EQUIPMENT SCHEDULE
<br />CONTRACTOR IS RESPONSIBLE, UPON AWARD, TO CONTACT AND VERIFY ALL DELIVERY
<br />DATES/TIMES WITH EVERY VENDOR LISTED BELOW. THIS IS UNIQUE TO
<br />CAPITAL EXPENDITURES PROJECTS. DATE CHANGE REQUESTS MUST BE SENT TO BOTH sharon.ha jdaszOwal—martcom AND
<br />duane.davisOwal—martcom
<br />MARK
<br />DESCRIPTION
<br />MANUFACTURER
<br />MODEL #
<br />SUPPLIED
<br />INSTALLED
<br />FINAL
<br />BY
<br />BY
<br />CONNECT
<br />R214
<br />M/D PRODUCE (EXTENDED KICKPLATE)
<br />KYSOR WARREN
<br />DX6LN
<br />WM
<br />C
<br />C
<br />P007C
<br />PRODUCE MISTING SYSTEM(AL,AR,AZ,CA,CO,CT,FL,GA,KS,KY,LA,MS,MT,NC,ND,NE,NM,NV,
<br />PRODEW
<br />-
<br />WM
<br />C
<br />C
<br />OK, P A, SC, SD, TN , TX, U T, VA, WV, WY)
<br />-
<br />REFRIGERATED SYSTEMS
<br />HILL PHOENIX
<br />-
<br />WM
<br />C
<br />C
<br />-
<br />INOVAR EQUIPMENT
<br />INOVAR
<br />-
<br />WM
<br />C
<br />I C
<br />-
<br />IPRODUCE SHELVES
<br />IMARCO
<br />-
<br />WM
<br />I C
<br />I C
<br />ABBREVIATION KEY
<br />C - CONTRACTOR
<br />WM - WAL-MART
<br />V - VENDOR
<br />VER 6.2.c
<br />------------ -'---------- --------------------
<br />ROOF DECK
<br />DO NOT USE DUSTWALL
<br />CONTINUE PLYWOOD TO SHORE ROOF JOISTS
<br />TO DECK
<br />WALL TO
<br />BE REMOVED
<br />SALES —A\(--
<br />1 /2" CD PLYWOOD
<br />4x8x8'-0" HORIZONTAL, 6'-0" LOAD BEARING
<br />PROVIDE 2X4 NAILER @ 4'-0" ELSEWHERE
<br />ALL JOINTS 11 1
<br />INSTALL CONTINUOUS
<br />LAYER 6 MIL. POLY
<br />SHEETS. TAPE ALL
<br />JOINTS
<br />NOTES:
<br />1. INSTALL TEMPORARY WALL IN
<br />FOR WALLS UP TO
<br />SECTIONS APPROXIMATELY
<br />14'-0", USE 4" 22
<br />40'-0" PER DAY
<br />GAUGE METAL
<br />(COORDINATE W/STORE
<br />STUDS © 24" O.C.
<br />MANAGER)
<br />OR 2X4 @ 16" O.C;
<br />FOR WALLS HIGHER
<br />2. LOCATE VERTICAL STUDS AS
<br />THAN 14'-0" USE
<br />NOT TO INTERFERE W/CEIL.
<br />6" 20 GAUGE
<br />GRID OR LIGHT FIXTURES
<br />METAL STUDS
<br />24" O.C. OR 2X6
<br />3. LOCATE HORIZONTAL 2X4
<br />@16" O.C.
<br />2" ABOVE CEILING EXCEPT
<br />LIGHT FIXTURE LOCATIONS
<br />PAINT SALES SIDE 4. SCREW PLYWOOD (MAXIMUM
<br />OF WALL © FRONT
<br />OF STORE, CASH SPACING: 12" O.C.)
<br />REGISTER & SNACK
<br />BAR
<br />SEALANT UNDER CONTINUOUS SEALANT
<br />BOTTOM PLATE AGAINST PLATE
<br />ANCHOR @ 24" O.C.
