MECHANICAL SPECIFICATIONS
<br />SCOPE: THE CONTRACTOR SHALL VISIT THE SITE AND EXAMINE THE DRAWINGS AND SPECIFICATIONS BEFORE SUBMITTING A PROPOSAL.
<br />ALL WORK SHALL BE IN ACCORDANCE WITH THE FLORIDA BUILDING CODES SEVENTH EDITION (2020), WITH ALL AMENDMENTS, AND LOCAL CODES AND ORDINANCES. INSTALLATION
<br />SHALL COMPLY WITH THE CODE REFERENCED STANDARDS SET BY NFPA, ASHRAE, ASPE, SMACNA, NEC AND UL. THE SYSTEMS, EQUIPMENT, DEVICES AND ACCESSORIES SHALL BE
<br />INSTALLED, FINISHED, TESTED AND ADJUSTED FOR CONTINUOUS AND PROPER OPERATION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR HIS WORK FITTING IN PLACE AND SHALL
<br />COORDINATE WITH OTHER TRADES TO AVOID INTERFERENCE WITH THEIR WORK. THE INFORMATION GIVEN HEREIN AND ON THE DRAWINGS IS AS EXACT AS COULD BE SECURED, BUT
<br />ITS EXTREME ACCURACY IS NOT GUARANTEED. THE DRAWINGS ARE DIAGRAMMATIC, INTENDED TO SHOW GENERAL ARRANGEMENT, CAPACITY AND LOCATION OF VARIOUS COMPONENTS,
<br />EQUIPMENTS, AND DEVICES. IF WORK IS REQUIRED IN A MANNER TO MAKE IT IMPOSSIBLE TO PRODUCE FIRST CLASS WORK, OR SHOULD DISCREPANCIES APPEAR AMONG THE
<br />CONTRACT DOCUMENTS, OR BETWEEN THE CONTRACT DOCUMENTS AND THE MANUFACTURER'S RECOMMENDATIONS,THE CONTRACTOR SHALL REQUEST INTERPRETATION BEFORE
<br />PROCEEDING WITH WORK. CONTRACTOR SHALL FURNISH AND INSTALL ALL MINOR ITEMS WHICH ARE OBVIOUSLY AND REASONABLY NECESSARY TO COMPLETE THE INSTALLATION
<br />WHETHER OR NOT SPECIFIED IN THE DOCUMENTS.
<br />REQUIRED COORDINATION: ALL WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN DUCTS AND PIPING (INCLUDING DIVIDED DUCTS) AND TRANSITIONS AROUND
<br />OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
<br />CONSTRUCTION PLANS: IN GENERAL, PLANS AND DIAGRAMS ARE SCHEMATIC ONLY AND SHOULD NOT BE SCALED.
<br />REQUIRED ACCESS: CONTRACTOR SHALL ENSURE THAT ALL EQUIPMENT AND DEVICES THAT REQUIRE REPLACEMENT, SERVICING, ADJUSTING OR MAINTENANCE SHALL BE LOCATED TO
<br />ALLOW EASY ACCESS AND SPACE FOR REMOVAL OF INTERNAL ASSEMBLIES, IF REQUIRED. CONTRACTOR SHALL PROVIDE ACCESS PANELS WHERE REQUIRED TO ALLOW ACCESS, EVEN
<br />IF NOT INDICATED ON THE DRAWINGS AT NO ADDITIONAL COST TO OWNER.
<br />WIND RESISTANCE: ALL EQUIPMENT, APPLIANCE AND SUPPORTS LOCATED EXTERIOR OF THE FACILITY SHALL BE INSTALLED TO RESIST WIND LOADS AS DETAILED IN THE BUILDING
<br />CODE.
<br />CUTTING AND PATCHING: ALL OPENINGS AROUND DUCT OR PIPE PENETRATIONS THROUGH SMOKE OR FIRE RATED FLOORS, CEILINGS OR WALLS SHALL BE SEALED AIRTIGHT WITH
<br />MATERIALS HAVING A RATING EQUAL TO THE MATERIAL OF THE WALL, CEILING OR FLOOR PENETRATED.
<br />EQUIPMENT TAGS: ALL EQUIPMENT WILL HAVE A PERMANENTLY FIXED ENGRAVED PHENOLIC LABEL CORRESPONDING TO THE EQUIPMENT TAG ON THE ENGINEER'S DRAWINGS.
