GRAPHICS SYMBOLS LEGEND
<br />GENERAL PLAN SYMBOLS CEILING / LIGHTING SYMBOLS POWER / COMMUNICATION SYMBOLS
<br />EXISTING PARTITION TO CEILING MOUNTED EXIT
<br />REMAIN SIGN WALL DUPLEX OUTLET
<br />EXISTING PARTITION TO SPRINKLER WALL QUAD OUTLET
<br />T - - BE REMOVED X
<br />X
<br />EXISTING DOOR TO sp; SPEAKER WALL DUPLEX -
<br />REMAIN `-' DEDICATED
<br />X
<br />EXISTING DOOR TO BE O CAMERA WALL TELE-DATA -
<br />�.� REMOVED C X SINGLE
<br />ROUND RECESSED WALL TELE-DATA - DUAL
<br />NEW DOOR OX FIXTURE X
<br />-� SQUARE RECESSED WALL TELEPHONE
<br />X FIXTURE X
<br />INTERIOR PARTITION
<br />n SQUARE RECESSED oX FLOOR DUPLEX OUTLET
<br />v
<br />TOP / B OT.O ELEVATION MARKER X WALL -WASH FIXTURE
<br />PARTITION TAG `�" X PENDANT FIXTURE OX FLOOR QUAD OUTLET
<br />f WALL MOUNTED FIXTURE AV FLOOR AV OUTLET
<br />ROOM NAME X X
<br />NUMBERI-� ROOM TAG UNDER -CABINET X
<br />F------ s CQ WALL JUNCTION BOX
<br />X FIXTURE
<br />1 KEYNOTE TAG 2X4 LED FIXTURE JIQ FLOOR JUNCTION BOX
<br />X X
<br />UMBE DOOR TAG FLOOR TELE-DATA -
<br />X 1X4 LED FIXTURE *X SINGLE
<br />P WINDOW/ GLAZING TAG ® FLOOR TELE-DATA -
<br />®X FLOOR
<br />X 2X2 LED FIXTURE
<br />RX REQUEST TO EXIT
<br />X BUTTON
<br />EXTERIOR ELEVATION TAG
<br />A-X.X
<br />UTILITY STRIP FIXTURE M� MOTION SENSOR
<br />X SURFACE MOUNTED
<br />EMERGENCY FIXTURE ® MAGNETIC LOCK
<br />X A-X.X X X INTERIOR ELEVATION TAG
<br />ACCESS PANEL CARD READER
<br />�
<br />i
<br />ES ELECTRIC STRIKE
<br />L,( X SECTION TAG
<br />A-X.X
<br />SUPPLY GRILLE EH ELECTRIC HINGE
<br />X EL ELECTRIC LOCK
<br />A-X.X
<br />'~I DETAIL TAGS HT AV WALL AV OUTLET
<br />XX RETURN GRILLE
<br />�.�. A-X.X HTC AV WALL AV CONTROL
<br />SIM PANEL
<br />ALIGN EXHAUST FAN HTa- WALL CABLE OUTLET
<br />ALIGN TO ESTABLISHED ❑O
<br />SURFACES
<br />EQUIPMENT TAG
<br />FIRE SAFETY SYMBOLS
<br />TYPE CEILING TAG R FIRE ALARM PULL STATION
<br />NEIGH
<br />FINISH w FIRE ALARM STROBE
<br />WALL FINISH TAG
<br />BASE FIRE ALARM
<br />FLOOR IN411 HORN/STROBE
<br />�J PATTERN / GRAIN © FIRE ALARM PHONE
<br />DIRECTION
<br />MATERIAL TRANSITION FEC FIRE EXTINGUISHER
<br />CABINET
<br />FE FIRE EXTINGUISHER
<br />CANISTER
<br />REVISION BUBBLE
<br />so SMOKE DETECTOR
<br />REVISION DELTA HEAT DETECTOR
<br />NOT IN CONTRACT
<br />WOOD BLOCKING
<br />OR SHIM
<br />WOOD FRAMING
<br />-CONTINUOUS
<br />FINISHED
<br />WOOD
<br />BATT INSULATION
<br />i
<br />SEMI -RIGID
<br />INSULATION - FIRE
<br />SAFING
<br />RIGID
<br />INSULATION
<br />SPRAY -ON FIRE
<br />SAFING OR
<br />INSULATION
<br />COMPRESSIBLE
<br />FILLER
<br />CERAMIC TILE
<br />PLASTER WITH
<br />METAL LATH
<br />GYPSUM BOARD
<br />FINISH
<br />WOOD FLOORING
<br />TERRAZZO FINISH
<br />I
<br />CARPET & PAD ,
<br />i
<br />1.
<br />THE WORK SHALL CONFORM TO THE APPLICABLE BUILDING CODE AND OTHER
<br />CONSTRUED AS EVIDENCE THAT SUCH AN EXAMINATION HAS BEEN MADE, AND
<br />40.
