<br />MECHANICAL, SYMBOLS AND ABBREVIATIONS
<br />ABBREVIATIONS DUCTWORK AT DIFFUSERS & GRILLES DUCTWORK SYMBOLS DRAWING SYMBOLS GENERAL PIPING SYMBOLS
<br />ACC AIR COOLED CHILLER IN INCHES SCHEDULED EQUIPMENT DESIGNATION. i ELEVATION DESIGNATION.
<br />SINGLE LINE -HARD DOUBLE LINE -HARD OR
<br />ACCU AIR-COOLED CONDENSING UNIT IN HG INCHES OF MERCURY OR FLEXIBLE FLEXIBLE CONNECTION ®UP ®DN SUPPLY DUCT (UP &DOWN) EQ (DOWN)
<br />-TOP INDICATES EQUIPMENT REFERENCE OFFICIAL �� DIRECTION OF PIPE PITCH D
<br />ACU AIR CONDITIONING UNIT IN WG INCH WATER GAUGE # CONNECTION ABBREVIATION PROJECT DATUM DIRECTION OF FLOW
<br />AD ACCESS DOOR IPLV INTEGRATED PART LOAD VALUE -BOTTOM INDICATES EQUIPMENT
<br />106 WEST NORTH BAY STREET 1 TAMPA, FL 33603
<br />T REVISION REFERENCE.
<br />AFF ABOVE FINISHED FLOOR -®-. �-. SUPPLY DIFFUSER OR GRILLE ® UP ® DN EXHAUST DUCT (UP & DOWN) NUMBER A REFER TO SHEET REVISION REDUCER OR INCREASER
<br />www.cjaegroup.com
<br />AFM AIR FLOW MEASURING kW KILOWATT (HORIZONTAL MOUNT) REFER TO EQUIPMENT SCHEDULES BLOCK
<br />AHU AIR -HANDLING .UNIT kWh KILOWATT HOUR
<br />AMP AMPERAGE � UP � DN RETURN DUCT (UP &DOWN) � SPECIALTY ITEMS TOP CONNECTION, 45° OR 90°
<br />APD AIR PRESSURE DROP LAT LEAVING AIR TEMPERATURE (2 j GAUGE FILTER, ETC.) 1 SHEET KEYNOTE REFERENCE J
<br />RE BOTTOM CONNECTION, 45° OR 90°
<br />ARI AIR CONDITIONING AND LB/HR POUNDS PER HOUR ---�-► -• ROUND REFER TO EQUIPMENT LIST
<br />- � -�
<br />REFRIGERATION INSTITUTE LF LINEAR FOOT (FEET) "- i """ + DIFFUSER WALL TYPE SUPPLY REGISTER OR GRILLE PLAN CONTINUATION REFERENCE. ROOM NAME SIDE CONNECTION
<br />ASME ROOM NAME &NUMBER
<br />1=1 1:7= ILM
<br />AMERICAN SOCIETY OF MECHANICAL LWT LEAVING WATER TEMPERATURE EFE
<br />-BOTTOM INDICATES ON WHICH
<br />ENGINEERS RETURN REGISTER OR -�.. EXHAUST OR RETURN REGISTER OR TOP GRILLE M_1 101 DESIGNATION
<br />-� CAPPED OUTLET
<br />SHEET CONTINUATION APPEARS
<br />MAX MAXIMUM GRILLE (HORIZONTAL MOUNT)
<br />B BOILER MBH 1,000 BTUH CONSTRUCTION BULLETIN D RISE OR DROP IN PIPE
<br />BD BACKDRAFT DAMPER MCA MINIMUM BRANCH CIRCUIT AMPACITY EXHAUST REGISTER OR GRILLE _ 1 100 REVISION NUMBER ,
<br />-®-� MOUNT) -; I UNION
<br />ENGINEERING
<br />BFP BACKFLOW PREVENTER MER MECHANICAL EQUIPMENT ROOM (HORIZONTAL -
<br />BHP BRAKE HORSEPOWER MERV MINIMUM EFFICIENCY REPORTING VALUE EXHAUST OR RETURN CEILING REGISTER OR GRILLE M-1 PIPE UP
<br />BTU BRITISH THERMAL UNIT MH MANHOLE --�� �.� EXHAUST OR RETURN SECTION DESIGNATION. POINT OF NEW
<br />PIPE DOWN
<br />BTUH BRITISH THERMAL UNIT PER HOUR MIN MINIMUM REGISTER OR GRILLE CONNECT NEW DUCT TO EXISTING DUCT -TOP INDICATES SECTION NUMBER, CONNECTION TO EXISTING
<br />MOP MAXIMUM OVERCURRENT PROTECTION (VERTICAL MOUNT) -BOTTOM INDICATES ON WHICH
<br />MECHANICAL • ELECTRICAL -PLUMBING
<br />SHEET SECTION APPEARS HALFTONE LIGHT LINE THERMOMETER
<br />800 HIGHLAND AVE. STE 102
<br />CC COOLING COIL N/A NOT APPLICABLE _„� SUPPLY REGISTER OR R INCLINED RISE, IN DIRECTION OF AIR FLOW INDICATES EXISTING WORK
<br />ORLANDO, FL 32603
<br />CFM CUBIC FEET PER MINUTE NC NOISE CRITERIA OR NORMALLY CLOSED GRILLE (VERTICAL -�-{--� DETAIL REFERENCE. PRESSURE GAUGE
<br />CH CHILLER NG NATURAL GAS MOUNT)
<br />CA LIC. NO.: 31963
<br />-TOP INDICATES SECTION NUMBER,
<br />CHIP CHILLED WATER PUMP NGFM NATURAL GAS FLOWMETER 2 HEAVY DASHED LINE
<br />i
<br />CHR CHILLED WATER RETURN NO NORMALLY OPEN -� [� RETURN GRILLE WITH D D M_1 -BOTTOM INDICATES ON WHICH - - - - - - INDICATES EXISTING WORK
<br />PHONE: (407) 260-8466
<br />WWW,DCL-ENG.COM
<br />, INCLINED DROP, IN DIRECTION OF AIR FLOW SHEET SECTION APPEARS FLOW ELEMENT
<br />CHS CHILLED WATER SUPPLY NPLV NON-STANDARD PART LOAD VALUE SOUND BOOTH TO BE DEMOLISHED
<br />CO CLEAN OUT NPSH NET POSITIVE SUCTION HEAD TEST PLUG (PRESSURE/TEMPERATURE)
<br />HEAVY LINE INDICATES
<br />CO2 CARBON DIOXODE NTS NOT TO SCALE ®