<br />3jNTS DUST WALL
<br />09.01.11
<br />a—
<br />(9—
<br />EXISTING COFFIN
<br />CASES TO REMAIN
<br />STAINLESS STEEL
<br />TRIM (TYP)
<br />P007: PRODUCE MISTING
<br />SYSTEM, REF PLUMBING -
<br />I
<br />EXISTING REACH -IN
<br />CASES TO REMAIN
<br />M/D
<br />R214: MULTI -DECK
<br />R214: MULTI -DECK
<br />R214: MULTI -DECK
<br />R214: MULTI -DEC
<br />R214: MULTI -DECK
<br />❑R214:
<br />PRODUCE
<br />PRODUCE
<br />PRODUCE
<br />PRODUCE
<br />PRODUCE
<br />PRODUCE
<br />_1
<br />..
<br />X-12
<br />DX6LN-1]
<br />CONTRACTOR SHALL FURNISH AND
<br />INSTALL STAINLESS STEEL TRIM TO
<br />CLOSE ANY GAPS THAT ARE LEFT
<br />BETWEEN THE END CASES AND
<br />LONG CASE RUNS AFTER THE CASES
<br />72'-6"
<br />CASES FURNISHED BY WALMART, INSTALLED
<br />BY CONTRACTOR. ALL NEW EQUIPMENT MUST ALL EXISTING REFRIGERATED
<br />BE ON SITE PRIOR TO STARTING ANY CASES ARE TO REMAIN
<br />ARE SET IN THEIR FINAL POSITION. DEMOLITION OR CONSTRUCTION. UNLESS OTHERWISE NOTED I
<br />3
<br />a
<br />FIXTURE PLAN-
<br />2
<br />O
<br />I �
<br />EXISTING COFFIN EXISTING REACH -IN
<br />CASES TO REMAIN CASES TO REMAIN
<br />,I I
<br />-
<br />r J
<br />-- --- 1----- 1-------1-------J------- _ 1-------- _,.. -.
<br />REMOVE EXISTING M/D PRODUCE CASES TO BE REPLACED I
<br />REMOVE EXISTING
<br />PRODUCE CASE
<br />MISTING SYSTEM TO
<br />BE REPLACED
<br />3
<br />4
<br />DEMOLITION PLAN
<br />SCALE: 1 /8" = 1'-0" -
<br />GENERAL NOTES
<br />09.01.1 1
<br />1. DIMENSIONS OF REFRIGERATED CASES ARE TO THE
<br />1.
<br />OUTERMOST POINTS OF THE CASES; ENDCAPS AND
<br />BUMPERS ARE CONSIDERED PART OF THE CASE,
<br />WHERE THEY OCCUR. DIMENSIONS ON THE FIXTURE
<br />PLANS ARE FOR LAYOUT OF OWNER -FURNISHED ITEMS
<br />2.
<br />ONLY AND ARE NOT TO BE USED FOR LOCATION OF
<br />WALLS AND OTHER CONTRACTOR BUILT ITEMS.
<br />2. CONTRACTOR SHALL FURNISH AND INSTALL STAINLESS
<br />STEEL TRIM TO CLOSE ANY GAPS THAT ARE LEFT
<br />BETWEEN THE END CASES AND LONG CASE RUNS
<br />AFTER THE CASES ARE SET IN THEIR FINAL POSITION.
<br />3.
<br />3. CASES FURNISHED BY WALMART, INSTALLED BY
<br />CONTRACTOR. ALL NEW EQUIPMENT MUST BE ON SITE
<br />PRIOR TO STARTING ANY DEMOLITION OR
<br />CONSTRUCTION.
<br />4.
<br />4. WALK-IN COOLERS/FREEZERS FURNISHED AND
<br />INSTALLED BY COOLER PANEL MANUFACTURER. ALL
<br />NEW EQUIPMENT MUST BE ON SITE PRIOR TO
<br />STARTING ANY DEMOLITION OR CONSTRUCTION.
<br />5. CONTRACTOR SHALL BE RESPONSIBLE FOR
<br />5.