<br />THE CONTRACTOR SHALL CONFIRM THE AVAILABILITY AND DELIVERY TIMES
<br />ORDINANCES, CODES AND REGULATIONS LISTED IN THE SPECIFICATIONS OR
<br />LATER CLAIMS WILL NOT BE RECOGNIZED FOR EXTRA LABOR, EQUIPMENT, OR
<br />FOR ALL SPECIFIED MATERIALS & EQUIPMENT REQUIRED TO PERFORM THE
<br />ON THE DRAWINGS, AND REQUIRED BY LOCAL BUILDING AUTHORITIES. THE
<br />MATERIALS, REQUIRED BECAUSE OF DIFFICULTIES ENCOUNTERED WHICH
<br />WORK UPON RECEIPT OF THE CONTRACT DOCUMENTS. SHOULD THE
<br />GOVERNING CODES, RULES AND REGULATIONS ARE COLLECTIVELY REFERRED
<br />COULD HAVE BEEN REASONABLY FORESEEN HAD SUCH AN EXAMINATION BEEN
<br />AVAILABILITY OF SPECIFIED ITEMS POSE A DELAY TO THE ON -TIME
<br />TO AS "THE CODE." THE CONTRACTOR SHALL REPORT ANY INCONSISTENCIES,
<br />MADE. THE GENERAL CONTRACTOR SHALL VERIFY ALL CONDITIONS AND
<br />COMPLETION OF THE PROJECT, THE CONTRACTOR SHALL NOTIFY THE
<br />CONFLICTS OR OMISSIONS DISCOVERED TO THE ARCHITECT FOR
<br />DIMENSIONS ON THE JOB SITE AND REPORT ANY AND ALL DISCREPANCIES
<br />ARCHITECT IMMEDIATELY AND PROPOSE AN EQUIVALENT SUBSTITUTION TO
<br />INTERPRETATION PRIOR TO PERFORMING THE WORK.
<br />AND/OR UNUSUAL CONDITIONS TO THE ARCHITECT PRIOR TO FINALIZING
<br />BE REVIEWED BY THE ARCHITECT IF SUCH A DELAY IS NOT ACCEPTABLE.
<br />BIDS OR COMMENCEMENT OF ANY CONSTRUCTION.
<br />2.
<br />WHERE APPLICABLE TO PROJECT SCOPE, THE GENERAL CONTRACTOR SHALL
<br />41.
<br />SUBSTITUTION OF ALL "EQUALS" SHALL BE ONLY AS APPROVED BY THE
<br />CONTACT BUILDING MANAGEMENT TO DETERMINE THE RULES OF THE
<br />16.
<br />THE GENERAL CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS
<br />ARCHITECT. WHERE THE TERM "OR EQUAL" IS USED THE ARCHITECT SHALL BE
<br />BUILDING RELATIVE TO CONSTRUCTION; WHEN AND HOW DELIVERIES CAN BE
<br />ON THE JOB SITE AND REPORT ANY AND ALL DISCREPANCIES AND/OR
<br />THE SOLE JUDGE OF EQUALITY BASED UPON THE INFORMATION FURNISHED
<br />MADE, WHAT PHASES AND TYPES OF CONSTRUCTION MAY BE DONE ON
<br />UNUSUAL OR HIDDEN CONDITIONS TO THE ARCHITECT PRIOR TO FINALIZING
<br />BY THE CONTRACTOR. SUBSTITUTIONS MUST BE ACCEPTED IN WRITING
<br />REGULAR OR OVERTIME BASIS, AND IN GENERAL ANY SPECIAL BUILDING
<br />BIDS OR COMMENCEMENT OF ANY CONSTRUCTION. THE GENERAL
<br />BEFORE THEY MAY BE USED.
<br />REQUIREMENTS WHICH WILL AFFECT THE COST OF ALL WORK BORNE BY THE
<br />CONTRACTOR SHALL MAKE KNOWN ANY AND ALL LIMITATIONS, EXCLUSIONS,
<br />GENERAL CONTRACTOR. ALL WORK SHALL CONFORM TO ALL BASE BUILDING
<br />OR MODIFICATIONS TO THE PROJECT DURING THE BID SELECTIONS PERIOD.
<br />42.
<br />THE CONTRACTOR SHALL PREPARE SUBMITTALS FOR REVIEW BY THE
<br />STANDARD SPECIFICATIONS AND BUILDING REGULATIONS, WHICH THE
<br />ANY AND ALL LIMITATIONS, EXCLUSIONS, OR MODIFICATIONS NOT ITEMIZED
<br />ARCHITECT, FOR ALL MATERIALS AND EQUIPMENT SPECIFIED. IF THE
<br />CONTRACTOR SHALL OBTAIN PRIOR TO SUBMISSION OF BID.
<br />IN THE BID PROPOSAL DOCUMENTS ARE PRESUMED "INCLUDED", IN WHICH
<br />CONTRACTOR, THE OWNER, OR THE OWNER'S REPRESENTATIVE SUBSTITUTES
<br />CASE NO ADDITIONAL MONIES WILL BE ALLOCATED FOR THIS WORK.
<br />A MATERIAL, METHOD OF ATTACHMENT, REVISES A CONSTRUCTION DETAIL,
<br />3.
<br />THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE
<br />OR IN ANY WAY ALTERS THE WORK SUCH THAT IT NO LONGER CONFORMS TO
<br />SUB -CONTRACTORS' RECEIPT OF COMPLETE SETS OF CONSTRUCTION
<br />17.
