My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
37924 Medical Arts Ct
Zephyrhills
>
Building Department
>
Building Plans
>
37924 Medical Arts Ct
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 2:17:04 PM
Creation date
2/19/2025 12:45:59 PM
Metadata
Fields
Template:
Building Plans
Street #
37924
Location
Medical Arts Ct
Contractor
Ryman Construction
Building Plans - Permit #
3085
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Z <br />ci <br />Z <br />z <br />Ld <br />_j <br />z <br />LJ <br />m in <br />:3 <br />Z <br />z <br />0 <br />m <br />ct <br />cn 0 <br />0 "� <br />(L z <br />m <br />CL <br />z <br />0 <br />< <br />'6 <br />to _j <br />, CL <br />w <br />0 <br />Z <br />Ld Z <br />(f) 0 <br />Ll N <br />off <br />!W <br />i a <br />0 <br />LLJ L) <br />2 <br />=) 0 <br />f5 z <br />V)!3 <br />z , <br />LU M <br />00. <br />LLJ <br />w <br />z <br />00 <br />oz 9 <br />Ir <br />LU <br />0 0 <br />R 9 <br />(L < <br />w <br />M a <br />W <br />2 �_ <br />> <br />Er <br />w <br />(n En <br />Ll Z <br />00 <br />CL <br />tn <br />w <br />It <br />tn- <br />z ED <br />w <br />w <br />_j <br />z 0 <br />L11 D <br />0 <br />x <br />Ld <br />>1 <br />0 (L <br />Q U) <br />V, <br />D <br />_j 0 <br />0 <br />o <br />z <br />LLI W <br />m <br />cq <br />e'� 0 <br />Uj L) <br />Pu o <br />0� Z <br />on <br />5 <br />Z <br />Lj <br />m _j <br />c; 0 <br />0 0 <br />z <br />Ld <br />m <br />0 <br />OD <br />Z <br />z <br />0 <br />LLJ N <br />0- <br />0 <br />jr Z <br />a. <br />Lq <br />0 <br />U) <br />LLJ LLI <br />L) <br />z <br />0- <br />I <br />0 <br />L) <br />LLJ <br />0 <br />9 I= <br />Lu Z <br />m Lo <br />Ld <br />M <br />w <br />Ld LI <br />is L) <br />>: <br />I <br />Li U) <br />Z-1 LL <br />0 <br />0 z <br />L) <br />Lu ro <br />M z <br />0 Lu <br />W <br />z <br />W <br />Z <br />LLT <br />L) Z <br />50_�' 12 <br />LLI o <br />W In <br />LL <br />00 <br />L) <br />z <br />w <br />z M <br />Lu <br />z <br />0 <br />X 0: <br />LU (L <br />m <br />8R <br />o <br />Li <br />In <br />0 <br />U) <br />V; <br />z <br />0 <br />IR- <br />LLJ <br />(L < <br />V) <br />E6 z <br />C.D < <br />z z <br />1 0 <br />0 � <br />D <br />V; " <br />V) <br />z <br />0 <br />(L 0 <br />(D�TE� PL��BING PLAN <br />.