<br />FIRESTOPPING: UL APPROVED MATERIALS AND METHODS SHALL PROTECT THE PENETRATIONS OF FIRE AND/OR SMOKE RATED WALLS, CEILINGS OR FLOORS. THE RATING OF THE
<br />FIRESTOPPING SHALL EQUAL THE RATING OF THE RATED ASSEMBLY. ALL INSULATION SHALL HAVE COMPOSITE FIRE AND SMOKE HAZARD RATINGS AS TESTED BY PROCEDURE ASTM
<br />E-84, NFPA-225, UL-723 NOT EXCEEDING:
<br />FLAME SPREAD 25
<br />SMOKE DEVELOPED 50
<br />FUEL DISTRIBUTED 50
<br />ACCESSORIES SUCH AS ADHESIVE, MASTIC, CEMENTS AND TAPES SHALL HAVE THE SAME COMPONENT RATING AS LISTED ABOVE.
<br />START-UP: CONTRACTOR SHALL STARTUP ALL EQUIPMENT AND FOLLOW THE MANUFACTURER'S START-UP PROCEDURES.
<br />OPERATING AND MAINTENANCE DATA: SUBMIT THREE COPIES OF MANUFACTURER'S OPERATING AND MAINTENANCE INSTRUCTIONS AND SPARE PARTS LIST FOR EACH PIECE OF
<br />EQUIPMENT.
<br />CONDENSATE DRAIN PIPING: CONDENSATE DRAIN PIPING SHALL BE PVC TYPE DWV. DRAINS SHALL BE PITCHED NOT LESS THAN 1 PERCENT. RUNS SHALL BE AS SHORT AS
<br />POSSIBLE WITHOUT ANY DIPS TO TRAP WATER AND INTERFERE WITH PROPER DRAINAGE. PROVIDE TRAPS AND CLEANOUTS AT DRAIN PAN CONNECTIONS. RUN CONDENSATE DRAIN
<br />PER PLANS. INSULATE CONDENSATE LINE INSIDE BUILDINGS WITH 1" ARMAFLEX (ASTM E-84).
<br />REFRIGERANT PIPING: SHALL BE ACR TUBING, DRIED AND SEALED, HARD TEMPER COPPER WITH WROUGHT COPPER BRAZED JOINTS. ASTM-1388. COORDINATE AND VERIFY PROPER
<br />REFRIGERANT PIPE SIZES AND CHARGES WITH EQUIPMENT MANUFACTURER PRIOR TO ANY INSTALLATION. INSULATE SUCTION LINE WITH 1" ARMAFLEX. WRAP INSULATION OUTSIDE
<br />BUILDING ABOVE GROUND WITH ARMACELL # ARMACHECK 350 SILVER TAPE (UV -RESISTANT).
<br />DIMENSIONAL DATA: ALL DUCTWORK DIMENSIONS SHOWN ON DRAWINGS ARE CLEAR INSIDE DIMENSIONS.
<br />SUPPLEMENTARY SUPPORTS: CONTRACTOR SHALL PROVIDE ALL SUPPLEMENTARY STEEL REQUIRED TO SUSPEND MECHANICAL EQUIPMENT AND MATERIALS, IN ORDER TO PROVIDE A
<br />"VIBRATION -FREE" RIGID INSTALLATION.
<br />DUCTWORK - GENERAL: FABRICATE AND INSTALL ALL DUCTWORK AND DUCT ACCESSORIES IN ACCORDANCE WITH THE LATEST EDITION OF APPLICABLE SMACNA STANDARDS, THE
<br />LATEST NFPA STANDARDS, AND THIS SPECIFICATION. THE MOST STRINGENT OF THESE SHALL BE THE MINIMUM STANDARD. MINIMUM OF 1" PRESSURE CLASS RATING FOR ALL
<br />DUCTWORK.
<br />ALL RECTANGULAR SUPPLY AND RETURN DUCTWORK TO BE R-6.0 RIGID FIBERGLASS DUCTBOARD (UL-181 AND 181A) WITH CLEANABLE AIRSIDE SURFACE AND EPA -APPROVED
<br />BIOCIDE (ANTI -MICROBIAL AGENT) IMPREGNATED IN MATTED AIR -SIDE SURFACE.
