Laserfiche WebLink
EPA CLEAN AIR ACT <br />GENERAL NOTES <br />REFER TO R1.1 FOR <br />CONTINUATION <br />REFER TO R1.1 FOR <br />CONTINUATION <br />m <br />EXISTING U <br />COMPRESSOR < <br />HOUSE #1 <br />t_06 <br />15.613 <br />(B4) <br />EXISTING <br />PICKUP <br />COOLER <br />15.613 <br />(B1,B2) <br />c <br />Q A9/A10 <br />A5/A6- A7/A8 <br />Q EXISTINIr <br />82 81 PICKUP <br />COOLS <br />15.613 <br />(A5,A6,A7,A8, <br />A9,A10,A11,Al2) <br />EXISTING <br />PRODUCE <br />COOLER <br />Q ;1 <br />t _ EXIS_ i <br />PICKUP <br />FRFF7FR <br />(C7) <br />R <br />m <br />� I <br />I <br />U <br />I <br />I <br />i <br />15.625 15.625 <br />1155B..66523551 <br />5..6 <br />35 <br />C°JIIIIIIIIIIIIIII <br />�IIIIIIIIIIIIIIiIII <br />15.63 <br />5 <br />C10 B4.MXFWEGH20'5XG (REPLACE) r(REPLAC6E <br />24'FWGH-L <br />(REPLACE) x11iAl2 <br />A7/A8 <br />55625 <br />Cl 5-6-3 m <br />C8 I <br />24'M5XXG <br />(RPLCAE)15.625 <br />B4 <br />FWEGH-L <br />/G� 15.624 (REPLACE) <br />15.634 <br />C7 <br />,5 6' MX5XG <br />15.624 (REPLACE) <br />15.634 <br />- A13 <br />3DRS KWN5F <br />(REPLACE) <br />v 15.624 <br />Q 15.634 <br />A4 <br />5DRS KWN5F <br />(REPLACE) <br />4 <br />R2 <br />(TYP OF TOP <br />FED CASES) <br />2 <br />) ++------- 15.625 15.625 <br />15.635 15.635 <br />A9 Al2 <br />17DRS KWN5F 17DRS KW <br />N5F <br />(REPLACE) (REPLACE) <br />-- <br />Ag---+� <br />S--4 A11/Al2 Al rT -A11 <br />I <br />I I <br />r-------------------- A10------------ t+-------------------All --------- <br />A9/A10/A11/Al2 Q 15.625 15.625 <br />15.635 15.635 <br />N 15.625 15.625 <br />d 15.635 A10 A11 15.635 <br />A5 14DRS KWN5F 14DRS KWN5F A8 <br />r 17DRS KWN5F (REPLACE) (REPLACE) 17DRS KWN5F <br />(REPLACE) (REPLACE) <br />+-------------------- A5--------------- f--------------------------•A8------------------------ <br />-A9/r; f---------A5- i <br />A5/A6 5--�*}-A7/A8A8TT A7 <br />I <br />I I <br />--------------------- A6------------ ------------------- q7•--------- <br />A5/A6/A7/A8 15.625 15.625 <br />M5%635 <br />15.63515.635 15.625 A6 A7 15.6351 14DRS KWN5F 14DRS KWN5F B2 <br />17DRS KWN5F (REPLACE) (REPLACE) 17DRS KWN5F <br />(REPLACE) (REPLACE) <br />F--------------------- B1-------------- ------------------------- B2------------------------- <br />t--------------- : <br />`r-j 5---- B2 .T <br />B 1 /B2 <br />WHEN REPLACING MULTI -DECK CASES AND DOOR <br />CASES, AND REUSING PIPING; RE -INSULATE THE <br />REFRIGERATION PIPING BEHIND THE CASES. THIS <br />APPLIES TO THE PIPING FOR THE CASES BEING <br />REPLACED AND TO EXPOSED PIPING FOR ADJACENT <br />CASES. IT ONLY APPLIES TO THAT PORTION OF THE <br />PIPING THAT IS ACCESSIBLE WITHOUT DISTURBING <br />EXISTING CASES TO REMAIN AND THAT IS NOT INSIDE OR <br />PART OF A REFRIGERATION RISER IN A CHASE. REFER TO <br />SPECS