R3 REFRIGERATION SCHEDULES <br />R3.1 REFRIGERATION SCHEDULES <br />R4 REFRIGERATION SUBMITTALS <br />ELECTRICAL <br />E1 POWER PLANS <br />E2 PARTIAL ONE -LINE DIAGRAM, DETAIL, AND SCHEDULES <br />E2.1 PANELBOARD SCHEDULES <br />RE1 FRONT REFRIGERATION ELECTRICAL PLAN <br />RE1.1 REAR REFRIGERATION ELECTRICAL PLAN AND DETAILS <br />ALL WORK SHALL COMPLY WITH PREVAILING <br />CODES FLORIDA BUILDING CODE, <br />NATIONAL ELECTRIC CODE, <br />AND THE CITY OF ZEPHYRHILLS <br />ORDINANCES <br />1 <br />REVIEW DATA:.._ <br />CITY DNG OFpCIALLS <br />BUILD <br />�- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --� <br />I----------------------- I <br />I� I <br />II I <br />II I I <br />II <br />II I I <br />11 I i <br />II <br />II I I <br />II I I <br />II I <br />I I <br />------=----------------- I <br />I' U <br />II I i <br />II I <br />I' � I <br />,�- - - - - - - - - - - - - - - - - - - - - - -� <br />I <br />I <br />I � I <br />I <br />I <br />L---------------------------------------------------------------------------_-_-----__------J <br />KEY PLAN_ <br />1 1" = 40'-0" <br />GENERAL REQUIREMENTS <br />1. <br />THE PLANS SHOWN THROUGHOUT THESE DOCUMENTS ARE <br />15. <br />OWNER SHALL OCCUPY THE BUILDING DURING CONSTRUCTION. <br />BASED ON LIMITED INFORMATION PROVIDED BY OWNER AND A <br />THE CONTRACTOR SHALL COORDINATE WITH STORE MANAGER <br />LIMITED SITE OBSERVATION SURVEY; THE DESIGN <br />AND THE OWNER'S MECHANICAL CONSTRUCTION MANAGER ALL <br />PROFESSIONAL CANNOT BE HELD RESPONSIBLE FOR THE <br />CONSTRUCTION PROCEDURES WHICH WILL INTERFERE WITH <br />ACCURACY OF THE EXISTING CONDITIONS ILLUSTRATED. <br />THE NORMAL DAILY OPERATIONS OF THE STORE. <br />2. <br />THE CONTRACTOR IS TO INSPECT THE STORE PRIOR TO <br />16. <br />THE CONTRACTOR SHALL OBTAIN PERMISSION FROM OWNER <br />COMMENCING WITH ANY WORK AND NOTIFY THE OWNER'S <br />FOR ALL INTERRUPTIONS OF UTILITY SERVICES TO THE EXISTING <br />MECHANICAL CONSTRUCTION MANAGER OF ANY <br />BUILDING PRIOR TO THE INTERRUPTION. ACCIDENTAL <br />DISCREPANCIES BETWEEN THESE PLANS AND THE EXISTING <br />INTERRUPTIONS SHALL BE REMEDIED IMMEDIATELY WITH <br />CONDITIONS. <br />APPROPRIATE FORCES. <br />3. <br />ALL WORK SHALL BE DONE IN A SAFE AND WORKMANLIKE <br />17. <br />ALL CAP-X/SPECIAL REFRIGERATION PROJECTS ARE TO BE BID <br />MANNER AND IN STRICT ACCORDANCE WITH THE LOCAL <br />AS NIGHT WORK. THE CONTRACTOR IS TO ASSUME ALL WORK IS <br />GOVERNING BUILDING CODE, NATIONAL ELECTRIC CODE, ADA- <br />TO BE CONDUCTED ONLY AS OVERNIGHT WORK. SOME WORK <br />ADAAGS, OSHA REGULATIONS, AND ALL APPLICABLE CODES, <br />MAY BE ALLOWED DURING REGULAR WORKING HOURS TO <br />REGULATIONS AND ORDINANCES HAVING