<br />ALL EXHAUST DUCTWORK AND FRESH AIR DUCTWORK SHALL BE GALVANIZED SHEET METAL STEEL OF LOCKFORMING GRADE CONFORMING TO ASTM A653 AND ASTM A924.
<br />DUCTWORK INSTALLATION: ALL INTERIOR DUCTWORK SHALL BE SEALED TO SMACNA CLASS (B) REQUIREMENTS WITH UL-181 MASTIC. PROVIDE DOUBLE THICKNESS TURNING VANES IN
<br />ALL NINETY (90) DEGREE SQUARE ELBOWS.
<br />CONTRACTOR SHALL FURNISH AND INSTALL ALL DUCT OFFSETS AS REQUIRED TO CLEAR INTERFERENCES WITH EXISTING BUILDING STRUCTURE, PIPES AND ELECTRICAL CONDUITS.
<br />FURNISH AND INSTALL ALL MISCELLANEOUS STEEL SUPPORTS REQUIRED FOR HANGING AND SUPPORTING DUCTWORK UNLESS OTHERWISE NOTED.
<br />VOLUME DAMPERS: DAMPERS SHALL BE PROVIDED IN THE BRANCHES OF THE DUCT SYSTEMS WHERE SHOWN ON DRAWINGS AND AS REQUIRED TO PROPERLY REGULATE THE VOLUME
<br />OF AIR DELIVERED TO OR WITHDRAWN FROM THE OUTLETS..
<br />FLEXIBLE DUCTWORK: FLEXIBLE DUCTWORK MAY BE USED FOR THE FINAL RUNOUTS TO AIR OUTLETS, AND SHALL BE SIZED TO MATCH AIR OUTLET NECK. FLEXIBLE DUCTS SHALL
<br />NOT EXCEED 8-FEET LENGTHS. NO FLEXIBLE DUCTS SHALL PENETRATE FIRE -RATED WALLS OR CEILINGS. FLEXIBLE DUCTS SHALL COMPLY WITH THE PROVISIONS OF UL-181 CLASS
<br />1 AIR DUCT MATERIAL. DUCTS SHALL BE FACTORY MADE AND COMPOSED OF: AN INNER FIBERGLASS WOVEN LINER, ENCAPSULATED HELIX COIL, A FIBERGLASS INSULATING BLANKET
<br />AND OUTER VAPOR BARRIER OF FIBERGLAS REINFORCED METALIZED FILM LAMINATE. PROVIDE THERMAFLEX MK-C FLEXIBLE DUCT OR APPROVED EQUAL (MIN. OF R-6.0). CARE IS
<br />TO BE TAKEN THAT ALL RUNOUTS OF FLEXIBLE DUCTS ARE INSTALLED AS STRAIGHT AS PRACTICAL AND FASTENED SO AS TO ELIMINATE AIR LEAKAGE. THE INSTALLATION SHALL
<br />CONFORM TO THE TECHNIQUES SHOWN IN THE UL APPROVED AND FACTORY -SUPPLIED INSTRUCTIONS.
<br />INSULATION: ASSURE ALL DUCTWORK IS SEALED PRIOR TO INSTALLING INSULATION.
<br />ALL METAL SUPPLY, RETURN, AND FRESH AIR (OUTSIDE AIR) DUCTWORK SHALL BE WRAPPED WITH 2" THICK FIBERGLASS BLANKET INSULATION WITH FSK (ASJ) FACING, MINIMUM
<br />INSTALLED R VALUE OF 6.0, AND FLAME SPREAD/SMOKE DEVELOPED RATINGS OF 25/50 BY ASTM E-84. INSTALL INSULATION ON DUCTWORK USING ADHESIVE AND/OR WELD PINS
<br />WITH WASHERS. SEAL ALL INSULATION JOINTS, SEAMS AND FASTENER PIN PENETRATIONS WITH VAPOR RETARDING PRESSURE SENSITIVE TAPE OR WITH GLASS FABRIC AND MASTIC.
<br />INSTALL TAPERED INSULATION TO THE TOP OF ALL EXTERIOR HORIZONTAL RECTANGULAR DUCTS WIDER THAN 24" BEFORE APPLYING THE FINISH INSULATION TO CAUSE A 1/2" PER
<br />FOOT SLOPE OF FINISH INSULATION TO SHED WATER.
