Laserfiche WebLink
GENERAL NOTES <br />0 <br />r` <br />U U <br />c <br />T <br />REDESIGNATE C18 <br />MAIN PIPING TO 18C. U <br />00 <br />REDESIGNATE D7 0 <br />MAIN PIPING TO 7D. <br />MQm <br />7D 18C <br />EXISTING <br />DAIRY <br />COOLER <br />--- C18.1------------------ <br />15.625 <br />15.635 15.625 <br />C18.1 15.635 <br />24' DR6LD C18.3 <br />(REPLACE) 1 FWEGH L / <br />(REPLACE) <br />C18.2 r---------C18.3------------ <br />28' DX6LD <br />N (REPLACE) <br />I _C6 <br />I U <br />I <br />I I <br />I I <br />+f I <br />5 <br />R2 <br />15.630 <br />(TYP OF CIRCUITS <br />ON A NEW LOOP) <br />7+} <br />15.1C ; C15.3 <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />N <br />U 15.625 <br />i 15.635 <br />I C15.2 <br />I <br />36' DX6LD <br />(REPLACE) <br />I <br />I <br />I <br />I <br />EXISTING <br />GROCERY <br />FREEZER <br />I 15.609 <br />(TYP) <br />15.625 <br />C15.1 <br />24' DX6LD <br />(REPLACE) <br />EXISTING <br />ICE CREAM <br />FREEZER <br />I <br />2 <br />I <br />I <br />EXISTING <br />AFTER C15.1 BRANCH <br />COMPRESSOR <br />0 <br />REDESIGNATE C15 MAIN <br />HOUSE #2 <br />v <br />U PIPING TO 15.1C. REPLACE <br />i <br />< <br />HORIZONTAL SUCTION ON <br />Lo <br />15.1C MAIN PIPING. LIQUID LINE <br />U <br />EXISTING TO REMAIN. <br />I 15.625 <br />U REFERENCE PIPING <br />j 15.635 <br />00 SCHEDULE FOR PIPE SIZE. <br />i C15.1 <br />24' DX6LD <br />_,L BRANCH OFF 15C EXTEND <br />i (REPLACE) <br />U <br />Y <br />U <br />15C <br />C10 <br />C6C r <br />C4 <br />OVERHEAD TO NEW <br />LOCATION AS SHOWN. <br />REFRENCE PIPING SCHEDULE <br />FOR PIPE SIZES. <br />C15.1--- <br />f <br />I I <br />REDESIGNATE C15 I I <br />I I <br />MAIN PIPING TO 15C. I I <br />I I <br />I I <br />I <br />I I <br />15.625 <br />15.635 <br />I <br />C11 <br />- i 36' MX5XG <br />EXISTING i (REPLACE) <br />MEAT <br />COOLER y <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />REFER TO R1 FOR <br />CONTINUATION <br />r <br />U <br />,-t co co O <br />REFER TO R1 FOR <br />CONTINUATION <br />EXISTING <br />MEAT <br />PREP <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />N <br />m <br />i <br />r <br />I <br />I <br />1 <br />I <br />I <br />I <br />I <br />I <br />I <br />.I, <br />HUSSMANN TO RETROFIT <br />LIDS ONTO EXISTING <br />FWG/FWEG FOR CIRCUIT B10. <br />REFER TO FIXTURE (TYP) <br />C 18.3 D7.3 <br />D7.2 <br />D7.1 <br />vu D7.1 <br />D7.2 <br />15.624 <br />15.634 <br />D7.1 <br />36' DX6LD <br />(REPLACE) <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />c� <br />U <br />I <br />I <br />I <br />I <br />I <br />r <br />I <br />I <br />I <br />I <br />I <br />I <br />i <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />r <br />m <br />I <br />I <br />I <br />I <br />I <br />I <br />1 <br />R2 <br />15.603 <br />15.612 <br />15.618 <br />(TYP) <br />15.625 <br />15.635 <br />C 15.3 <br />16' FWGH-L/ <br />FWEGH-L <br />(REPLACE) <br />15.625 <br />15.635 <br />B12 <br />16' FWGH-U <br />FWEGH-L <br />(REPLACE) <br />15.625 <br />15.635 <br />67 <br />24' FWGH-L/ <br />FWEGH-L <br />(REPLACE) <br />15.635 <br />B100� <br />12' FWG/FWEG <br />(EXISTING) <br />15.613 <br />(B10) <br />D7.3 <br />15.624 <br />15.634 <br />D7.3 <br />INSTALL REFRIGERATED CASES IN ACCORDANCE <br />WITH MANUFACTURER'S INSTRUCTIONS TO <br />24' DX6LN <br />ALLOW FOR COMPLETE REMOVAL OF THE CASE <br />(REPLACE) <br />r> <br />DRAIN GRATE FOR INSPECTION AND CLEANING, <br />o <br />TYP OF ALL KYSOR CASES. <br />2 <br />COORDINATE ROUTING OF <br />REFRIGERATION PIPING TO AVOID <br />R2 <br />CONFLICT WITH EXISTING PIPING. <br />LIGHTS, SKYLIGHTS, AND <br />15.601 <br />DUCTWORK. REF PIPING <br />15.602 <br />SCHEDULE FOR PIPE SIZE. (TYP) <br />D7.2 <br />15.624 <br />15.634 <br />D7.2 <br />36' DX6LD <br />(REPLACE) <br />4 <br />R2 <br />(TYP OF TOP <br />FED CASES) <br />PIPING SCHEDULE SYSTEM <br />A <br />HORIZONTAL VERTICAL <br />PIPE SUCTION SUCTION RISER <br />DESIGNATION (IN.) AS REQ'D (IN.) <br />LIQUID <br />(IN.) <br />ESTIMATED <br />TOTAL LENGTH^^ <br />(FT) <br />Al <br />1 3/8 <br />1 1/8 ^ <br />112 <br />147 <br />Ala <br />1 1/8 <br />7/8 <br />1/2 <br />1/2 <br />ETR <br />ETR <br />Alb <br />1 1/8 <br />7/8 <br />A2 <br />1 1/8 <br />7/8 <br />112 <br />1/2 <br />246 <br />96 <br />A4* <br />7/8 <br />5/8 <br />A5* <br />1 3/8 <br />7/8 ***` <br />1/2 <br />92 <br />A6* <br />1 318 <br />7/8 **** <br />1/2 <br />92 <br />A7* <br />1 3/8 <br />7/8 ***` <br />1/2 <br />130 <br />A8* <br />1 3/8 <br />7/8 **** <br />1/2 <br />118 <br />A9* <br />1 3/8 <br />7/8 **** <br />1/2 <br />113 <br />A10* <br />1 3/8 <br />718 **** <br />1/2 <br />113 <br />All* <br />1 3/8 <br />7/8 **** <br />112 <br />151 <br />Al2* <br />1 3/8 <br />718 '*** <br />1/2 <br />139 <br />A13* <br />5/8 <br />1/2 <br />1/2 <br />100 <br />^ RISER SIZE IS SHOWN EVEN WHERE A RISER IS NOT EXPECTED. THIS IS FOR <br />REFERENCE ONLY AND TO BE USED IN THE EVENT THAT A PIPING CONFLICT CAUSES <br />THE NEED FOR A RISER. IF RISER LENGTH EXCEEDS 4 FEET, IT MUST BE APPROVED <br />BY ENGINEER OF RECORD. <br />^^ESTIMATED TOTAL LENGTH INCLUDES HORIZONTAL AND VERTICAL PIPE SECTIONS. <br />THIS IS ONLY AN ESTIMATE AND ACTUAL LENGTH WILL VARY. <br />Updated: 6/26/2023 <br />NOTE: CONTENTS OF SCHEDULE CONTAINS INFORMATION DERIVED FROM OWNER'S <br />RECORD SCHEDULES, MANUFACTURER SUBMITTALS, CUTSHEETS, AND OWNER'S <br />DESIGN PARAMETERS AT THE TIME THE SCHEDULE WAS PREPARED. FIELD VERIFY <br />AS IT MAY NOT REFLECT EXISTING CONDITIONS. <br />PIPING SCHEDULE SYSTEM C <br />HORIZONTAL <br />PIPE SUCTION <br />DESIGNATION (IN.) <br />VERTICAL <br />SUCTION RISER <br />AS REQ'D (IN.) <br />LIQUID <br />(IN.) <br />ESTIMATED <br />TOTAL LENGTH^^ <br />(FT.) <br />C 1 <br />7/8 <br />1/2 <br />1/2 <br />223 <br />C2* <br />1 3/8 <br />1 1/8 **** <br />518 <br />340 <br />C3 <br />7/8 <br />5/8 <br />1/2 <br />317 <br />_ <br />1 3/8 <br />7/8 **** <br />518 <br />322 <br />_C4* <br />C5 <br />1 1/8 <br />7/8 <br />718 <br />260 <br />C5.1 <br />1 1/8 <br />5/8 ^ <br />1/2 <br />2 <br />C5.2 <br />5/8 <br />1/2 ^ <br />1/2 <br />24 <br />C6* <br />1 3/8 <br />7/8 <br />1/2 <br />278 - <br />C7* <br />7/8 <br />518 **** <br />1/2 <br />155 <br />C8* <br />1 318 <br />1 1/8 <br />5/8 <br />143 <br />C9 <br />7/8 <br />7/8 <br />1/2 <br />99 <br />C10* <br />1 3/8 <br />1 1/8 <br />5/8 <br />120 <br />C11* <br />1 5/8 <br />1 3/8 <br />7/8 <br />52 <br />15C* <br />1 1/8 <br />7/8 ^ <br />112 <br />13 ** <br />C15.1** <br />518 **** <br />5/8 **** <br />1/2 **** <br />96 ** <br />15.1 C* <br />7/8 "*** <br />5/8 ^ <br />112 <br />102 ** <br />C15.2** <br />518 **** <br />1/2 **** <br />1/2 **** <br />51 ** <br />C15.3** <br />1/2 ***" <br />1/2 *** <br />1/2 "*** <br />60 ** <br />18C* <br />1 118 <br />5/8 ^ <br />112 <br />133 ** <br />C18.1** <br />1/2 **** <br />112 **** <br />112 **** <br />80 ** <br />C18.2** <br />5/8 **** <br />112 **** <br />1/2 **** <br />52 ** <br />C18.3" <br />1/2'"'*" <br />1/2 "** <br />112 **** <br />85 ** <br />1 315 <br />C19* <br />1 1/8 <br />1 5/8 <br />! 1/2 <br />^ RISER SIZE IS SHOWN EVEN WHERE A RISER IS NOT EXPECTED. THIS IS FOR <br />REFERENCE ONLY AND TO BE USED IN THE EVENT THAT A PIPING CONFLICT CAUSES <br />THE NEED FOR A RISER. IF RISER LENGTH EXCEEDS 4 FEET, IT MUST BE APPROVED <br />BY ENGINEER OF RECORD. <br />AA ESTIMATED TOTAL LENGTH INCLUDES HORIZONTAL AND VERTICAL PIPE SECTIONS. <br />THIS IS ONLY AN ESTIMATE AND ACTUAL LENGTH WILL VARY. <br />Updated: 6/26/2023 <br />NOTE: CONTENTS OF SCHEDULE CONTAINS INFORMATION DERIVED FROM