JURISDICTION. <br />FACILITATE COMPLETION SCHEDULES. WORK WILL ONLY BE <br />PERMITTED DURING REGULAR WORKING HOURS WITH THE <br />4. <br />THE CONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH <br />STORE MANAGEMENT'S AND/OR OWNER'S MECHANICAL <br />KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS. THE <br />CONSTRUCTION MANAGER'S PERMISSION. WORK TO BE <br />FAILURE TO ACQUAINT HIMSELF WITH ALL DRAWINGS AND <br />PERFORMED ON THE EXTERIOR OF THE BUILDING, ROOFTOP, <br />SPECIFICATIONS DOES NOT RELIEVE THE CONTRACTOR'S <br />BACK ROOM, BEHIND DUST WALLS, AND WORK THAT DOES NOT <br />RESPONSIBILITY OF PERFORMING HIS WORK PROPERLY. NO <br />SIGNIFICANTLY INTERFERE WITH STORE OPERATIONS MAY BE <br />ADDITIONAL COMPENSATION SHALL BE ALLOWED DUE TO <br />ALLOWED WITH THE STORE MANAGEMENT'S AND/OR OWNER'S <br />FAILURE TO FAMILIARIZE WORKERS WITH ALL DRAWINGS AND <br />MECHANICAL CONSTRUCTION MANAGER'S PERMISSION. THE <br />SPECIFICATIONS. <br />CONTRACTOR SHALL PAY FOR ADDITIONAL SECURITY <br />PERSONNEL TO SUPERVISE ACCESS TO THE BUILDING AS <br />5. <br />THE EXISTING BUILDING SHALL BE PROTECTED FROM MOISTURE, <br />REQUIRED BY STORE MANAGEMENT. CONTRACTOR SHALL <br />DUST AND DEBRIS. INSTALL DUST PARTITIONS OR DRAPES AS <br />PROVIDE ALL SAFETY EQUIPMENT AND EXTERIOR LIGHTING AS <br />SHOWN OR AS REQUIRED TO KEEP DUST AND MOISTURE FROM <br />REQUIRED TO MAINTAIN A SAFE WORKING ENVIRONMENT FOR <br />OWNER'S PREMISES. <br />WORK REQUIRED AT NIGHT. THE CONTRACTOR SHALL PREPARE, <br />AND DELIVER TO STORE MANAGEMENT, A SCHEDULE OF WORK <br />6. <br />ANY DAMAGE TO OWNER'S PROPERTY WHICH OCCURS DURING <br />FOR THE ENTIRE PROJECT SCOPE OF WORK. THIS SCHEDULE <br />THE PROCESS OF CONSTRUCTION SHALL BE REPAIRED AT NO <br />WILL INCLUDE ALL PHASES OF WORK TO BE PERFORMED AND <br />ADDITIONAL COST TO THE OWNER; THIS INCLUDES ALL <br />SHALL LIST THE START AND COMPLETION TIMES FOR EACH <br />MERCHANDISE. CONTRACTOR SHALL PAY THE OWNER THE COST <br />PHASE OF WORK. THE CONTRACTOR SHALL UPDATE THIS <br />FOR ALL DAMAGED MERCHANDISE. <br />SCHEDULE WEEKLY AS CONSTRUCTION PROGRESSES.THE <br />CONTRACTOR SHALL COORDINATE WITH THE ENGINEER OF <br />7. <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECEIVING, <br />RECORD ON DEVIATIONS IN INSTALLATION AND CONSTRUCTION <br />HANDLING, AND STORAGE OF OWNER FURNISHED EQUIPMENT, <br />OF FIXTURES, PIPING. AND OTHER ITEMS SPECIFIED IN THESE <br />CONTRACTOR SHALL COORDINATE DELIVERY DATE CHANGES <br />CONSTRUCTION DOCUMENTS. <br />WITH OWNER'S HVAC/REFRIGERATION ADMINISTRATOR. <br />CONTRACTOR SHALL PROVIDE EITHER ON -SITE STORAGE <br />18. <br />SALES FLOOR TO BE ACCESSIBLE TO CUSTOMERS DURING NON - <br />CONTAINERS, COORDINATE EQUIPMENT LAYDOWN AREA ON- <br />CONSTRUCTION HOURS. PROVIDE ALL NECESSARY TEMPORARY <br />SITE, AND/OR OFF -SITE STORAGE FOR OWNER FURNISHED <br />BARRIERS AND COVERS CAPABLE OF WITHSTANDING SHOPPING <br />EQUIPMENT AND ANY OTHER CONSTRUCTION ITEMS. <br />CART TRAFFIC AND CUSTOMER INTERACTION TO PREVENT <br />CONTRACTOR SHALL COORDINATE LOCATION OF ANY ON -SITE <br />CUSTOMER ACCESS OR EXPOSURE TO ANY CONSTRUCTION <br />STORAGE CONTAINERS AND/OR EQUIPMENT LAYDOWN AREA <br />RELATED HAZARDS. COORDINATE WITH STORE MANAGER. <br />WITH STORE MANAGEMENT PRIOR TO PLACEMENT. <br />CONTRACTOR IS RESPONSIBLE FOR SECURITY AND CONDITION <br />19. <br />FURNISH AND INSTALL SEISMIC BRACING BASED ON <br />OF OWNER FURNISHED EQUIPMENT KEPT IN STORAGE AND <br />APPROPRIATE SEISMIC ZONE REQUIREMENTS PER SMACNA <br />SHALL PROVIDE PERSONNEL TO RECEIVE AND MOVE <br />PUBLISHED SEISMIC DETAILS AND LOCAL AND NATIONAL CODES. <br />EQUIPMENT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR <br />CONTRACTOR'S RESPONSIBILITY INCLUDES STRUCTURAL <br />THE TIMELY ORDERING OF MATERIALS TO PROHIBIT DELAYS OF <br />ENGINEER'S CERTIFICATION ON DETAILS SUBMITTED FOR <br />THE CONSTRUCTION SCHEDULE OF THIS PROJECT. IT IS THE <br />PERMITTING. <br />RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE <br />DELIVERY OF MATERIALS IN A TIMELY MANNER. <br />20, <br />CONTRACTOR SHALL PAINT ALL NEW CONDUIT, DUCT, PLUMBING <br />PIPING, SPRINKLER PIPING. AND SUPPORTS EXPOSED TO SALES <br />8. <br />THE CONTRACTOR SHALL MAINTAIN THE INTEGRITY OF THE <br />FLOOR WITHOUT EXCEPTIONS. MATCH CEILING OR ADJACENT <br />EXISTING BUILDING SECURITY AT ALL TIMES. THIS INCLUDES <br />WALL COLOR (WHERE APPLICABLE). CONDUIT AND PIPING SHALL <br />KEEPING THE BUILDING SECURE OF PERSONS, ENVIRONMENTAL <br />BE PAINTED PRIOR TO INSTALLATION. <br />ELEMENTS OR HAZARDS. THE CONTRACTOR SHALL BE <br />RESPONSIBLE TO MAINTAIN THE INTEGRITY OF ALL EXISTING <br />21. <br />REFER TO SPECIFICATION SECTIONS 01600 - PRODUCT <br />SECURITY SYSTEMS. THE CONTRACTOR SHALL OBTAIN <br />REQUIREMENTS AND APPENDIX A - PRODUCTS AND WORK BY <br />PERMISSION FROM THE STORE MANAGER PRIOR TO THE <br />OWNER OR SEPARATE CONTRACTOR. THESE SECTIONS <br />MODIFICATION OF ANY EXISTING SECURITY SYSTEM FOR THE <br />INCLUDE SPECIFIC INFORMATION REGARDING ITEMS AND <br />OPENING (DEMOLITION) OF ANY EXTERIOR WALL. <br />SERVICES TO BE FURNISHED AND INSTALLED BY INDIVIDUALS <br />OTHER THAN THE CONTRACTOR. <br />9. <br />THE CONTRACTOR SHALL KEEP THIS AREA CLEAN AND FREE OF <br />DEBRIS AND IS TO REMOVE ALL TRASH AND DEBRIS FROM THE <br />22. <br />REPORT ANY DISCREPANCIES FOUND IN THE FIELD IMMEDIATELY <br />CONSTRUCTION AREA