<br />NOTE TO CONTRACTOR
<br />ON EXISTING CONDITIONS:
<br />CONTRACTOR SHALL VISIT THE SITE PRIOR TO BID
<br />AND SURVEY ALL EXISTING CONDITIONS AND
<br />EQUIPMENT PRIOR TO SUBMITTING BID FOR WORK
<br />REQUIRED BY THESE DOCUMENTS. THIS
<br />INCLUDES ABOVE THE CEILING AND ON TOP OF
<br />THE ROOF.
<br />2. CONTRACTOR SHALL REFER TO AND READ
<br />THROUGH ALL OF THE "CONTRACTOR'S SCOPE OF
<br />WORK" AS DEFINED IN THE BID SPECIFICATIONS
<br />AND DOCUMENTS AS PART OF THE BID PROCESS.
<br />3. IF AT ANY TIME, THERE IS DISCREPANCY BETWEEN
<br />THE PLANS & SPECS, OR CONFUSION ZCONCERN
<br />OVER REQUIRED WORK, CONTRACTOR SHALL
<br />IMMEDIATELY NOTIFY ARCHITECT, ENGINEER, &ZOR
<br />OWNER AND GET DIRECTION BEFORE PROCEEDING
<br />WITH WORK IN QUESTION.
<br />4. FOR ALL EXISTING EQUIPMENT TO BE
<br />RE -LOCATED &/OR RE -USED, CONTRACTOR
<br />SHALL BE RESPONSIBLE FOR DISCONNECTION,
<br />SAFE STORAGE, & RE -CONNECTION OF SAID
<br />EQUIPMENT COMPLETELY.
<br />5. FOR ALL EXISTING EQUIPMENT TO BE
<br />DEMOLISHED (I.E. DEMO) CONTRACTOR SHALL BE
<br />RESPONSIBLE FOR DISCONNECTION, REMOVAL, &
<br />DISPOSAL OFF -SITE PER CODE, OF SAID
<br />EQUIPMENT COMPLETELY.
<br />HVAC LEGEND
<br />SUPPLY AIR DIFFUSER OR GRILLE
<br />RETURN/EXH. AIR REGISTER OR GRILLE
<br />NEW DUCTWORK, WITH SIZE LISTED
<br />FLEXIBLE DUCT
<br />DUCT SMOKE DETECTOR
<br />FIRE DAMPER
<br />---M I SMOKE/FIRE DAMPER
<br />CID
<br />CONDENSATE DRAIN
<br />RFT
<br />REFRIGERANT LINE SET
<br />0
<br />THERMOSTAT BASE
<br />@
<br />HUMIDITY SENSOR
<br />[T]
<br />REMOTE TEMPERATURE SENSOR
<br />CARBON DIOXIDE SENSOR
<br />CARBON MONOXIDE SENSOR
<br />4+
<br />AIRFLOW DIRECTION
<br />44
<br />1" DOOR UNDERCUT
<br />0
<br />ROUND, DIAMETER
<br />AFF
<br />ABOVE FINISHED FLOOR
<br />CFM
<br />CUBIC FEET PER MINUTE
<br />TYP
<br />TYPICAL - ITEM OR METHOD
<br />VID / MANUAL VOLUME DAMPER (W/HANDLE)
<br />MID V.&_ _Jq MOTORIZED DAMPER
<br />SUPPLY DUCT
<br />TAKE -OFF WITH SCOOP
<br />SUPPLY DUCT
<br />TAKE -OFF WITH VID
<br />DOUBLE THICK
<br />VANES
<br />SIDE DIFFUSER
<br />WITH VD
<br />(N)
<br />NEW
<br />(E)
<br />EXISTING
<br />SWITCH
<br />CONNECT NEW
<br />TO EXISTING
<br />WAVE GUIDE
<br />GRAVITY BACK -DRAFT
<br />DAMPER
<br />BAROMETRIC RELIEF
<br />DAMPER
<br />CONDENSATE LINE ON ROOF SUPPORTS
<br />DIFFUSER TAG EQUIPMENT TAG
<br />AIRFLOW --EQUIPMENT
<br />TYPE
<br />400 CFM
<br />CD- 12"0
<br />\_NECK \—EQUIPMENT
<br />MARK SIZE NUMBER
<br />C5
<br />00
<br />co 0
<br />CO (0
<br />Z
<br />z 0- U-
<br />c:
<br />F_ co
<br />co 0
<br />CO —
<br />0
<br />ry
<br />BRANCH DUCT RUNOUTS: SHALL BE GALVANIZED ROUND (SNAPLOCK) SEAM LOCKED DUCTWORK WITH EXTERNAL FIBERGLASS WRAP INSULATION (R-6.0).
