Laserfiche WebLink
VENDOR CONTACT LIST <br />CONTRACTOR IS RESPONSIBLE, UPON AWARD, TO CONTACT AND VERIFY ALL DELIVERY DATES/TIMES WITH <br />EVERY VENDOR LISTED BELOW. THIS IS UNIQUE TO CAPITAL EXPENDITURES PROJECTS. DATE CHANGE <br />REQUESTS MUST BE SENT TO BOTH sharon.ha amftol-marLcom AND duane.davisOwal-martcom <br />VENDOR PHONE CONTACT <br />HILL/PHOENIX (REFRIG. SYSTEMS) 800-518-6630 Ext 3025 JOEL CRANE <br />KYSOR//WARREN 888-899-9184 TOM BOLTON <br />THE MARCO CO. 800-356-2848 AUTUMN ARMSTRONG <br />NOVAR 800-341-7795 CAROL DEATHERAGE <br />PRODEW 770-420-3060 ISHERRY WILSON <br />WAL-MART CONTACT LIST <br />CONTACT PHONE AND/OR EMAIL TITLE <br />WAL-MART SUPERCENTER #0706 (813) 782-1957 STORE <br />KOENIG, JACQUE (479) 633-5814 CONSTRUCTION MANAGER <br />jacque.koenig@wol-mcirt.com <br />PERMITTING CONTACT LIST <br />UPON NOTICATION OF CONTRACT AWARD, CONTRACTOR MUST CONTACT ENGINEERING FIRM'S PERMITTING <br />SPECIALIST REGARDING BUILDING PERMIT STATUS. CONTRACTOR SHALL NOT CONTACT AHJ PRIOR TO <br />CONTACTING PERMITTING SPECIALIST. IN SOME JURISDICTIONS IT MAY BE NECESSARY FOR THE CONTRACTOR <br />TO DELIVER PERMIT PLAN SETS AND PAY PERMIT FEES TO THE AHJ IN ORDER TO RECEIVE CONSTRUCTION <br />PERMITS. UPON REVIEW OF PROJECT SCOPE THE AHJ MAY REQUIRE THE CONTRACTOR TO SUBMIT FOR <br />ADDITIONAL REVIEW TO ADDITIONAL LOCAL. COUNTY, STATE, AND/OR FEDERAL AUTHORITIES WHICH MAY <br />NOT BE LOCATED WITHIN THE PROJECT AREA. <br />CONTACT EMAIL TITLE <br />JOANNA HAILE joanna.haile@hei-eng.com PERMITTING SPECIALIST <br />LIZ BROWN Iiz.brown@hei-eng.com PERMITTING COORDINATOR <br />VER. 6.2.05 <br />SCOPE OF WORK SUMMARY <br />NOTE: THE INTENT OF THIS SUMMARY IS TO ASSIST <br />VENDORS IN IDENTIFYING EQUIPMENT NEEDS. IT IS <br />NOT INTENDED FOR USE BY CONTRACTOR TO CAPTURE <br />ALL SCOPE ISSUES. REFER TO PLANS AND <br />SPECIFICATIONS (WHERE APPLICABLE) FOR ADDITIONAL <br />INFORMATION. <br />REPLACE MULTI -DECK PRODUCE CASES <br />REPLACE PRODUCE MISTING SYSTEM <br />CODE COMPLIANCE <br />ALL DRAWINGS ARE IN COMPLIANCE WITH THE <br />FOLLOWING CODES: <br />THE FLORIDA BUILDING CODE, 2010 EDITION (2009 <br />IBC) <br />THE NATIONAL ELECTRICAL CODE, 2008 EDITION <br />THE FLORIDA BUILDING CODE, 2010 MECHANICAL <br />EDITION (2009 IMC) <br />THE FLORIDA BUILDING CODE, 2010 PLUMBING <br />EDITION (2009 IPC) <br />USE AND OCCUPANCY GROUP: M <br />CONSTRUCTION TYPE: V <br />BUILDING AREA: UNCHANGED <br />OCCUPANT LOAD: UNCHANGED <br />FIRE PROTECTION: YES <br />Rjainiart:;: <br />REFRIGERATION CAP=X PROJECT <br />FIXTURE <br />T1 TITLE SHEET <br />F1 FIXTURE PLANS AND DETAIL <br />USMV=005779 <br />ZEPHYRHILL . FL <br />STORE #0706 <br />NDEX OF DRAWINGS <br />PLUMBING <br />P1 PLUMBING PLAN AND SCHEDULE <br />REFRIGERATION <br />R1 REFRIGERATION PLAN AND DETAIL <br />R2 REFRIGERATION LEGEND <br />ELECTRICAL <br />REM1 REFRIGERATION ENERGY MANAGEMENT PLAN <br />AND DETAIL <br />RE1 REFRIGERATION ELECTRICAL PLAN AND <br />SCHEDULE <br />1 2 3 4 5 6 7 8 9 10 11 12 <br />I I I i I <br />I II I I I I i <br />� KEY PLAN <br />15.3 <br />Q <br />15 <br />J <br />,I <br />DEMOLITION REQUIREMENTS <br />1. ALL DEMOLITION SHALL BE CARRIED OUT IN A <br />SAFE MANNER AND IN STRICT ACCORDANCE <br />WITH OSHA REGULATIONS. <br />2. THE CONTRACTOR SHALL FIELD VERIFY THE <br />EXTENT OF DEMOLITION. THE WORK INCLUDES, <br />BUT IS NOT LIMITED TO, THE DEMOLITION AND <br />REMOVAL OF WALLS, DOORS, FLOORS, AND <br />ELECTRICAL ITEMS INCLUDING CONDUITS AS <br />SHOWN ON DRAWING OR AS REQUIRED FOR <br />THE INSTALLATION OF NEW WORK FOR A <br />COMPLETE JOB. <br />3. WHEN UTILITIES ARE REMOVED, CAP AND SEAL <br />A MINIMUM OF 8" BELOW FINISH FLOOR OR A <br />MINIMUM OF 6" ABOVE FINISHED CEILING. SHOW <br />ALL ABANDONED AND CAPPED UTILITIES ON <br />AS-BUILTS, DRAWINGS, AND RECORDED <br />DOCUMENTS. <br />4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO <br />PROVIDE ADEQUATE SHORING, BRACING, AND <br />SUPPORT SYSTEMS AND TO KEEP THE EXISTING <br />STRUCTURE INTACT AND IN A SAFE CONDITION <br />DURING THE REMOVAL OF STRUCTURAL ITEMS <br />AND NEW CONSTRUCTION. <br />5. THE CONTRACTOR SHALL RETAIN A REGISTERED <br />PROFESSIONAL ENGINEER TO DESIGN THE <br />SHORING AND SPECIFY DEMOLITION <br />PROCEDURES. <br />6. IT IS THE CONTRACTOR'S RESPONSIBILITY FOR <br />MEANS AND METHODS OF DEMOLITION AND NEW <br />CONSTRUCTION. PRIOR TO THE EXCAVATION OF <br />FOUNDATIONS ADJACENT TO THE EXISTING <br />STRUCTURE, PROVIDE ADEQUATE SUPPORT FOR <br />THE SUB -BASE TO PREVENT UNDERMINING. <br />7. DURING DEMOLITION AND RECONSTRUCTION, THE <br />CONTRACTOR SHALL COORDINATE WITH THE <br />WALMART MECHANICAL SERVICES CONSTRUCTION <br />MANAGER ANY REQUIRED SAFETY BARRIERS OR <br />BARRICADES. REFER TO THE WALMART <br />MECHANICAL SERVICES CONSTRUCTION MANAGER <br />FOR PHASING AND SCHEDULING DEMOLITION <br />AND NEW CONSTRUCTION. <br />8. IMMEDIATE SALVAGE/LEGAL DISPOSAL OF ALL <br />DECOMMISSIONED EQUIPMENT SHALL BE THE <br />RESPONSIBILITY OF THE CONTRACTOR. AT THE <br />DISCRETION OF THE WALMART MECHANICAL <br />SERVICES CONSTRUCTION MANAGER WALMART <br />SHALL RETAIN THE OPTION TO OCCASIONALLY <br />SALVAGE EMS EQUIPMENT, VARIABLE FREQUENCY <br />DRIVE EQUIPMENT, COMPRESSORS, WALK-IN <br />DOORS, EVAPORATORS, REFRIGERATED CASES, <br />ETC. FROM REFRIGERATION EQUIPMENT TO BE <br />REPLACED DURING THE CAP-X PROJECT. THE <br />CONTRACTOR SHALL COORDINATE WITH THE <br />WALMART MECHANICAL SERVICES CONSTRUCTION <br />MANAGER ALL ITEMS TO BE RETAINED BY <br />WALMART PRIOR TO REMOVAL OF THE <br />EQUIPMENT SHOWN ON THE DEMOLITION PLANS. <br />THE CONTRACTOR SHALL CAREFULLY REMOVE <br />ANY ITEMS TO BE RETAINED BY WALMART AND <br />DELIVER THOSE ITEMS, READY FOR SHIPMENT, <br />TO THE WALMART MECHANICAL SERVICES <br />CONSTRUCTION MANAGER. ALL REMOVED ITEMS <br />NOT ALLOCATED FOR SALVAGE BY WALMART <br />SHALL BE THE CONTRACTOR'S RESPONSIBILITY <br />TO IMMEDIATELY REMOVE FROM THE JOB SITE <br />AND ARRANGE DISPOSAL IN ACCORDANCE WITH <br />LOCAL CODES. <br />GENERAL REQUIREMENTS <br />1. THE PLANS SHOWN THROUGHOUT THESE DOCUMENTS ARE BASED <br />ON LIMITED INFORMATION PROVIDED BY WALMART; THE DESIGN <br />PROFESSIONAL HAS NOT SURVEYED THIS STORE AND CANNOT BE <br />HELD RESPONSIBLE FOR THE ACCURACY OF THE EXISTING <br />CONDITIONS ILLUSTRATED. <br />2. ALL SUBCONTRACTORS ARE TO INSPECT THE STORE PRIOR TO <br />COMMENCING WITH ANY WORK AND NOTIFY THE WALMART <br />MECHANICAL SERVICES CONSTRUCTION MANAGER OF ANY <br />DISCREPANCIES BETWEEN THESE PLANS AND THE EXISTING <br />CONDITIONS. <br />3. ALL WORK SHALL BE DONE IN A SAFE AND WORKMANLIKE <br />MANNER AND IN STRICT ACCORDANCE WITH THE LOCAL GOVERNING <br />BUILDING CODE, NATIONAL ELECTRIC CODE, ADA-ADAAGS, AND ALL <br />APPLICABLE CODES, REGULATIONS AND ORDINANCES HAVING <br />JURISDICTION. <br />4. EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH <br />KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR <br />RELATED FIELD. THE FAILURE TO ACQUAINT HIMSELF WITH THIS <br />KNOWLEDGE DOES NOT RELIEVE HIM OF ANY RESPONSIBILITY FOR <br />PERFORMING HIS WORK PROPERLY. NO ADDITIONAL <br />COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT <br />OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS <br />KNOWLEDGE. <br />5. THE EXISTING BUILDING SHALL BE PROTECTED FROM MOISTURE, <br />DUST AND DEBRIS. INSTALL DUST PARTITIONS OR DRAPES AS <br />SHOWN OR AS REQUIRED TO KEEP DUST AND MOISTURE FROM <br />WALMART PREMISES. <br />6. ANY DAMAGE TO WALMART PROPERTY WHICH OCCURS DURING THE <br />PROCESS OF CONSTRUCTION SHALL BE REPAIRED AT NO <br />ADDITIONAL COST TO WALMART; THIS INCLUDES ALL MERCHANDISE. <br />CONTRACTOR SHALL PAY WALMART THE COST FOR ALL DAMAGED <br />MERCHANDISE. <br />7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECEIVING, <br />HANDLING, AND STORAGE OF OWNER FURNISHED EQUIPMENT. <br />CONTRACTOR SHALL COORDINATE DELIVERY DATE CHANGES WITH <br />WALMART REFRIGERATION ADMINISTRATOR. CONTRACTOR SHALL <br />PROVIDE EITHER ON -SITE STORAGE CONTAINERS AND/OR OFF -SITE <br />STORAGE FOR OWNER FURNISHED EQUIPMENT AND ANY OTHER <br />CONSTRUCTION ITEMS. CONTRACTOR SHALL COORDINATE LOCATION <br />OF ANY ON -SITE STORAGE CONTAINERS WITH STORE MANAGEMENT <br />PRIOR TO PLACEMENT. CONTRACTOR IS RESPONSIBLE FOR <br />SECURITY AND CONDITION OF OWNER