Laserfiche WebLink
s_...sswrwv.l:uulua..uL 1. .L. l�{..v` �w..i:.�_. w.J� 1:. ... ue_.:...w.:luu.t�n::lum�. •4u.uu�es. .•. � _ _ ...W:YI:. iLW .L._..l �.:�1. _ I:. 1. I ..�LI.. I. .', t. ..._.. i_ ..J...IL. � l �..l '.:�I W W.l IL1.l _ d:'141. 119..-4![B�LLY!' W®1191111LLll1:'IAI.LI".Lk ,:imL"Yi .. l i i 11 S .-1 _ _ __ _ _ _.dYla.'w - _ l . I i..l• - _ L . 26 l <br />__ -. .. . _. _ _ ___. _:_`. ... _.. _ :-._.- __. �._ -..� _ -._.. .. :yam__.. ..-i. y..-- I 1.. I-l-NI..-I e.JW�..:uii�LL:s.41� _lil _ -��.l w. _1.-.:L11L LW1�l..�:�..Wi �S�.L C W. �' �IYI'Y--1lMl•11 <br />I <br />3 <br />I <br />C <br />F <br />I <br />c <br />I <br />n <br />IAIQI 11 ATInAI IAnVf-T <br />NOTES: <br />1. PULL FLEXIBLE DUCT INNER LINER OVER <br />RIGID DUCT WITH MINIMUM 4" OVERLAP. <br />SEAL FLEXIBLE DUCT INNER LINING TO <br />RIGID DUCT WITH MASTIC ON THE INSIDE <br />OF THE LINER. <br />2. SECURE LINER WITH STAINLESS STEEL <br />DRAW BAND. <br />3. SECURE FLEXIBLE DUCT INSULATION <br />AND OUTER JACKET WITH STAINLESS <br />STEEL DRAW BAND. <br />4. PULL RIGID DUCT INSULATION AND BUTT <br />JOINT TO TERMINATION OF FLEXIBLE <br />DUCT. APPLY 3" WIDE TAPE SIMILAR TO <br />FSK TAPE TO CREATE VAPOR BARRIER <br />SEAM. TAPE SHALL BE COMPATIBLE <br />WITH FLEXIBLE DUCT INSULATION <br />JACKET AND RIGID DUCT INSULATION <br />JACKET, APPLY MASTIC OVER TAPE FOR <br />DURABILITY. <br />3 FLEXIBLE DUCT CONNECTOR TO INSULATED RIGID DUCT <br />SCALE: 12" = V-0" <br />NOTES: <br />MIN. 1" WIDE BAND <br />CLAMP AT ELBOW <br />FLEXIBLE DUCT <br />pRAWBAND (1) <br />(3) DRAWBAND (2) <br />DIFFUSER WITH <br />ROUND INLET CONNECTION <br />CEILING FIRE DAMPER. INSTALLED PER <br />MANUFACTURER RECOMMENDATIONS (UL <br />555) <br />CEILING <br />1. PULL FLEXIBLE DUCT'S INNER LINER OVER DIFFUSER COLLAR AND SECURE WITH DRAW <br />BAND. <br />2. SECURE FLEXIBLE DUCT INSULATION AND OUTER JACKET WITH DRAW BAND. <br />3. MAINTAIN MIN. 1.5 RADIUS ELBOW <br />4 DIFFUSER/GRILLE CONNECTOR <br />SCALE: 12" = V-0" <br />IMAGING EQUIPMENT NOTES <br />THESE DRAWINGS SHALL BE USED IN CONJUNCTION WITH THE IMAGING EQUIPMENT VENDOR <br />PLANS AND/OR DETAILS, AND THEY ARE INTENDED TO GIVE THE CONTRACTOR A GENERAL <br />KNOWLEDGE OF THE WORK ASSOCIATED WITH THE INSTALLATION OF THE IMAGING <br />EQUIPMENT. IT IS NOT INTENDED TO INDICATE ALL WIRING, CONNECTIONS, J-BOXES, <br />SWITCHES, ETC, OR ANCILLARY COMPONENTS REQUIRED FOR INSTALLATION. ALL <br />EQUIPMENT SHALL BE INSTALLED PER THE OWNER APPROVED MANUFACTURER'S <br />INSTALLATION DRAWINGS. INSTALLATION SHALL BE COORDINATED IN FIELD WITH IMAGING <br />EQUIPMENT MANUFACTURER. <br />IT IS THE INTENTION OF THESE DRAWINGS THAT ALL WORK (LABOR, MATERIALS, ETC.) <br />REQUIRED FOR A COMPLETE AND OPERATIONAL SYSTEM SHALL BE PROVIDED. <br />EQUIPMENT MANUFACTURER SHALL SUPPLY FIXED LENGTH CABLES, WHEREBY ALL <br />MEASUREMENTS SHALL BE DETERMINED FROM ELECTRICAL TROUGH RUNS INDICATED ON <br />THE DRAWINGS. ANY CHANGES TO EQUIPMENT PLACEMENT OR TROUGH ROUTINGS AT JOB <br />SITE WILL CAUSE THE DELIVERY OF INACCURATE AND ERRONEOUS CABLE LENGTHS. THIS <br />MAY RESULT IN ADDITIONAL COST FOR REPLACEMENT CABLES AND DELAY EQUIPMENT <br />INSTALLATION. COORDINATE PLACEMENT OF ALL EQUIPMENT WITH EQUIPMENT INSTALLER <br />PRIOR TO ROUGH -IN. <br />ALL RADIOLOGY EQUIPMENT SHALL BE TESTED AND RECORDED FOR CHASSIS LEAKAGE IN <br />ACCORDANCE WITH NFPA 99, SECTION 8-4.1.3.4. PROVIDE A WRITTEN REPORT, SIGNED, <br />SEALED AND DATED BY THE PERSON SUPERVISING THE TEST FOR EACH PIECE OF <br />EQUIPMENT TABULATION PERMITTED AND RECOMMENDED. <br />r MECHANICAL FLOOR PLAN - NEW <br />SCALE: 1/4" = V-0" <br />AIR DISTRIBUTION DEVICE SCHEDULE <br />SYMBOL <br />TYPE <br />AIRFLOW <br />SIZE <br />DUCT <br />COLOR <br />REMARKS <br />(CFM) <br />(1N x IN) <br />CONNECTION SIZE <br />0 - 50 <br />12 x 12 <br />SUPPLY DIFFUSERS SHALL BE EQUAL TO PRICE AMD <br />SUPPLY <br />WITH18x18 DIMENSION "A" SIZE FOR UNIFORM APPEARANCE <br />51 - 240 <br />24 x 24 <br />MAX.NECK VELOCITY 700 FPM <br />SUPPLY CEILING <br />SEE PLAN <br />WHITE <br />MAX. NC = 30 <br />241 - 325 <br />24 x 24 <br />CD <br />GRILLE 24x24 <br />MODULAR <br />FOR DUCT <br />CONNECTION <br />MAX. PRESSURE DROP 0.10" <br />CEILING LAY -IN OR SURFACE MOUNT <br />CFM <br />SIZE <br />USED FOR GENERAL PURPOSE <br />330 - 480 <br />24 x 24 <br />485 - 740 <br />24 x 24 <br />0 - 50 <br />12 x 12 <br />RETURN/EXHAUST GRILLES SHALL BE EQUAL TO PRICE 630 L-STYLE WITH 10x10 <br />RETURN/EXHAUST AIR <br />DUCT CONNECTION SIZE <br />51 - 240 <br />24 x 24 <br />MAX. NECK VELOCITY 450 FPM <br />RG <br />SEE PLAN <br />MAX. NC = 20 <br />MAX. PRESSURE DROP 0.10"WHITE <br />CFM <br />RETURN <br />241 - 325 <br />24 x 24 <br />FOR DUCT <br />CEILING LAY -IN OR SURFACE MOUNT <br />GRILLE <br />CONNECTION <br />USED FOR GENERAL PURPOSE <br />EA <br />330 - 480 <br />24 x 