Laserfiche WebLink
2 <br />3 <br />An <br />4 1 5 <br />I <br />C <br />11! <br />A <br />Q <br />N <br />M <br />O <br />N <br />0 <br />N <br />N <br />DESCRIPTION OF REQUIRED INFECTION <br />CONTROL PRECAUTIONS - CLASS IV <br />DURING CONSTRUCTION: <br />1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING <br />DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM. <br />2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, <br />PLYWOOD, PLASTIC, TO SEAL AREA FROM NON WORK <br />AREA OR IMPLEMENT CONTROL CUBE METHOD (CART <br />WITH PLASTIC COVERING AND SEALED CONNECTION TO <br />WORK SITE HEPA VACUUM FOR VACUUMING PRIOR TO <br />EXIT BEFORE CONSTRUCTION BEGINS. <br />3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE <br />UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS. <br />4. SEAL OLES, PIPES, CONDUITS, AND PUNCTURES. <br />5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL <br />TO PASS THROUGH THIS ROOM SO THEY CAN BE <br />VACUUMED USING A HEPA CLEANER BEFORE LEAVING <br />WORK SITE OR THEY CAN WEAR CLOTH OR PAPER <br />COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE <br />WORK SITE. <br />6.ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO <br />WEAR SHOE COVERS. SHOE COVERS MUST BE CHANGED <br />EACH TIME THE WORKER EXITS THE WORK AREA. <br />7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL <br />COMPLETED PROJECT IS INSPECTED BY THE OWNER'S <br />SAFETY DEPARTMENT AND INFECTION CONTROL <br />DEPARTMENT AND THROUGHLY CLEANED BY THE OWNER'S <br />ENVIRONMENTAL SERVICES DEPT. <br />UPON COMPLETION <br />1. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE <br />SPREAD OF DIRT AND DEBRIS <br />2. CONTAIN CONSTRUCTION WASTE BEFORE TRNASPORT IN <br />TIGHTLY COVERED CONTAINERS. <br />3. COVER TRANSPORT RECETACLES OR CARTS. TAPE <br />COVERING UNLESS SOLID LID. <br />4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS. <br />5. WET MOP AREA WITH DISINFECTANT. <br />6, REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE <br />WORK IS BEING PERFORMED. <br />Copyright 0 2018. This drawing is an instrument of service and property of RS&H. Inc. Any use or reproduction without the <br />expressed written consent of this corporation is prohibited. All rights reserved. <br />NOTE: THIS IS PARTIAL PLAN OF MECHANICAL AND <br />TOOLS SHOP LOCATED EAST OF BAKERY <br />] 0 <br />2 <br />NEW CONSTRUCTION WORK TO i - - OFFICE <br />ENCLOSE NEW ELECTRICAL ^ 101 -- <br />i <br />!u_ <br />OPEN AIR BREEZEWAY <br />OPEN AIR BREEZEWAY <br />STAIR „C„ I --�n _- _ �� ❑ <br />i I - <br />' OFFICE I <br />-�1 <br />- - - Q <br />o <br />AREA OF WORK • k _ _ _ _.