FURNISHED EQUIPMENT KEPT <br />IN STORAGE AND SHALL PROVIDE PERSONNEL TO RECEIVE AND <br />MOVE EQUIPMENT. <br />8. THE CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN THE <br />INTEGRITY OF ALL EXISTING SECURITY SYSTEMS. THE CONTRACTOR <br />SHALL OBTAIN PERMISSION FROM THE WALMART STORE MANAGER <br />PRIOR TO THE MODIFICATION OF ANY EXISTING SECURITY SYSTEM <br />FOR THE OPENING (DEMOLITION) OF ANY EXTERIOR WALL. <br />9. THE CONTRACTOR SHALL KEEP THIS AREA CLEAN AND FREE OF <br />DEBRIS AND IS TO REMOVE ALL TRASH AND DEBRIS FROM THE <br />CONSTRUCTION AREA DAILY. NO FLAMMABLE MATERIALS OR LIQUIDS <br />MAY BE STORED IN THE EXISTING BUILDING OR IN THE NEW <br />ADDITION. <br />10. REMOVE ANY EXISTING ITEMS, SERVICES, FINISHES/OR SURFACES <br />AS REQUIRED FOR THE INSTALLATION OF NEW CONSTRUCTION. <br />11. PROVIDE FURRING FOR CONDUITS AND PIPING, SHOWN OR NOT, <br />AND FINISH OUT FURRING TO MATCH ADJACENT EXISTING FINISHES. <br />12. REPAIR, REROUTE, AND EXTEND ALL SERVICES, PIPING, CONDUIT <br />OF EXISTING ITEMS AND EQUIPMENT AS REQUIRED DURING THE <br />CONSTRUCTION PROCESS FOR THE COMPLETE INSTALLATION AND <br />OPERATION OF NEW EQUIPMENT. THIS INCLUDES ALL ITEMS <br />SHOWN OR NOT SHOWN ON THE DRAWINGS. <br />13. RESET EXISTING EQUIPMENT OR RELATED ITEMS AS REQUIRED FOR <br />PROPER OPERATION. WHERE EXISTING FINISHES ARE TO REMAIN, <br />CLEAN, REPAIR, PATCH, AND/OR RE -PAINT AS NECESSARY TO <br />BLEND WITH ADJACENT SURFACES. <br />14. CONSULT WALMART MECHANICAL SERVICES CONSTRUCTION MANAGER <br />FOR COMPLETE APPLICABLE SCOPE OF WORK. THE CONTRACTOR <br />SHALL MAINTAIN THE REQUIRED NUMBER OF EXITS WITHIN THE <br />STORE. MAINTAIN EXIT SIGNS AND EMERGENCY LIGHTING AT ALL <br />TIMES, AS REQUIRED BY THE LOCAL BUILDING OFFICIAL. <br />15. WALMART SHALL OCCUPY THE BUILDING DURING CONSTRUCTION. <br />THE CONTRACTOR SHALL COORDINATE WITH WALMART STORE <br />MANAGER AND THE WALMART MECHANICAL SERVICES CONSTRUCTION <br />MANAGER ALL CONSTRUCTION PROCEDURES WHICH WILL INTERFERE <br />WITH THE NORMAL DAILY OPERATIONS OF THE STORE. <br />16. THE CONTRACTOR SHALL OBTAIN PERMISSION FROM WALMART FOR <br />ALL INTERRUPTIONS OF UTILITY SERVICES TO THE EXISTING <br />BUILDING PRIOR TO THE INTERRUPTION. ACCIDENTAL <br />INTERRUPTIONS SHALL BE REMEDIED IMMEDIATELY WITH <br />APPROPRIATE FORCES. <br />17. ALL CAP-X REFRIGERATION PROJECTS ARE TO BE BID AS NIGHT <br />WORK. THE CONTRACTOR IS TO ASSUME ALL WORK IS TO BE <br />CONDUCTED ONLY AS OVERNIGHT WORK. SOME WORK MAY BE <br />ALLOWED DURING REGULAR WORKING HOURS TO FACILITATE <br />COMPLETION SCHEDULES. WORK WILL ONLY BE PERMITTED DURING <br />REGULAR WORKING HOURS WITH THE STORE MANAGEMENT'S <br />AND/OR MECHANICAL SERVICES CONSTRUCTION MANAGER'S <br />PERMISSION. WORK TO BE PERFORMED