24 <br />PROVIDE 22x22 GRILLE PLENUM BOXES FOR ALL 24x24 RETURN/EXHAUST <br />CFM <br />GRILLES WITH AIRFLOW GREATER THAN 400 CFM. <br />485 - 98fl <br />24 x 24 <br />LOW EXHAUST <br />30 x 10 <br />EXHAUST GRILLES SHALL BE EQUAL TO PRICE 630 L-STYLE WITH 450 DEFLECTION <br />OR <br />SEE PLAN <br />3/4" BLADE SPACING <br />24 x 12 <br />RETURN AIR <br />LOW RETURN <br />360-720 <br />FOR DUCT' <br />WHITE <br />MAX. NECK VELOCITY 400 FPM <br />MAX. NC = 20 <br />GRILLE <br />CONNECTION <br />MAX. PRESSURE DROP 0.10" <br />EA <br />20 x 14 <br />CEILING LAY -IN OR SURFACE MOUNT <br />CFM <br />USED FOR GENERAL PURPOSE <br />18 x 16 <br />GRILLES WITH AIRFLOW GREATER THAN 360 CFM. <br />NOTES: <br />1. TRANSITION DUCTWORK AS REQUIRED TO GRILLE CONNECTION SIZE INDICATED. <br />2. DIFFUSERS/GRILLES/REGISTERS SHALL BE ALUMINUM. <br />3. PROVIDE INTEGRAL VOLUME DAMPER. <br />4. PROVIDE FLEXIBLE DUCT CONNECTIONS TO ALL AIR DISTRIBUTION DEVICES IN LAY -IN CEILINGS. EXPOSED AIR DISTRIBUTION DEVICES SHALL HAVE HARD DUCT CONNECTIONS. <br />GENERAL NOTES <br />1. EXISTING SYSTEMS SHOWN HEREIN WERE TAKEN <br />FROM DOCUMENTS FURNISHED BY OTHERS AND <br />MAY NOT REFLECT EXACT FIELD CONDITIONS. <br />THEREFORE, THE ENGINEER CAN NOT <br />GUARANTEE THE ACCURACY OF SAME, NOR THAT <br />ALL SYSTEMS AND/OR SYSTEMS COMPONENTS <br />ARE SHOWN. THE CONTRACTOR SHALL VERIFY <br />FIELD CONDITIONS PRIOR TO BID AND INFORM <br />THE ENGINEER OF ANY MAJOR DISCREPANCY <br />THAT IT WILL REQUIRE RELOCATING EXISTING <br />PIPING, CONDUIT, EQUIPMENT, ETC. TO ALLOW <br />INSTALLATION OF NEW WORK AND COULD <br />POTENTIALLY AFFECT THE COST. <br />2. REFER TO INFECTION CONTROL RISK <br />ASSESSMENT IN PROJECT MANUAL FOR <br />REQUIRED PREVENTIVE MEASURES TO BE TAKEN <br />FOR EACH AREA, <br />3. DUE TO THE CEILING SPACE LIMITATIONS, IT IS <br />IMPERATIVE THAT ALL DUCTWORK, PIPING, <br />LIGHTING AND EQUIPMENT INSTALLATION TO BE <br />COORDINATED AMONG ALL TRADES PRIOR TO THE <br />INSTALLATION OF ANY UTILITIES. PIPING RISERS <br />AND DROPS ARE SHOWN. CONTRACTOR TO <br />PROVIDE AT NO ADDITIONAL COST TO THE OWNER <br />ALL DUCT OFFSETS, BENDS AND TRANSITIONS <br />REQUIRED FOR A COMPLETE FUNCTIONAL <br />SYSTEM. <br />4. ROUTE ALL DUCTWORK IN ABOVE CEILING. HOLD <br />DUCTWORK TIGHT TO STRUCTURE. FOR CLARITY, <br />NOT ALL THE DUCTWORK RISERS AND DROPS ARE <br />SHOWN. <br />5. FOR CLARITY, NOT ALL THE DUCTWORK AND <br />6. CONTRACTOR TO COORDINATE WITH ALL TRADES <br />TO ENSURE A MINIMUM CLEARANCE OF 36" IS <br />PROVIDED FOR ALL AIR TERMINAL DEVICES. <br />SPACE SHALL BE MAINTAINED FROM THE TOP OF <br />AIR TERMINAL DEVICE TO THE TOP OF THE <br />CEILING, <br />7. INSTALL DUCTWORK RUN -OUT TO ALL SUPPLY, <br />RETURN AND EXHAUST DIFFUSERS/GRILLES WITH <br />A MINIMUM OF 2 ELBOWS 6 FT OF FLEXIBLE DUCTA <br />8. AFTER DEMOLITION, CAP REMAINING OPEN ENDED <br />DUCTS/PIPING AS REQUIRED. <br />9. SOME WORK MAY BE REQUIRED TO BE <br />PERFORMED AFTER HOURS OR ON WEEKENDS. <br />COORDINATE ALL SYSTEM SHUTDOWNS WITH <br />OWNER IN WRITING, <br />10. CONTRACTOR TO CAP OR SHUT DOWN ALL <br />SUPPLY, RETURN AND EXHAUST AIR DUCTWORK <br />AND DIFFUSERS SERVING AREAS UNDER <br />CONSTRUCTION TO HELP MAINTAIN NEGATIVE <br />PRESSURE. <br />11. PROVIDE VISUAL AIRFLOW INDICATORS AT EACH <br />CONSTRUCTION ENTRANCE TO THE WORK ZONE. <br />SCRUBBER SHALL BE 99.97% HEPA AND ALL <br />REQUIREMENTS SHALL BE COORDINATED WITH <br />INFECTION CONTROL RISK ASSESSMENT <br />MEASURES IN PROJECT MANUAL. CONNECT A <br />TEMPORARY RETURN DUCT AS SHOWN AND <br />BALANCE AS NECESSARY TO MAINTAIN A MINIMUM <br />NEGATIVE 0.01" IN THE CONSTRUCTION AREA AT <br />ALL TIMES. REMAINING AIRFLOW SHALL BE <br />RECIRCULATED TO THE CONSTRUCTION ZONE. <br />AIR SCRUBBER SHALL OPERATE CONTINUOUSLY <br />DURING CONSTRUCTION, <br />12. ALL NEW DUCTWORK SHALL MATCH EXISTING. <br />VERIFY EXISTING DUCTWORK CONSTRUCTION <br />AND THICKNESS, DUCTWORK SHALL BE <br />CONSTRUCTED TO WITHSTAND PRESSURES IN <br />THE SYSTEM BUT NOT LESS THAN 2"WG FOR <br />SUPPLY DOWNSTREAM OF AIR TERMINALS, 3"WG <br />UPSTREAM OF THE AIR TERMINAL DEVICES <br />AND -3"WG FOR RETURN SYSTEMS. FIELD VERIFY <br />EXISTING DUCTWORK SIZES. NEW DUCTWORK <br />AND FLEX DUCT TO MATCH EXISTING. <br />13, HATCHED AREAS ARE NOT UNDER THE SCOPE OF <br />THIS PROJECT. ALL EXISTING AIR HANDLING <br />UNITS, DUCTWORK, DIFFUSERS, GRILLES, PIPING, <br />ETC., IN THE HATCHED AREAS ARE EXISTING TO <br />REMAIN. <br />14. AT CONCLUSION OF PROJECT, SUBMIT A <br />COMPLETE T & B REPORT. <br />KEYED NOTES <br />1 RELOCATE LOW RETURN GRILLE TO PLAN EAST <br />SIDE OF THE CHASE TO ALLOW IMAGING <br />EQUIPMENT INSTALLATION. <br />2 REBALANCE TO AIRFLOW IN DARK OR PREVIOUS <br />RECORDED VALUES. <br />MARK LOCATION SERVICE -AIRFLOW DATA FILTERS COOLING COIL WATER SIDE REMARKS <br />SUPPLY AIR OUTDOOR AIR PRE -FILTER FINAL CAPACITY AIR SIDE 1 <br />RTU __..... .