OWNER'S <br />RECORD SCHEDULES, MANUFACTURER SUBMITTALS, CUTSHEETS, AND OWNER'S <br />DESIGN PARAMETERS AT THE TIME THE SCHEDULE WAS PREPARED. FIELD VERIFY <br />AS IT MAY NOT REFLECT EXISTING CONDITIONS. <br />cx-10.27.17 <br />REFER TO GENERAL NOTES ON SHEET R1 FOR NOTES PERTAINING <br />TO THIS SHEET. <br />PIPING AND REFRIGERATION <br />SCHEDULE SYMBOLS <br />REFER TO PIPING AND REFRIGERATION SCHEDULE SYSMBOLS ON <br />SHEET R1 FOR NOTES PERTAINING TO THIS SHEET. <br />KEYNOTES <br />15.601 SLOPE REFRIGERANT LINES BACK TO COMPRESSORS AT 1" <br />PER 20' OF RUN. LOCATE HIGHEST POINT OF <br />REFRIGERATION LINES JUST BELOW BOTTOM CHORD OF <br />JOIST OR BEAM. COORDINATE ELEVATION TO AVOID <br />CONFLICTS WITH DUCTWORK, LIGHTING, SKYLIGHTS, ETC. <br />15.602 SUPPORT HORIZONTAL RUNS OF REFRIGERANT LINES ON <br />1-5/8" X 1-5/8" UNISTRUT CHANNELS ON MAXIMUM OF 6 FOOT <br />CENTERS. <br />15.603 AT ALL POINTS WHERE SUCTION LINES RISE, PROVIDE A <br />SUCTION LINE TRAP AT THE BASE OF THE RISER. <br />15.609 PROVIDE PVC DRAIN LINE FROM EACH CASE DRAIN <br />CONNECTION SAME SIZE AS CASE OUTLET, AND END OVER <br />FLOOR RECEPTOR W/AIR GAP; PITCH DRAINS 1/8" PER 12". <br />PROVIDE DRAIN COVER GRATE TO MATCH EXISTING. <br />CONTRACTOR SHALL ENSURE RECEPTOR(S) AND DRAIN <br />LINE(S) SERVING CASE LINE-UP ARE FREE OF <br />OBSTRUCTIONS AND FUNCTION PROPERLY. WHERE <br />EXTENSIVE DAMAGE EXISTS AND/OR PROPER DRAINAGE <br />CANNOT BE OBTAINED COORDINATE WITH WALMART <br />MECHANICAL CONSTRUCTION MANAGER. <br />15.612 PROVIDE INTERMEDIATE SUCTION LINE TRAP IN WALL OR <br />VOID SPACE. INTERMEDIATE TRAP SHOULD BE PLACED AT <br />THE MIDPOINT OF ANY SUCTION LINE RISE WHICH EXCEEDS <br />16 FEET. <br />15.613 REPLACE EXISTING SUCTION RISER. REFER TO PIPING <br />SCHEDULE FOR SIZE. <br />15.618 ROUTE PIPING THROUGH PVC CHASE. REFERENCE FIXTURE <br />PLANS FOR SIZE AND PVC REFRIGERATION CHASE DETAIL. <br />15.624 ROUTE REFRIGERATION LINES ON TOP OF CASE FOR ALL <br />TOP FED CONNECTED CASES. SLOPE BACK TO <br />COMPRESSOR AT 1" PER 20'-0" OF RUN. REFER TO TOP FED <br />PIPING DETAIL. <br />15.625 ROUTE REFRIGERATION LINES IN BASE OF CASE FOR ALL <br />BOTTOM FED CONNECTED CASES. SLOPE BACK TO <br />COMPRESSOR AT 1" PER 20'-0" OF RUN. <br />15.630 REFRIGERATION CONTRACTOR SHALL FURNISH AND <br />INSTALL FULL PORT ISOLATION BALL VALVES AT TOP OF <br />RISER. <br />15.634 REFRIGERATION CONTRACTOR SHALL INSTALL <br />REFRIGERATION MANUFACTURER -FURNISHED LIQUID LINE <br />SOLENOID VALVE AND EVAPORATOR PRESSURE <br />REGULATOR IN A SERVICE ACCESSIBLE LOCATION ON TOP <br />OF CASE. CONTRACTOR SHALL FURNISH AND INSTALL FULL <br />PORT ISOLATION BALL VALVE IN A SERVICE ACCESSIBLE <br />LOCATION ON TOP OF CASE. INSTALL CONTROL WIRING <br />FROM VALVES BACK TO CASE OR RACK CONTROLLER. <br />REFER TO REFRIGERATION SUBMITTALS/SCHEDULES AND <br />BAS PLANS FOR EXACT REQUIREMENTS. REFER TO <br />SPECIFICATIONS FOR ASSET TAGGING REQUIREMENTS. <br />15.635 REFRIGERATION CONTRACTOR SHALL INSTALL <br />REFRIGERATION MANUFACTURER -FURNISHED LIQUID LINE <br />SOLENOID VALVE AND EVAPORATOR PRESSURE <br />REGULATOR IN A SERVICE ACCESSIBLE LOCATION INSIDE <br />CASE DRAIN PAN. CONTRACTOR SHALL FURNISH AND <br />INSTALL FULL PORT ISOLATION BALL VALVE IN A SERVICE <br />ACCESSIBLE LOCATION INSIDE CASE DRAIN PAN. INSTALL <br />CONTROL WIRING FROM VALVES BACK TO CASE OR RACK <br />CONTROLLER. REFER TO REFRIGERATION <br />SUBMITTALS/SCHEDULES AND BAS PLANS FOR EXACT <br />REQUIREMENTS. REFER TO SPECIFICATIONS FOR ASSET <br />TAGGING REQUIREMENTS. <br />PIPING SCHEDULE SYSTEM <br />B <br />PIPE <br />DESIGNATION <br />HORIZONTAL <br />SUCTION <br />(IN.) <br />VERTICAL <br />SUCTION RISER LIQUID <br />AS REQ'D (IN.) (IN.) <br />ESTIMATED <br />TOTAL LENGTH^^ <br />(FT ) <br />B1* <br />1 5/8 <br />1 1/8 **** <br />112 <br />156 <br />B2* <br />1 5/8 <br />1 1/8 ***" <br />1/2 <br />182 <br />B3 <br />1 1/8 <br />7/8 <br />1/2 <br />179 <br />B4* <br />7/8 <br />1/2 ***'" <br />1/2 <br />72 <br />B5* <br />1 1/8 <br />7/8 <br />1/2 <br />72 <br />136 <br />5/8 <br />1/2 <br />1/2 <br />160 <br />B7* <br />1 1/8 <br />7/8 <br />1/2 <br />71 <br />B8 <br />1 3/8 <br />1 1/8 <br />1/2 <br />120 <br />B9 <br />1 5/8 <br />1 5/8 A <br />5/8 <br />153 <br />B9a <br />1 3/8 <br />1 1/8 <br />1/2 <br />ETR <br />B9b <br />1 3/8 <br />1 1/8 <br />1/2 <br />ETR <br />B10* <br />1 318 <br />5/8 **** <br />1/2 <br />337 <br />B12* <br />1 1/8 <br />7/8 <br />112 <br />_ <br />158 <br />B 13 <br />5/8 <br />1/2 <br />1/2 <br />180 <br />^ RISER SIZE IS SHOWN EVEN WHERE A RISER IS NOT EXPECTED. THIS IS FOR <br />REFERENCE ONLY AND TO BE USED IN THE EVENT THAT A PIPING CONFLICT CAUSES <br />THE NEED FOR A RISER. IF RISER LENGTH EXCEEDS 4 FEET, IT MUST BE APPROVED <br />BY ENGINEER OF RECORD. <br />AA ESTIMATED TOTAL LENGTH INCLUDES HORIZONTAL AND VERTICAL PIPE SECTIONS. <br />THIS IS ONLY AN ESTIMATE AND ACTUAL LENGTH WILL VARY. <br />Updated: 6/26/2023 <br />NOTE: CONTENTS OF SCHEDULE CONTAINS INFORMATION DERIVED FROM OWNER'S <br />RECORD