ON THE EXTERIOR OF THE <br />BUILDING, ROOFTOP, BACK ROOM, BEHIND DUST WALLS, AND <br />WORK THAT DOES NOT SIGNIFICANTLY INTERFERE WITH STORE <br />OPERATIONS MAY BE ALLOWED WITH THE STORE MANAGEMENT'S <br />AND/OR MECHANICAL SERVICES CONSTRUCTION MANAGER'S <br />PERMISSION. THE CONTRACTOR SHALL PAY FOR ADDITIONAL <br />SECURITY PERSONNEL TO SUPERVISE ACCESS TO THE BUILDING AS <br />REQUIRED BY STORE MANAGEMENT. CONTRACTOR SHALL PROVIDE <br />ALL SAFETY EQUIPMENT AND EXTERIOR LIGHTING AS REQUIRED TO <br />MAINTAIN A SAFE WORKING ENVIRONMENT FOR WORK REQUIRED AT <br />NIGHT. THE CONTRACTOR SHALL PREPARE, AND DELIVER TO STORE <br />MANAGEMENT, A SCHEDULE OF WORK FOR THE ENTIRE PROJECT <br />SCOPE OF WORK. THIS SCHEDULE WILL INCLUDE ALL PHASES OF <br />WORK TO BE PERFORMED AND SHALL LIST THE START AND <br />COMPLETION TIMES FOR EACH PHASE OF WORK. THE CONTRACTOR <br />SHALL UPDATE THIS SCHEDULE WEEKLY AS CONSTRUCTION <br />PROGRESSES. <br />NOTE TO BIDDING CONTRACTORS <br />THESE PLANS ARE TYPICALLY ISSUED FOR BID AS REDUCED "1 /2 (HALF) SIZE" DOCUMENTS. <br />SCALES SHOWN APPLY TO ORIGINAL "FULL SIZE" DOCUMENTS ONLY. DO NOT SCALE <br />DRAWINGS, FIELD VERIFY ALL DIMENSIONS. <br />EXISTING CONDITIONS WERE TAKEN EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING <br />FROM ORIGINAL DRAWINGS AND MAY A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND <br />NOT REFLECT EXACT "AS -BUILT" SPECIFICATIONS IN THEIR RELATED FIELD. THE <br />CONDITIONS. CONTRACTOR SHALL FAILURE TO ACQUAINT HIMSELF WITH THIS <br />FIELD VERIFY ALL EXISTING CONDITIONS KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY <br />NOTE: ALL WORK ON THIS SHEET IS PRIOR TO SUBMITTING FINAL BIDS. OF PERFORMING HIS WORK PROPERLY. NO <br />TO BE COMPLETED BY WALMART CONTRACTOR SHALL CAREFULLY ADDITIONAL COMPENSATION SHALL BE ALLOWED <br />APPROVED CONTRACTOR. COORDINATE NEW WORK AND BECAUSE OF CONDITIONS THAT OCCUR DUE <br />DEMOLITION WITH ALL OTHER TO FAILURE TO FAMILIARIZE WORKERS WITH THIS <br />DISCIPLINES AND EXISTING CONDITIONS. I KNOWLEDGE. <br />ZN <br />o� o <br />NW � l <br />�W <br />�c � V mm <br />WZ <br />C om� <br />Zt9 WY41 <br />oWo <br />tt�Jao 'd <br />WZ s <br />=W 00 �w <br />0 <br />m v <br />P � <br />J <br />W <br />} <br />Ld O J O w O Z <br />21tt Z02"T'w2 <br />W o>wrz-z¢¢aQsIwo¢ <br />¢ N § N OO N O tn= Z¢ON3 <br />0 wF-\w2 Jw�F-<520 <br />OJ <br />0H�5m 5,V)ooNQ� <br />0 3�Q0B�w�Za",o <br />Ld ~ C.7�00J��odU� mzr <br />¢a ¢� z�cr <br />Z LLJ0�� <br />��nZ ��w wUM W ZUZ <br />0¢ OU wNWWW��?��� <br />w�w000< <br />=z_Now¢w�a2:O w <br />-oL� 0Jaaawoam <br />ISSUE BLOCK <br />CHECKED BY: RDF/JAL <br />DRAWN BY: RDF <br />DOCUMENT DATE: 01 /03/12 <br />W910 it <br />STATE OF <br />Net_ <br />TITLE <br />SHEET <br />SHEET: <br />Tl <br />