<br />COMP COMPRESSOR UNIT ACCESS DOOR NEW WORK
<br />COP COEFFICIENT OF PERFORMANCE OA OUTSIDE AIR DUCTWORK SPECIALTIES OR AIR VENT
<br />CP CONDENSATE PUMP OD OUTSIDE DIAMETER I I--2 FLEXIBLE CONNECTION, EQUIPMENT,
<br />CU CONDENSING UNIT VIBRATION, OR SEISMIC
<br />DRAIN
<br />CV CONSTANT VOLUME P PUMP V DUCT REHEAT COIL FLEXIBLE DUCT DIFFUSER NOTATION
<br />O� FC FC
<br />CW COLD WATER (POTABLE) PCF POUNDS PER CUBIC FOOT (FEET) VANED ELBOW (PROVIDE ALL SQUARE OR
<br />PD PRESSURE DROP15 � VIBRATION SENSOR
<br />ACC } ]� � ��� RECTANGULAR ELBOWS WITH VANES EVEN IF
<br />DB DECIBELS PF PRE -FILTER ACCESS DOOR IDUCT FLEXIBLE CONNECTION NECK SIZE IN
<br />SYMBOL IS MISSING) DUCT SIZE IN INCHES (NET
<br />Db DRY-BULB TEMPERATURE PHC PREHEAT COIL INCHES
<br />INSIDE DIMENSIONS)
<br />DEG DEGREE PPM PARTS PER MILLION 42' POINT OF CHANGE IN DUCT (ROUND SHOWN) a CEILING DIFFUSER
<br />DP DEW POINT TEMPERATURE PSI POUNDS PER SQUARE INCH BUTTERFLY TYPE VALVE
<br />RA RETURN AIR CONSTRUCTION BY INDICATES ROUND. CD (CD) IDENTIFICATION
<br />DX DIRECT EXPANSION WITH CONTROLLER LOCATED PRESSURE CLASS STANDARD RADIUS ELBOW (LONG RADIUS) 450 VALVE AND PIPING DEVICES SYMBOLS
<br />ON SIDE OF VALVE 10re SA
<br />EA EXHAUST AIR REA RELIEF AIR f
<br />EAT ENTERING AIR TEMPERATURE RF RETURN FAN SUPPLY AIR DUCT + AIR QUANTITY (CFM) GATE VALVE
<br />EER ENERGY EFFICIENCY RATIO RH RELATIVE HUMIDITY -I VAV SUPPLY AIR VALVE 10x8 GLOBE VALVE
<br />10x8
<br />EF EXHAUST FAN RC REHEAT COIL BUTTERFLY TYPE VALVE NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH) DIFFUSER AIR PATTERN EXHAUST AIR DUCT (EA)
<br />EGS EMERGENCY GAS SHUTOFF RLA 1 ARROW: 1 WAY RETURN AIR DUCT (RA) CHECK VALVE
<br />RUN LOAD AMPERE OR WITH CONTROLLER ANGLED
<br />ENT ENTERING RO REVERSE OSMOSIS AM 2 ARROWS: 2 WAY RG
<br />DOWN, SEE DETAIL AIR FLOW MEASURING-� EXISTING DUCT TO REMAIN 3 ARROWS: 3 WAY 12x6 EA WYE STRAINER WITH DRAIN VALVE
<br />ESP EXTERNAL STATIC PRESSURE RPM REVOLUTIONS PER MINUTE �] � STATION 250
<br />ET EXPANSION TANK RTU ROOF TOP UNIT 4 ARROWS: 4 WAY
<br />ETD EXISTING TO DEMO - - NO ARROWS: 4 WAY CD -SUPPLY DIFFUSER r� umu-- FLEXIBLE PIPING CONNECTION
<br />EWT ENTERING WATER TEMPERATURE SA SUPPLY AIR VENTURI VALVE WITH �- - -� EXISTING DUCT TO BE REMOVED RG - RETURN GRILLE
<br />STAMPS AND APPROVALS
<br />_ _
<br />ETR EXISTING TO REMAIN SAD SOUND ATTENUATING DEVICE CONTROLLER LOCATED ON EA - EXHAUST AIR GRILLE ANGLE GLOBE VALVE
<br />LD - LINEAR DIFFUSER
<br />SAT SUPPLY AIR TERMINAL SIDE OF VALVE
<br />F FAHRENHEIT SD SMOKE DETECTOR OR SMOKE DAMPER LG - LINEAR RET/EXH GRILLE ��I BUTTERFLY VALVE
<br />MANUAL VOLUME DAMPER
<br />TG -TRANSFER GRILLE
<br />FCO FLUSH CLEAN OUT SF SUPPLY FAN
<br />F/S COMBINATION FIRE SMOKE DAMPER I�-�(1 BALL VALVE
<br />FCU FAN COIL UNIT L1�-�LJ I�
<br />SP STATIC PRESSURE XX
<br />SQ.FT SQUARE FOOT (FEET) VENTURI VALVE WITH
<br />FD FLOOR DRAIN OR FIRE DAMPER OR FIRE, SMOKE OR FIRE/SMOKE DAMPER
<br />SS STAINLESS STEEL CONTROLLER ANGLED DOWN, D - CONTROL VALVE
<br />FM FLOW METER SEE DETAIL
<br />FPM FEET
<br />PER MINUTE TAB TESTING, ADJUSTING, BALANCE
<br />FPS FEET PER SECOND FIELD MOUNTED CONTROLS --Q-- PRESSURE REGULATING VALVE
<br />TSP TOTAL STATIC PRESSURE
<br />FS FLOW SWITCH TSTAT THERMOSTAT
<br />FSTAT FREEZESTAT PRESSURE SAFETY VALVE
<br />HEATER 45° SUPPLY (1) SPACE THERMOSTAT T❑ TEMPERATURE SENSOR
<br />UH UNIT
<br />SPACE HUMIDISTAT H� HUMIDITY SENSOR CIRCUIT SETTER VALVE OR BALANCING VALVE
<br />HC HEATING COIL UL UNDERWRITERS LABORATORY STANDARD BRANCH SUPPLY OR
<br />HP HORSEPOWER VAV VARIABLE AIR VOLUME RETURN, NO SPUTTER (45° TAP) F� DUCT SMOKE DETECTOR © PRESSURE SENSOR
<br />D
<br />HSTAT HUMIDISTAT VFD VARIABLE FREQUENCY DRIVE PLUG VALVE
<br />HW HOT WATER VTR VENT THRU ROOF
<br />PRESSURE REDUCING VALVE PRV
<br />( )
<br />a�EL C�
<br />_ ••••
<br />•'�\CEN '
<br />HWC HOT WATER COIL 45° RETURN
<br />\.
