Laserfiche WebLink
GROCERY PLUMBING EQUIPMENT CONNECTION SCHEDULE <br />NO. DESCRIPTION MANUFACTURER FW I RO I CW HW WASTE VENT I ROUGH -IN REQUIREMENTS NOTES <br />PRODUCE EQUIPMENT SCHEDULE <br />P007 PRODUCE MISTING SYSTEM --- 1 2 CONNECT 1 2" RO TO MISTING SYSTEM A,B,C,D <br />GENERAL NOTES <br />1. EQUIPMENT & TRIM FURNISHED BY WALMART, ROUGH -IN & FINAL CONNECTIONS BY PLUMBING CONTRACTOR. <br />PLUMBING EQUIPMENT SCHEDULE NOTES <br />A. PROVIDE SHUT-OFF VALVES. <br />B. PROVIDE BACKFLOW PREVENTER ON WATER SUPPLY PER LOCAL CODE REQUIREMENTS. <br />C. PLUMBING CONTRACTOR SHALL PROVIDE AND INSTALL FLEXIBLE WATER PIPING AND QUICK DISCONNECT TO EQUIPMENT. <br />D. IF RO WATER IS NOT AVAILABLE, PROVIDE INDIVIDUAL WATER FILTER PACKS AS REQUIRED BY WALMART MECHANICAL SERVICES CONSTRUCTION MANAGER. <br />J/ * r-," EXISTING REACH -IN FREEZER <br />TO REMAIN TO PRODUCE CASES TO REMAIN <br />15.410 MISTING SYSTEM <br />15.401 (BY CONTRACTOR) <br />P007, WITH FILTER <br />PACK AS SCHEDULED <br />b <br />1\LI Lr L_ L/\IJI IIVV 1 1\V VVVL <br />CASE CLEANOUT SYSTEM <br />WITH NEW AS INDICATED <br />� PLUMBING PLAN <br />PLUMBING KEYNOTES <br />I <br />15.401 CONNECT TO EXISTING COLD WATER PIPE OF <br />EQUAL OR LARGER SIZE. VERIFY SIZE AND <br />LOCATION AT SITE. PROVIDE SHUT-OFF VALVE IN <br />NEW PIPE AT POINT OF CONNECTION. <br />15.410 EXISTING PIPING TO REMAIN (VERIFY LOCATION IN <br />FIELD). <br />15.411 WHERE NEW REFRIGERATED CASES ARE <br />REPLACING EXISTING CASES AT SAME LOCATION, <br />EXISTING FLOOR DRAINS MAY BE REUSED IN LIEU <br />OF NEW CASE DRAINS SHOWN IF EXISTING DRAIN <br />IS IN AN ADEQUATE AND REUSABLE LOCATION. <br />(VERIFY IN FIELD). <br />15.430 CONTRACTOR TO INSTALL PRODUCE MISTING <br />SYSTEM AND CONTROL BOX FURNISHED BY <br />OWNER. CONTRACTOR TO PROVIDE FINAL <br />TERMINATION TO INLET OF CONTROL BOX. <br />EQUIPMENT SHALL BE LOCATED WHERE SHOWN <br />ON DRAWING. <br />15.431 CONTRACTOR TO PROVIDE 1 /2" R.O. WATER WITH <br />SHUT-OFF VALVES TO PRODUCE MISTING SYSTEM <br />AND PRODUCE CASE CLEANOUT SYSTEM. LOCATE <br />SECONDARY VALVES FOR CLEANOUT SYSTEM AT <br />CASE KICKPLATES. CONNECT R.O. WATER PIPING <br />TO INLET OF PRODUCE MISTING UNIT. PIPING <br />MATERIAL SHALL BE PER SPECIFICATIONS. <br />PLUMBING SYMBOLS <br />DOMESTIC COLD WATER (CW) <br />- - DOMESTIC HOT WATER (HW) <br />— - - - HOT WATER RECIRCULATION (HWR) <br />--SS-- SANITARY SEWER (SAN) <br />--GW-- GREASE WASTE (GW) <br />---V--- PLUMBING VENT (V) <br />DEMOLITION OF PIPING <br />4; <br />SHUT <br />OFF <br />VALVE <br />(SOV) <br />—�-�i <br />SHUT <br />OFF <br />VALVE <br />IN RISE <br />RISE AND FALL IN PIPE <br />- —O <br />NEW FLOOR CLEANOUT (FCO) <br />- -� <br />EXISTING FLOOR CLEANOUT <br />(FCO) <br />® <br />FLOOR DRAIN, CASE DRAIN <br />FUNNEL FLOOR DRAIN (FD) <br />& <br />® <br />PREP AREA DRAIN & <br />STOCKROOM FLOOR DRAIN <br />(FD) <br />❑� <br />FOOD SINK DRAIN (FS) <br />® <br />TRENCH DRAIN (TD) <br />PLUMBING RISER NUMBER <br />CONNECT TO EXISTING <br />VTR I VENT THRU ROOF <br />VBF I VENT BELOW FLOOR <br />ETR EXISTING TO REMAIN <br />HS HAND SINK <br />3CS THREE -COMPARTMENT SINK <br />CTS COUNTERTOP SINK <br />HB HOSE BIBB <br />X- DETAIL NUMBER <br />XX SHEET NUMBER <br />F7 