__^-___. ___._..-.__.. ._.____._._.__ _^_� - WATER MAX EWT LWT BASIS OF DESIGN: <br />TYPE TYPE TOTAL SENSIBLE EAT j' LAT - FLOW PD. (°F) (°F) TRANE <br />(CFM) (CFM) ( } _._-1-- T_--a-- (GPM) (FT WC) <br />(MBH) (MBH) DB °F �WB (OF)' DB ff) WB (OF) <br />AHU RADIOLOGY / V-BANK FLAT __....� � <br />2 PENTHOUSE CATH LABS 2 & 3 27,346 13;085 211 THROWAWAY CARTRIDGE 1,575,130 77.1 68.7 50. 49.8 236.9 - 40.3 53.6 MCCA066EAB050A00 <br />REHEAT I I <br />I <br />MARK <br />TYPE <br />MAX - <br />MIN <br />MAX. <br />MAX. <br />MIN. COIL <br />HEATING COIL <br />NOTES <br />RH <br />RH-1 <br />X-RAY 6 <br />AIRFLOW <br />(CFM) <br />525 _ <br />AIRFLOW <br />(CFM) <br />N/A <br />AIR <br />PD <br />("WG) <br />0.5._ ._. <br />WATER <br />PD <br />(" H20) <br />5.0__.,. <br />SIZE <br />(IN.) <br />_12x10._.__ <br />_____ - <br />REHEAT CAP. EAT EWT LWT <br />AIRFLOW <br />T650 14.8 155.0 180.0 160.01 <br />BASIS OF DESIGN: <br />EXHAUST FAN (EXISTINPI_ <br />MARK <br /># <br />-EF-20 <br />SERVES - <br />RADIOLOGY <br />CFM <br />�1,950 <br />ESP <br />W.G.) <br />0.75 <br />QTY. <br />1 <br />TYPE <br />_DOWNBLASTJ <br />DRIVE <br />BELT <br />CONTROL <br />CONST. <br />MOUNTING <br />ROOF <br />ELECTRICAL <br />HP VOLT PH <br />tO 120 1 <br />NOTES <br />BASIS OF DESIGN: <br />GREENHECK <br />GB-180-5-X <br />106 WEST NORTH BAY STREET I TAMPA, FL 33603 <br />www.cjaegroup.com <br />MECHANICAL -ELECTRICAL -PLUMBING <br />800 HIGHLAND AVE. STE 102 <br />ORLANDO, FL 32803 <br />CA LIC. NO.: 31963 <br />PHONE: (407) 250-6485 <br />WWW.DCL-ENG.COM <br />STAMPS AND APPROVALS <br />I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS <br />PREPARED BY ME OR UNDER MY DIRECT SUPERVISION, AND THAT I AM A <br />DULY LICENSED ENGINEER UNDER THE LAWS OF THE STATE OF FLORIDA. <br />TO THE BEST OF MY KNOWLEDGE THESE PLANS AND SPECIFICATIONS <br />COMPLY WITH THE APPLICABLE BUILDING CODES. <br />DANIEL CESAR, PE; LICENSE NO: 68670 <br />PROJECT NAME <br />ADVENT HEALTH ZEPHYRHILLS ROOM 6 <br />X-RAY REPLACEMNET <br />PROJECT LOCATION <br />7050 GALL BOULEVARD <br />ZEPHYRHILLS, FL 33541 <br />PROJECT NUMBER <br />2021-009 <br />PROJECT PHASE <br />100% CONSTRUCTION DOCUMENTS <br />ISSUE DATE <br />AUGUST 18, 2021 <br />REVISIONS LIST <br />NO• I DATE I DESCRIPTION <br />SHEET TITLE <br />MECHANICAL <br />FLOOR PLAN - <br />NEW <br />SHEET NO. <br />M301 <br />