<br />HWP HEATING HOT WATER PUMP W WATTS
<br />HWR HEATING HOT WATER RETURN Wb WET -BULB (TEMPERATURE) WATER LEVEL CONTROLLER
<br />••.•'
<br />* ° d•6
<br />HWS HEATING HOT WATER SUPPLY WCO WALL CLEAN OUT
<br />HX HEAT EXCHANGER WF WATER FILTER DUCT MOUNTED COIL (REHEAT COIL) O FLOW METER
<br />`,� •'�
<br />HZ HERTZ WPD WATER PRESSURE DROP
<br />• •.•<O�•'�,
<br />1/0 INPUT/OUTPUT YCO YARD CLEAN OUT
<br />g�s00NAL
<br />nnnun�„
<br />MECHANICAL SPECIFICATIONS
<br />APPLICABLE CODES/STANDARDS: EQUIPMENT GENERAL:
<br />1. FLORIDA BUILDING CODE 7TH EDITION (2020) - BUILDING, MECHANICAL, PLUMBING AND ENERGY CONSERVATION 11, NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA) 1. ALL EQUIPMENT SHALL BE UL LISTED, NO EXCEPTIONS.
<br />2. NFPA-1 UNIFORM FIRE CODE (2015) 12. NATIONAL ELECTRICAL SAFETY CODE 2. EACH TYPE OF EQUIPMENT SHALL BE BY ONE MANUFACTURER AND SHALL HAVE CAPACITIES AND CHARACTERISTICS AS LISTED IN THE EQUIPMENT SCHEDULES.
<br />3. NFPA-70 NATIONAL ELECTRICAL CODE (2017) 13. REQUIREMENTS OF LOCAL POWER CORPORATION 3. UNLESS OTHERWISE NOTED, ALL MECHANICAL EQUIPMENT SHALL BE PROVIDED WITH VIBRATION ISOLATING MOUNTINGS TO PREVENT TRANSMISSION OF VIBRATION TO AND WITHIN THE BUILDING STRUCTURE.
<br />I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS
<br />4. NFPA-72 NATIONAL FIRE ALARM CODE (2016) 14. ADA STANDARDS FOR ACCESSIBLE DESIGN (2010) 4. LOCATE ALL MECHANICAL EQUIPMENT SUCH THAT THE MANUFACTURER'S RECOMMENDED SERVICE CLEARANCE INCLUDING CLEARANCE BETWEEN UNIT), AND THE FBC REQUIRED CLEARANCE TO COMBUSTIBLES IS MAINTAINED.
<br />PREPARED BY ME OR UNDER MY DIRECT SUPERVISION, AND THAT I AM A
<br />5. NFPA-99 HEALTH CARE FACILITIES CODE (2015) 15. AMERICAN SOCIETY FOR TESTING AND MATERIAL (ASTM) 5. INSTALL ALL EQUIPMENT IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. IF FIELD CONDITIONS PROHIBIT INSTALLATION OF EQUIPMENT IN LOCATIONS SHOWN, SUBMIT A WRITTEN REQUEST FOR INFORMATION (RFI) TO
<br />DULY LICENSED ENGINEER UNDER THE LAWS OF THE STATE OF FLORIDA.
<br />6. NFPA-101 LIFE SAFETY CODE (2018) 16. THE OCCUPATION SAFETY AND HEALTH ACT (OSHA) THE ENGINEER IMMEDIATELY BEFORE PROCEEDING.
<br />TO THE BEST OF MY KNOWLEDGE THESE PLANS AND SPECIFICATIONS
<br />7. LATEST EDITION OF ALL OTHER NFPA ARTICLES NOT LISTED, 17. FLORIDA ADMINISTRATIVE CODE 69A3.012 6. WHENEVER POSSIBLE, DO NOT LOCATE ROOFTOP EQUIPMENT SUCH THAT THE SERVICE PANEL IS WITHIN 10'-0" OF AN OPEN ROOF EDGE WHICH REQUIRES GUARDS.
<br />COMPLY WITH THE APPLICABLE BUILDING CODES.
<br />8. UNDERWRITERS LABORATORIES, INC. PUBLICATIONS 18. GUIDELINES FOR DESIGN AND CONSTRUCTION OF HEALTH CARE FACILITIES (FGI - 2018)
<br />DANIEL CESAR, PE; LICENSE NO: 68670
<br />9. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 19. ASTM LATEST STANDARDS. DUCTWORK AND DUCTWORK ACCESSORIES:
<br />10. AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) 1. FLEXIBLE DUCT SHALL COMPLY WIT UL-181 CLASS 1. FLEXIBLE DUCTWORK SHALL HAVE AN INNER FIBERGLASS WOVEN LINER, ENCAPSULATING HELIX COIL, A FIBERGLASS INSULATING BLANKET (R-VALUE OF AT LEAST 6.0) AND OUTER
<br />VAPOR BARRIER OF FIBERGLASS REINFORCED METALIZED FILM LAMINATE. FLEXIBLE DUCTS SHALL BE THERMAFLEX MK-C OR APPROVED EQUAL. NO FLEX DUCT SHALL EXCEED 15' -0" IN LENGTH.
<br />2. ALL INSULATION SHALL HAVE A FIRE/SMOKE RATING LESS THAN 25/50.
<br />BASIS OF DESIGN: 3. ALL STEEL DUCTWORK SHALL BE JOINED WITH A NON -HARDENING, NON -MIGRATING MASTIC APPROPRIATE FOR THE ENVIRONMENTAL CONDITIONS OF THE SPACE FOR WHICH IT IS INSTALLED. FLEXIBLE DUCTWORK SHALL MEET THE
<br />1. THE MECHANICAL CONTRACT DOCUMENTS HAVE BEEN PREPARED USING THEFGI-2018 DESIGN CRITERIA WITH THE FOLLOWING DESIGN CONDITIONS: FLORIDA ENERGY EFFICIENCY CODE. SEAL ALL SHEET METAL JOINTS WITH A SEALANT COMPOUNDED SPECIFICALLY FOR SEALING JOINTS AND SEAMS IN DUCTWORK. SEALANT SHALL BE EQUAL TO RCD#8 MASTIC. JOINTS FOR
<br />INDOOR: SUMMER 75 DEG F DB / 50% RH WINTER 72 DEG F DB DUCTWRAP AND DUCTBOARD SHALL BE WITH GLASS FIBER FABRIC WITH A VAPOR BARRIER COATING OF 30 MILL DRY FILM THICKNESS. VAPOR BARRIER COATING SHALL BE EQUAL TO RCD#9.
