My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 Gall Blvd (117)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 Gall Blvd (117)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:08:17 PM
Creation date
2/19/2025 1:08:09 PM
Metadata
Fields
Template:
Building Plans
Street #
7050
Location
Gall Blvd
Contractor
Interior Enterprises
Building Plans - Permit #
3084
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />3 <br />4 <br />I <br />C <br />I <br />V <br />INTERIOR FINISHES SCHEDULE <br />REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION. FINAL COLOR SELECTIONS TO BE VERIFIED WITH OWNER. <br />FINISH <br />KEYNOTE <br />MANUFACTURER <br />STYLE <br />COLOR <br />ADDITIONAL COMMENTS <br />ACOUSTIC CEILING TILE <br />ACT-1 <br />ARMSTRONG <br />DUNE <br />WHITE <br />24"x24" SQUARE LAY -IN <br />ACOUSTIC CEILING GRID <br />ARMSTRONG <br />ALUMINUM <br />WHITE <br />15/16" <br />PAINT <br />PT-1 <br />SHERWIN WILLIAMS <br />EGGSHELL <br />7668 MARCH WIND <br />SHEET VINYL FLOORING <br />SV-1 <br />PATCRAFT <br />HOLISTIC <br />ECHO 00120 <br />78.95"x65.94" SHEET; HEAT WELDED SEAMS WITH ROD COLOR MATCHING <br />TILE FLOORING <br />TIL-1 <br />DALTILE <br />FABRIQUE <br />P690 GRIS LINEN <br />12"X24" TILE; DARK GROUT TO MATCH TILE; RUNNING BOND <br />WALL TILE <br />TIL-2 <br />DALTILE <br />FABRIQUE <br />P690 GRIS LINEN <br />12X24" TILE; DARK GROUT TO MATCH TILE; HORIZONTAL RUNNING BOND <br />RUBBER BASE <br />RB-1 <br />JOHNSONITE <br />MILLWORK LINE <br />47 BROWN <br />5.25" WALL BASE; INFLECTION PROFILE <br />PLASTIC LAMINATE - CASEWORK <br />PL-1 <br />FORMICA <br />COMMERCIAL <br />6413 SILVER RIFTWOOD <br />SOLID SURFACE COUNTERTOP <br />SS-1 <br />WILSONART <br />SOLID SURFACE <br />9204CE MORNING ICE <br />0.75" <br />CORNER GUARDS <br />CG-1 <br />INPRO <br />160CG H.I. <br />MATCH PAINT COLOR <br />4' HEIGHT <br />CONSTRUCTION PLAN KEYNOTES <br />PLEASE REFER TO G.02 FOR GENERAL NOTES FOR NEW CONSTRUCTION. <br />NOTE: ALL OPEN HOLES OR DAMAGE IN WALLS ABOVE CEILING MUST BE <br />REPAIRED. CAULK/SEAL ALL EXISTING AND NEW PENETRATIONS. <br />C1 COORDINATE "XRAY IN USE" LIGHT FUNCTION WITH EQUIPMENT VENDOR AFTER <br />EQUIPMENT INSTALLATION. <br />C2 REINSTALL EXISTING LEAD -LINED DOOR. <br />C3 INSTALL NEW EQUIPMENT FLOOR PLATE. REFER TO STRUCTURAL DRAWINGS FOR <br />DETAILS. COORDINATE WITH VENDOR -PROVIDED XRAY EQUIPMENT DRAWINGS. <br />C4 INSTALL NEW CASEWORK AND SINK. REINSTALL EXISTING PTD AND SD. <br />C5 INSTALL NEW 36"HT X 30"W LEAD -LINED VIEW WINDOW. REFER TO INSTALLATION <br />DETAILS 14/A.90. <br />C6 INSTALL NEW SHEET VINYL FLOORING THROUGHOUT ENTIRE X-RAY ROOM. <br />FLOOR LEVEL TOLERANCE MUST MEET 1/8" OVER A 10'-0" SPAN THROUGHOUT <br />THE X-RAY