FOR PIPE INSULATION REQUIREMENTS. <br />15.625 <br />15.635 <br />C6 <br />15.609 24' BX3LN <br />(TYP) (REPLACE) <br />I <br />SUPPORT <br />REFRIGERATION <br />PIPING ON UNISTRUT <br />MOUNTED BEHIND <br />CASES (TYP) <br />15.625 <br />15.635 <br />C2 <br />8' QC-R-64-IC/ <br />QC-6R-35-EC <br />(REPLACE) <br />15.625 <br />15.635 <br />C4 <br />20, DX6XN <br />(REPLACE) <br />I <br />I <br />i <br />I <br />----C2 -- INSTALL REFRIGERATED CASES IN ACCORDANCE WITH <br />MANUFACTURER'S INSTRUCTIONS TO ALLOW FOR <br />COMPLETE REMOVAL OF THE CASE DRAIN GRATE FOR <br />INSPECTION AND CLEANING, TYP OF ALL KYSOR CASES. <br />(TYP) <br />15.624 <br />15.634 <br />a, C 19 <br />E 8' DX6XN <br />(REPLACE) <br />_j <br />CX-11.02-15 <br />CAPX- W-10.05.20 <br />COMPLY WITH EPA CLEAN AIR ACT, TITLE VI, SECTION 608 AND CODE <br />1. <br />PLAN INDICATES GENERAL ROUTING OF REFRIGERANT LINES, <br />OF FEDERAL REGULATION TITLE 40. PART 82 WHEN ADDING OR <br />WITH A SINGLE LINE SHOWN INDICATING BOTH SUCTION AND <br />REMOVING REFRIGERATED EQUIPMENT. RECORD ALL EQUIPMENT <br />LIQUID LINE ROUTING FOR EACH SYSTEM. <br />IDENTIFICATION NUMBERS, MODEL AND SERIAL NUMBERS, THE <br />AMOUNT OF REFRIGERANT RECOVERED FROM EACH UNIT, THE DATE <br />2. <br />REFRIGERATION SYSTEM INSTALLATION SHALL BE IN COMPLETE <br />OF DECOMMISSIONING, COMPANY NAME AND SIGNATURE OF ON- <br />CONFORMANCE WITH SPECIFICATIONS, AND WITH ALL <br />SITE SUPERVISOR. <br />REQUIREMENTS OF REFRIGERATION EQUIPMENT <br />MANUFACTURER. <br />KEYNOTES <br />3. <br />REFRIGERATION DRAWINGS ARE PROVIDED AS AN AID TO <br />BIDDERS AND TO INDICATE DESIRED ROUTING OF <br />REFRIGERATION LINES; CONTRACTOR SHALL ASSUME FULL <br />RESPONSIBILITY FOR CORRECT INSTALLATION OF PIPING AND <br />15.601 SLOPE REFRIGERANT LINES BACK TO COMPRESSORS AT 1" <br />ACCESSORIES TO PROVIDE A COMPLETE AND FULLY <br />PER 20' OF RUN. LOCATE HIGHEST POINT OF <br />OPERATING SYSTEM. <br />REFRIGERATION LINES JUST BELOW BOTTOM CHORD OF <br />JOIST OR BEAM. COORDINATE ELEVATION TO AVOID <br />4. <br />REFER TO SPECIFICATION 15600 FOR INSULATION THICKNESS. <br />CONFLICTS WITH DUCTWORK, LIGHTING, SKYLIGHTS, ETC. <br />INSIDE DIAMETER OF INSULATION SHALL MATCH PIPE DIAMETER <br />TO MINIMIZE AIR GAPS BETWEEN PIPING AND INSULATION. <br />15.602 SUPPORT HORIZONTAL RUNS OF REFRIGERANT LINES ON <br />PROVIDE FACTORY PRE -MANUFACTURED FITTINGS AT ALL <br />1 X 1-5/8" UNISTRUT CHANNELS ON MAXIMUM OF 6 FOOT <br />TRAPS AND ELBOWS. WHERE PRE -MANUFACTURED FITTINGS <br />CENTERS. <br />ARE UNAVAILABLE MITER CUT ALL FITTINGS TO ENSURE <br />15.603 AT ALL POINTS WHERE SUCTION LINES RISE, PROVIDE A <br />PROPER SEAL BETWEEN INSULATION SEGMENTS. <br />SUCTION LINE TRAP AT THE BASE OF THE RISER. <br />15.609 PROVIDE PVC DRAIN LINE FROM EACH CASE DRAIN <br />5. <br />PIPE INSULATION SHALL BE BLACK REGARDLESS OF EXISTING <br />CONNECTION SAME SIZE AS CASE OUTLET, AND END OVER <br />INSULATION COLOR. <br />FLOOR RECEPTOR W/AIR GAP; PITCH DRAINS 1/8" PER 12". <br />PROVIDE DRAIN COVER GRATE TO MATCH EXISTING. <br />6. <br />COORDINATE REFRIGERATION DEMOLITION ISSUES WITH THE <br />CONTRACTOR SHALL ENSURE RECEPTOR(S) AND DRAIN <br />FIXTURE DRAWINGS. REFER TO FIXTURE PLANS FOR <br />LINE(S) SERVING CASE LINE-UP ARE FREE OF <br />REFRIGERATION EQUIPMENT DEMOLITION AND COOLER REPAIR <br />OBSTRUCTIONS AND FUNCTION PROPERLY. WHERE <br />AND REMODELING. <br />EXTENSIVE DAMAGE EXISTS AND/OR PROPER DRAINAGE <br />CANNOT BE OBTAINED COORDINATE WITH WALMART <br />7. <br />REFRIGERATION SYSTEM SHALL REMAIN OPERATIONAL DURING <br />MECHANICAL CONSTRUCTION MANAGER. <br />REMODELING. DURING THE PHASING OF OLD TO NEW SYSTEMS, <br />15.612 PROVIDE INTERMEDIATE SUCTION LINE TRAP IN WALL OR <br />BOTH NEW AND OLD REFRIGERATION SYSTEMS MAY BE <br />VOID SPACE. INTERMEDIATE TRAP SHOULD BE PLACED AT <br />REQUIRED TO OPERATE AT THE SAME TIME FOR A SHORT <br />THE MIDPOINT OF ANY SUCTION LINE RISE WHICH EXCEEDS <br />PERIOD. <br />16 FEET. <br />15.613 REPLACE EXISTING SUCTION RISER. REFER TO PIPING <br />8. <br />WHERE NEW REFRIGERATED EQUIPMENT IS INDICATED ON THE <br />SCHEDULE FOR SIZE. <br />DRAWINGS, PROVIDE DEMOLITION, REMOVAL, AND TEMPORARY <br />STORAGE OF OLD EQUIPMENT PER OWNER'S MECHANICAL <br />15.624 ROUTE REFRIGERATION LINES ON TOP OF CASE FOR ALL <br />SERVICES CONSTRUCTION MANAGER'S INSTRUCTIONS, AND <br />TOP FED CONNECTED CASES. SLOPE BACK TO <br />REFRIGERATION DEMO NOTES. <br />COMPRESSOR AT 1" PER 20'-0" OF RUN. REFER TO TOP FED <br />PIPING DETAIL. <br />9. <br />COORDINATE REMOVAL AND DISPOSAL OF EXISTING <br />15.625 ROUTE REFRIGERATION LINES IN BASE OF CASE FOR ALL <br />EVAPORATORS, REFRIGERATED CASES, AND CONDENSING <br />BOTTOM FED CONNECTED CASES. SLOPE BACK TO <br />UNITS, WITH OWNER'S MECHANICAL SERVICES CONSTRUCTION <br />COMPRESSOR AT 1" PER 20'-0" OF RUN. <br />MANAGER. <br />15.634 REFRIGERATION CONTRACTOR SHALL INSTALL <br />REFRIGERATION MANUFACTURER -FURNISHED LIQUID LINE <br />10. <br />REMOVE COPPER LINES, EVAPORATORS, AND CONDENSATE <br />SOLENOID VALVE AND EVAPORATOR PRESSURE <br />LINES FROM COOLERS/ FREEZERS BEING REMOVED FROM SITE. <br />REGULATOR IN A SERVICE ACCESSIBLE LOCATION ON TOP <br />COORDINATE WITH WALK-IN PANEL VENDOR FOR TIME LINE OF <br />OF CASE. CONTRACTOR SHALL FURNISH AND INSTALL FULL <br />REPLACEMENT. REFERENCE SPECIFICATION FOR CONTACT <br />PORT ISOLATION BALL VALVE IN A SERVICE ACCESSIBLE <br />INFORMATION. <br />LOCATION ON TOP OF CASE. INSTALL CONTROL WIRING <br />FROM VALVES BACK TO CASE OR RACK CONTROLLER. <br />11. <br />WALK-IN PANEL VENDOR SHALL PROPERLY PREPARE ALL <br />REFER TO