<br />ALL WORK COSTS SUBMITTED FOR THIS PROJECT ARE FURNISHED WITHOUT
<br />THESE DOCUMENTS, WITHOUT THE WRITTEN ACCEPTANCE OF THE
<br />DOCUMENTS, AS WELL AS ALL FUTURE ADDENDA, BULLETINS, FIELD
<br />OBLIGATION; THE CLIENT RESERVES THE RIGHT TO ACCEPT OR REJECT ANY
<br />ARCHITECT, SUCH ACTION WILL RELIEVE THE ARCHITECT OF ANY
<br />DIRECTIVES AND CHANGE ORDERS.
<br />PROPOSAL OR PART OF ANY COST SUBMITTED.
<br />RESPONSIBILITY OR LIABILITY INCLUDING, BUT NOT LIMITED TO, AESTHETIC
<br />CONSEQUENCES, SUBSEQUENT FAILURES) AND PERSONAL OR PROPERTY
<br />4.
<br />THE CONTRACTOR SHALL COORDINATE THE STORAGE OF MATERIALS AND
<br />18.
<br />WHERE APPLICABLE TO PROJECT SCOPE, EXISTING CONSTRUCTION AND
<br />DAMAGE ATTRIBUTABLE TO THIS CHANGE.
<br />SHALL PROVIDE PROTECTION AS NECESSARY TO PREVENT VANDALISM AND
<br />DIMENSIONS SHOWN ARE PER EXISTING DRAWINGS. ALL EXISTING
<br />LOSS OF MATERIALS BY THEFT OR DAMAGE SUSTAINED DUE TO EXPOSURE TO
<br />INFORMATION MUST BE VERIFIED IN THE FIELD. NEITHER THE OWNER NOR
<br />43.
<br />REVIEW OF A SPECIFIC ITEM SHALL NOT CONSTITUTE A REVIEW OF AN
<br />INAPPROPRIATE ENVIRONMENTAL CONDITIONS AND WILL REPAIR & REPLACE
<br />THE ARCHITECTS ARE RESPONSIBLE FOR ACCURACY OF EXISTING
<br />ASSEMBLY OF WHICH THE ITEM IS A COMPONENT.
<br />DAMAGE OR LOSSES AT THE CONTRACTOR'S EXPENSE WITHOUT CHARGE TO
<br />INFORMATION. EXISTING CONSTRUCTION CONDITIONS IN AREAS WHERE NEW
<br />THE OWNER.
<br />WORK IS NOT PLANNED MAY BE NOT COMPLETELY SHOWN.
<br />44.
<br />SUBMITTALS THAT CONTAIN EXCESSIVE ERRORS OR ARE INCOMPLETE OR
<br />INADEQUATE MAY BE RETURNED WITHOUT ACTION. COSTS INCURRED FOR
<br />5.
<br />WHERE ADJACENT AREAS BEYOND THE IMMEDIATE CONSTRUCTION AREA WILL
<br />19.
<br />WITHIN ONE (1) WEEK (5 BUSINESS DAYS), OF THE AWARD OF THIS
<br />THE RESULTANT DELAYS WILL BE THE RESPONSIBILITY OF THE CONTRACTOR.
<br />BE OCCUPIED DURING THE CONSTRUCTION PERIOD, THE CONTRACTOR SHALL:
<br />CONTRACT, PRIOR TO MOBILIZATION FOR ANY WORK, THE CONTRACTOR
<br />A. CONFORM TO OWNERS AND TENANT REQUIREMENTS FOR HOURS OF
<br />SHALL FURNISH A CONSTRUCTION SCHEDULE SHOWING CHRONOLOGICALLY
<br />45.
<br />REVIEW OF SUBMITTALS SHALL NOT RELIEVE THE CONTRACTOR OF
<br />CONSTRUCTION OPERATIONS, ACCESS TO TENANT SPACES AND
<br />THE PHASES OF THE WORK, AND ALL RELATED WORK FOR THE COMPLETION
<br />OBLIGATIONS OR RESPONSIBILITIES FOR DEVIATIONS FROM THE
<br />ALLOWABLE NOISE LEVEL DURING TENANT BUSINESS HOURS,
<br />OF THE PROJECT. THIS SCHEDULE SHALL INDICATE ALL ORDERING LEAD
<br />REQUIREMENTS OF THESE CONTRACT DOCUMENTS, UNLESS THE ARCHITECT
<br />B. CONSTRUCTION OPERATIONS SHALL NOT BLOCK HALLWAYS ACCESSIBLE
<br />TIMES, LENGTH OF TIME FOR EACH PHASE, ITS START AND COMPLETION,
<br />IS NOTIFIED, AND SPECIFICALLY APPROVES, OF THE DEVIATIONS AT THE TIME
<br />ROUTES OR MEANS OF EGRESS FOR TENANTS OF BUILDING.
<br />WITH A PROJECTED COMPLETION DATE.
<br />OF SUBMISSION.
<br />C. CONSTRUCTION OPERATIONS SHALL NOT CAUSE INTERRUPTIONS OF
<br />ELECTRICAL SERVICES TO THE TENANTS OF THE BUILDING WITHOUT
<br />20.
<br />CONTRACTOR AND SUBCONTRACTORS SHALL ATTEND JOB MEETINGS
<br />46.