<br />NOTE: BRANCH DUCT RUNOUTS & FLEXIBLE DUCTS SHALL BE THE SAME SIZE DUCT AS THE DIFFUSER NECK CONNECTED TO, AS LISTED ON THE FLOOR PLAN. Job NUmbw
<br />GRILLES AND DIFFUSERS: ALL GRILLES AND DIFFUSERS SHALL BE INSTALLED WITH AN INSULATED BOOT OR BLANKET. PROVIDED A METHOD OF VOLUME CONTROL BY DEVICE
<br />ADJUSTABLE AT DIFFUSER FACE OR MANUAL VOLUME DAMPERS AT TAKEOFF BRANCHES. COORDINATE DIFFUSER AND GRILLE LOCATIONS WITH ELECTRICAL LIGHTING LAYOUTAND
<br />ARCHITECTURAL REFLECTED CEILING PLAN.
<br />CONTROLS: PROVIDE CONTROLS COMPLETE TO SUIT THE EQUIPMENT PROVIDED AND TO ACCOMPLISH THE SEQUENCE OF OPERATION AS REQUIRED BY PLANS AND SYSTEMS. LOCATE
<br />THERMOSTATS 48" ABOVE FINISHED FLOOR, UNLESS OTHERWISE NOTED. THERMOSTATIC CONTROLS SHALL BE PROGRAMMABLE TO INCLUDE ALL ITEMS REQUIRED BY FBC-ENERGY
<br />CODE SIXTH EDITION AND SHALL HAVE LOCKOUT FUNCTION WITH PASSWORD.
<br />MINIMUM FUNCTIONALITY SHALL INCLUDE: 7-DAY A WEEK PROGRAMMABLE CONTROLLER WITH SETBACKS UP TO 85—F AND DOWN TO 55-F, 10-HOUR BATTERY BACKUP, MANUAL
<br />OVERRIDE FOR 2-HOURS, AND AUTOMATIC STARTING (OPTIMUM START) ADJUSTABLE DAILY START TIMES.
<br />TESTING AND BALANCING: THE CONTRACTOR SHALL ENSURE THAT ALL DEVICES AND SYSTEMS ARE COMPLETE, TESTED AND BALANCED, AND READY FOR OPERATION WHEN THE FACILITY
<br />IS HANDED OVER THE OWNER. THE AIR CONDITIONING SYSTEM SHALL BE TESTED IN ACCORDANCE WITH CURRENT AABC OR NEBB OR NBC PROCEDURES. A CERTIFIED, WRITTEN
<br />REPORT SHALL BE SUBMITTED TO MECHANICAL ENGINEER FOR APPROVAL. THE CONTRACTOR SHALL RECTIFY DISCREPANCIES BETWEEN THE ACTUAL INSTALLATION AND CONTRACT
<br />DOCUMENTS WHEN IN THE OPINION OF THE T&B AGENCY OR THE ENGINEER, THAT THE DISCREPANCIES WILL AFFECT SYSTEM BALANCE AND PERFORMANCE.
<br />SUBMITTALS REQUIRED:
<br />SUBMIT SHOP DRAWINGS FOR ALL MATERIALS, EQUIPMENT, AND SYSTEMS REQUIRED BY THESE DOCUMENTS (SEE ARCH. PLANS/SPECS FOR SPECIFIC FORMATTING), INCLUDING:
<br />SPLIT SYSTEMS
<br />TEST/BALANCE REPORT
<br />EXHAUST FANS
<br />DIFFUSERS AND GRILLES
<br />DUCTWORK, INSULATION AND ACCESSORIES (CONNECTIONS, MASTICS, ETC.)