<br />GENERAL: 4. ALL DUCTS SIZES ARE CLEAR INSIDE DIMENSIONS. COORDINATE DUCTWORK ROUTING, DIMENSION AND ELEVATION WITH ALL TRADES. MAKE ALLOWANCES FOR BEAMS, PIPING AND OTHER OBSTRUCTIONS. TRANSFORM, DIVIDE OR
<br />1. CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIAL, EQUIPMENT, ACCESS PANELS, CONTROL SYSTEMS, DEVICES, PERMITS AND SERVICES NECESSARY FOR FURNISHING AN INSTALLATION OF A COMPLETE SERVICEABLE MECHANICAL SYSTEM OFFSET DUCTS AS REQUIRED, IN SUCH A MANNER AS TO MAINTAIN SAME CROSS SECTIONAL AREA. DUCT SIZE SUBSTITUTIONS ARE ACCEPTABLE ONLY IF THE CLEAR AREA SUBSTITUTED IS NOT LESS THAN THAT SHOWN AND THE DUCT
<br />AS OUTLINED IN THE CONTRACT DRAWINGS AND SPECIFICATIONS. THE EQUIPMENT, DEVICES AND ACCESSORIES SHALL BE INSTALLED AND ADJUSTED FOR PROPER AND CONTINUOUS OPERATION. ASPECT RATIO IS LESS THAN 3 TO 1.
<br />2. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL NECESSARY FITTINGS AS REQUIRED BY ALL APPLICABLE CODES AND GOVERNING AUTHORITIES. 5. PROVIDE 45-DEGREE ENTRY ON ALL RECTANGULAR BRANCH CONNECTIONS. PROVIDE CONICAL TAPS WITH DAMPERS ON ALL ROUND BRANCH CONNECTIONS.
<br />3. ALL MECHANICAL SYSTEMS ARE TO BE INSTALLED IN ACCORDANCE WITH FLORIDA BUILDING CODE ALL APPLICABLE SECTIONS OF THE NFPA STANDARDS, ANSI STANDARDS, U.L. STANDARDS, LOCAL CODES, LOCAL ORDINANCES, AMENDMENTS 6. PROVIDE LONG RADIUS ELBOWS, 3-PIECE ELBOWS, OR TURNING VANES AT ALL 90-DEGREE TURNS. SQUARE ELBOWS ARE NOT ACCEPTABLE.
<br />AND MANUFACTURER RECOMMENDATIONS. 7. TEST ALL DUCTWORK FOR LEAKS PRIOR TO INSULATING OR CONCEALING IT. THE MAXIMUM ALLOWABLE LEAKAGE RATE SHALL BE IN ACCORDANCE WITH SMACNA.
<br />4. ALL MATERIALS SHALL BE NEW (UNLESS OTHERWISE INDICATED) ANY DAMAGE EQUIPMENT SHALL BE REPLACED AT NOT COST TO THE OWNER. DURING CONSTRUCTION, EQUIPMENT SHALL BE STORED IN THE MANUFACTURER'S ORIGINAL 8. PROVIDE VOLUME DAMPERS AT ALL BRANCH TAKE -OFFS OR AS INDICATED ON PLANS. DAMPER SHALL BE PROVIDED WITH LOCKING QUADRANTS ON EXPOSED OR ACCESSIBLE. PROVIDE VOLUME DAMPERS SIMILAR TO YOUNG
<br />B
<br />PACKAGING IN A SAFE AND DRY PLACE UNTIL READY FOR USE. REGULATORS FOR AIR DEVICES LOCATED IN HARD CEILINGS OR COORDINATE CEILING ACCESS PANELS WITH ARCHITECT/OWNER.
<br />5. ALL WORK SHALL BE COORDINATED ALL OTHER TRADES PRIOR TO BEGINNING ANY WORK OR ORDERING ANY MATERIALS. COORDINATE ALL WORK FOR SIZES, LOCATIONS, CLEARANCES, ACCESS AND ELECTRICAL CONNECTIONS WITH ALL THE 9. PROVIDE NORMALLY CLOSED OUTSIDE AIR DAMPERS TO AUTOMATICALLY OPEN ONLY WHEN THE HEATING OR COOLING SYSTEMS (HEATER OR COMPRESSOR) IS OPERATING IN THE OCCUPIED MODE. DAMPERS SHALL BE ACCESSIBLE AND
<br />TRADES, CONTRACTOR SHALL NOTIFY THE ARCHITECT IN WRITING OF ANY CONFLICTS, CODE OR SAFETY ISSUES THAT MAY EXIST PRIOR TO ANY FABRICATION OR ORDERING OF EQUIPMENT. RESOLUTION OF SUCH CONFLICTS THAT WERE NOT NEAR THE BUILDING ENTRY POINT.
<br />REPORTED PRIOR TO STARTING CONSTRUCTION SHALL REMAIN RESPONSIBILITY OF THE CONTRACTOR AND CHANGE ORDER PROPOSALS FOR SUCH WORK WILL NOT BE ACCEPTED. 10. PROVIDE GRAVITY BACKDRAFT DAMPERS IN ALL EXHAUST DUCTS NEAR THE BUILDING EXIT POINT, DAMPERS SHALL BE INSTALLED WHERE THEY ARE ACCESSIBLE.
<br />6. THESE DRAWINGS AND SPECIFICATIONS REPRESENT THE DESIGN INTENT BASED ON INFORMATION AVAILABLE AT THE TIME OF DESIGN. ANY SUBSTANTIAL MODIFICATIONS OR ALTERATIONS MADE DURING THE CONSTRUCTION PHASE SHALL BE 11. PROVIDE FLEXIBLE CONNECTORS AT ALL DUCT CONNECTIONS TO FANS OR AIR HANDLING UNITS, UNLESS SPECIFICALLY NOTED OTHERWISE.
<br />REPORTED TO THE ENGINEER PRIOR TO START WORK. MODIFICATIONS MADE WITHOUT THE ENGINEER'S WRITTEN APPROVAL SHALL REMAIN THE RESPONSIBILITY OF THE CONTRACTOR. 12. PROVIDE SUPPLY AIR DUCT SMOKE DETECTORS FOR ALL AIR HANDLING SYSTEMS GREATER THAN 2,000 CFM. UPON ACTIVATION, SMOKE DETECTORS SHALL AUTOMATICALLY SHUTDOWN THE AIR HANDLING SYSTEM AND GENERATE A
<br />7. CONTRACTOR TO FIELD ROUTE DUCTS AS REQUIRED. FOR CLARITY, ALL DUCT RISERS AND DROPS ARE NOT SHOWN. CONTRACTOR TO PROVIDE AT NO ADDITIONAL COST TO THE OWNER ALL DUCT OFFSETS, BENDS AND TRANSITIONS SIGNAL TO THE BUILDING FIRE ALARM (IF PROVIDED). PROVIDE A REMOTE KEY SWITCH WITH PILOT LIGHT IN CEILING BELOW UNIT FOR DETECTOR RESET.