REFRIGERATION SUBMITTALS/SCHEDULES AND <br />COOLER/FREEZER PANELS, GLASS DOORS, SLIDER OR SWING <br />BAS PLANS FOR EXACT REQUIREMENTS. REFER TO <br />DOORS, PALLETIZE, AND PREPARE THE EQUIPMENT TO SHIP <br />SPECIFICATIONS FOR ASSET TAGGING REQUIREMENTS. <br />OFF SITE. <br />15.635 REFRIGERATION CONTRACTOR SHALL INSTALL <br />REFRIGERATION MANUFACTURER -FURNISHED LIQUID LINE <br />12. <br />COORDINATE WITH FIRE PROTECTION CONTRACTOR FOR THE <br />SOLENOID VALVE AND EVAPORATOR PRESSURE <br />REMOVAL OF SPRINKLERS FOR ALL REMOVED <br />REGULATOR IN A SERVICE ACCESSIBLE LOCATION INSIDE <br />COOLER/FREEZER BOXES. <br />CASE DRAIN PAN. CONTRACTOR SHALL FURNISH AND <br />INSTALL FULL PORT ISOLATION BALL VALVE IN A SERVICE <br />13. <br />COORDINATE WITH ELECTRICAL CONTRACTOR FOR THE <br />ACCESSIBLE LOCATION INSIDE CASE DRAIN PAN. INSTALL <br />REMOVAL OF ALL REMOVED COOLER/FREEZER BOXES <br />CONTROL WIRING FROM VALVES BACK TO CASE OR RACK <br />ELECTRICAL WIRING DEVICES. <br />CONTROLLER. REFER TO REFRIGERATION <br />SUBMITTALS/SCHEDULES AND BAS PLANS FOR EXACT <br />14. <br />COORDINATE WITH BAS CONTRACTOR FOR THE REMOVAL OF <br />REQUIREMENTS. REFER TO SPECIFICATIONS FOR ASSET <br />ALL REMOVED COOLER/FREEZER BOXES BAS WIRING AND <br />TAGGING REQUIREMENTS. <br />DEVICES. <br />15. <br />EXISTING REFRIGERATION PIPING MAY BE RE -USED UNLESS <br />OTHERWISE NOTED ON PLANS. REFER TO SCHEDULES FOR PIPE <br />SIZE REQUIREMENTS. <br />10, BUILDING COMPONENTS ABANDONED BY THE SCOPE OF WORK <br />SHALL BE SECURED TO PREVENT FALLING, LOOSENING, OR <br />CREATING DAMAGE OF ANY KIND IN THE FUTURE. <br />17. IF ANY RACK SYSTEMS WILL BE OPENED TO ADD OR REPLACE <br />CASES, EVAPORATORS, ETC. THEN 24 TO 48 HOURS AFTER THE <br />WORK IS COMPLETED AND ALL FINAL ADJUSTMENTS HAVE BEEN <br />MADE, PROVIDE AND CHANGE LIQUID LINE FILTER CORES, OIL <br />SYSTEM FILTER USING SPORLAN OF STYLE FILTER, AND <br />REPLACE SUCTION FILTERS. FILTERS ARE TO BE RATED FOR <br />WAX REMOVAL CONTRACTOR TO PROPERLY DISPOSE OF OIL <br />AND COMPONENTS REPLACED. REFER TO SPECIFICATION 15600. <br />REFERENCE FIXTURE DRAWINGS FOR ALL NEW CASES <br />BEING INSTALLED FOR CONNECTION LOCATION OF <br />18. REFER TO GROCERY FIXTURE DRAWINGS FOR ADDITIONAL <br />UTILITIES. (TOP FED VS. BOTTOM FED) <br />WORK BY REFRIGERATION CONTRACTOR. <br />19. INSTALL ASSET TAGS ON ALL NEW REFRIGERATED CASES AND <br />SEPARATE CONTRACTOR IS RESPONSIBLE FOR RE -SKIN <br />COMPLETE THE DATA COLLECTION INFORMATION. DELETE <br />OF EXISTING REFRIGERATED CASES TO REMAIN. <br />DEMOED ASSETS FROM ASSET TAGGING APPLICATION. REFER <br />TO SPECIFICATIONS. <br />ALL WORK ON THIS SHEET IS TO BE COMPLETED BY AN <br />20. UPON START-UP OF ALL NEW REFRIGERATED EQUIPMENT, <br />OWNER'S APPROVED CONTRACTOR. <br />REFRIGERATION CONTRACTOR SHALL