VENDOR CONTACT LIST
<br />CONTRACTOR IS RESPONSIBLE, UPON AWARD, TO CONTACT AND VERIFY ALL DELIVERY DATES/TIMES WITH
<br />EVERY VENDOR LISTED BELOW. THIS IS UNIQUE TO CAPITAL EXPENDITURES PROJECTS. DATE CHANGE
<br />REQUESTS MUST BE SENT TO BOTH sharon.ha amftol-marLcom AND duane.davisOwal-martcom
<br />VENDOR PHONE CONTACT
<br />HILL/PHOENIX (REFRIG. SYSTEMS) 800-518-6630 Ext 3025 JOEL CRANE
<br />KYSOR//WARREN 888-899-9184 TOM BOLTON
<br />THE MARCO CO. 800-356-2848 AUTUMN ARMSTRONG
<br />NOVAR 800-341-7795 CAROL DEATHERAGE
<br />PRODEW 770-420-3060 ISHERRY WILSON
<br />WAL-MART CONTACT LIST
<br />CONTACT PHONE AND/OR EMAIL TITLE
<br />WAL-MART SUPERCENTER #0706 (813) 782-1957 STORE
<br />KOENIG, JACQUE (479) 633-5814 CONSTRUCTION MANAGER
<br />jacque.koenig@wol-mcirt.com
<br />PERMITTING CONTACT LIST
<br />UPON NOTICATION OF CONTRACT AWARD, CONTRACTOR MUST CONTACT ENGINEERING FIRM'S PERMITTING
<br />SPECIALIST REGARDING BUILDING PERMIT STATUS. CONTRACTOR SHALL NOT CONTACT AHJ PRIOR TO
<br />CONTACTING PERMITTING SPECIALIST. IN SOME JURISDICTIONS IT MAY BE NECESSARY FOR THE CONTRACTOR
<br />TO DELIVER PERMIT PLAN SETS AND PAY PERMIT FEES TO THE AHJ IN ORDER TO RECEIVE CONSTRUCTION
<br />PERMITS. UPON REVIEW OF PROJECT SCOPE THE AHJ MAY REQUIRE THE CONTRACTOR TO SUBMIT FOR
<br />ADDITIONAL REVIEW TO ADDITIONAL LOCAL. COUNTY, STATE, AND/OR FEDERAL AUTHORITIES WHICH MAY
<br />NOT BE LOCATED WITHIN THE PROJECT AREA.
<br />CONTACT EMAIL TITLE
<br />JOANNA HAILE joanna.haile@hei-eng.com PERMITTING SPECIALIST
<br />LIZ BROWN Iiz.brown@hei-eng.com PERMITTING COORDINATOR
<br />VER. 6.2.05
<br />SCOPE OF WORK SUMMARY
<br />NOTE: THE INTENT OF THIS SUMMARY IS TO ASSIST
<br />VENDORS IN IDENTIFYING EQUIPMENT NEEDS. IT IS
<br />NOT INTENDED FOR USE BY CONTRACTOR TO CAPTURE
<br />ALL SCOPE ISSUES. REFER TO PLANS AND
<br />SPECIFICATIONS (WHERE APPLICABLE) FOR ADDITIONAL
<br />INFORMATION.
<br />REPLACE MULTI -DECK PRODUCE CASES
<br />REPLACE PRODUCE MISTING SYSTEM
<br />CODE COMPLIANCE
<br />ALL DRAWINGS ARE IN COMPLIANCE WITH THE
<br />FOLLOWING CODES:
<br />THE FLORIDA BUILDING CODE, 2010 EDITION (2009
<br />IBC)
<br />THE NATIONAL ELECTRICAL CODE, 2008 EDITION
<br />THE FLORIDA BUILDING CODE, 2010 MECHANICAL
<br />EDITION (2009 IMC)
<br />THE FLORIDA BUILDING CODE, 2010 PLUMBING
<br />EDITION (2009 IPC)
<br />USE AND OCCUPANCY GROUP: M
<br />CONSTRUCTION TYPE: V
<br />BUILDING AREA: UNCHANGED
<br />OCCUPANT LOAD: UNCHANGED
<br />FIRE PROTECTION: YES
<br />Rjainiart:;:
<br />REFRIGERATION CAP=X PROJECT
<br />FIXTURE
<br />T1 TITLE SHEET
<br />F1 FIXTURE PLANS AND DETAIL
<br />USMV=005779
<br />ZEPHYRHILL . FL
<br />STORE #0706
<br />NDEX OF DRAWINGS
<br />PLUMBING
<br />P1 PLUMBING PLAN AND SCHEDULE
<br />REFRIGERATION
<br />R1 REFRIGERATION PLAN AND DETAIL
<br />R2 REFRIGERATION LEGEND
<br />ELECTRICAL
<br />REM1 REFRIGERATION ENERGY MANAGEMENT PLAN
<br />AND DETAIL
<br />RE1 REFRIGERATION ELECTRICAL PLAN AND
<br />SCHEDULE
<br />1 2 3 4 5 6 7 8 9 10 11 12
<br />I I I i I
<br />I II I I I I i
<br />� KEY PLAN
<br />15.3
<br />Q
<br />15
<br />J
<br />,I
<br />DEMOLITION REQUIREMENTS
<br />1. ALL DEMOLITION SHALL BE CARRIED OUT IN A
<br />SAFE MANNER AND IN STRICT ACCORDANCE
<br />WITH OSHA REGULATIONS.
