Laserfiche WebLink
1 <br />2 <br />3 <br />4 <br />GENERAL NOTES <br />i <br />' s <br />- <br />— — - - <br />1. <br />EXISTING SYSTEMS SHOWN HEREIN WERE TAKEN <br />FROM DOCUMENTS FURNISHED BY OTHERS AND <br />I <br />MAY NOT REFLECT EXACT FIELD CONDITIONS. <br />_ <br />THEREFORE, THE ENGINEER CAN NOT <br />106 WEST NORTH BAY STREET 1 TAMPA, FL 33603 <br />GUARANTEE THE ACCURACY OF SAME, NOR THAT <br />www.cjaegroup.com <br />ALL SYSTEMS AND/OR SYSTEMS COMPONENTS <br />ARE SHOWN. THE CONTRACTOR SHALL VERIFY <br />FIELD CONDITIONS PRIOR TO BID AND INFORM <br />THE ENGINEER OF ANY MAJOR DISCREPANCY <br />THAT IT WILL REQUIRE RELOCATING EXISTING <br />PIPING, CONDUIT, EQUIPMENT, ETC. TO ALLOW <br />- <br />INSTALLATION OF NEW WORK AND COULD <br />POTENTIALLY AFFECT THE COST. <br />04 <br />2. <br />REFER TO INFECTION CONTROL RISK <br />' P <br />ASSESSMENT IN PROJECT MANUAL FOR <br />REQUIRED PREVENTIVE MEASURES TO BE TAKEN <br />Em'mG IN EER ING <br />- <br />FOR EACH AREA. <br />3. <br />DUE TO THE CEILING SPACE LIMITATIONS, IT IS <br />MECHANICAL • ELECTRICAL PLUMBING <br />IMPERATIVE THAT ALL DUCTWORK, PIPING, <br />i <br />LIGHTING AND EQUIPMENT INSTALLATION TO BE <br />800 HIGHLAND AVE. STE 102 <br />60x21 <br />COORDINATED AMONG ALL TRADES PRIOR TO THE <br />ORLANDO, FL 32803 <br />22x10 <br />INSTALLATION OF ANY UTILITIES. PIPING RISERS <br />CA LIC. NO.: $1963 <br />36x12 <br />36x12 <br />- - <br />AND DROPS ARE SHOWN, CONTRACTOR TO <br />PHONE: (407) 250.8485 <br />PROVIDE AT NO ADDITIONAL COST TO THE OWNER <br />WWW.DCL-ENG.COM <br />ALL DUCT OFFSETS, BENDS AND TRANSITIONS <br />REQUIRED FOR A COMPLETE FUNCTIONAL <br />\ <br />SYSTEM. <br />4. <br />ROUTE ALL DUCTWORK IN ABOVE CEILING. HOLD <br />DUCTWORK TIGHT TO STRUCTURE. FOR CLARITY, <br />NOT ALL THE DUCTWORK RISERS AND DROPS ARE <br />- <br />- <br />SHOWN. <br />6 I <br />I I <br />_-� <br />18x1$ <br />cU <br />IN <br />5. <br />FOR CLARITY, NOT ALL THE DUCTWORK AND <br />R <br />6. <br />CONTRACTOR TO COORDINATE WITH ALL TRADES <br />TO ENSURE A MINIMUM CLEARANCE OF 36" IS <br />2 <br />RH <br />PROVIDED FOR ALL AIR TERMINAL DEVICES. <br />SPACE SHALL BE MAINTAINED FROM THE TOP OF <br />AIR TERMINAL DEVICE TO THE TOP OF THE <br />CEILING. <br />� <br />18x12 <br />7, <br />INSTALL DUCTWORK RUN -OUT TO ALL SUPPLY, <br />RETURN AND EXHAUST DIFFUSERS/GRILLES WITH <br />- _ <br />- - <br />AMINIMUM OF 2 ELBOWS 6 FT OF FLEXIBLE DUCT.\ <br />T <br />FD --� <br />T <br />- <br />- <br />476 <br />100 <br />x <br />8. <br />-, <br />AFTER DEMOLITION, CAP REMAINING OPEN ENDED <br />DUCTS/PIPING AS REQUIRED. <br />t� <br />2 <br />/ <br />1 <br />9. <br />SOME WORK MAY BE REQUIRED TO BE <br />PERFORMED AFTER HOURS <br />OR ON WEEKENDS. <br />COORDINATE ALL SYSTEM SHUTDOWNS WITH <br />STAMPS AND APPROVALS <br />CD <br />OWNER IN WRITING. <br />35 <br />14x1.0 <br />10. <br />CONTRACTOR TO CAP OR SHUT DOWN ALL <br />SUPPLY, RETURN AND EXHAUST AIR DUCTWORK <br />AND DIFFUSERS SERVING AREAS UNDER <br />cJ I <br />F <br />-- <br />CONSTRUCTION TO HELP MAINTAIN NEGATIVE <br />a <br />PRESSURE. <br />Q <br />11. <br />PROVIDE VISUAL AIRFLOW INDICATORS AT EACH <br />CONSTRUCTION ENTRANCE TO THE WORK ZONE. <br />SCRUBBER SHALL BE 99.97% HEPA AND ALL <br />REQUIREMENTS SHALL BE COORDINATED WITH <br />INFECTION CONTROL RISK ASSESSMENT <br />MEASURES IN PROJECT MANUAL. CONNECT A <br />TEMPORARY RETURN DUCT AS SHOWN AND <br />BALANCE AS NECESSARY TO MAINTAIN A MINIMUMlE� <br />C�c <br />CD <br />NEGATIVE 0.01" IN THE CONSTRUCTION AREA AT <br />"'--"' <br />10 <br />�� 10 IL <br />CD <br />`� <br />ALL TIMES, REMAINING AIRFLOW SHALL BE <br />RECIRCULATED TO THE CONSTRUCTION ZONE. <br />.