DAILY. NO FLAMMABLE MATERIALS OR <br />TO OWNER AND THE ENGINEER PRIOR TO MAKING ANY <br />LIQUIDS MAY BE STORED IN THE EXISTING BUILDING OR IN THE <br />STRUCTURAL MODIFICATIONS OR ORDERING OF ANY <br />NEW ADDITION. <br />MATERIALS. <br />10. <br />REMOVE ANY EXISTING ITEMS. SERVICES. SIGNAGE, FINISHES/OR <br />23. <br />IT IS IMPERATIVE THAT THE ROOF FRAMING, DECKING AND <br />SURFACES AS REQUIRED FOR THE INSTALLATION OF NEW <br />ROOFING SYSTEM BE COMPLETED IMMEDIATELY UPON THE <br />CONSTRUCTION. <br />DEMOLITION OF ANY PORTION OF AN EXTERIOR WALL OR <br />MAKING ANY OPENINGS IN THE ROOF TO ELIMINATE POTENTIAL <br />11. <br />PROVIDE FURRING FOR CONDUITS AND PIPING, SHOWN OR NOT, <br />WATER DAMAGE OR MOISTURE INFILTRATION. THE <br />AND FINISH OUT FURRING TO MATCH ADJACENT EXISTING <br />CONTRACTOR SHALL KEEP THE BUILDING WATERTIGHT AT ALL <br />FINISHES. <br />TIMES. <br />12. <br />REPAIR, REROUTE, AND EXTEND ALL SERVICES, PIPING, CONDUIT <br />24. <br />THE GENERAL CONTRACTOR SHALL RESPOND TO ALL <br />OF EXISTING ITEMS AND EQUIPMENT AS REQUIRED DURING THE <br />REQUIREMENTS OF THE ENGINEER FOR VERIFICATIONS, <br />CONSTRUCTION PROCESS FOR THE COMPLETE INSTALLATION <br />RESPONSES, AND SUBMISSIONS. ALL ADJACENT BUILDINGS (IF <br />AND OPERATION OF NEW EQUIPMENT. THIS INCLUDES ALL ITEMS <br />APPLICABLE) SHALL REMAIN IN SERVICE DURING <br />SHOWN OR NOT SHOWN ON THE DRAWINGS. <br />DEMOLITION/CONSTRUCTION. <br />13. <br />RESET EXISTING EQUIPMENT OR RELATED ITEMS INCLUDING <br />25. <br />MUD AND DEBRIS TRACKED ONTO OWNER PAVING OR CITY <br />SIGNAGE AS REQUIRED FOR PROPER OPERATION. WHERE <br />STREETS TO BE CLEANED IMMEDIATELY. <br />EXISTING FINISHES ARE TO REMAIN, CLEAN, REPAIR, PATCH, <br />AND/OR RE -PAINT AS NECESSARY TO BLEND WITH ADJACENT <br />26. <br />BUILDING COMPONENTS AFFECTED BY THE SCOPE OF WORK <br />SURFACES. <br />AND ALLOWED TO REMAIN SHALL BE SECURED TO PREVENT <br />FALLING, LOOSENING, OR CREATING DAMAGE OF ANY KIND IN <br />14. <br />CONSULT OWNER'S MECHANICAL CONSTRUCTION MANAGER <br />THE FUTURE. <br />FOR COMPLETE APPLICABLE SCOPE OF WORK. THE <br />CONTRACTOR SHALL MAINTAIN THE REQUIRED NUMBER OF <br />EXITS WITHIN THE STORE. MAINTAIN EXITSIGNS AND <br />EMERGENCY LIGHTING AT ALL TIMES, AS REQUIRED BY THE <br />LOCAL BUILDING OFFICIAL. <br />ROOFING NOTE <br />VERIFY ALL ROOFING WORK WITH OWNER CONTACT PRIOR TO <br />BEGINNING WORK: <br />KYLE ROUGHTON (479) 204-3047 KYLE.R000HTON@WALMART.COM <br />SETH LOMBARD (479) 258-6054 SETH.LOMBARD@WALMART.COM <br />CHRIS CRUSE (479) 277-2991 CHRIS.CRUSE@WALMART.COM <br />HVAC FIRE ALARM NOTE <br />CONTACT WALMART SECURITY SERVICES REGIONAL DIRECTOR TO <br />COORDINATE CONNECTION OF