<br />2. THE CONTRACTOR SHALL FIELD VERIFY THE
<br />EXTENT OF DEMOLITION. THE WORK INCLUDES,
<br />BUT IS NOT LIMITED TO, THE DEMOLITION AND
<br />REMOVAL OF WALLS, DOORS, FLOORS, AND
<br />ELECTRICAL ITEMS INCLUDING CONDUITS AS
<br />SHOWN ON DRAWING OR AS REQUIRED FOR
<br />THE INSTALLATION OF NEW WORK FOR A
<br />COMPLETE JOB.
<br />3. WHEN UTILITIES ARE REMOVED, CAP AND SEAL
<br />A MINIMUM OF 8" BELOW FINISH FLOOR OR A
<br />MINIMUM OF 6" ABOVE FINISHED CEILING. SHOW
<br />ALL ABANDONED AND CAPPED UTILITIES ON
<br />AS-BUILTS, DRAWINGS, AND RECORDED
<br />DOCUMENTS.
<br />4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO
<br />PROVIDE ADEQUATE SHORING, BRACING, AND
<br />SUPPORT SYSTEMS AND TO KEEP THE EXISTING
<br />STRUCTURE INTACT AND IN A SAFE CONDITION
<br />DURING THE REMOVAL OF STRUCTURAL ITEMS
<br />AND NEW CONSTRUCTION.
<br />5. THE CONTRACTOR SHALL RETAIN A REGISTERED
<br />PROFESSIONAL ENGINEER TO DESIGN THE
<br />SHORING AND SPECIFY DEMOLITION
<br />PROCEDURES.
<br />6. IT IS THE CONTRACTOR'S RESPONSIBILITY FOR
<br />MEANS AND METHODS OF DEMOLITION AND NEW
<br />CONSTRUCTION. PRIOR TO THE EXCAVATION OF
<br />FOUNDATIONS ADJACENT TO THE EXISTING
<br />STRUCTURE, PROVIDE ADEQUATE SUPPORT FOR
<br />THE SUB -BASE TO PREVENT UNDERMINING.
<br />7. DURING DEMOLITION AND RECONSTRUCTION, THE
<br />CONTRACTOR SHALL COORDINATE WITH THE
<br />WALMART MECHANICAL SERVICES CONSTRUCTION
<br />MANAGER ANY REQUIRED SAFETY BARRIERS OR
<br />BARRICADES. REFER TO THE WALMART
<br />MECHANICAL SERVICES CONSTRUCTION MANAGER
<br />FOR PHASING AND SCHEDULING DEMOLITION
<br />AND NEW CONSTRUCTION.
<br />8. IMMEDIATE SALVAGE/LEGAL DISPOSAL OF ALL
<br />DECOMMISSIONED EQUIPMENT SHALL BE THE
<br />RESPONSIBILITY OF THE CONTRACTOR. AT THE
<br />DISCRETION OF THE WALMART MECHANICAL
<br />SERVICES CONSTRUCTION MANAGER WALMART
<br />SHALL RETAIN THE OPTION TO OCCASIONALLY
<br />SALVAGE EMS EQUIPMENT, VARIABLE FREQUENCY
<br />DRIVE EQUIPMENT, COMPRESSORS, WALK-IN
<br />DOORS, EVAPORATORS, REFRIGERATED CASES,
<br />ETC. FROM REFRIGERATION EQUIPMENT TO BE
<br />REPLACED DURING THE CAP-X PROJECT. THE
<br />CONTRACTOR SHALL COORDINATE WITH THE
<br />WALMART MECHANICAL SERVICES CONSTRUCTION
<br />MANAGER ALL ITEMS TO BE RETAINED BY
<br />WALMART PRIOR TO REMOVAL OF THE
<br />EQUIPMENT SHOWN ON THE DEMOLITION PLANS.