<br />REQUIRED FOR COMPLETE FUNCTIONAL SYSTEM AND TO ACCOMMODATE FIELD CONDITIONS. 13. ELBOWS OR CHANGES IN DUCT DIRECTION GREATER THAN 45 DEGREES SHALL BE FITTED WITH AIR TURNS CONSISTING OF CURVED AIRFOIL BLADES OR VANES WHICH ALLOW THE AIR TO MAKE ABRUPT TURNS WITHOUT TURBULENCE.
<br />8. WALL, ROOF AND CEILING OPENINGS INDICATED ON DRAWINGS ARE NOMINAL DIMENSIONS ONLY, ADJUST OPENING AS REQUIRED. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING FIRE RATING AND WEATHERPROOFING INTEGRITY OF TURNING VANES ARE NOT ALLOW IN RETURN AND/OR EXHAUST SYSTEMS.
<br />ALL DUCTWORK AND PIPING AND PENETRATIONS. ALL PIPING AND/OR EQUIPMENT PENETRATIONS SHALL BE SLEEVED AND FIRE RATED AS REQUIRED TO MAINTAIN WALLS OR FLOOR INTEGRITY. 14. PROVIDE FIRE, SMOKE OR COMBINATION FIRE/SMOKE DAMPERS IN ALL PENETRATIONS OF RATED SURFACES AS REQUIRED BY CODE. DAMPERS SHALL BE INSTALLED ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS AND THE
<br />AdventHealth
<br />9. HANG PIPING AND EQUIPMENT (WHERE INDICATED ON DRAWINGS) FROM STRUCTURE AS NECESSARY. COORDINATE WITH STRUCTURAL/ARCHITECT FOR WEIGHTS AND PROPER ATTACHMENTS. PROVIDE SUPPORTING AS REQUIRED FOR U.L. LISTING REQUIREMENTS. INTERLOCK MECHANICAL SYSTEMS WITH THE FIRE ALARM SYSTEM.
<br />Q INSTALLATION OF EQUIPMENT. 15. ASSEMBLE, INSTALL AND SEAL ALL DUCTWORK IN ACCORDANCE WITH THE LATEST SMACNA HVAC DUCT CONSTRUCTION STANDARD" "FIBROUS FIBROUS GLASS DUCT CONSTRUCTION STANDARDS". CONSTRUCT DUCTWORK TO MINIMUM 2"
<br />10. MECHANICAL PLANS ARE IN GENERAL DIAGRAMMATIC IN NATURE SHALL BE READ IN CONJUNCTION WITH THE ARCHITECTURAL, PLUMBING, ELECTRICAL AND STRUCTURAL PLANS. INFORMATION GIVEN HEREIN AND ON DRAWINGS IS AS EXACT DUCT CLASS, SEAL CLASS "A" UNLESS NOTED OTHERWISE. ANY WORK WHICH DOES NOT CONFORM TO THESE STANDARDS MAY BE REJECTED AT ANY TIME.
<br />AS COULD BE SECURED BUT IS NOT GUARANTEED. DO NOT SCALE DRAWINGS FOR EXACT DIMENSIONS. a. ALL DUCTWORK SHALL BE AS FOLLOWS OR APPROVED EQUAL:
<br />a byr h i l !1 s
<br />11. PROVIDE ADEQUATE SIDE CLEARANCE PER NEC. AT MINIMUM OF T CLEARANCE IN FRONT OF ANY 120-240 VOLTS RATED PANELS AND DISCONNECTS AND 4' CLEARANCE IN FRONT OF ANY 480 VOLTS RATED PANELS OR DISCONNECTS. SUPPLY, OUTSIDE AIR, MAKE-UP AIR AND RETURN AIR DUCTWORK SHALL BE CONSTRUCTED OF GALVANIZED SHEET STEEL UNLESS NOTED OTHERWISE. ALL SUPPLY, OUTSIDE AIR AND RETURN DUCTS SHALL BE PROVIDED WITH
<br />12. PROVIDE A MINIMUM OF 10' CLEARANCE BETWEEN OUTSIDE AIR INTAKES AND ANY EXHAUST OPENING, FAN OR VENT. COORDINATE NEW EXHAUST/INTAKE OPENINGS OR VENTS FOR PLUMBING EQUIPMENT WITH EXISTING INTAKES AND VENTS. 1-1/2" INSULATION THICKNESS AND R-VALUE OF AT LEAST 6.0. FLEXIBLE GLASS FIBER EQUAL TO OWENS CORNING "ALL SERVICE DUCT WRAP" OR JOHNS MANVILLE MICROLITE. 1-1/2" THICK, MINIMUM DENSITY OF 0.75 LB/FT3 WITH
<br />13. NO WORK SHALL BE COVERED OR CONCEALED UNTIL PROPERLY INSPECTED AND TESTED. THERMAL CONDUCTIVITY OF NOT MORE THAN 0.27 AT 75°F MEAN TEMPERATURE, AND SUITABLE FOR TEMPERATURES TO 250°F.
<br />PROJECT NAME
<br />14. THE CONTRACTOR SHALL CONTINUALLY RECORD ALL DEVIATIONS TO THE CONTRACT DOCUMENTS MADE DURING CONSTRUCTION AND PROVIDE A COMPLETE SET OF THESE RECORD DRAWINGS TO THE OWNER WITHIN 30 DAYS OF b. ALL EXHAUST AIR DUCTWORK SHALL BE CONSTRUCTED OF GALVANIZED STEEL OR STAINLESS STEEL, 2-INCH PRESSURE CLASS, SMACNA SEAL CLASS "A". WET EXHAUST DUCTS SHALL BE ALUMINUM OR STAINLESS STEEL.
<br />ADVENT HEALTH ZEPHYRHILLS ROOM G
<br />COMPLETION OF CONSTRUCTION. IF REQUIRED BY THE AUTHORITY HAVING JURISDICTION, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO SECURE THE SERVICES OF A LICENSED PROFESSIONAL ENGINEER TO PROVIDE SIGNED C. PROVIDE ALL EXTERIOR INSULATED DUCTWORK WITH A MINIMUM 8 MIL THICK ALUMINUM OR PVC JACKET.