DUCT SMOKE DETECTORS IN THE <br />NEW MECHANICAL EQUIPMENT TO THE FIRE ALARM PANEL. DAVID <br />WINSTEAD, SOUTH EAST REGION 18, <br />DAVID.W INSTEAD@WALMART.COM <br />CONTRACTOR BID NOTICE <br />CAP-X COMBO <br />THIS PROJECT CONSISTS OF BOTH HVAC AND REFRIGERATION AS <br />PART OF THE SCOPE OF WORK. OWNER WILL AWARD THE <br />PROJECT TO A SINGLE CONTRACTOR AND ALL WORK DISCLOSED IN <br />THIS SET OF DOCUMENTS WILL BE COMPLETED AS ONE PROJECT. <br />THEREFORE, CONSTRUCTION SET-UP, RIGGING EQUIPMENT <br />CHARGES, PERMITS, FEES, ETC. WILL NEED TO BE INCLUDED IN THE <br />CONSTRUCTION BID. <br />INFORMATION SAFETY BOARD <br />SAFETY BOARDS AND OR POSTED CONSTRUCTION SCHEDULES <br />ARE REQUIRED ON CERTAIN CAP-X PROJECTS DEPENDING ON THE <br />PROJECT TYPE. CAP-X PROJECTS WILL BE LISTED AS ONE OF THE <br />FOLLOWING TYPES: COMBO, REF-1, REF-2, REF-3, REF-4, HVAC-1, <br />HVAC-2, HVAC-3, OR HVAC-4. <br />REF-1 / REF-2 / COMBO: INFORMATION SAFETY BOARD REQUIRED <br />W/ POSTED CONSTRUCTION SCHEDULE <br />REF-3: INFORMATION SAFETY BOARD REQUIRED W/ POSTED <br />CONSTRUCTION SCHEDULE <br />REF-4: NOT REQUIRED <br />HVAC-1: INFORMATION SAFETY BOARD REQUIRED W/ POSTED <br />CONSTRUCTION SCHEDULE <br />HVAC-2: INFORMATION SAFETY BOARD REQUIRED W/ POSTED <br />CONSTRUCTION SCHEDULE <br />HVAC-3: INFORMATION SAFETY BOARD REQUIRED W/ POSTED <br />CONSTRUCTION SCHEDULE <br />HVAC- 4: NOT REQUIRED <br />REFER TO THE MECHANICAL CONSTRUCTION PROJECT <br />SPECIFICATION MANUAL SECTION 01500 - TEMPORARY FACILITIES <br />AND CONTROLS FOR COMPLETE TEMPORARY FACILITY AND <br />CONTROLS FOR COMPLETE TEMPORARY FACILITY REQUIREMENTS. <br />NOTE TO BIDDING CONTRACTORS <br />THESE PLANS ARE TYPICALLY ISSUED FOR BID AS REDUCED "1/2 <br />(HALF) SIZE" DOCUMENTS. SCALES SHOWN APPLY TO ORIGINAL <br />"FULL SIZE" DOCUMENTS ONLY. DO NOT SCALE DRAWINGS, FIELD <br />I VERIFY ALL DIMENSIONS. <br />THE AWARDED CONTRACTOR SHALL BE RESPONSIBLE FOR THE <br />ENTIRE SCOPE OF WORK INDICATED ON THESE PLANS, THE <br />ASSOCIATED SPECIFICATIONS AND OWNER SCOPE OF WORK <br />DOCUMENT. THIS CAPITAL EXPENDITURE SHALL BE COMPLETED AS <br />A "TURN KEY" PROJECT BY THE AWARDED CONTRACTOR AND SHALL <br />INCLUDE BUT NOT LIMITED TO ALL SHEETS ON THIS PRINT: HVAC, <br />REFRIGERATION, PLUMBING, ELECTRICAL EMS CONTROLS SYSTEMS, <br />ARCHITECTURAL AND STRUCTURAL DISCIPLINES. <br />0 <br />w 1 <br />1 <br />zwow a�o� <br />w <br />W <br />HO��z~o�zcn� <br />waw�UO <br />� <br />=zw� <br />CF ��WF�OpO�wU <br />aQ ��ogw�a�zQoow <br />w w a w n m <br />u- <br />> o <br />�� jao�o=U�~tea <br />Z <br />O <br />U w¢ F�wu w� <br />aLJ �N naC70wF O=p <br />�u 16 <br />Zz10 <br />pwvi¢M�w Qw000¢ <br />g <br />z��0o°' C�a�QW <br />�aQ' �Z JUD W www OO <br />0- <br />p <br />O0iw0Q�=g�Zp�OQ <br />✓ wa zw�O�QXC7wa0F w <br />FDN (-)QCod0 W 2:]2c�QF-- <br />Z <br />m <br />O <br />lc:::"0 <br />o - <br />cn <br />w v <br />w <br />w <br />s <br />r-Lo <br />W <br />Cn CV � <br />K <br />CN <br />Lu m CD <br />w <br />i,w�x <br />Z <br />no o <br />Z <br />FrYLL <br />z <br />O}N <br />Z <br />oQ <br />o <br />O <br />ocr- <br />in F- w <br />~ <br />W O <br />Xwo <br />l <br />r'"� <br />z <br />z <br />= <br />Lu ZWO <br />w <br />NFX <br />w <br />w-i <br />Z <br />�w <br />J <br />U) <br />-J ti <br />L0 - <br />Lu <br />_ <br />Li- <br />z <br />° <br />�� <br />w <br />U <br />F- <br />O <br />m <br />O <br />%0 J <br />(-) <br />CO C=:) LL <br />0 O <br />p O <br />o <br />co a <br />O N <br />0 <br />n/ z CDI� w CD <br />0 <br />0 Lo <br />O N <br />0 � F- <br />D- <br />W <br />N <br />�I <br />ISSUE BLOCK <br />CHECKED BY: JPL/JDS <br />DRAWN BY: AMU <br />DOCUMENT DATE: 06/30/23 <br />THIS ITEM HAS BEEN <br />ELECTRONICALLY SIGNED <br />AND SEALED BY MICHAEL <br />DEAN SCHAEFER ON THE <br />DATE LISTED BELOW <br />USING A DIGITAL <br />SIGNATURE. <br />PRINTED COPIES OF THIS <br />DOCUMENT ARE NOT <br />CONSIDERED SIGNED AND <br />SEALED AND THE <br />SIGNATURE MUST BE <br />VERIFIED ON ANY <br />ELECTRONIC COPIES. <br />MICHAEL D. SCHAEFER <br />LICENSE # 89591 <br /># • No. 89591 <br />STATE of <br />06/30/2023 <br />TITLE SHEET <br />x <br />w <br />w <br />w <br />Q <br />U <br />0 <br />J <br />w <br />Q <br />U <br />75 <br />USE AND OCCUPANCY GROUP: M <br />CONSTRUCTION TYPE: V-B <br />BUILDING AREA: ETR <br />OCCUPANT LOAD: ETR <br />FIRE PROTECTION: BUILDING IS EQUIPED THROUGHOUT WITH AN <br />AUTOMATIC SPRINKLER SYSTEM. <br />SEISMIC DESIGN CATEGORY A <br />ULTIMATE DESIGN WIND SPEED: 138 MPH <br />EXISTING CONDITIONS WERE TAKEN FROM <br />ORIGINAL DRAWINGS AND MAY NOT REFLECT <br />EXACT "AS -BUILT" CONDITIONS. CONTRACTOR <br />SHALL FIELD VERIFY ALL EXISTING CONDITIONS <br />PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR <br />SHALL CAREFULLY COORDINATE NEW WORK AND <br />DEMOLITION WITH ALL OTHER DISCIPLINES AND <br />EXISTING CONDITIONS. <br />EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING <br />A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND <br />SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE <br />TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES <br />NOT RELIEVE THE RESPONSIBILITY OF PERFORMING <br />THE WORK PROPERLY. NO ADDITIONAL <br />COMPENSATION SHALL BE ALLOWED BECAUSE OF <br />CONDITIONS THAT OCCUR DUE TO FAILURE TO <br />FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. <br />SHEET: - <br />T1 <br />