REQUEST THE BUILDING <br />PERFORMANCE REPORT FOR ALL RACKS AND SUCTION <br />REFRIGERATION CONTRACTOR IS RESPONSIBLE FOR ALL <br />GROUPS WHERE WORK IS PERFORMED. ANY DEVIATIONS <br />FINAL REFRIGERATION ELECTRICAL TERMINATIONS TO <br />NOTED ON THE REPORT MUST BE CORRECTED PRIOR TO <br />REFRIGERATION EQUIPMENT. <br />PROJECT CLOSE OUT. REQUEST VIA EMAIL AT <br />B.PTEAM1 @WAL-MART.COM <br />VERIFY EXACT LOCATION OF ALL REFRIGERATED CASES <br />WITH FINAL MERCHANDISE PLAN. <br />COORDINATE LOCATION OF REFRIGERATED CASES WITH <br />PLUMBING CONTRACTOR PRIOR TO CUTTING OF FLOOR <br />AND SETTING DRAINS. <br />CONTRACTOR TO RE -USE EXISTING CASE DRAINS. <br />REPLACE DRAIN IF MORE THAN 1/2 OF DRAIN IS EXPOSED <br />TO SALES FLOOR. FIELD VERIFY EXACT LOCATIONS. <br />PRIOR TO SETTING NEW REFRIGERATED CASES, <br />THOROUGHLY CLEAN ALL DEBRIS FROM FLOOR DRAIN <br />AND/OR FLOOR SINK GRATES AND BODIES. HYDRO -JET <br />EACH FLOOR DRAIN AND/OR FLOOR SINK TO THE MAIN. <br />ALL EXISTING REFRIGERATED CASES ARE TO REMAIN <br />UNLESS NOTED OTHERWISE. <br />PRIOR TO INSTALLING ANY EQUIPMENT OR ADJUSTING <br />RACK PARAMETERS, OWNER'S CONSTRUCTION <br />MANAGER SHALL REQUEST A SUCTION GROUP REPORT <br />FOR ALL RACKS AND SUCTION GROUPS WHERE WORK IS <br />PERFORMED. REQUEST VIA EMAIL AT B.PTEAM1 @WAL- <br />MART.COM <br />REFRIGERATION SYMBOLS <br />CX-09.25 18 <br />XXX <br />XXX <br />CIRCUIT NUMBER (CIRCUIT INFORMATION) <br />MODEL NUMBER <br />CO II- <br />CLEANOUT (CO) <br />--------- <br />CONDENSATE DRAIN LINE (CD) <br />t9 <br />CONNECT TO EXISTING <br />Ls <br />CONTINUATION <br />X <br />XX <br />DETAIL NUMBER <br />SHEET NUMBER (DETAIL REFERENCE) <br />® <br />EVAPORATOR COIL <br />ISOLATION VALVE <br />ELBOW - TURNED DOWN <br />0 ELBOW - TURNED UP <br />XX.XXX REFRIGERATION KEYNOTE REFERENCE <br />REFRIGERATION PIPING (ABOVE) <br />- - - - - - - - REFRIGERATION PIPING (BELOW) <br />---� REFRIGERATION PIPING CASE CONNECTION <br />ETR EXISTING TO REMAIN <br />(TYP) TYPICAL <br />PIPING AND REFRIGERATION <br />SCHEDULE SYMBOLS <br />CX-10 06-20 <br />* MODIFY CIRCUIT OR PIPE LENGTH <br />** NEW CASE, COIL, CIRCUIT OR VALVE <br />**** CHANGE EXISTING PIPE SIZE AS INDICATED OR NEW <br />PIPE <br />A RISER SIZE IS SHOWN EVEN WHERE A RISER IS NOT <br />EXPECTED. THIS IS FOR REFERENCE ONLY AND IS TO <br />BE USED IN THE EVENT THAT A PIPING CONFLICT <br />CAUSES THE NEED FOR A RISER. IF THE RISER <br />LENGTH EXCEEDS 4 FEET, IT MUST BE APPROVED BY <br />ENGINEER OF RECORD. <br /># CONTRACTOR TO FIELD VERIFY EXISTING RISER <br />SIZE. IF EXISTING PIPE SIZE DOES NOT MATCH <br />SCHEDULE, REPLACE EXISTING RISER WITH NEW <br />SIZE AS SHOWN. <br />0 <br />Cn <br />O zWo aW00>1 <br />U ZUZ <br />LL W�_zF-OOZcn� <br />D <br />W <br />UH <br />o EZWF wUaz�F z <br />Q .. Fu)LL W W LLw QUO <br />as �F_ou,w.0ozo w <br />W W <wo'm <br />O <br />W }OQ�d'd <br />�� <br />min =>UF WQ <br />Z <br />O <br />0Q <br />U wQ �o'Wu-W2 <br />Q_-,c c o'ow1-O=p <br />3�W <br />~ <br />Zo DO?ZUIS Z<wuc cZ <br />zd-y.1 �ioOF--3Z=LL F-ZU <br />m=! 