�A <br />Z 4� <br />SINK LEGEND <br />1 THE PLUMBER WILL SUPPLY AND INSTALL A WATER PRESSURE REGULATOR ON <br />INCOMING WATER SUPPLY. THE PLUMBER WILL SET THE REGULATOR NOT TO <br />EXCEED 65 PSI. <br />2. THE PLUMBER WILL INSTALL THE WATER FILTER (AND THE WATER SOFTENER, AS <br />NEEDED) ON THE COLD WATER MAIN ENTERING THE DENTAL SUITE. THE WATER <br />FILTER WILL BE SUPPLIED BY EITHER BENCO DENTAL OR THE DOCTOR. <br />3. THE PLUMBER WILL SUPPLY AND INSTALL SEPARATE MANUAL SHUT—OFF VALVES <br />ON ALL SINKS, DENTAL UNITS, AND OUTLETS REQUIRING WATER AND/OR AIR. <br />4. ALL SINKS AND FAUCETS WILL BE CONNECTED BY THE PLUMBER. <br />5. ALL PIPES WILL BE CONCEALED WITHIN THE WALLS AND/OR THE FLOOR, UNLESS <br />OTHERWISE NOTED ON THE BENCO DRAWINGS. <br />6. THE PLUMBER WILL SEAL ALL PENETRATIONS THROUGH THE FLOOR WITH A <br />FIRESTOP OR EQUIVALENT WATERPROOFING. <br />7. ALL PIPES WILL BE FLUSHED CLEAR OF ALL DEBRIS BY THE PLUMBER. <br />8. THE PLUMBER WILL BE ONSITE ON THE DAY(S) OF INSTALLAnON TO WORK WITH <br />THE BENCO REPRESENTATIVE ON THE FINAL HOOK—UP. THE PLUMBER WILL <br />SUPPLY AND INSTALL ANY AND ALL MATERIALS INDICATED IN THE PLUMBING <br />DETAILS SHOWN AND THE MANUFACTURER'S INSTALLATION INSTRUC71ON SHEETS. <br />9. THE PLUMBER WILL PROVIDE AND INSTALL ALL WATER SAFETY DEVICES (i.e. CHECK <br />VALVES, BACKFLOW PREVENTERS, ErC.) IN ACCORDANCE WITH LOCAL CODE. <br />10. THE PLUMBER WILL INSTALL COMPLETE AND MAKE FINAL HOOK—UP TO THE <br />FOLLOWING DENTAL EQUIPMENT, SUPPLIED BY THE DOCTOR AND/OR BENCO <br />DENTAL, INCLUDING, BUT NOT LIMITED TO: <br />— AIR COMPRESSOR <br />— VACUUM PUMP <br />— AIR/WATER SEPARATORS <br />— WATER CONTROL VALVE AND FILTER ASSEMBLY <br />11. AN ELECTRIC MASTER WATER CONTROL VALVE AND FILTER ASSEMBLY IS REQUIRED <br />FOR ANY/ALL COLD WATER LINES FEEDING ALL DENTAL EQUIPMENT. THIS WATER <br />CONTROL VALVE AND FILTER ASSEMBLY IS REQUIRED WHETHER SUPPLIED BY <br />BENCO, THE DOCTOR, OR THE PLUMBER. THE PLUMBER IS TO VERIFY THE EXACT <br />LOCATION OF THE WATER CONTROL VALVE AND FILTER ASSEMBLY WITH THE <br />DOCTOR/OWNER, AND A BENCO REP AT THE TIME OF LAYOUT AND PRIOR TO <br />EQUIPMENT SELECTION. <br />12. THE PLUMBER WILL COMPLY WITH ALL BENCO INSPECTIONS, AS NOTED IN THE <br />GENERAL NOTES ON THE FIRST PAGE OF THESE DOCUMENTS. <br />13. GENERAL DENTAL PLUMBING LINES SHOWN ARE FOR GRAPHICALLY DISPLAYING <br />ORIGINATION AND TERMINATION POINTS. FIELD CONDITIONS MAY ALTER PLUMBING <br />LINE LAYOUT, PER PLUMBERS DISCRETION. THE FINAL LAYOUT OF THE PLUMBING <br />LINES IS THE RESPONSIBILITY OF THE PLUMBER. <br />14. THE APPLICATION OF DRIVE GAS (NFPA, 2012, 99.5.3.7, AS THIS IS NOT <br />CONSIDERED NFPA "AIR" ) AS NOTED ON THIS PLAN IS NOT USED FOR <br />LIFE—SUPPORT PURPOSES SUCH AS RESPIRATORS, IPPS MACHINES, ANALGESIA, <br />ANESTHESIA, AND SO FORTH. <br />15. NFPA, 2012, 99.5.3.8 VACUUM PIPING <br />16. NFPA, 2012, 99.5.3.8 SCAVENGING PIPING <br />NFPA LEGEND <br />SYMBOL <br />NFPA <br />2012/2015 <br />NFPA <br />2018 <br />O=OXYGEN <br />99.5.3.6 <br />99.15.4.4.2 <br />N=NITROUS OXIDE <br />99.5.3.6 <br />99.15.4.4.2 <br />S=SCAVENGING <br />99.5.3.8 <br />99.15.4.4.4 <br />V=VACUUM <br />99.5.3.8 <br />99.15.4.4.4 <br />D=DRIVE GAS/ <br />DENTAL AIR <br />99.5.3.6 <br />99.15.4.3.3.2 <br />99.15.4.4.3 <br />W=W.A.G.D. <br />99.5.3.8 <br />99.15.3.2.1.5 <br />SINK — SINK, FAUCET AND STRAINER SUPPLIED BY OTHERS. PLUMBER <br />SHALL INSTALL HOT AND COLD WATER LINES, WASTE AND TRAP <br />ROUGH —IN PER LOCAL CODES. <br />SJUK — SINK, FAUCET AND STRAINER PROVIDED WITH CABINETRY <br />SUPPLIED BY BENCO. PLUMBER SHALL INSTALL HOT AND COLD WATER <br />LINES, WASTE AND TRAP ROUGH —IN PER LOCAL CODES. PLUMBER <br />SHALL BE RESPONSIBLE FOR FINAL HOOKUP. SEE MANUFACTURER'S <br />SPECIFICATIONS FOR EXACT LOCATION AND REQUIREMENTS. <br />NFPA REFERENCES FOR N20/02 (NON -ANESTHESIA) <br />2012 <br />2015 <br />2018 <br />MED GAS PIPING, <br />BRAZING, & TESTING <br />99.5.3.6 <br />99.5.3.6 <br />99.15.4 <br />MED GAS STORAGE <br />99.11.3 <br />99.11.3 <br />99.11.3 <br />MED GAS STORAGE <br />VENTILATION <br />NATURAL: <br />MECHANICAL- <br />99.9.3.6.5.2 <br />99.9.3.6.5.3 <br />99.9.3.6.5.2 <br />99.9.3.6.5.3 <br />99.9.3.6.5.2 <br />99.9.3.6.5.3 <br />CATEGORY 3 DRIVE GAS <br />99.5.3.7 <br />99.5.3.7 <br />DENTAL AIR <br />99.15.4.3.3.2 <br />CATEGORY 3 VACUUM <br />99.5.3.8 <br />99.5.3.8 <br />DENTAL VACUUM <br />99.15.4.3.3.3 <br />CATEGORY 3 SCAVENGING <br />99.5.3.8 <br />99.5.3.8 <br />NITROUS OXIDE <br />SCAVENGING <br />99.15.4.3.3.4 <br />filAummatake <br />mclotu <br />PITTSTON, PA - DALLAS,TX <br />I . 8 0 0 . 4 6 2 . 3 6 2 6 / <br />PRACTICE <br />SOLUTIONS <br />COSTA MESA, CA <br />B E N C 0 . C 0 M <br />IV HermanMitter <br />C <br />E <br />E <br />0 <br />0 <br />E <br />n <br />cn <br />cu <br />0 <br />Jc <br />f j <br />i4 <br />mq <br />.j <br />LL <br />ISSUED: DATE: <br />ZONE STUDY MM/DD/YY <br />DESIGN SCHEMATIC 07/07/21 <br />DCD (FOR REVIEW) 07/23/21 <br />DCD IMM/DDNY <br />PROJECT #: <br />C121070-RL <br />DRAWN BY: t REVIEWED BY.TCHECKED BY: <br />TH <br />OTHERS,RL _T <br />DRAWING TITLE: <br />DENTAL PLUMBING PLAN <br />SHEET: <br />Q4.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.