<br />THE CONTRACTOR SHALL CAREFULLY REMOVE
<br />ANY ITEMS TO BE RETAINED BY WALMART AND
<br />DELIVER THOSE ITEMS, READY FOR SHIPMENT,
<br />TO THE WALMART MECHANICAL SERVICES
<br />CONSTRUCTION MANAGER. ALL REMOVED ITEMS
<br />NOT ALLOCATED FOR SALVAGE BY WALMART
<br />SHALL BE THE CONTRACTOR'S RESPONSIBILITY
<br />TO IMMEDIATELY REMOVE FROM THE JOB SITE
<br />AND ARRANGE DISPOSAL IN ACCORDANCE WITH
<br />LOCAL CODES.
<br />GENERAL REQUIREMENTS
<br />1. THE PLANS SHOWN THROUGHOUT THESE DOCUMENTS ARE BASED
<br />ON LIMITED INFORMATION PROVIDED BY WALMART; THE DESIGN
<br />PROFESSIONAL HAS NOT SURVEYED THIS STORE AND CANNOT BE
<br />HELD RESPONSIBLE FOR THE ACCURACY OF THE EXISTING
<br />CONDITIONS ILLUSTRATED.
<br />2. ALL SUBCONTRACTORS ARE TO INSPECT THE STORE PRIOR TO
<br />COMMENCING WITH ANY WORK AND NOTIFY THE WALMART
<br />MECHANICAL SERVICES CONSTRUCTION MANAGER OF ANY
<br />DISCREPANCIES BETWEEN THESE PLANS AND THE EXISTING
<br />CONDITIONS.
<br />3. ALL WORK SHALL BE DONE IN A SAFE AND WORKMANLIKE
<br />MANNER AND IN STRICT ACCORDANCE WITH THE LOCAL GOVERNING
<br />BUILDING CODE, NATIONAL ELECTRIC CODE, ADA-ADAAGS, AND ALL
<br />APPLICABLE CODES, REGULATIONS AND ORDINANCES HAVING
<br />JURISDICTION.
<br />4. EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH
<br />KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR
<br />RELATED FIELD. THE FAILURE TO ACQUAINT HIMSELF WITH THIS
<br />KNOWLEDGE DOES NOT RELIEVE HIM OF ANY RESPONSIBILITY FOR
<br />PERFORMING HIS WORK PROPERLY. NO ADDITIONAL
<br />COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT
<br />OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS
<br />KNOWLEDGE.
<br />5. THE EXISTING BUILDING SHALL BE PROTECTED FROM MOISTURE,
<br />DUST AND DEBRIS. INSTALL DUST PARTITIONS OR DRAPES AS
<br />SHOWN OR AS REQUIRED TO KEEP DUST AND MOISTURE FROM
<br />WALMART PREMISES.
<br />6. ANY DAMAGE TO WALMART PROPERTY WHICH OCCURS DURING THE
<br />PROCESS OF CONSTRUCTION SHALL BE REPAIRED AT NO
<br />ADDITIONAL COST TO WALMART; THIS INCLUDES ALL MERCHANDISE.
<br />CONTRACTOR SHALL PAY WALMART THE COST FOR ALL DAMAGED
<br />MERCHANDISE.
<br />7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECEIVING,
<br />HANDLING, AND STORAGE OF OWNER FURNISHED EQUIPMENT.
<br />CONTRACTOR SHALL COORDINATE DELIVERY DATE CHANGES WITH
<br />WALMART REFRIGERATION ADMINISTRATOR. CONTRACTOR SHALL
<br />PROVIDE EITHER ON -SITE STORAGE CONTAINERS AND/OR OFF -SITE
<br />STORAGE FOR OWNER FURNISHED EQUIPMENT AND ANY OTHER
<br />CONSTRUCTION ITEMS. CONTRACTOR SHALL COORDINATE LOCATION
<br />OF ANY ON -SITE STORAGE CONTAINERS WITH STORE MANAGEMENT
<br />PRIOR TO PLACEMENT. CONTRACTOR IS RESPONSIBLE FOR
<br />SECURITY AND CONDITION OF OWNER FURNISHED EQUIPMENT KEPT
<br />IN STORAGE AND SHALL PROVIDE PERSONNEL TO RECEIVE AND
<br />MOVE EQUIPMENT.