<br />REVIEW OF SUBMITTALS SHALL NOT RELIEVE THE CONTRACTOR'S OBLIGATION
<br />PRIOR NOTIFICATION AND APPROVALS. PROPERLY PROTECT ALL FLOORS,
<br />REQUIRED BY THIS CONTRACT.
<br />FOR COORDINATION NOR WAIVE RESPONSIBILITY FOR ERRORS AND
<br />MAIL CHUTES AND STAIR DOORS IN PUBLIC AREAS SUBJECT TO
<br />OMISSIONS IN THE SUBMITTALS, INCLUDING "FIELD MEASURE."
<br />CONSTRUCTION TRAFFIC. SHOE WIPING MATS WILL BE INSTALLED AT ALL
<br />21.
<br />THE CONTRACTOR SHALL OBTAIN ALL PERMITS FOR ALL SITE DEVELOPMENT
<br />OPENINGS BETWEEN CONSTRUCTION AREAS AND ALL PUBLIC SPACES. ALL
<br />WORK, PAY ALL FEES FOR PERMITS AND CHECK ALL GOVERNING AUTHORITIES'
<br />47.
<br />CHANGES IN THE SCOPE OF WORK OR IN CONSTRUCTION DETAILS, WHETHER
<br />ACTIVE AREAS SHALL BE KEPT CLEAN AND FREE FROM DEBRIS.
<br />SPECIFICATIONS FOR BUT NOT LIMITED TO, GUTTERS, SIDEWALKS, POLES,
<br />DUE TO FIELD CONDITIONS OR OMISSIONS BY THE CONTRACTOR, ARCHITECT
<br />D. ERECT AND MAINTAIN TEMPORARY BRACING, LIGHTS, DUSTPROOF
<br />AND OTHER STRUCTURES, INCLUDING THE REMOVAL OR RELOCATION OF
<br />OR OWNER, SHALL BE DOCUMENTED BY THE ARCHITECT AND APPROVED,
<br />PARTITIONS, BARRICADES, FENCES AND WARNING SIGNS AS NECESSARY
<br />EXISTING UTILITIES OR OTHER PHYSICAL OBJECTS SHOWN ON PLANS OR
<br />PRIOR TO EXECUTION.
<br />TO PREVENT INJURY, NOISE, DUST AND INCONVENIENCE TO OTHER
<br />NOTED OTHERWISE.
<br />TENANTS, THE PUBLIC, AND TO PREVENT DAMAGE TO ADJACENT
<br />48.
<br />SHOULD THE GENERAL CONTRACTOR CLAIM THAT AN ISSUE, DIRECTED
<br />CONSTRUCTION WHICH IS TO BE LEFT IN PLACE.
<br />22.
<br />CREATE AND IMPLEMENT AN EROSION AND SEDIMENTATION CONTROL PLAN
<br />REVISION, OR CHANGE TO THE ORIGINAL CONTRACT INVOLVES ADDITIONAL
<br />E. CONTRACTOR SHALL FOLLOW THE RECOMMENDED CONTROL MEASURES
<br />FOR ALL SITE CONSTRUCTION ACTIVITIES ASSOCIATED WITH THE PROJECT.
<br />COST UNDER HIS CONTRACT, HE SHALL GIVE WRITTEN NOTICE WITHIN A
<br />OF THE SHEET METAL AND AIR CONDITIONING NATIONAL CONTRACTORS
<br />THE PLAN MUST CONFORM TO THE EROSION AND SEDIMENTATION
<br />PERIOD OF NOT MORE THAN THREE (3) WEEKS (15 BUSINESS DAYS), BUT
<br />ASSOCIATION (SMACNA) IAQ GUIDELINES FOR OCCUPIED BUILDINGS
<br />REQUIREMENTS OF THE 2003 EPA CONSTRUCTION GENERAL PERMIT OR LOCAL
<br />SHALL NOT PROCEED TO EXECUTE THE WORK UNTIL WRITTEN APPROVAL FOR
<br />UNDER CONSTRUCTION, 2ND EDITION 2007, ANSI/SMACNA 008-2008
<br />STANDARDS AND CODES, WHICHEVER IS MORE STRINGENT.
<br />THE CHANGE REQUEST IS RECEIVED. NO SUCH CLAIMS WILL BE VALID UNLESS
<br />(CHAPTER 3). PROTECT STORED ON -SITE AND INSTALLED ABSORPTIVE
<br />SO MADE. NO PAYMENT FOR SUCH CLAIMS WILL BE MADE UNTIL FINAL
<br />MATERIALS FROM MOISTURE DAMAGE.
<br />23.
<br />ALL REQUIRED PERMITS MUST BE OBTAINED FROM ALL APPLICABLE
<br />SETTLEMENT.
<br />F. IF PERMANENTLY INSTALLED AIR HANDLERS ARE USED DURING
<br />AUTHORITIES HAVING JURISDICTION PRIOR TO START OF CONSTRUCTION.
<br />CONSTRUCTION, FILTRATION MEDIA WITH A MINIMUM EFFICIENCY
<br />49.
<br />ALL CLAIMS FOR ADDITIONAL WORK WILL BE SUBMITTED IN WRITING FOR
<br />REPORTING VALUE (MERV) OF 8 MUST BE USED AT EACH RETURN AIR
<br />24.