<br />THERMOSTATS & CONTROLS
<br />SUBSTITUTIONS: CONTRACTOR SHALL PAY FOR ANY AND ALL ADDED COSTS ASSOCIATED WITH ANY SUBSTITUTION, INCLUDING SUBSTITUTIONS THAT REQUIRE CHANGES TO THE OTHER
<br />BUILDING COMPONENTS, SUCH AS ELECTRICAL, STRUCTURAL REINFORCING, CEILINGS, WALLS, ROOFS, ETC. THIS WILL INCLUDE ANY ENGINEERING/ARCHITECTURAL RE -DESIGN COSTS
<br />AS A RESULT OF SAID SUBSTITUTION. THESE COSTS SHALL NOT BE BORNE BY THE OWNER, ARCHITECT, NOR ENGINEER, REGARDLESS OF ACCEPTABILITY OF SUBSTITUTION.
<br />ENGINEER RESERVES THE RIGHT TO ACCEPT OR DENY ANY SUBSTITUTION THAT HE DOES NOT DEEM TO BE EQUIVALENT, AND CONTRACTOR SHALL PROVIDE SPECIFIED OR EQUIVALENT
<br />MATERIALS/EQUIPMENT AT NO ADDITION COST TO OWNER, SHOULD A SUBSTITUTION BE DENIED.
<br />GUARANTEE: THE ONE-YEAR GUARANTEE PERIOD SHALL NOT START UNTIL THE PROJECT IS FULLY COMPLETED AND THE CONTRACTOR HAS RECEIVED THE FINAL PAYMENT AND
<br />CERTIFICATION OF OCCUPANCY. ALL EQUIPMENT AND ALL WORK SHALL BE FULLY GUARANTEED, PARTS AND LABOR, FOR ONE YEAR FROM THE DATE OF THE CERTIFICATE OF
<br />COMPLETION. REPAIRS MADE DURING THIS PEROID MUST BE FULLY GUARANTEED FOR AN ADDITIONAL ONE YEAR PERIOD FROM THE DATE OF REPAIRS. IN ADDITION, THE
<br />CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ANY DAMAGE TO THE BUILDING, AND ITS CONTENTS OR OTHER EQUIPMENT, CAUSED BY DEFECTS OR IMPROPER INSTALLATION
<br />OF EQUIPMENT OR MATERIAL INSTALLED. A 5-YEAR WARRANTY IS REQUIRED FOR COMPRESSORS.
<br />SPLIT SYSTEM SEQUENCE OF OPERATIONS:
<br />AHU TO SUPPLY AIR CONTINUOUSLY IN
<br />OCCUPIED MODE AND COMPRESSOR TO CYCLE
<br />TO MAINTAIN SPACE TEMPERATURE SETPOINT
<br />(COOLING — 75-F, HEATING 687). AHU TO
<br />CHANGE INTO UNOCCUPIED MODE VIA
<br />PROGRAMMING. DURING UNOCCUPIED MODE,
<br />AHU'S SUPPLY AIR AND COMPRESSORS SHALL
<br />CYCLE TO MAINTAIN SETBACK TEMPERATURE
<br />(COOLING — 807, HEATING 607).
<br />.MINI SPLIT SYSTEM SEQUENCE OF OPERATIONS:
<br />MAHU'S TO SUPPLY AIR CONTINUOUSLY IN
<br />OCCUPIED MODE AND COMPRESSOR TO CYCLE
<br />TO MAINTAIN SPACE TEMPERATURE SETPOINT
<br />(COOLING — 757, HEATING 687). MAHU'S TO
<br />RUN CONTINUOUSLY.
<br />EXHAUST FAN SEQUENCE OF OPERATION:
<br />REFER TO FAN SCHEDULE FOR INTERLOCKS AND
<br />OPERATION PARAMETERS.
<br />STEPANEK—L
<br />k2tAmA N DASSOCIATES
<br />2257 TWELVE OAKS WAY, SUITE 103
<br />WESLEY CHAPEL, FL 33544
<br />PH (813) 991-1248
<br />REGISTRY # 8397 21-143
<br />Revkdons
<br />\N D
<br />No 56189
<br />39
<br />STATE 0 F
<br />R
<br />0 itillill
<br />NAk-
<br />Sh"t No.
<br />mi
<br />MATTHEW D. LEWIS, P.E. FL LIC#56189
<br />-1 T__ 1 11 1 L L
<br />
|