<br />8. THE CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN THE
<br />INTEGRITY OF ALL EXISTING SECURITY SYSTEMS. THE CONTRACTOR
<br />SHALL OBTAIN PERMISSION FROM THE WALMART STORE MANAGER
<br />PRIOR TO THE MODIFICATION OF ANY EXISTING SECURITY SYSTEM
<br />FOR THE OPENING (DEMOLITION) OF ANY EXTERIOR WALL.
<br />9. THE CONTRACTOR SHALL KEEP THIS AREA CLEAN AND FREE OF
<br />DEBRIS AND IS TO REMOVE ALL TRASH AND DEBRIS FROM THE
<br />CONSTRUCTION AREA DAILY. NO FLAMMABLE MATERIALS OR LIQUIDS
<br />MAY BE STORED IN THE EXISTING BUILDING OR IN THE NEW
<br />ADDITION.
<br />10. REMOVE ANY EXISTING ITEMS, SERVICES, FINISHES/OR SURFACES
<br />AS REQUIRED FOR THE INSTALLATION OF NEW CONSTRUCTION.
<br />11. PROVIDE FURRING FOR CONDUITS AND PIPING, SHOWN OR NOT,
<br />AND FINISH OUT FURRING TO MATCH ADJACENT EXISTING FINISHES.
<br />12. REPAIR, REROUTE, AND EXTEND ALL SERVICES, PIPING, CONDUIT
<br />OF EXISTING ITEMS AND EQUIPMENT AS REQUIRED DURING THE
<br />CONSTRUCTION PROCESS FOR THE COMPLETE INSTALLATION AND
<br />OPERATION OF NEW EQUIPMENT. THIS INCLUDES ALL ITEMS
<br />SHOWN OR NOT SHOWN ON THE DRAWINGS.
<br />13. RESET EXISTING EQUIPMENT OR RELATED ITEMS AS REQUIRED FOR
<br />PROPER OPERATION. WHERE EXISTING FINISHES ARE TO REMAIN,
<br />CLEAN, REPAIR, PATCH, AND/OR RE -PAINT AS NECESSARY TO
<br />BLEND WITH ADJACENT SURFACES.
<br />14. CONSULT WALMART MECHANICAL SERVICES CONSTRUCTION MANAGER
<br />FOR COMPLETE APPLICABLE SCOPE OF WORK. THE CONTRACTOR
<br />SHALL MAINTAIN THE REQUIRED NUMBER OF EXITS WITHIN THE
<br />STORE. MAINTAIN EXIT SIGNS AND EMERGENCY LIGHTING AT ALL
<br />TIMES, AS REQUIRED BY THE LOCAL BUILDING OFFICIAL.
<br />15. WALMART SHALL OCCUPY THE BUILDING DURING CONSTRUCTION.
<br />THE CONTRACTOR SHALL COORDINATE WITH WALMART STORE
<br />MANAGER AND THE WALMART MECHANICAL SERVICES CONSTRUCTION
<br />MANAGER ALL CONSTRUCTION PROCEDURES WHICH WILL INTERFERE
<br />WITH THE NORMAL DAILY OPERATIONS OF THE STORE.
<br />16. THE CONTRACTOR SHALL OBTAIN PERMISSION FROM WALMART FOR
<br />ALL INTERRUPTIONS OF UTILITY SERVICES TO THE EXISTING
<br />BUILDING PRIOR TO THE INTERRUPTION. ACCIDENTAL
<br />INTERRUPTIONS SHALL BE REMEDIED IMMEDIATELY WITH
<br />APPROPRIATE FORCES.