0 E 0O~QUaw <br />D <br />Hirwomu��LUW0cE l <br />W <br />oo=i-way=mDz�vWOg',. <br />�Wo.ZF-LOLLQQdwaDt-w <br />=uJW OQ Dd' LLx W U W W D=i <br />U) <br />F-�N U0(ndOw2:�CCIYQF- <br />Z <br />m <br />_ <br />0 <br />0 � <br />0 <br />U <br />N <br />w <br />cc <br />� <br />Lu v <br />~ '� <br />�� M <br />w <br />coo <br />W IY <br />U)�� <br />Z <br />mN <br />Nwo <br />Q LJ <br />>cQ <br />n <br />W <br />oz:cv <br />U) <br />F- <br />Z - <br />W U <br />q�Q <br />L <br />XxLI� <br />O <br />oofw <br />NCn c' <br />z <br />Z <br />= <br />Luz <br />w�"t <br />w <br />cD 0- <br />w <br />Z <br />�LxLI <br />J <br />Lij <br />LL <br />z <br />� m <br />o2� <br />1- <br />1 <br />U <br />O <br />m <br />O <br />00 J <br />CO C) LL c) <br />U) <br />00 <br />p O <br />CD CL <br />O Lo <br />0 <br />Z o <br />L.L w o <br />0 <br />0 N <br />O N <br />0 W <br />Cn <br />0� <br />W <br />N w <br />w <br />m <br />D <br />z <br />m <br />O <br />ISSUE BLOCK <br />CHECKED BY: KK/JPL <br />DRAWN BY: MJS <br />DOCUMENT DATE: 06/30/23 <br />THIS ITEM HAS BEEN <br />ELECTRONICALLY SIGNED <br />AND SEALED BY MICHAEL <br />DEAN SCHAEFER ON THE <br />DATE LISTED BELOW <br />USING A DIGITAL <br />SIGNATURE. <br />PRINTED COPIES OF THIS <br />DOCUMENT ARE NOT <br />CONSIDERED SIGNED AND <br />SEALED AND THE <br />SIGNATURE MUST BE <br />VERIFIED ON ANY <br />ELECTRONIC COPIES. <br />MICHAEL D. SCHAEFER <br />LICENSE # 89591 <br />+ :• no.89591 <br />i.STATE OF <br />06/30/2023 <br />FRONT <br />REFRIGERATION <br />PLAN <br />IY <br />w <br />w <br />w <br />Q <br />U <br />co <br />0 <br />J <br />w <br />Q <br />U <br />W_ <br />1DFRONT REFRIGERATION PLAN <br />/8" = -0" 1 <br />EXISTING CONDITIONS WERE TAKEN FROM <br />ORIGINAL DRAWINGS AND MAY NOT REFLECT <br />EXACT "AS BUILT" CONDITIONS. CONTRACTOR <br />SHALL FIELD VERIFY ALL EXISTING CONDITIONS <br />PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR <br />SHALL CAREFULLY COORDINATE NEW WORK AND <br />DEMOLITION WITH ALL OTHER DISCIPLINES AND <br />EXISTING CONDITIONS. <br />EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING <br />A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND <br />SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE <br />TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES <br />NOT RELIEVE THE RESPONSIBILITY OF PERFORMING <br />THE WORK PROPERLY. NO ADDITIONAL <br />COMPENSATION SHALL BE ALLOWED BECAUSE OF <br />CONDITIONS THAT OCCUR DUE TO FAILURE TO <br />FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. <br />SHEET: <br />R1 <br />