SCHEDULES. MANUFACTURER SUBMITTALS, CUTSHEETS, AND OWNER'S <br />DESIGN PARAMETERS AT THE TIME THE SCHEDULE WAS PREPARED. FIELD VERIFY <br />AS IT MAY NOT REFLECT EXISTING CONDITIONS. <br />PIPING SCHEDULE <br />SYSTEM <br />D <br />PIPE <br />DESIGNATION <br />HORIZONTAL <br />SUCTION <br />(IN.) <br />VERTICAL <br />SUCTION RISER <br />AS REQ'D (IN.) <br />LIQUID <br />(IN) <br />ESTIMATED <br />TOTAL LENGTH^'` <br />(FT.) <br />D 1 <br />1 5/8 <br />1 3/8 <br />7/8 <br />226 <br />D2 <br />1 5/8 <br />1 3/8 <br />7/8 <br />262 <br />D3 <br />1 1/8 <br />7/8 <br />1/2 <br />228 <br />D4 <br />7/8 <br />5/8 <br />1/2 <br />146 <br />D5 <br />1 1/8 <br />7/8 ^ <br />1/2 <br />112 <br />D5a <br />7/8 <br />5/8 <br />1/2 <br />ETR <br />D5b <br />7/8 <br />5/8 <br />1/2 <br />ETR <br />D6 <br />1 3/8 <br />1 1/8 ^ <br />5/8 <br />86 <br />D6a <br />1 1/8 <br />7/8 <br />1/2 <br />ETR <br />D6b <br />1 1/8 <br />7/8 <br />1/2 <br />ETR <br />7D* <br />1 518 <br />1 1/8 ^ <br />7/8 <br />153 ** <br />D7.1** <br />5/8 **** <br />1/2 "*"* <br />1/2 **** <br />60 ** <br />11)7.2** <br />5/8 "**" <br />1/2 "`*" <br />1/2 *** <br />95- <br />D7.3** <br />1 1/8 *** <br />7/8 **** <br />1/2 **** <br />105 ** <br />D9 <br />2 1/8 <br />1 5/8 A <br />7/8 <br />238 <br />D9a <br />1 3/8 <br />1 1/8 <br />1/2 <br />ETR <br />D9b <br />1 3/8 <br />1 1/8 <br />1/2 <br />ETR <br />D9c <br />1 3/8 <br />1 1/8 <br />1/2 <br />ETR <br />D 11 <br />2 1/8 <br />1 3/8 <br />7/8 <br />330 <br />D 12 <br />1 5/8 <br />1 118 <br />1 5/8 <br />304 <br />^ RISER SIZE IS SHOWN EVEN WHERE A RISER IS NOT EXPECTED. THIS IS FOR <br />REFERENCE ONLY AND TO BE USED IN THE EVENT THAT A PIPING CONFLICT CAUSES <br />THE NEED FOR A RISER. IF RISER LENGTH EXCEEDS 4 FEET, IT MUST BE APPROVED <br />BY ENGINEER OF RECORD. <br />AA ESTIMATED TOTAL LENGTH INCLUDES HORIZONTAL AND VERTICAL PIPE SECTIONS. <br />THIS IS ONLY AN ESTIMATE AND ACTUAL LENGTH WILL VARY. <br />Updated: 6/22/2023 <br />NOTE: CONTENTS OF SCHEDULE CONTAINS INFORMATION DERIVED FROM OWNER'S <br />RECORD SCHEDULES, MANUFACTURER SUBMITTALS, CUTSHEETS. AND OWNER'S <br />DESIGN PARAMETERS AT THE TIME THE SCHEDULE WAS PREPARED. FIELD VERIFY <br />AS IT MAY NOT REFLECT EXISTING CONDITIONS. <br />W <br />0 <br />w �o Iwo �wc� > <br />of <br />U) <br />w <br />O zwp dZUz <br />LL W�zF-OOZU7� <br />W <br />�F <br />o Fzu" Eul z�Fz <br />ui <br />a� LLw° <br />U- <br />�. F�¢ <br />U: <br />Z <br />�QOF=Cc) <br />U-i� <br />w0Q0 wLoaLO zompzz <br />p <br />Owui ¢ot¢=U00¢ <br />¢U¢Ow <br />�¢xw l W.2w-HoEE <br />�o=�°ate=7�z°mm� <br />Lwa- zFHOF <br />Q0W -D�-w <br />=coW c<5cc w9wwz= <br />� <br />171N C)0 U]d0 W �JX0'¢F <br />Z <br />0 <br />_ <br />OCD0 <br />N <br />V J <br />W <br />~ <br />W <br />W <br />CEO <br />" un <br />rr <br />cn <br />W <br />Z <br />�ma <br />UZoN_o <br />Q w <br />> co < <br />w <br />o <br />Z <br />E LL <br />Z <br />o>_N <br />I- <br />Z - <br />0Xo <br />woo <br />N <br />o�w <br />Q <br />UJ <br />Z <br />2 <br />ZW� <br />W <br />Ncn� <br />L'Lu X <br />I- <br />w <br />,, i <br />ZLu <br />� w <br />� M <br />U) <br />co m <br />co <br />O <br />O <br />m <br />O <br />00 J <br />� C= 1 U <br />00 <br />o j O <br />J O <br />c6 a <br />O N <br />= OLo <br />o <br />L1 z I o <br />LLI o <br />o V <br />OC <br />I <br />0 c <br />CL <br />W <br />N w <br />w <br />m <br />z <br />m <br />O <br />ISSUE BLOCK <br />CHECKED BY: KK/JPL <br />DRAWN BY: MJS <br />DOCUMENT DATE: 06/30/23 <br />THIS ITEM HAS BEEN <br />ELECTRONICALLY SIGNED <br />AND SEALED BY MICHAEL <br />DEAN SCHAEFER ON THE <br />DATE LISTED BELOW <br />USING A DIGITAL <br />SIGNATURE. <br />PRINTED COPIES OF THIS <br />DOCUMENT ARE NOT <br />CONSIDERED SIGNED AND <br />SEALED AND THE <br />SIGNATURE MUST BE <br />VERIFIED ON ANY <br />ELECTRONIC COPIES. <br />MICHAEL D. SCHAEFER <br />LICENSE # 89591 <br />D. `f� <br />` �*tf i <br />NO. 89591 <br />* . <br />.0-. <br />0* STATE OF <br />RIID <br />06/30/2023 <br />REAR <br />REFRIGERATION <br />PLAN <br />w <br />w <br />w <br />U <br />0 <br />J <br />w <br />Q <br />_ <br />U <br />REAR REFRIGERATION PLAN <br />1 1/8" = T-0" - - - <br />EXISTING CONDITIONS WERE TAKEN FROM <br />ORIGINAL DRAWINGS AND MAY NOT REFLECT <br />EXACT "AS -BUILT" CONDITIONS. CONTRACTOR <br />SHALL FIELD VERIFY ALL EXISTING CONDITIONS <br />PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR <br />SHALL CAREFULLY COORDINATE NEW WORK AND <br />DEMOLITION WITH ALL OTHER DISCIPLINES AND <br />EXISTING CONDITIONS, <br />EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING <br />A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND <br />SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE <br />TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES <br />NOT RELIEVE THE RESPONSIBILITY OF PERFORMING <br />THE WORK PROPERLY. NO ADDITIONAL <br />COMPENSATION SHALL BE ALLOWED BECAUSE OF <br />CONDITIONS THAT OCCUR DUE TO FAILURE TO <br />FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. <br />SHEET- <br />R1.1 <br />