DENOTES EQUIPMENT FURNISHED BY OWNER <br />AND INSTALLED BY CONTRACTOR. ROUGH -IN <br />AND CONNECTION IS BY CONTRACTOR. SEE <br />OWNER -PROVIDED EQUIPMENT INFORMATION <br />FOR ACTUAL ROUGH -IN HEIGHT <br />REQUIREMENTS. <br />O DENOTES EQUIPMENT FURNISHED AND <br />INSTALLED BY CONTRACTOR. ROUGH -IN AND <br />CONNECTION IS BY CONTRACTOR. <br />??.??? PLUMBING KEY NOTES. <br />GENERAL PLUMBING NOTES <br />09.01.1 1 <br />1. GENERAL NOTES ARE APPLICABLE TO ALL PLUMBING <br />WORKING DRAWINGS. <br />2. STORE MUST BE KEPT OPERATIONAL. ARRANGE ALL WORK <br />TO KEEP DISRUPTIONS TO OPERATIONS TO A MINIMUM. <br />COORDINATE DISRUPTIONS WITH THE WALMART STORE <br />MANAGER AND WALMART MECHANICAL SERVICES <br />CONSTRUCTION MANAGER. <br />3. COORDINATE ALL WORK WITH OTHER TRADES. VERIFY <br />CONDITIONS BEFORE ROUTING PIPING. <br />4. FURNISH AND INSTALL ALL MATERIALS FOR A COMPLETE <br />INSTALLATION IN ALL RESPECTS, READY FOR INTENDED <br />USE AND IN STRICT ACCORDANCE WITH ALL STATE AND <br />LOCAL CODES AND MANUFACTURER'S RECOMMENDATIONS. <br />COORDINATE WITH EXISTING AND NEW CONSTRUCTION. PAY <br />ALL NECESSARY FEES AND PERMITS. <br />5. EXISTING WATER AND SANITARY PIPING SIZES AND <br />LOCATIONS HAVE NOT BEEN FIELD VERIFIED. THEY ARE <br />TAKEN FROM ORIGINAL BUILDING PRINTS. CONTRACTOR IS <br />RESPONSIBLE TO FIELD VERIFY LOCATIONS AND SIZES OF <br />ALL EXISTING PIPING THAT IS BEING CONNECTED TO OR <br />MODIFIED. <br />6. CAP ALL PIPING OPENINGS DURING CONSTRUCTION UNTIL <br />FINAL CONNECTIONS TO EQUIPMENT AND ACCESSORIES <br />ARE MADE. <br />EXISTING CONDITIONS WERE TAKEN EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING <br />FROM ORIGINAL DRAWINGS AND MAY A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND <br />NOT REFLECT EXACT "AS -BUILT" SPECIFICATIONS IN THEIR RELATED FIELD. THE <br />CONDITIONS. CONTRACTOR SHALL FAILURE TO ACQUAINT HIMSELF WITH THIS <br />FIELD VERIFY ALL EXISTING CONDITIONS KNOWLEDGE DOES NOT RELIEVE THE RESPONSIBILITY <br />NOTE: ALL WORK ON THIS SHEET IS PRIOR TO SUBMITTING FINAL BIDS. OF PERFORMING HIS WORK PROPERLY. NO <br />TO BE COMPLETED BY WALMART CONTRACTOR SHALL CAREFULLY ADDITIONAL COMPENSATION SHALL BE ALLOWED <br />APPROVED CONTRACTOR. COORDINATE NEW WORK AND BECAUSE OF CONDITIONS THAT OCCUR DUE <br />DEMOLITION WITH ALL OTHER TO FAILURE TO FAMILIARIZE WORKERS WITH THIS <br />DISCIPLINES AND EXISTING CONDITIONS. I KNOWLEDGE. <br />o� <br />o <br />0 <br />N <br />WZ <br />� <br />0 WM <br />Zo <br />ZY <br />O�zO <br />WZ <br />=`Y <br />co <br />CDJ <br />3 SOX <br />f� <br />M <br />�V <br />E3J <br />r <br />W p JJN OWpZ <br />d'fn- <br />Li <br />cy—wxFza 5 opo <br />a� a oz�f-' zw <br />Q W Z o w- Z Q N 3 <br />Of <Nr No fn �Up �a <br />O Why\w W_XJW2F0OJ <br />aaoo�� a�a?wmw <br />� co, <br />w� <br />� QZa�Fo <br />F= c��oow�ooa,cwi��zr <br />l� J <br />QW�H4���r��'^Q <br />a(Azo5zFz�-LlJzoz <br />a- 0 o wcnw wwww*wo <br />d LnQU 5F�,��,..II wMog<o'o <br />FoLZNzogwaawoam <br />cm co <br />00 <br />o <br />oW� <br />o <br />o <br />C/D <br />oWw <br />z <br />0 <br />ISSUE BLOCK <br />CHECKED BY: RDF/JAL <br />DRAWN BY: ASM <br />DOCUMENT DATE: 01 /03/12 <br />PLUMBING <br />PLAN AND <br />SCHEDULE <br />SHEET: <br />p 1 <br />