EQUIPMENT AREA, AS INDICATED BY DASHED LINE. <br />C7 INSTALL NEW CEILING GRID AND TILE. REFER TO 1 /A.30 FOR REFLECTED CEILING <br />PLAN INFORMATION. <br />C8 REPAIR HOLE W/ LEAD -LINED GWB. <br />Cg RELOCATE EXISTING LOW AIR RETURN GRILL TO ADJACENT FACE. REFER TO MECH. <br />C10 REFINISH EXISTING WALLS AFTER WALL COVERING REMOVAL, AS REQ'D. REPAINT <br />ALL WALLS THROUGHOUT. <br />C11 ADD ALTERNATE 1 - UPGRADE FINISHES IN TOILET ROOM <br />1. PROVIDE NEW FLOOR TILE (TIL-1; RB-1). <br />2. PROVIDE NEW WALL TILE (TIL-2) UP TO 5'-0" AT TOILET/LAV WALL ONLY. <br />3. PAINT ENTIRE ROOM (PT-1) <br />4. PROTECT EXISTING NURSE CALL PULL STATION AND FIRE ALARM STROBE <br />DURING CONSTRUCTION. <br />5. REINSTALL TOILET, WALL -HUNG SINK, GRAB BARS, TPD, PTD, SD. <br />6. INSTALL NEW MIRROR (CFCI). REFER TO SPEC. <br />7. INSTALL NEW ACT-1. REFER TO A.30 REFLECTED CEILING PLAN AND MEP <br />DRAWINGS FOR LIGHT FIXTURES, DIFFUSERS/EXHAUST, SPRINKLER HEAD <br />INFORMATION. <br />C11 PROVIDE ONE 2"x16" WOOD SUPPORT BOARD HIDDEN IN WALL. LOCATE BOARD <br />CENTERLINE 84" AFF. BOARD SHALL SUPPORT 150 POUNDS LATERAL LOAD (FULL <br />FORCE). REFER TO X-RAY EQUIPMENT PLANS FOR ADDITIONAL INFORMATION. <br />NOTE: <br />ALL PLUMBING FIXTURES AND <br />ACCESSORIES MUST BE MOUNTED <br />TO MEET FLORIDA BUILDING CODE <br />2020 ACCESSIBILITY REQUIREMENTS. <br />FLOOR LINE <br />ACCESSIBLE MOUNTING HEIGHTS (:: <br />- <br />3 TOILET ROOM FIXTURES <br />SCALE: 1/4" = 1'-0" <br />3'-6" 12 <br />MA: <br />TOHET PAPER <br />DGUGER <br />I � <br />3'-0" <br />a_ <br />MIN. MIN. o', <br />GRAB BAR ZI <br />d a <br />d <br />FLOOR BASE <br />m <br />WALL <br />MIRROR MIRROR SOAP DISPENSER AND <br />8" FOLLOW MANUFACTURER PAPER TOWEL DISPENSER <br />MIN. INSTRUCTION FOR IN —WALL <br />LAVATORY STRUCTURAL SUPPORT — <br />PROVIDE INSULATED <br />PROTECTION AT EXPOSED <br />o zK4" PIPES & SURFACES <br />I <br />CV Z <br />N <br />Q FLOOR LINE 11 ° MAX. <br />W KI <br />DEMOLITION PLAN KEYNOTES <br />PLEASE REFER TO G.02 FOR GENERAL NOTES FOR DEMOLITION. <br />p� <br />REMOVE EXISTING LEAD -LINED VIEW WINDOW. PREPARE PARTITION TO RECEIVE NEW, <br />NOTE: OWNER TO COORDINATE REMOVAL OF EXISTING X-RAY AND OTHER CLINICAL <br />LARGER LEAD -LINED VIEW WINDOW, AS SPECIFIED. <br />EQUIPMENT PRIOR TO ERECTION OF ICRA CONSTRUCTION BARRIER. <br />D8 <br />PROTECT EXISTING COUNTERTOP AND WORK SPACE. <br />D1 <br />INSTALL CONSTRUCTION BARRIER PARTITIONS AND 20-MINUTE FIRE RATED DOOR <br />AND FRAME (SELF -CLOSING AND LATCHING). REFER TO ICRA PLAN AND MECHANICAL <br />pg <br />REMOVE EXISTING SHEET FLOORING THROUGHOUT ROOM FOR REPLACEMENT. <br />PLAN (HEPA FILTER) FOR ADDITIONAL CONSTRUCTION BARRIER INFORMATION. <br />02 <br />INSTALL