<br />SED RECORD DRAWINGS, d. INSULATION AND JACKET FOR ALL SUPPLY, OUTSIDE AIR AND RETURN DUCTWORK: EQUAL TO OWENS-CORNING "FRK" OR JOHNS MANVILLE "FSK". GLASS FIBER REINFORCED FOIL KRAFT LAMINATE WITH
<br />X-RAY
<br />X-RAY REPLACEMNET
<br />DUCCTTWORK AND/OR PIPING SHALL BE CONCEALED IN WALLS, CHASES OR CEILINGS UNLESS NOTED OTHERWISE ON DRAWINGS. PAINT ALL EXPOSED DUCTWORK BLACK UNLESS NOTED OTHERWISE. P RMIEANCE NOT EXCEEDING 0.02 PERM ND BEACH PUNCTURE RESISTANCE 25 UNITS MINIMUMDE
<br />15. ALILD
<br />.
<br />16. PROVIDE ACCESS PANELS TO ALL VALVES AND DEVICES WITHIN CHASES OR ABOVE NON -ACCESSIBLE CEILINGS. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES. e. PROVIDE INSULATION AND JACKET AS INDICATED BELOW FOR SUPPLY AND RETURN DUCTWORK. FLEXIBLE GLASS FIBER EQUAL TO OWENS CORNING "ALL SERVICE DUCT WRAP" OR JOHNS MANVILLE MICROLITE. 1-1/2" THICK,
<br />17. COORDINATE ALL ELECTRICAL EQUIPMENT CONNECTIONS WITH DIVISION 26 PRIOR TO ORDERING ANY EQUIPMENT. CONTRACTOR SHALL NOTIFY THE ARCHITECT IN WRITING OF ANY CONFLICTS OR SAFETY ISSUES THAT MAY EXIST PRIOR TO MINIMUM DENSITY OF 0.75 LB/FT3 WITH THERMAL CONDUCTIVITY OF NOT MORE THAN 0.27 AT 75°F MEAN TEMPERATURE, AND SUITABLE FOR TEMPERATURES TO 250°F.
<br />PROJECT LOCATION
<br />ORDERING OFEQUIPMENT. JACKET EQUAL TO OWENS-CORNING "FRK" OR JOHNS MANVILLE "FSK". GLASS FIBER REINFORCED FOIL KRAFT LAMINATE WITH PERMEANCE NOT EXCEEDING 0.02 PERM AND BEACH PUNCTURE RESISTANCE 25 UNITS MINIMUM.
<br />7050 GALL BOULEVARD
<br />18. NOT RUN ANYPIPING NG ABOVE ELECTRICAL PANELS, THROUGH ELECTRICAL ROOMS OR ANY OTHER WATER SENSITIVE AREAS UNLESS NOTED OTHERWISE ON THE PLANS.
<br />19. INSULATE ALL PIPING FROM CONCRETE. INSULATION SHALL HAVE A FIRE/SMOKE RATING LESS THAN 25/50.
<br />ZEPHYRHILLS FL 33541
<br />20. DO NOT PENETRATE WALL FOOTINGS WITH PIPING. COORDINATE TO DROP FOOTINGS AS REQUIRED TO CLEAR PLUMBING SERVICES WHERE ABSOLUTELY NECESSARY. ALL PIPING PENETRATING A BEARING WALL OR FOOTING MUST BE DUCTWORK SUPPORTS AND HANGERS:
<br />SLEEVED AND LOCATION APPROVED BY STRUCTURAL ENGINEER. 1. DUCTWORK SHALL NOT BE SUPPORTED BY ANYTHING OTHER THAN THE BUILDING STRUCTURE. NOTHING SHALL BE SUPPORTED BY THE DUCTWORK EITHER.
<br />PROJECT NUMBER
<br />21. PERFORM ALL WORK NECESSARY TO PREPARE THE STRUCTURE FOR THE INSTALLATION OF THE WORK. ALL HOLES, OPENINGS AND DAMAGED MATERIALS OCCURRED DURING THE CONSTRUCTION PERIOD SHALL BE REPAIRED. ALL 2. PROVIDE ALL NECESSARY HANGER RODS, CLAMPS AND ATTACHMENTS TO PROPERLY INSTALL AND SUPPORT DUCTWORK, MECHANICAL PIPING AND EQUIPMENT FROM THE BUILDING STRUCTURE.
<br />2021-009
<br />PENETRATIONS SHALL BE SLEEVED AND SEALED TO BE WATER AND AIR TIGHT. 3. DUCTWORK AND MECHANICAL EQUIPMENT SHALL BE PROVIDED UNISTRUT AND SUSPENSION RODS AS REQUIRED.
<br />22. ALL MECHANICAL SYSTEMS SERVING OTHER SPACES OR FLOORS THAT RUN THROUGH THE PROJECT AREA SHALL REMAIN ACTIVE DURING CONSTRUCTION SO AS NOT TO CAUSE ANY DISRUPTION TO THESE OTHER SPACES DURING THE 4. ALL SUPPORTS EXPOSED TO OUTDOORS SHALL BE PRIMED AND PAINTED TO PREVENT RUSTING. FINISH COLOR AS SELECTED BY OWNER.
<br />PROJECT PHASE
<br />DEMOLITION OF THE EXISTING DUCTWORK 5. WIRE STRAPS OR PERFORATED METAL STRAPPING IS NOT ACCEPTABLE FOR SUPPORTS FOR DUCTWORK.
<br />6. PROVIDE MANUFACTURED PIPE HANGERS, RODS, AND INSERTS OR CLAMPS FOR THE PROPER SUPPORT OF ALL PIPING. BAND IRON, TIE WIRE, OR WIRE STRAPPING ARE NOT ACCEPTABLE, ALL PIPES SHALL BE SUPPORTED AT REGULAR
<br />100% CONSTRUCTION DOCUMENTS
<br />SUBSTITUTIONS: INTERVALS. PIPE SWAY AND/OR VIBRATION WILL NOT BE ACCEPTABLE. DO NOT HANG PIPING FROM ANYTHING OTHER THAN THE BUILDING STRUCTURE.
<br />1. EQUIPMENT INDICATED AS BASIS OF DESIGN (BOD) ON THE DRAWINGS AND WITHIN THESE SPECIFICATIONS SHALL BE CONSIDERED AS "STANDARD OF QUALITY". NO SUBSTITUTIONS SHALL BE MADE WITHOUT PRIOR WRITTEN APPROVAL OF THE
<br />ISSUE DATE
<br />ENGINEER. AIR DISTRIBUTION DEVICES:
<br />AUGUST 18, 2021
<br />2. DEVIATIONS FROM SPECIFIED EQUIPMENT AFFECTING ELECTRICAL REQUIREMENTS SHALL BE COORDINATED BETWEEN VENDOR AND CONTRACTOR PRIOR TO SUBMITTING BIDS. ANY DEVIATION THAT WAS NOT COORDINATED SHALL NOT 1. ACCEPTABLE MANUFACTURERS ARE: TITUS, PRICE, METALAIRE, TUTTLE & BAILEY, AND BARBER COLEMAN.