<br />ALL COSTS FOR INSPECTIONS AND/OR TESTS SHALL BE THE RESPONSIBILITY
<br />THE CLIENT'S APPROVAL. THE CONTRACTOR SHALL INCLUDE A COMPLETE
<br />GRILLE.
<br />OF THE CONTRACTOR, U.N.O.
<br />NARRATIVE DESCRIPTION OF THE WORK TO BE PERFORMED AS WELL AS
<br />MATERIALS TO BE USED, THE AREA OR SPACE BEING WORKED IN, AND UNDER
<br />6.
<br />AS APPLICABLE TO PROJECT SCOPE, ALL CUTTING, CHASING, DRILLING OR
<br />25.
<br />THE GENERAL CONTRACTOR SHALL PAY THE EXPENSES FOR ALL
<br />WHOSE AUTHORIZATION THE WORK TO BE PERFORMED WAS INITIATED.
<br />DEMOLITION OF WALLS, SLABS, ETC. REQUIRING THE USE OF JACKHAMMERS
<br />TRANSPORTATION, HOISTING AND ELEVATOR USE CHARGES ON ALL
<br />OR OTHER HEAVY HAND OR POWER TOOLS SHALL BE PERFORMED AFTER
<br />MATERIALS OR EQUIPMENT TO THE POINT OF USE, AND SHALL BE
<br />50.
<br />THE PRESENCE OF A REPRESENTATIVE OF THE ARCHITECT ON THE JOB SITE
<br />REGULAR BUSINESS HOURS ON AN OVERTIME BASIS IF NECESSARY, UNLESS
<br />RESPONSIBLE FOR ALL UNLOADING, CHECKING AND STORAGE OF THE SAME IN
<br />DOES NOT IMPLY CONCURRENCE WITH OR THE APPROVAL OF ANY WORK. THE
<br />THE BUILDING MANAGEMENT AND ANY AFFECTED TENANTS PROVIDE A
<br />CONNECTION WITH THIS CONTRACT.
<br />CONTRACTOR SHALL CALL TO THE ATTENTION OF THE ARCHITECT, IN
<br />WRITTEN WAIVER EXPRESSLY PERMITTING OTHERWISE.
<br />WRITING, ALL SPECIFIC ITEMS FOR WHICH ARCHITECT'S REVIEW IS
<br />26.
<br />THE CONTRACTOR SHALL MAKE ALL ARRANGEMENTS, MAINTAIN AND PAY ALL
<br />REQUIRED.
<br />7.
<br />THE CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR
<br />COSTS FOR TEMPORARY WATER, PLUMBING, POWER, LIGHTING, HEATING OR
<br />JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS
<br />VENTILATION REQUIRED TO PROPERLY CONDUCT THE WORK.
<br />51.
<br />UPON SUBSTANTIAL COMPLETION OF WORK THE CONTRACTOR SHALL
<br />PROJECT INCLUDING SAFETY OF ALL PERSONS AND PROPERTY. THIS
<br />PREPARE A "PUNCHLIST" OF CORRECTIONS AND UNSATISFACTORY AND/OR
<br />REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO
<br />27.
<br />DO NOT SCALE THESE DRAWINGS; WRITTEN DIMENSIONS SHALL GOVERN.
<br />INCOMPLETE WORK FOR REVIEW BY THE ARCHITECT.
<br />NORMAL WORKING HOURS. THE CONTRACTOR SHALL PROVIDE PUBLIC
<br />SHOULD ANY DIMENSIONAL DISCREPANCIES BE ENCOUNTERED,
<br />PROTECTION, AS NECESSARY AND REQUIRED BY GOVERNING AGENCIES
<br />CLARIFICATIONS SHALL BE OBTAINED FROM THE OFFICE OF THE ARCHITECT.
<br />52.
<br />THE CONTRACTOR SHALL MAINTAIN AT THE SITE, ONE RECORD COPY OF ALL
<br />HAVING JURISDICTION, UNTIL CLIENT ACCEPTANCE OF THE PREMISES.
<br />DRAWINGS, PERMITS, SUBMITTALS AND SAMPLES ON WHICH TO RECORD ALL
<br />28.
<br />LARGE SCALE DETAILS SHALL GOVERN OVER SMALLER SCALE PLANS AND
<br />CHANGES DURING CONSTRUCTION. ACCESS TO THESE SHALL BE PROVIDED
<br />8.
<br />THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR THE PROVISION
<br />ELEVATIONS. INFORM ARCHITECT OF DISCREPANCIES PRIOR TO PROCEEDING
<br />FOR THE USE OF ALL TRADES, CLIENT REPRESENTATIVES AND THE
<br />AND MAINTENANCE OF ALL BRACING, SHORING, ENCLOSURES, BARRIERS OR
<br />WITH WORK.
<br />ARCHITECT, DURING ALL PHASES OF CONSTRUCTION.
<br />SCAFFOLDING REQUIRED TO PROVIDE A SAFE WORKING ENVIRONMENT AS
<br />DICTATED BY SITE CONDITIONS AND THE PROGRESS OF WORK.
<br />29.
<br />INSTALL ALL EQUIPMENT AND MATERIALS PER MANUFACTURERS'
<br />53.