<br />17. ALL CAP-X REFRIGERATION PROJECTS ARE TO BE BID AS NIGHT
<br />WORK. THE CONTRACTOR IS TO ASSUME ALL WORK IS TO BE
<br />CONDUCTED ONLY AS OVERNIGHT WORK. SOME WORK MAY BE
<br />ALLOWED DURING REGULAR WORKING HOURS TO FACILITATE
<br />COMPLETION SCHEDULES. WORK WILL ONLY BE PERMITTED DURING
<br />REGULAR WORKING HOURS WITH THE STORE MANAGEMENT'S
<br />AND/OR MECHANICAL SERVICES CONSTRUCTION MANAGER'S
<br />PERMISSION. WORK TO BE PERFORMED ON THE EXTERIOR OF THE
<br />BUILDING, ROOFTOP, BACK ROOM, BEHIND DUST WALLS, AND
<br />WORK THAT DOES NOT SIGNIFICANTLY INTERFERE WITH STORE
<br />OPERATIONS MAY BE ALLOWED WITH THE STORE MANAGEMENT'S
<br />AND/OR MECHANICAL SERVICES CONSTRUCTION MANAGER'S
<br />PERMISSION. THE CONTRACTOR SHALL PAY FOR ADDITIONAL
<br />SECURITY PERSONNEL TO SUPERVISE ACCESS TO THE BUILDING AS
<br />REQUIRED BY STORE MANAGEMENT. CONTRACTOR SHALL PROVIDE
<br />ALL SAFETY EQUIPMENT AND EXTERIOR LIGHTING AS REQUIRED TO
<br />MAINTAIN A SAFE WORKING ENVIRONMENT FOR WORK REQUIRED AT
<br />NIGHT. THE CONTRACTOR SHALL PREPARE, AND DELIVER TO STORE
<br />MANAGEMENT, A SCHEDULE OF WORK FOR THE ENTIRE PROJECT
<br />SCOPE OF WORK. THIS SCHEDULE WILL INCLUDE ALL PHASES OF
<br />WORK TO BE PERFORMED AND SHALL LIST THE START AND
<br />COMPLETION TIMES FOR EACH PHASE OF WORK. THE CONTRACTOR
<br />SHALL UPDATE THIS SCHEDULE WEEKLY AS CONSTRUCTION
<br />PROGRESSES.
<br />NOTE TO BIDDING CONTRACTORS
<br />THESE PLANS ARE TYPICALLY ISSUED FOR BID AS REDUCED "1 /2 (HALF) SIZE" DOCUMENTS.
<br />SCALES SHOWN APPLY TO ORIGINAL "FULL SIZE" DOCUMENTS ONLY. DO NOT SCALE
<br />DRAWINGS, FIELD VERIFY ALL DIMENSIONS.
<br />EXISTING CONDITIONS WERE TAKEN EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING
<br />FROM ORIGINAL DRAWINGS AND MAY A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND
<br />NOT REFLECT EXACT "AS -BUILT" SPECIFICATIONS IN THEIR RELATED FIELD. THE
<br />CONDITIONS. CONTRACTOR SHALL FAILURE TO ACQUAINT HIMSELF WITH THIS
<br />FIELD VERIFY ALL EXISTING CONDITIONS KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY
<br />NOTE: ALL WORK ON THIS SHEET IS PRIOR TO SUBMITTING FINAL BIDS. OF PERFORMING HIS WORK PROPERLY. NO
<br />TO BE COMPLETED BY WALMART CONTRACTOR SHALL CAREFULLY ADDITIONAL COMPENSATION SHALL BE ALLOWED
<br />APPROVED CONTRACTOR. COORDINATE NEW WORK AND BECAUSE OF CONDITIONS THAT OCCUR DUE
<br />DEMOLITION WITH ALL OTHER TO FAILURE TO FAMILIARIZE WORKERS WITH THIS
<br />DISCIPLINES AND EXISTING CONDITIONS. I KNOWLEDGE.
<br />ZN
<br />o� o
<br />NW � l
<br />�W
<br />�c � V mm
<br />WZ
<br />C om�
<br />Zt9 WY41
<br />oWo
<br />tt�Jao 'd
<br />WZ s
<br />=W 00 �w
<br />0
<br />m v
<br />P �
<br />J
<br />W
<br />}
<br />Ld O J O w O Z
<br />21tt Z02"T'w2
<br />W o>wrz-z¢¢aQsIwo¢
<br />¢ N § N OO N O tn= Z¢ON3
<br />0 wF-\w2 Jw�F-<520
<br />OJ
<br />0H�5m 5,V)ooNQ�
<br />0 3�Q0B�w�Za",o
<br />Ld ~ C.7�00J��odU� mzr
<br />¢a ¢� z�cr
<br />Z LLJ0��
<br />��nZ ��w wUM W ZUZ
<br />0¢ OU wNWWW��?���
<br />w�w000<
<br />=z_Now¢w�a2:O w
<br />-oL� 0Jaaawoam
<br />ISSUE BLOCK