<br />CAUSE ANY CHANGES OF BID AT A LATER TIME. 2. PROVIDE AND INSTALL ALL AIR DEVICES IN LOCATIONS INDICATED ON DRAWINGS. VERIFY LOCATIONS AND CEILING TYPES WITH ARCHITECTURAL DRAWINGS PRIOR TO ORDERING. PROVIDE INTEGRAL VOLUME DAMPER FOR ALL AIR
<br />REVISIONS LIST
<br />3. SUBSTITUTIONS ARE ACCEPTABLE PROVIDED THAT THE SUBSTITUTED EQUIPMENT HAS EQUIVALENT CAPACITY AS THAT SCHEDULED AND IS PROVIDED BY AN ACCEPTABLE MANUFACTURER AS LISTED FOR THAT EQUIPMENT TYPE. DEVICES LOCATED IN HARD CEILINGS AND INTEGRAL RADIATION DAMPER FOR ALL DEVICES LOCATED IN RATED CEILINGS.
<br />CONTRACTOR SHALL SUBMIT PRODUCT DATA FOR ALL SUBSTITUTIONS TO THE ENGINEER FOR APPROVAL PRIOR SUBSTITUTING OR ORDERING. SUBMITTALS SHALL INCLUDE DIMENSIONS, WEIGHT, CLEARANCES, FAN/PUMP CURVES, 3. ALL AIR DEVICES SHALL BE ALUMINUM, EXCEPT THOSE INSTALLED IN RATED WALLS OR CEILINGS WHICH SHALL BE STEEL. FINISH OF ALL DEVICES SHALL BE WHITE UNLESS OTHERWISE NOTED ON PLANS. THE CONTRACTOR SHALL VERIFY
<br />NO.
<br />DATE
<br />DESCRIPTION
<br />ELECTRICAL CHARACTERISTICS, SOUND LEVEL DATA, AND INSTALLATION DETAILS. SUBSTITUTION ARE WILL ONLY BE ACCEPTABLE AFTER WRITTEN APPROVAL FROM THE ENGINEER. CONTRACTOR SHALL BE FINANCIALLY RESPONSIBLE FOR FINISH COLOR AND STYLE OF ALL AIR DEVICES WITH THE ARCHITECT PRIOR TO ORDERING,
<br />ANY AND ALL CHANGES TO ENGINEERING PLANS REQUIRED BY AUTHORITY HAVING JURISDICTION FOR ALL THE SUBSTITUTIONS. 4. ALL SURFACES OF DUCTWORK VISIBLE THROUGH AIR DEVICES SHALL BE PAINTED FLAT BLACK.
<br />5. FURNISH SUPPLY AIR GRILLES AND RETURN AIR REGISTERS WITH OPPOSED BLADE BALANCING DAMPERS AS SCHEDULED ON THE DESIGN DOCUMENTS.
<br />SHOP DRAWINGS AND SUBMITTALS: 6. AIR DISTRIBUTION SHALL NOT EXCEED NC-30 NOISE CRITERIA AS DEFINED IN THE LATEST ASHRAE GUIDE.
<br />1. SUBMIT SHOP DRAWINGS AND MANUFACTURER'S DATA FOR ALL NEW EQUIPMENT TO ENGINEER FOR APPROVAL PRIOR TO PURCHASING AND/OR FABRICATION. SHOP DRAWINGS FOR EQUIPMENT REQUIRING ELECTRIC POWER AND/OR
<br />CONTROL WIRING SHALL INCLUDE COMPLETE WIRING DIAGRAMS.
<br />2. CONTRACTOR SHALL SUBMIT COMPLETE DUCTWORK SHOP DRAWINGS FOR REVIEW BY THE ENGINEER. SHOP DRAWINGS SHALL INCLUDE COORDINATION WITH OTHER DISCIPLINES AND EXACT OPENINGS REQUIRED IN EXTERIOR WALLS AND TEST AND BALANCE:
<br />A
<br />ALL DEVICES WITH THEIR RESPECTIVE SERVICE CLEARANCES. 1. IF THE BUILDING'S MECHANICAL SYSTEMS ARE 15 TONS OR LESS PER SYSTEM. THE MECHANICAL CONTRACTOR MAY TEST, ADJUST, AND BALANCE THE SYSTEM.
<br />3. SPECIFICALLY MARK GENERAL CATALOG SHEETS AND DRAWINGS TO INDICATE SPECIFIC ITEMS SUBMITTED AND ITS CORRELATION TO SPECIFIC DESIGNATION FOR PRODUCT IN DRAWINGS. 2. IF THE BUILDING'S SYSTEMS ARE OVER 15 TONS PER SYSTEM, PROVIDE THE SERVICES OF AN INDEPENDENT TEST AND BALANCE AGENCY TO TEST, ADJUST, BALANCE, AND CERTIFY THE PERFORMANCE OF THE ENTIRE HVAC SYSTEM.
<br />4. SPECIFICALLY INDICATE PROPER IDENTIFICATION OF EQUIPMENT BY NAME AND/OR NUMBER, AS INDICATED IN SPECIFICATION AND SHOWN ON DRAWINGS. TESTING AND BALANCING CONTRACTOR SHALL HOLD A CURRENT CERTIFICATE FROM A NATIONALLY RECOGNIZED TESTING AGENCY. ALL PROCEDURES SHALL BE PERFORMED IN ACCORDANCE WITH AABC OR NEBB STANDARDS. NOTE
<br />5. WHEN MANUFACTURER'S REFERENCE NUMBERS ARE DIFFERENT FROM THOSE SPECIFIED, PROVIDE CORRECT CROSS-REFERENCE NUMBERS FOR EACH ITEM. CLEARLY MARK AND NOTE SUBMITTALS ACCORDINGLY. THAT FAN SELECTION POINTS REPRESENT DESIGN AIR FLOW RATES WITHOUT CONSIDERING DUCT LEAKAGE. PROVIDE ADDITIONAL DUCT SEALS AND ADJUST FANS TO COMPENSATE FOR DUCT LEAKAGE. PERFORM ALL TESTS NECESSARY
<br />6. SUBMITTALS THAT ARE NOT COMPLETE, NOT PERMANENT OR NOT PROPERLY CHECKED BY CONTRACTOR WILL BE RETURN WITHOUT REVIEW. IF PROJECT SITE CONTAINS MULTIPLE BUILDINGS, CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO ESTABLISH AND CONFIRM CAPACITY, QUALITY, AND COMPLETED STATUS OR WORK.