<br />DURING THE COURSE OF CONSTRUCTION, ACTUAL LOCATIONS SHALL BE
<br />RECOMMENDATIONS. ANY DIFFICULTIES ARE TO BE REPORTED TO THE
<br />INDICATED TO SCALE IN RED INK ON THE OWNERS RECORD DRAWINGS FOR
<br />9.
<br />WHERE APPLICABLE BY PROJECT SCOPE, DURING THE ENTIRE CONSTRUCTION
<br />ARCHITECT IMMEDIATELY.
<br />ALL RUNS OF MECHANICAL AND ELECTRICAL WORK INCLUDING CONCEALED
<br />PERIOD, ALL EXITS, EXIT LIGHTING, FIRE PROTECTION DEVICES AND ALARMS
<br />WORK WHICH DEVIATES FROM THE DRAWINGS. UPON COMPLETION OF THE
<br />SHALL BE CONTINUOUSLY MAINTAINED IN CONFORMANCE WITH LOCAL
<br />30.
<br />THE CONTRACTOR AND EACH SUBCONTRACTOR SHALL WARRANTEE ALL WORK
<br />PROJECT, INCLUDING ALL PUNCH -LIST ITEMS, THIS INFORMATION SHALL BE
<br />BUILDING CODE AND OTHER GOVERNING ENTITY REQUIREMENTS. U.N.O., ALL
<br />PERFORMED FOR A MINIMUM PERIOD OF ONE (1) YEAR AS SPECIFIED IN THE
<br />NEATLY TRANSFERRED BY THE CONTRACTOR TO A SET OF DRAWINGS, WHICH
<br />EXISTING, SERVICES AND DEVICES SHALL REMAIN ACTIVE.
<br />CONSTRUCTION CONTRACT. ALL DEFECTS OCCURRING IN THE WARRANTEE
<br />SHALL BE MARKED "AS BUILT SET" AND COPIES SHALL BE PROVIDED TO BOTH
<br />PERIOD SHALL BE CORRECTED AT NO ADDITIONAL COST..
<br />THE OWNER AND THE ARCHITECT. WITHIN THREE (3) WEEKS (15 BUSINESS
<br />10.
<br />THE CONTRACTOR SHALL PROTECT THE PROPERTY OF THE CLIENT AND THE
<br />DAYS) OF THE RECEIPT OF THE "AS BUILT SET," APPROVAL FOR FINAL
<br />BUILDING OWNER. INCLUDING, BUT NOT LIMITED TO, WINDOWS, FLOOR AND
<br />31.
<br />THE CLIENT, ARCHITECT, CONSULTANTS AND ALL INSPECTORS FROM
<br />PAYMENT TO THE CONTRACTOR SHALL BE GRANTED OR REASONABLE CAUSE
<br />CEILING FINISHES, PUBLIC TOILETS, ELEVATORS, DOORS & BUCKS,
<br />PERTINENT AGENCIES SHALL BE PERMITTED ACCESS TO THE JOB SITE AT ALL
<br />SHOWN WHY SUCH APPROVAL HAS BEEN DENIED.
<br />ELECTRICAL AND AIR-CONDITIONING EQUIPMENT. THE CONTRACTOR SHALL
<br />TIMES DURING NORMAL WORKING HOURS.
<br />PROTECT ADJOINING PROPERTY. DAMAGE CAUSED BY THE CONTRACTOR'S
<br />54.
<br />PRIOR TO THE COMPLETION OF THE WORK, THE CONTRACTOR SHALL
<br />WORK OR WORKMEN MUST BE MADE GOOD, IN A TIMELY FASHION. PATCHING
<br />32.
<br />THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT
<br />ASSEMBLE AND FURNISH THE CLIENT A COMPLETE SET OF MANUFACTURERS'
<br />AND REPLACEMENT OF DAMAGED WORK SHALL BE PERFORMED AT THE COST
<br />NECESSARY TO EXECUTE ALL WORK, EXCEPT WHERE NOTED AS NOT IN
<br />CATALOG, OPERATING INSTRUCTIONS, START-UP CHECK LISTS, MAINTENANCE
<br />OF THE CONTRACTOR.THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR
<br />CONTRACT (N.I.C.). UNLESS OTHERWISE NOTED ON THESE DRAWINGS OR IN
<br />INSTRUCTIONS AND SIMILAR DATA, AS WELL AS ALL GUARANTEE(S) FOR ALL
<br />ALL SUB -CONTRACTORS. IF THE CONTRACTOR FAILS TO COMPLETE THE
<br />THE SPECIFICATIONS AS BEING NOT IN CONTRACT OR EXISTING, ALL ITEMS,
<br />EQUIPMENT AND OPERABLE DEVICES FURNISHED OR INSTALLED BY THE
<br />REPAIRS IN A TIMELY FASHION, SAID REPAIRS WILL BE MADE BY A
<br />MATERIALS, ETC. AND THE INSTALLATION OF SAME ARE A PART OF THE
<br />CONTRACTOR UNDER THIS CONTRACT, AND SHALL ORIENT AND INSTRUCT
<br />CONTRACTOR SELECTED BY THE OWNER'S REPRESENTATIVE AND BACK
<br />CONTRACT DEFINED BY THESE DRAWINGS AND SPECIFICATIONS.