-- - - - - - <br />PHI -1 - I o_ -- - <br />I� <br />ELECTRICAL -- -' <br />H <br />TEMP''--PH1 3 - J I - <br />STORAGE FE il <br />OFFICE <br />PH1-2 • <br />i <br />! <br />PASSAGE L] <br />MECHANICAL MECHANICAL <br />PHASING SCHEDULE <br />PHASE 1: (CONSTRUCTION COMPLETION BY DECEMBER 2020) <br />l RS&H <br />1. <br />1715 N. Westshore Blvd., Suite 600 <br />J <br />Tampa„ Florida 33607-3999 <br />2. RENOVATE DISHWASH ROOM, EVS. ADJACENT PASSAGEWAY AND STAFF TOILET/ ROOMS. <br />904-256-2500 Fax 904-256-2503 <br />3. WORK INCLUDES REMOVAL/ REPLACEMENT OF THE FLOORING AND FLOOR SLAB TO REPLACE UNDERGROUND UTILITIES (SEE <br />PHASING PLAN FOR EXTENT OF SLAB REMOVAL). <br />www.rsandh.com <br />4. REMOVAL/ REPLACEMENT OF THE CEILING, ALL CEILING DEVICES AND WALL FINISHES. <br />FL Cert. Nos. AAC001886 ` IB26000956 <br />5. REMOVAL AND REPLACEMENT OF DISHWASH ROOM EQUIPMENT (PER FOOD SERVICE CONSULTANT DRAWINGS) AND WATER <br />5620 ` LCC000210 ` GB238 <br />SOFTENER SYSTEM. <br />6. CONSTRUCT WALL AND DOORS FOR NEW ELECTRICAL PANELS IN TEMPORARY STORAGE ROOM <br />7. REPLACEMENT OF MECHANICAL AND ELECTRICAL SYSTEMS. <br />8. REPLACEMENT OF MAIN PLUMBING SYSTEM RUNNING BENEATH THE DISHWASH AND ADJACENT PASSAGE AREA <br />9. OBTAIN C. 0. FOR USE OF RENOVATED DISHWASH ROOM AND STAFF TOILET ROOMS. <br />PHASE 2: (CONSTRUCTION DURING 21ND QUARTER OF 2021) 5 <br />Advent <br />Health <br />1 RE OVAL OF EX ST NG HOOD A D ONS U TI N F WA L. O R. F -1 ND ASSO IA E D CT O K 0 N LOSE 0 <br />IS W S A EA IN H B KE Y AR A. <br />PER FOOD SERVICE CONSULTANT DRAWINGS. <br />3 CONSTRUCT NEW CONCRETE PAD AND INSTALL NEW AHU IN COURTYARD PROVIDE ALL NECESSARY HARDWARE AND <br />ACCESSORIES TO COMPLETE INSTALLATION, INCLUDING BUT NOT LIMITED TO CONNECTING TO THE EXISTING CHILLED <br />WATER AND REHEAT SYSTEM IN THE EXISTING MECHANICAL ROOM. THE MAIN KITCHEN MUST REMAIN IN OPERATION UNTIL <br />PHASE 3. CONSTRUCT WALLS AND DOORS TO ENCLOSE NEW AIR HANDLER UNIT. <br />4. RENOVATE SERVERY AREA TO ADD NEW RETAIL SERVING LINE AND COOKLINE PER FOOD SERVICE CONSULTANT DRAWINGS. <br />5 RENOVATE DIETICIAN OFFICE TO CONVERT TO DRY STORAGE. <br />6. RENOVATE/ FINISH UPGRADE PASSAGEWAY AND NEW DIETICIAN OFFICE. <br />7. REPLACEMENT OF MECHANICAL, PLUMBING AND ELECTRICAL SYSTEMS. <br />8. OBTAIN C.O. FOR USE OF RENOVATED OFFICE. DRY STORAGE, SERVERY AND TEMPORARY KITCHEN PREP. <br />- - - - -- - <br />PROJECT TITLE: <br />PHASE 3 & 4: (CONSTRUCTION AFTER PHASE 2) <br />1. RENOVATE EXISTING KITCHEN AREA. <br />2. WORK INCLUDES REMOVAL/ REPLACEMENT OF THE FLOORING AND FLOOR SLAB TO REPLACE ALL UNDERGROUND <br />UTILITIES. REMOVAL/ REPLACEMENT OF THE FINISHED CEILING, ALL CEILING DEVICES. WALL FINISHES AND FOOD SERVICE <br />EQUIPMENT. REMOVAL OF EXISTING AHUs AND LOUVER IN THE EXISTING MECHANICAL ROOM. CONSTRUCT INFILL WALL AT <br />LOUVER OPENING AND CONCRETE PADS FOR EQUIPMENT CONDENSER UNITS. <br />3. REPLACEMENT OF MECHANICAL, PLUMBING AND ELECTRICAL SYSTEMS. <br />4. REPLACEMENT OF MAIN PLUMBING SYSTEMS RUNNING BENEATH THE KITCHEN AREA. <br />KITCHEN RENOVATION <br />5. REMOVAL/ REPLACEMENT OF DOORS IN THE ENGINEERING ROOM. <br />6. REMOVAL/ REPLACEMENT OF FOOD SERVICE EQUIPMENT IN TEMP. KITCHEN PREP (BAKERY) TO CONVERT TO DRY STORAGE <br />ADVENTHEALTH ZEPHYRHILLS <br />7. OBTAIN C.O. FOR USE OF RENOVATED KITCHEN AND DRY STORAGE. <br />PHASE 1 SEQUENCE NOTES <br />QPH1-1 OWNER VACATES PHASE 1 AREA OF WORK AND REMOVES FURNISHINGS AND ACCESSORIES <br />1 <br />PH1-2 CONTRACTOR INSTALLS DUST BARRIER PARTITIONS AND SETS UP ICRA <br />PI1-3 PROVIDE A HEPA UNIT WITH TEMPORARY EXHAUST. SEE MECHANICAL DRAWINGS. <br />PI1-4 CONTRACTOR PERFORMS DEMOLITION AND NEW CONSTRUCTION WORK IN PHASE 1 AREA OF WORK. <br />PI1-5 CONTRACTOR SCHEDULES ACHA AND BUILDING DEPARTMENT INSPECTIONS <br />PH1-6 UPON INSPECTION APPROVALS, OWNER EQUIPS AND OCCUPIES PHASE 1 AREA OF WORK, <br />PHASING PLAN LEGEND <br />EXISTING ITEM TO REMAIN <br />- - - - - EXISTING ITEM TO BE DEMOLISHED <br />SCOPE OF WORK <br />EXISTING TO REMAIN/ NOT IN <br />A CONTRACT <br />- <br />SUPERVISOR <br />❑ 1 <br />1 <br />FE <br />�`- Lj <br />TAPE SEAL FULL PERIMETER <br />OF DOOR (BOTH SIDES) <br />u � I <br />1 L1 - <br />- 1 I EXISTING 2HR FIRE WALL, <br />I DECOMMISSION THIS WALL <br />I <br />�- <br />DIET <br />1 <br />1 I <br />TAPE SEAL FULL PERIMETER <br />6 <br />RI <br />( - I <br />lil AREA OF WORK <br />tom- EL OF DOOR (BOTH SIDES) <br />DISHWA H � � � LJ � PASSAGE � �TOILET7 ' '1 S _ / 1 <br />_ - ROOM C <br />-- ---- --- �� i - - EXISTING 1HR FIRE WALL. <br />PI1-1 i 1' I DECOMMISSION THIS WALL <br />- <br />I - PH1-4 PH1-2TOTt <br />REMOVE EXISTING FLOOR SLAB AND <br />I - BELOW GROUND UTILITIES AS INDICATED. <br />I- CONTR. I REMOVE CEILING TILES AS REQUIRED FOR <br />'HOFFICE ' ANTE WOMEN R.R. MEN R.R. CONNECTING TO EXISTING DUCTWORK. <br />� , <br />z <br />- PHI 3 I ROOM 1 <br />FE <br />- REMOVE AND ADD NEW <br />CORRIDOR _ _ _ _ CONTRACTOR ACCESS - _ _ J WATER SOFTENER <br />SYSTEM <br />PHASE 1 CONSTRUCTION <br />SCALE: N.T.S. <br />3 <br />4 <br />EXTENT OF SLAB REMOVAL <br />I.C.R.A DUST BARRIER LEGEND <br />TEMPORARY CONSTURCTION DUST <br />BARRIER WALL - SEE DETAIL A-501 <br />TEMPORARY PLASTIC MEMBRANE DUST <br />BARRIER: <br />•- USED IN SERVERY FOR WORK RELATED <br />TO NEW DUCTWORK. EXTEND PLASTIC <br />MEMBRANE FROM FLOOR TO CEILING. <br />SEAL TIGHT DURING CONSTRUCTION. <br />PATH OF CONTRACTOR ACCESS FROM <br />EXTERIOR DOOR TO ENTRY DOOR OF <br />CONSTRUCTION ANTE ROOM. PROVIDE <br />STICKY MATTS ON BOTH SIDES OF ANTE <br />CONTRACTOR ACCESS ROOM DOOR. A DIFFERENTIAL <br />- - - - - - - - - n PRESSURE GAUGE ADJACENT TO THE <br />♦�♦ ANTE ROOM DOOR, AND A HEPA <br />VACUUM INSIDE OF THE <br />CONSTRUCTION ANTE ROOM. REFER TO <br />OWNER'S ICRA PERMIT FOR ADDITIONAL <br />REQUIREMENTS <br />NIGHT SHIFT WORK AREA: INSTALL <br />PLASTIC MEMBRANE DUST BARRIER <br />FOR OVERNIGHT ABOVE CEILING WORK <br />-- IN THIS AREA. COORDINATE ACCESS TO <br />EACH SPACE WITH OWNER AND SAFETY <br />OFFICER AND FOLLOW OWNER'S ICRA <br />PROTOCOLS FOR ABOVE CEILING <br />WORK. REMOVE DUST BARRIER AND <br />CLEAN SPACE BY 6 A.M. <br />� _I[ 21 NEGATIVE PRESSURE HEPA FILTER <br />LHi 1L y MACHINE. SEE MECH. DWGS <br />NOTE: <br />THE PRIMARY AND FIRST INSPECTION OF AN ICRA IS THE <br />RESPONSIBILITY OF THE FACILITY. PROCEDURES INCLUDE A <br />PERMIT AND DAILY INSPECTION THAT IS TO BE LOGGED IN. AT <br />THE 80%, FACILITY MUST PROVIDE A COPY OF THE ICRA LOG <br />AND PERMIT (SIGNED BY FACILITY AND CONTRACTOR) TO ARCH <br />REVIEWER (AT THE INITIAL MEETING) BEFORE CONDUCTING <br />THE SURVEY OF THE AREA FOR ICRA COMPLIANCE. <br />CONTRACTOR TO PROVIDE TEMPORARY EXIT SIGNS AND <br />FIRE EXTINGUISHERS AS REQUIRED. <br />5 <br />PROJECT ADDRESS: <br />7050 Gall Blvd. Zephyrhills, FL 33541 <br />SEAL <br />OF F(��/o <br />.9 <br />y00-JIN K/M . <br />AR95652 <br />ST ED.Ao <br />Digitally signed by <br />Yoo-Jin Kim <br />Date: 201121.02.04 <br />10:59['&-�UR00 <br />' <br />REVISIONS <br />NO-T DESCRIPTION DATE <br />1 1 REVISION NO.1 6/15/20 <br />5 1 CCD NO.2 2/03/21 <br />DATE ISSUED: 03/20/2020 <br />REVIEWED BY: YK <br />DRAWN BY: YK/ KN <br />DESIGNED BY: JS <br />PROJECT NUMBER: <br />504- 0226- 000 <br />0 2019 RS&H. INC. <br />SHEET TITLE: <br />PHASING PLANS <br />SHEET ID: <br />PH001 <br />PROJECT STATUS: <br />CONSTRUCTION <br />DOCUMENTS <br />r%4 <br />N <br />7 <br />to <br />�r <br />a <br />0 <br />0 <br />M <br />W <br />0 <br />0 <br />v <br />F-- <br />z <br />w_ <br />J <br />U <br />Q <br />U <br />2 <br />Q <br />