CONSTRUCTION BARRIER PARTITION TO PROTECT ACTIVE CONTROL AREA, <br />10 <br />REMOVE EXISTING CEILING TILE AND GRID FOR REPLACEMENT. REMOVE ALL LIGHT <br />FIXTURES, DIFFUSERS AND GRILLES. VERIFY WITH OWNER FOR SALVAGE OR <br />ALIGN WITH EXISTING BULKHEAD IN CEILING. <br />DISPOSAL, <br />COORDINATE REMOVAL OF UNISTRUT SYSTEM AND STRUCTURE ABOVE WITH NEW <br />D3 <br />REMOVE, PROTECT AND STORE EXISTING LEAD -LINED ROOM ENTRY DOOR FOR <br />UNISTRUT SYSTEM (DELEGATED DESIGN). <br />REINSTALLATION UPON PROJECT COMPLETION. <br />D11 <br />REMOVE EXISTING CASEWORK. <br />D4 <br />REMOVE EXISTING FLOOR PLATE AND REMAINING FLOOR -MOUNTED EQUIPMENT, <br />AFTER X-RAY VENDOR HAS REMOVED CLINICAL EQUIPMENT. <br />12 <br />REMOVE MURAL WALL COVERING THROUGHOUT ENTIRE X-RAY ROOM. SEE STOP LINE. <br />D5 <br />REMOVE WALL —MOUNTED EQUIPMENT AND ELECTRICAL TROUGHS/CHASES, AS <br />13 <br />ADD ALTERNATE 1 — UPGRADE FINISHES IN TOILET ROOM <br />REQUIRED. COORDINATE WITH NEW CONSTRUCTION, ELECTRICAL AND <br />1. REMOVE EXISTING TOILET, WALL —HUNG SINK, GRAB BARS, TPD, PTD, SD — <br />VENDOR —PROVIDED EQUIPMENT PLANS FOR NEW ELECTRICAL AND DATA FEEDS. <br />PROTECT AND HOLD FOR REINSTALLATION. PROTECT EXISTING NURSE CALL <br />PULL —STATION AND FIRE STROBE. <br />D6 <br />REMOVE EXISTING CASEWORK AND SINK. TEMPORARILY CAP PLUMBING TO RECEIVE <br />2. REMOVE AND DISPOSE EXISTING FLOORING, WALL TILE, CEILING TILE AND <br />NEW SINK. SALVAGE PTD AND SD FOR REUSE/REINSTALLATION. <br />FIXTURES (GRID TO REMAIN), MIRROR FOR NEW FINISHES. <br />iia� <br />IIIIIIIT <br />HAND SHOWER & <br />CONTROLS <br />27" <br />MAX. <br />106 WEST NORTH BAY STREET / TAMPA, FL 33603 <br />http://cjaegroup.com <br />STAMPS AND APPROVALS <br />I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS <br />PREPARED BY ME OR UNDER MY DIRECT SUPERVISION, AND THAT I AM A <br />DULY LICENSED ARCHITECT UNDER THE LAWS OF THE STATE OF FLORIDA. <br />TO THE BEST OF MY KNOWLEDGE, THESE PLANS AND SPECIFICATIONS <br />COMPLY WITH THE APPLICABLE BUILDING CODES. <br />CARLA J. HARVEY; LICENSE NO: AR95088 <br />RIA <br />Advent Health <br />e sI <br />PROJECT NAME <br />ADVENTHEALTH ZEPHYRHILLS <br />ROOM 6 X-RAY REPLACEMENT <br />PROJECT LOCATION <br />7050 GALL BOULEVARD <br />ZEPHYRHILLS, FL 33541 <br />PROJECT NUMBER <br />2021-009 <br />PROJECT PHASE <br />100% CONSTRUCTION DOCUMENTS <br />ISSUE DATE <br />AUGUST 18, 2021 <br />REVISIONS LIST <br />NO. I DATE DESCRIPTION <br />SHEET TITLE <br />DEMOLITION PLAN, FLOOR PLAN <br />AND FINISH PLAN/SCHCEDULE <br />SHEET NO. <br />2 �NE� CONSTRUCTION PLAN No <br />: <br />DEMOLITION PLAN No <br />SCALE: 1 /4" = 1 '-0" <br />KEY PLAN N0 <br />Am20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.