<br />THE PERSONNEL DESIGNATED BY THE CLIENT IN THE OPERATION OF ALL SUCH
<br />CHARGED ACCORDINGLY.
<br />EQUIPMENT.
<br />33.
<br />MINOR DETAILS NOT SHOWN OR SPECIFIED, BUT NECESSARY FOR PROPER
<br />11,
<br />THE CONTRACTOR SHALL INDEMNIFY AND HOLD HARMLESS THE OWNER, THE
<br />CONSTRUCTION OF ANY PART OF THE WORK, SHALL BE INCLUDED AS IF THEY
<br />55.
<br />THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER IN THE EVENT
<br />TENANT, AND ARCHITECT AGAINST ANY AND ALL CLAIMS AND DEMANDS FOR
<br />WERE INDICATED IN THE DRAWINGS, UNLESS OTHERWISE AGREED UPON.
<br />THAT MOLD, ASBESTOS, OR OTHER ENVIRONMENTAL HAZARD IS UNCOVERED.
<br />THE DAMAGE TO THE PROPERTY OF ANY PERSON, FIRM OR INDIVIDUAL OR
<br />WHERE THE CONTRACT, CONSTRUCTION NOTES OR DRAWINGS CALL FOR ANY
<br />THE OWNER SHALL RETAIN A QUALIFIED CONSULTANT WHO SHALL ARRANGE
<br />FOR PERSONAL INJURIES (INCLUDING DEATH) ARISING OUT OF, OR SUFFERED
<br />WORK OF A MORE STRINGENT NATURE THAN THAT REQUIRED BY THE
<br />FOR THE PROMPT IDENTIFICATION, TESTING, TREATMENT, REMEDIATION AND
<br />WHILE ENGAGED IN, OR CAUSED, IN WHOLE OR IN PART, BY THE EXECUTION
<br />BUILDING CODE, OR ANY OTHER ENTITY HAVING JURISDICTION OVER THE
<br />STORAGE OF THE MOLD OR ASBESTOS AS REQUIRED BY LAW AND GOOD
<br />OF THE WORK; THE CONTRACTOR SHALL WELL AND TRULY DEFEND THE
<br />WORK, THE WORK OF THE MORE STRINGENT NATURE CALLED SHALL BE
<br />CONSTRUCTION PRACTICES. THE ARCHITECT SHALL BEAR NO RESPONSIBILITY
<br />OWNER, TENANT AND ARCHITECT AND SHALL PAY ALL MONIES AWARDED FOR
<br />FURNISHED IN ALL CASES.
<br />FOR WORK RELATED TO THESE MATERIALS.
<br />SUCH DAMAGES OR INJURIES (INCLUDING DEATH), ALL COSTS INCLUDING
<br />ATTORNEY'S FEES SUSTAINED, AND SHALL OBTAIN A FULL ACQUAINTANCE
<br />34.
<br />FOR ALL MATERIALS PURCHASED THE CONTRACTOR SHALL FURNISH
<br />56.
<br />THE CONTRACTOR IS ADVISED THAT THE PREMISE HAS NOT BEEN TESTED FOR
<br />AND RELEASE IN FAVOR OF THE OWNER, TENANT AND ARCHITECT, UNLESS
<br />MATERIALS WHICH YIELD THE HIGHEST PERCENT OF PRE -CONSUMER
<br />LEAD PAINT OR OTHER POTENTIALLY HAZARDOUS MATERIALS. THE
<br />SUCH LIABILITY RESULTS SOLELY FROM THE NEGLIGENCE OF THE OWNER,
<br />(POST-INDUSTRIAL) AND POST -CONSUMER RECYCLED CONTENT. THE
<br />CONTRACTOR SHALL USE ALL APPROPRIATE PRECAUTIONS IN THE CARRYING
<br />TENANT, ARCHITECT, ITS AGENTS OR EMPLOYEES.
<br />CONTRACTOR SHALL FURNISH THESE MATERIALS WITHIN THE PARAMETERS
<br />OUT OF ALL CONSTRUCTION OPERATIONS WHICH MIGHT DISTURB SUCH
<br />OF THE BUDGET AND SHALL NOT PURCHASE ANY COST -ADDING MATERIAL OR
<br />MATERIALS.
<br />12.
<br />THE ARCHITECT SHALL NOT BE HELD RESPONSIBLE FOR THE PERFORMANCE
<br />PAY A PREMIUM (MORE THAN FAIR MARKET VALUE) WITHOUT ARCHITECT AND
<br />OF ANY WORK, NOR FOR THE MEANS AND METHODS OF CONSTRUCTION
<br />OWNER ACKNOWLEDGEMENT AND APPROVAL.
<br />57.
<br />ALL CONTRACTORS SHALL CARRY PROPERTY DAMAGE AND PUBLIC LIABILITY
<br />CHOSEN BY THE CONTRACTOR OR ANY SUB -CONTRACTORS, NOR SHALL THE
<br />INSURANCE AS REQUIRED BY ANY GOVERNING AGENCIES HAVING
<br />ARCHITECT GUARANTEE THE PERFORMANCE OF THEIR CONTRACTS.
<br />35.
