Laserfiche WebLink
• <br />PLAN NOTES <br />A. ALL ELEVATIONS SHOWN ON THIS SHEET <br />ARE BASED ON FINISHED FLOOR AT 0'-0" (U.N.O.) <br />B. COORDINATE SLAB PENETRATIONS WITH LOCATIONS <br />SHOWN ON PLUMBING AND ELECTRICAL PLANS. <br />C. TRENCHING SHOWN ON THIS SHEET REPRESENTS NEW <br />PLUMBING OR ELECTRICAL LINES OR FIXTURE TO BE <br />INSTALLED. REPLACE/REMOVE SLAB PER DETAILS ON SHEET S-2.1. <br />G.C. TO COORDINATE EXACT EXTENT OF SLAB REPLACEMENT/REMOVAL. <br />USE SAW TO CUT SLAB AND DO NOT DAMAGE EXISTING WALLS, <br />COLUMN OR FOOTING WHICH ARE T00 REMAIN. <br />D.ALL ANGLED SLAB CUTS TO BE CUT AT 45 DEGREES. <br />E. FOR EXISTING DRAIN AREAS: G.C. TO REPLACE AND <br />RESLOPE SLAB AS REQUIRED WHERE PROPOSED SLAB <br />CUTS AS SHOWN ON PLAN CONFLICT WITH EXISTING <br />SLOPED SLAB. REF: STRUCTURAL AS—BUILTS REV 1 BY <br />PUBLIX DATED 04-14-2008 AND ASSOCIATED REMODELS. <br />® INDICATES NEW CONCRETE SLAB AT TRENCHING AREAS. <br />EINDICATES TOP OF EXISTING FINISH FLOORS IS AT (0'-0"), <br />UNLESS NOTED OTHERWISE. <br />�o <br />h <br />�00 <br />00 <br />�O O <br />a <br />�� <br />� <br />1� <br />v <br />kn c <br />00 <br />0 <br />� <br />P., <br />rw 0- <br />J <br />W <br />w 0 <br />0 <br />rn Z <br />.� 0 <br />rn <br />0 <br />04 <br />Z W o <br />m Z H N <br />LU W <br />x -J Le) <br />(n o <br />U <br />w a <br />0 <br />V <br />v I <br />W <br />Q <br />IL <br />r <br />O r <br />M <br />co <br />X Um <br />X <br />w m Z <br />CL <br />^ Co <br />w I..L M 5 <br />J <br />U <br />Y , <br />N <br />r <br />Z <br />O <br />O <br />CU <br />>- o <br />W <br />N o <br />Q 0 <br />oLL <br />J C- <br />w m j <br />z <br />8 Cn <br />o � CnCL <br />a �N <br />��� • �� ��� tit <br />; Z <br />d N <br />N <br />�YnX1 <br />f4 p u lL <br />a yam/` Las <br />IL LU <br />It <br />8 <br />O <br />N <br />J <br />-7 <br />N <br />m <br />� <br />QN <br />J <br />op <br />� <br />O <br />o� <br />Z M <br />O <br />LV <br />w CODp3 <br />V <br />1 SLAB PLAN <br />S-2 SCALE: 0'-1/8" - 1'-0" <br />S- <br />C <br />2 8 2019 <br />Hawkins Construction, Inc. <br />