<br />MISCELLANEOUS WALK-IN COOLER/FREEZER WORK
<br />INCLUDING BUT NOT LIMITED TO EVAPORATORS,
<br />ELECTRICAL, EMS, SPRINKLER PENDANTS, CURBS,
<br />SANITARY COVE BASE, THRESHOLDS, FLOOR REPAIR
<br />6.
<br />AND RACKING.
<br />6. CONTRACTOR SHALL PAINT ALL NEW CONDUIT
<br />EXPOSED TO SALES FLOOR. MATCH CEILING OR
<br />ADJACENT WALL COLOR (WHERE APPLICABLE). CONDUIT
<br />SHALL BE PAINTED PRIOR TO INSTALLATION.
<br />7.
<br />CONSTRUCTION LEGEND
<br />09.01.11
<br />EXISTING TO REMAIN
<br />8.
<br />- - — DEMOLISHED
<br />AREA TO BE DEMOLISHED
<br />1.
<br />2.
<br />3.
<br />4.
<br />5.
<br />DEMOLITION REQUIREMENTS
<br />09.01.1 1
<br />ALL DEMOLITION SHALL BE CARRIED OUT IN A SAFE
<br />MANNER AND IN STRICT ACCORDANCE WITH OSHA
<br />REGULATIONS.
<br />THE CONTRACTOR SHALL FIELD VERIFY THE EXTENT OF
<br />DEMOLITION. THE WORK INCLUDES, BUT IS NOT LIMITED
<br />TO, THE DEMOLITION AND REMOVAL OF WALLS, DOORS,
<br />FLOORS, AND ELECTRICAL ITEMS INCLUDING CONDUITS AS
<br />SHOWN ON DRAWING OR AS REQUIRED FOR THE
<br />INSTALLATION OF NEW WORK FOR A COMPLETE JOB.
<br />WHEN UTILITIES ARE REMOVED, CAP AND SEAL A
<br />MINIMUM OF 8" BELOW FINISH FLOOR OR A MINIMUM OF
<br />6" ABOVE FINISHED CEILING. SHOW ALL ABANDONED AND
<br />CAPPED UTILITIES ON AS-BUILTS, DRAWINGS, AND
<br />RECORDED DOCUMENTS.
<br />IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE
<br />ADEQUATE SHORING, BRACING, AND SUPPORT SYSTEMS
<br />AND TO KEEP THE EXISTING STRUCTURE INTACT AND IN
<br />A SAFE CONDITION DURING THE REMOVAL OF
<br />STRUCTURAL ITEMS AND NEW CONSTRUCTION.
<br />THE CONTRACTOR SHALL RETAIN A REGISTERED
<br />PROFESSIONAL ENGINEER TO DESIGN THE SHORING AND
<br />SPECIFY DEMOLITION PROCEDURES.
<br />IT IS THE CONTRACTOR'S RESPONSIBILITY FOR MEANS
<br />AND METHODS OF DEMOLITION AND NEW CONSTRUCTION.
<br />PRIOR TO THE EXCAVATION OF FOUNDATIONS ADJACENT
<br />TO THE EXISTING STRUCTURE, PROVIDE ADEQUATE
<br />SUPPORT FOR THE SUB -BASE TO PREVENT
<br />UNDERMINING.
<br />DURING DEMOLITION AND RECONSTRUCTION, THE
<br />CONTRACTOR SHALL COORDINATE WITH THE WALMART
<br />MECHANICAL SERVICES CONSTRUCTION MANAGER ANY
<br />REQUIRED SAFETY BARRIERS OR BARRICADES AND DUST
<br />WALLS. REFER TO THE WALMART MECHANICAL SERVICES
<br />CONSTRUCTION MANAGER FOR PHASING AND SCHEDULING
<br />DEMOLITION AND NEW CONSTRUCTION.