«.•' 3« <br />-�'�" <br />35® <br />AIR SCRUBBER SHALL OPERATE CONTINUOUSLY <br />_ <br />* <br />DURING CONSTRUCTION. <br />' <br />CC3 ,• <br />tl <br />_-- <br />12. <br />ALL NEW DUCTWORK SHALL MATCH EXISTING. <br />•:ct q Ip •• •�, <br />20 <br />- <br />VERIFY EXISTING DUCTWORK CONSTRUCTION <br />�F,S'S'''«•.,«•'«'*���;. <br />- <br />AND THICKNESS. DUCTWORK SHALL BE'H� <br />�CNAL EN <br />�- <br />nrionlimn� <br />CONSTRUCTED TO WITHSTAND PRESSURES IN <br />THE SYSTEM BUT NOT LESS THAN 2"WG FOR <br />6x20 I <br />SUPPLY DOWNSTREAM OF AIR TERMINALS, 3"WG <br />6� <br />`` <br />- <br />i <br />- <br />UPSTREAM OF THE AIR TERMINAL DEVICES <br />AND -3"WG FOR RETURN SYSTEMS, <br />I <br />1 <br />13. <br />HATCHED AREAS ARE NOT UNDER THE SCOPE OF <br />THIS PROJECT. ALL EXISTING AIR HANDLING <br />"-On FD <br />_ <br />UNITS, DUCTWORK, DIFFUSERS, GRILLES, PIPING, <br />_ <br />� <br />_ <br />ETC., IN THE HATCHED AREAS ARE EXISTING TO <br />THAT THIS PLAN, SPECIFICATION WAS <br />FD <br />REMAIN. <br />I HEREBY CERTIFY OR REPORT <br />r— <br />PREPARED BY ME OR UNDER MY DIRECT SUPERVISION, AND THAT I AM A <br />t <br />14, <br />AT CONCLUSION OF PROJECT, SUBMIT <br />DULY LICENSED ENGINEER UNDER THE LAWS OF THE STATE OF FLORIDA. <br />TO THE BEST OF MY KNOWLEDGE THESE PLANS AND SPECIFICATIONS <br />r <br />_� <br />.— <br />COMPLETE T & B REPORT. <br />COMPLY WITH THE APPLICABLE BUILDING CODES. <br />75 <br />CD <br />DANIEL CESAR, PE; LICENSE NO: 68670 <br />EA <br />85 <br />' <br />KEYED NOTES <br />20x10 <br />PROVIDE TEMPORARY HEPA FILTERS (99.7% <br />80 <br />_ <br />HEPA) AIR SCRUBBER FOR CONSTRUCTION <br />Cf� <br />PHASE. HEPA AIR SCRUBBERS SHALL BE EQUAL <br />- <br />280 <br />� <br />TO HEPA AIRE MODEL PRETADOR PAS 2400 HC <br />WITH VARIABLE AIRFLOW OF 700 TO 2,100 CFM <br />AND IT SHALL BE CONNECTED TO EMERGENCY <br />i <br />POWER. COORDINATE ALL REQUIREMENTS <br />— <br />WITH INFECTION CONTROL RISK ASSESSMENT <br />MEASURES IN PROJECT MANUAL. NUMBER OF <br />80 <br />18x12 <br />UNITS TO BE DETERMINED BY CONTRACTOR TO <br />280 <br />ARCHIVE THE MINIMUM NEGATIVE PRESSURE <br />REQUIRED. ROUTE TEMPORARY 12"0 FLEXIBLE <br />DUCT FROM DISCHARGE OF HEPA UNIT TO <br />CD <br />CEILING OF CORRIDOR OUTSIDE DEMOLITION <br />280 <br />CONSTRUCTION BARRIER. <br />2 <br />DEMO EXISTING RETURN GRILLE AND RELOCATE <br />TO OTHER SIDE OF THE CHASE. REFER TO NEW <br />m- -mLa Ith <br />Advell]: <br />PLANS FOR ADDITIONAL DETAILS. <br />mimmmmicU <br />MECHANICAL <br />FLOOR PLAN - DEMO <br />Zephyrhills <br />.SCALE: 114" =V-0" <br />PROJECT NAME <br />ADVENT HEALTH ZEPHYRHILLS ROOM 6 <br />X-RAY REPLACEMNET <br />PROJECT LOCATION <br />7050 GALL BOULEVARD <br />ZEPHYRHILLS, FL 33541 <br />PROJECT NUMBER <br />2021-009 <br />PROJECT PHASE <br />100% CONSTRUCTION DOCUMENTS <br />ISSUE DATE <br />AUGUST 18, 2021 <br />REVISIONS LIST <br />NO, <br />DATE <br />DESCRIPTION <br />A <br />SHEET TITLE <br />MECHANICAL <br />FLOOR PLAN - <br />DEMO <br />SHEET NO. <br />