<br />FOR ALL MATERIALS PURCHASED THE CONTRACTOR SHALL FURNISH
<br />JURISDICTION AND COMPLYING WITH STATUTORY REQUIREMENTS FOR
<br />MATERIALS MANUFACTURED WITHIN A 500 MILE RADIUS OF THE PROJECT
<br />DISABILITY AND WORKMEN'S COMPENSATION.
<br />13.
<br />THE CONTRACTOR SHALL PERFORM DAILY CLEANING OF THE JOB SITE DURING
<br />SITE WHERE AVAILABLE, WITHIN BUDGET, WITHIN FAIR MARKET VALUE AND
<br />THE CONSTRUCTION PERIOD AND SHALL PROTECT FINISHED WORK FROM
<br />DO NOT PRESENT RISK TO THE PROJECT SCHEDULE.
<br />DAMAGE. IMMEDIATELY PRIOR TO OCCUPANCY, THE CONTRACTOR SHALL
<br />PERFORM FINAL CLEANING OF THE WORK AREA INCLUDING, BUT NOT LIMITED
<br />36.
<br />FOR ALL NEW WOOD PRODUCTS INCLUDING BUT NOT LIMITED TO PARTICLE
<br />TO, WET WIPING OF FURNITURE, AND CASEWORK, WASHING AND WAXING OF
<br />BOARD, MDF, PLYWOOD, OSB AND WOOD DOORS, THE CONTRACTOR SHALL
<br />VCT FLOORING AND THE VACUUMING OF CARPET. ALL CLEANING SHALL BE IN
<br />FURNISH MATERIALS THAT CONTAIN NO ADDED UREA-FORMADALHYDE.
<br />ACCORDANCE WITH MANUFACTURERS' RECOMMENDATIONS.
<br />37.
<br />DETAILS ARE INTENDED TO SHOW THE INTENT OF THE DESIGN. MINOR
<br />14.
<br />THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE WORK OF ALL
<br />MODIFICATIONS MAY BE REQUIRED TO SUIT FIELD CONDITIONS. REQUIRED
<br />SUB -CONTRACTORS AND SHALL PERFORM SUCH MISCELLANEOUS WORK AS
<br />MODIFICATIONS SHALL BE INCLUDED AS PART OF THE WORK.
<br />MAY BE NECESSARY FOR THEM TO COMPLETE THEIR WORK. IT IS EXPECTED
<br />THAT THE CONTRACTOR SHALL ALSO CLOSELY COORDINATE THE WORK WITH
<br />38.
<br />ALL WORK SHALL BE EXECUTED IN A PROFESSIONAL MANNER BY TRADES
<br />THAT OF ALL OTHER VENDORS RETAINED BY THE CLIENT TO ASSURE THAT
<br />PERSONS SKILLED IN THEIR RESPECTIVE TRADES AND IN ACCORDANCE WITH
<br />ALL SCHEDULES ARE MET AND THAT WORK PROCEEDS WITHOUT DELAY.
<br />THE INDUSTRY STANDARD TRADE PRACTICES.
<br />15.
<br />BIDDERS, BEFORE SUBMITTING PROPOSALS, SHALL VISIT AND CAREFULLY
<br />39.
<br />ALL WORK SHALL BE PLUMB, LEVEL AND TRUE. THE CONTRACTOR SHALL LAY
<br />EXAMINE THE AREA AFFECTED BY THE WORK TO FAMILIARIZE THEMSELVES
<br />OUT ALL WORK AND ESTABLISH ALL POINTS, GRADES, LINES AND LEVELS AND
<br />WITH THE EXISTING CONDITIONS AND THE DIFFICULTIES THAT WILL AFFECT
<br />ASSUME FULL RESPONSIBILITY FOR THE SAME.
<br />THE EXECUTION OF THE WORK. SUBMISSION OF A PROPOSAL WILL BE
<br />N
<br />o
<br />N
<br />ti
<br />0
<br />0
<br />z
<br />U
<br />a
<br />0
<br />m
<br />o
<br />�
<br />N
<br />w
<br />d
<br />�
<br />0
<br />LL
<br />w
<br />D
<br />U)
<br />0
<br />z
<br />INFINITY ENGINEERING
<br />GROTTY', LLC
<br />1208 East Kennedy Boulevard
<br />Suite 230
<br />Tampa, Florida 33602
<br />[p]. 813,434.4770
<br />[fl: 813.445.4211
<br />www.iegroup.net
<br />FL Cert. of Auth. No. 27889
<br />r
<br />NISIT SAPPARKHAO, P.E.
<br />FL EG. NO . 64085
<br />No b408ST
<br />.�.
<br />nt
<br />LO
<br />TZ
<br />M
<br />L+_
<br />O
<br />J
<br />z =
<br />U
<br />_J a.
<br />W
<br />= N
<br />j
<br />00
<br />0 J
<br />W
<br />N
<br />a
<br />a o
<br />@ 00
<br />a) I-
<br />E
<br />M
<br />z
<br />a
<br />0
<br />n
<br />am
<br />F-
<br />W
<br />W
<br />F_
<br />O
<br />z
<br />J
<br />ct
<br />W
<br />z
<br />W
<br />IF -Project No.
<br />Sheet
<br />280-22.00
<br />/�
<br />A-N. 1
<br />_
<br />Date
<br />AS NOTED
<br />Scale
<br />AS NOTED
<br />
|