<br />IMMEDIATE SALVAGE/LEGAL DISPOSAL OF ALL
<br />DECOMMISSIONED EQUIPMENT SHALL BE THE
<br />RESPONSIBILITY OF THE CONTRACTOR. AT THE
<br />DISCRETION OF THE WALMART MECHANICAL SERVICES
<br />CONSTRUCTION MANAGER WALMART SHALL RETAIN THE
<br />OPTION TO OCCASIONALLY SALVAGE EMS EQUIPMENT,
<br />VARIABLE FREQUENCY DRIVE EQUIPMENT, COMPRESSORS,
<br />WALK-IN DOORS, EVAPORATORS, REFRIGERATED CASES,
<br />ETC. FROM REFRIGERATION EQUIPMENT TO BE REPLACED
<br />DURING THE CAP-X PROJECT. THE CONTRACTOR SHALL
<br />COORDINATE WITH THE WALMART MECHANICAL SERVICES
<br />CONSTRUCTION MANAGER ALL ITEMS TO BE RETAINED BY
<br />WALMART PRIOR TO REMOVAL OF THE EQUIPMENT SHOWN
<br />ON THE DEMOLITION PLANS. THE CONTRACTOR SHALL
<br />CAREFULLY REMOVE ANY ITEMS TO BE RETAINED BY
<br />WALMART AND DELIVER THOSE ITEMS, READY FOR
<br />SHIPMENT, TO THE WALMART MECHANICAL SERVICES
<br />CONSTRUCTION MANAGER. ALL REMOVED ITEMS NOT
<br />ALLOCATED FOR SALVAGE BY WALMART SHALL BE THE
<br />CONTRACTOR'S RESPONSIBILITY TO IMMEDIATELY REMOVE
<br />FROM THE JOB SITE AND ARRANGE DISPOSAL IN
<br />ACCORDANCE WITH LOCAL CODES.
<br />DEMOLITION NOTES
<br />09.01.1 1
<br />THE CONTRACTOR SHALL REMOVE EXISTING
<br />REFRIGERATED CASES AND EQUIPMENT AS SHOWN ON
<br />DEMOLITION PLAN. PROPERLY PUMP DOWN AND
<br />RECYCLE REFRIGERANT. PREPARE FOR DISPOSAL.
<br />PROMPTLY HAUL OFF AND PROPERLY DISPOSE OF
<br />AND/OR RECYCLE ALL EQUIPMENT REMOVED FROM
<br />STORE.
<br />WHERE APPLICABLE COOLER PANEL MANUFACTURER
<br />SHALL DEMOLISH AND PROMPTLY HAUL OFF WALK-IN
<br />PANELS AND DOORS TO BE REPLACED.
<br />DURING DEMOLITION AND RECONSTRUCTION PHASES,
<br />COORDINATE LOCATION OF ALL DUST WALLS AND
<br />SECURITY ENCLOSURES WITH WALMART STORE
<br />MANAGER. REFER TO DUST WALL DETAIL.
<br />ALL NEW EQUIPMENT MUST BE ON SITE PRIOR TO
<br />STARTING ANY DEMOLITION OR CONSTRUCTION.
<br />PATCH/REPAIR FLOOR COVERING AS REQUIRED AFTER
<br />INSTALLATION OF NEW CASES. MATCH EXISTING
<br />FLOORING TYPE, COLOR, PATTERN, AND FINISH.
<br />v o� a
<br />w �wwo
<br />(n O_' J(n QU OQNO_p
<br />D °�~~ oV)
<br />WOf Ld prH zaaQQSULio
<br />awl N O 0w o o wi= Z a W 3
<br />O D_'~N M1w~X J w0_F OJ
<br />LL. aaoo0m
<br />Z pv<z 0owwx� Z xw�O
<br />az o� w o
<br />N a�
<br />f- z,L'n.o�a oo.�o z�
<br />w� O
<br />J Q CuLi
<br />Q~ H� U O}� 2
<br />�(a/1Z 0jwF wUwwzuz
<br />0 O cn w
<br />Nac��rw�w�o ?���
<br />cn �o1NzoaLaawoam
<br />ISSUE BLOCK
<br />CHECKED BY: RDF/JAL
<br />DRAWN BY: RDF
<br />DOCUMENT DATE: 01 /03/12
<br />FIXURE
<br />PLANS
<br />AND
<br />DETAIL
<br />SHEET:
<br />Fl
<br />
|