<br />INDIVIDUALLY PER DISCIPLINE. 3. UPON COMPLETION OF ALL TESTING AND BALANCING, AND PRIOR TO FINAL ACCEPTANCE. SUBMIT THREE (3) COPIES OF THE FINAL TEST AND BALANCE REPORT TO THE ENGINEER FOR APPROVAL.
<br />7. DUCTWORK SHOP DRAWINGS WILL ONLY BE REVIEWED FOR COMPLIANCE WITH DESIGN DRAWINGS AND SPECIFICATIONS. DRAWINGS WILL NOT BE CHECKED FOR COORDINATION WITH OTHER TRADES OR BUILDINGS STRUCTURE. IT IS THE 4. AIR SYSTEM BALANCING SHALL BE ACCOMPLISHED IN A MANNER TO FIRST REDUCE THROTTLING LOSSES, THEN FAN SPEED SHALL BE ADJUSTED TO MEET DESIGN FLOW CONDITIONS, EXCEPT THAT DAMPER THROTTLING MAY BE USED FOR
<br />RESPONSIBILITY OF THE CONTRACTORS TO COORDINATE AND VERIFY ROUTING AND EXACT LOCATION OF SYSTEM COMPONENTS. BALANCING FAN MOTORS OF 1 HORSEPOWER OR LESS, OR IF DAMPER THROTTLING RESULTS IN NO GREATER THAN 1/3 HORSEPOWER DRAW ABOVE THAT REQUIRED IF THE FAN SPEED WERE ADJUSTED.
<br />5. SPECIFIC TESTS INCLUDE (BUT ARE NOT LIMITED TO):
<br />SHEET TITLE
<br />WARRANTIES AND MAINTENANCE: TEST & ADJUST SUPPLY FAN RPM TO DESIGN REQUIREMENTS.
<br />1. CONTRACTOR SHALL WARRANTY ALL MECHANICAL SYSTEMS, EQUIPMENT, PARTS AND LABOR FOR A PERIOD OF ONE (1) YEAR. WARRANTY PERIOD SHALL NOT START UNTIL PROJECT IS COMPLETED AND CONTRACTOR HAD RECEIVED TEST & RECORD MOTOR LOAD AMPERES. DO NOT EXCEED NAMEPLATE RATING.
<br />MECHANICAL
<br />CERTIFICATED OF COMPLETION. ALL REPAIRERS MADE DURING THE WARRANTY PERIOD SHALL BE GUARANTEE FOR AN ADDITIONAL YEAR FROM THE TIME THE REPAIR IS COMPLETED. TEST & RECORD SYSTEM STATIC PRESSURES.
<br />2. DEFECTS OF ANY KIND (DUE TO FAULTY WORK OR MATERIALS) DURING THE WARRANTY PERIOD SHALL BE IMMEDIATELY REPAIRED AT CONTRACTOR OWN EXPENSE TO THE ENTIRE SATISFACTION OF THE OWNER, ARCHITECT AND ENGINEER. TEST & RECORD INDOOR COIL ENTERING & LEAVING AIR CONDITIONS.
<br />LEGEND
<br />SUCH REPAIRS SHALL INCLUDE ALL DAMAGE TO THE FINISH OR FURNISHING OF THE BUILDING RESULTING FROM THE ORIGINAL DEFECT OR REPAIRS. TEST & RECORD INDOOR COIL LEAVING AIR CONDITIONS.
<br />3. CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ANY DAMAGE TO THE BUILDING, ITS COMPONENTS, OTHER EQUIPMENT OR ANY PROCESS CAUSED BY DEFECTS OR IMPROPER INSTALLATIONS OF ITS EQUIPMENT. TEST & ADJUST EACH AIR DISTRIBUTION DEVICE TO PROVIDE AIRFLOW WITHIN 10% OF DESIGN,
<br />4. EQUIPMENT PROVIDED IN THE PROJECT SHALL BE COVERED BY THE MANUFACTURER'S WARRANTY FOR THE DURATION OF THAT WARRANTY. TEST & VERIFY OPERATION OF ALL ELECTRIC HEATERS,
<br />5. ALL EQUIPMENT AND FIXTURES SHALL BE TESTED, ADJUSTED, LUBRICATED, CLEANED, STARTED (IF APPLICABLE) AND PROVEN TO BE IN GOOD OPERATING CONDITION BY THE CONTRACTOR PRIOR TO AT FINAL ACCEPTANCE.
<br />6. PROVIDE COPIES OF ALL MANUFACTURER'S WARRANTIES AND CONTRACTOR WARRANTIES TO THE OWNER AT FINAL ACCEPTANCE. OPERATING AND MAINTENANCE (O&M) MANUALS:
<br />SHEET NO.
<br />1. CONTRACTOR SHALL PROVIDE COMPLETE MAINTENANCE MANUALS TO THE OWNER IN ACCORDANCE TO FLORIDA BUILDING CODE - ENERGY CONSERVATION ON ALL NEW EQUIPMENT.
<br />SYSTEM IDENTIFICATION: 2. ORGANIZE OPERATING AND MAINTENANCE DATA INTO MANAGEABLE SIZE.
<br />1. PROVIDE IDENTIFICATION LABELS ON OR NEAR EACH PIECE OF EQUIPMENT AND EACH OPERATION DEVICE AND DISCONNECT. LABELS SHALL BE CONSTRUCTED OF ENGRAVED PLASTIC LAMINATE SIGN OR PLASTIC EQUIPMENT MARKER 3. ALL DATA SHALL BE BINDED PROPERLY AND INDEXED. PROVIDE HEAVY DUTY 2" BINDER - 3 RING VINYL COVERED BINDERS WITH POCKET FOLDERS. ALL BINDERS SHALL BE PROPERLY IDENTIFIED ON FRONT AND SPINE. AT MINIMUM
<br />mool
<br />PERMANENTLY SECURED TO EQUIPMENT. LETTERING SHALL BE MINIMUM 1/2-INCH HIGH FOR EQUIPMENT NAME AND 5/8-INCH HIGH FOR EQUIPMENT INFORMATION. INCLUDE THE FOLLOWING INFORMATION.
<br />2. VALVES SHALL BE TAGGED USING PLASTIC LAMINATE TAGS SECURED WITH BRASS CHAINS INDICATING THE VALVE SIZE, SERVICE AND FUNCTION.
<br />
|