My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
36577 Smithfield Ln
Zephyrhills
>
Building Department
>
Building Plans
>
36577 Smithfield Ln
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 2:59:45 PM
Creation date
2/19/2025 1:53:22 PM
Metadata
Fields
Template:
Building Plans
Street #
36577
Location
Smithfield Ln
Contractor
Lennar
Building Plans - Permit #
Unknown
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
" <br />Co Fo <br />a 2 LBS. E P S <br />FOAM <br />1 1/2" <br />5 BRACKET DETAIL <br />1 11- 1 -0 <br />11 <br />q 2 LBS. EPS o <br />FOAM <br />2 1/2" <br />6 BRACKET DETAIL <br />-1_n <br />il <br />2 LBS. EPS <br />FOAM <br />= 1 <br />O <br />N <br />4" 4" 4" 4" <br />1, T-4 <br />r7 WINDOW 1DETAIL <br />pia = _n <br />CV <br />v <br />ROOF FINISH <br />PER ELEVATION <br />12 <br />15 ROOF SHEATHING <br />MANUFACTURED <br />ROOFTRUSS <br />E—MTL DRIP EDGE <br />2X4 SUB -FASCIA <br />ALUMINUM WRAP <br />1'-0" ALUMINUM SOFFIT <br />NOTE: REFER TO STRUCTURAL SOFFIT <br />DETAIL SF01 SHEET SS FOR SOFFIT <br />ATTACHMENT DETAIL <br />8�jSOFFIT DETAIL <br />'Aia = _n <br />ROOF FINISH <br />PER ELEVATION <br />12 <br />ROOF SHEATHING <br />4 <br />MANUFACTURED <br />ROOF TRUSS <br />„ <br />MTL DRIP EDGE <br />2X4 SUB -FASCIA <br />ALUMINUM WRAP <br />ALUMINUM SOFFIT <br />NOTE: REFER TO STRUCTURAL SOFFIT <br />DETAIL SF01 SHEET SS FOR SOFFIT <br />ATTACHMENT DETAIL <br />SOFFIT DETAIL <br />9 <br />nn 1 <br />Sall = 11_0 <br />I <br />4"X1" THICK SMOOTH 4" <br />STUCCO BAND <br />101,ia11 _�� n11 <br />7X1" THICK SMOOTH <br />STUCCO BAND----,, <br />C <br />C <br />10" <br />12" X 1 1/4" THICK SMOOTH <br />N 1 STUCCO BAND <br />M <br />1" 8„ <br />3 1/2" SMOOTH STUCCO <br />FINISH <br />PERMA WRAP COLUMN <br />OR EQUAL <br />1" 1" <br />V-0" <br />4" SMOOTH STUCCO <br />FINISH <br />,44 k <br />6" SMOOTH STUCCO <br />OVER CMU <br />CD <br />AV EL �]r <br />1,47 <br />°O 5/8" SMOOTH STUCCO <br />OVER CMU <br />�h ELEV AT U-0" <br />FIRST FLOOR FF <br />12 <br />13 WWII W Aia11 = 1 1_n1� <br />5/8" STUCCO OVER <br />CMU <br />4" STUCCO BAND <br />GARAGE <br />DOOR <br />2"X2" THICK PAINTED <br />RAISED TRIM BAND <br />N <br />6"X1" THICK PAINTED <br />RAISED TRIM BAND <br />5/8" STUCCO OVER <br />i,4 CMU <br />1n N <br />ELEV AT 18'-0" <br />7/8" <br />STUCCO <br />OVER FRAME - <br />CASING BEAD <br />W/ WEEPS <br />OVER <br />FLASHING <br />ELEV AT 10'-0" <br />2ND FLOOR FF <br />ELEV AT 8'-8" <br />T.O.M. <br />ROOFSHINGLE <br />ROOF <br />ELEV AT 0'-0" 1 <br />1 ST FLOOR FF <br />FRONT ELEVATION A <br />1 /411 = 1 1-011 <br />SHINGLE <br />ROOF <br />_4'OFF RIDGE <br />VENT <br />��■Ir1�lIIr1Ii.SHINR <br />51 <br />..aiuul■IIIII■IIIII■IIIII■IIIIi�._ROOF- <br />z � <br />�JC7 <br />ou)w <br />* 7/8" STUCCO <br />N - �OpV�EpR� : <br />V 10LYJ� <br />rM <br />WEEP <br />SCREED A/C UNIT <br />TYP• AND PAD <br />5/8"— <br />STUCCO <br />ELEV AT 0'-0" ON CMUIn ,_ <br />1ST FLOOR FF <br />ELEV AT 0'-0" <br />FIRST FLOOR FF <br />�° 2 REAR ELEVATION A <br />1 /811= 11-011 <br />4' OFF RIDGE <br />12 VENT 8 <br />5� N�2�SSRSOOF HINGLE A5 <br />r` <br />ELEV AT 18'-0" _ <br />T.O.P. <br />211 C.J z F- C.J C.J. <br />ELEV AT 10'-0" J = " 7/8" STUCCO <br />7 X2" THICK * _ C7 * F� <br />PAINTED RAISED 2ND FLOOR FF 3-0 0 coW OVER <br />TRIM BAND FRAME — — — <br />ELEV AT 8'-8" _ _ ��—�� 12 <br />T.O.M. <br />DRIP "V" <br />SCREED 5/8" WEE 2'-0" <br />STUCCO SCREED <br />ON CMU TYP. C° <br />ELEV AT 0'-0" <br />1ST FLOOR FF <br />6"X2" PAINTED <br />RAISED TRIM RIGHT F�_0�FVA�TON ABAND811=1 <br />4' OFF RIDGE <br />8 VENT <br />A5 5� SHINGLE <br />ROOF <br />'I111■IIIII■IIIII■IIIII■I111 <br />1 <br />I <br />FLOOR <br />FF <br />' <br />.anl■nnl■nnl■nnl■nnl■Ilnl■m11■Iu11■nnl■nnl■n1n■nnunnl■nnl■nnl■nnl■mm�ull■nm:-�a�urn■I.:���Inmm11 <br />ELEV AT 18' <br />-0" <br />.IIIII■IIIII■IIIII■IIIII■IIIII■IIIII■IIIII■IIIII■IIIII■IIIII■IIIII■IIIII■IIIII■IIIII■IIIII■IIIII■IIIII■IIIII■IIIII■IIIII■1e��11111■IIIII� !111■III <br />�i11I1■IIIII■IIIII■IIIII�IIIII■IIIII■IIIII■IIIII■IIIII■IIIII■IIIII■IIIII�IOII■IIIII■IIIII■IIIII■IIIII■IIIII■IIIII■IIIII■IIIII■IIIIi►,•�i�un�ru.-ern <br />CASING <br />■ - <br />1 1 • - <br />EAD W/ <br />OVER WEEPS <br />FRAME OVER <br />FLASHING <br />Nil, <br />1 ■ISCREED <br />-.I .STUCCO <br />a ON ■',cp TYP. <br />ZD <br />LEFT ELEVATION A <br />1 /811 = 1 1-011 <br />DRIP "V" SCREED, <br />AT BOTTOM OF <br />BAND <br />5 <br />A5 <br />9'-8" <br />6-0" <br />16'-4" <br />a <br />ON <br />cn <br />�r <br />o <br />a <br />W <br />ON <br />4' OFF RIDGE <br />VEND <br />0 <br />0 <br />0 <br />0 <br />�SLs OPE <br />pw <br />pW SLR <br />5:12 <br />-v> <br />vt> 5:12 <br />I <br />WN <br />I <br />OL <br />J <br />CO <br />W N <br />— <br />O <br />L0 <br />W <br />� <br />I <br />p <br />N <br />SLOPE <br />SLOP <br />v <br />5:12 <br />512 <br />SLOPE <br />5:12 <br />PROOF PLAN APLAN A <br />1 /811 = 1 1-011 <br />FLASHING NOTES: <br />DUE TO CLARITY NOT ALL REQUIRED FLASHING ARE <br />INDICATED ON DRAWINGS. REFER TO FBC RES 2020 (7TH <br />EDITION), SECTION R703.4. AND R903.2 APPROVED <br />CORROSION -RESISTIVE FLASHING SHALL BE PROVIDED AT <br />ALL ROOFING SYSTEM INTERRUPTIONS, TERMINATIONS, <br />INTERSECTIONS, AND PENETRATIONS AND IN THE <br />EXTERIOR WALL ENVELOPE IN SUCH A MANNER AS TO <br />PREVENT ENTRY OF WATER INTO THE WALL CAVITY OR <br />PENETRATION OF WATER TO THE BUILDING STRUCTURAL <br />FRAMING COMPONENTS. THE FLASHING SHALL EXTEND <br />TO THE SURFACE OF THE EXTERIOR WALL FINISH AND <br />SHALL BE INSTALLED TO PREVENT WATER FROM <br />REENTERING THE EXTERIOR WALL ENVELOPE. APPROVED <br />CORROSION -RESISTANT FLASHING SHALL BE INSTALLED <br />AT ALL OF THE FOLLOWING LOCATIONS: <br />1. AT TOP OF ALL EXTERIOR WINDOW AND DOOR <br />OPENINGS IN SUCH A MANNER AS TO BE LEAK PROOF, <br />EXCEPT THAT SELF -FLASHING WINDOWS HAVING A <br />CONTINUOUS LAP OF NOT LESS THAN 1-1/8 INCHES (28 <br />MM) OVER THE SHEATHING MATERIAL AROUND THE <br />PERIMETER OF THE OPENING, INCLUDING CORNERS, DO <br />NOT REQUIRE ADDITIONAL FLASHING; JAMB FLASHING <br />MAY ALSO BE OMITTED WHEN SPECIFICALLY APPROVED <br />BY THE BUILDING OFFICIAL. <br />2. AT THE INTERSECTION OF CHIMNEYS OR OTHER <br />MASONRY CONSTRUCTION WITH FRAME OR STUCCO <br />WALLS, WITH PROJECTING LIPS ON BOTH SIDES UNDER <br />STUCCO COPINGS. <br />3. UNDER AND AT THE ENDS OF MASONRY, WOOD OR <br />METAL COPINGS AND SILLS. <br />4. CONTINUOUSLY ABOVE ALL PROJECTING WOOD <br />TRIM. <br />5. WHERE EXTERIOR PORCHES, DECKS OR STAIRS <br />ATTACH TO A WALL OR FLOOR ASSEMBLY OF <br />WOOD -FRAME CONSTRUCTION. <br />6. AT WALL AND ROOF INTERSECTIONS. <br />7. AT BUILT-IN GUTTERS. <br />8. WHENEVER THERE IS A CHANGE IN ROOF SLOPE OR <br />DIRECTION. <br />9. AT ROOF CRICKET OR SADDLE. <br />10. AROUND ROOF OPENINGS. <br />GENERAL FLASHING NOTES: <br />INSTALL FLASHING IN ACCORDANCE WITH FBC RES 7TH <br />EDITION (2020), SECTION R703.4 AND IN ACCORDANCE <br />WITH STANDARD APPLICATIONS ILLUSTRATED IN THE <br />ARCHITECTURAL SHEET METAL MANUAL (LATEST <br />EDITION) AS PUBLISHED BY THE SHEET METAL AND AIR <br />CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION, <br />INC. <br />WINDOW NOTE: <br />ALL NEW WINDOWS MUST MEET A MINIMUM 'U'-VALUE OF <br />0.4 OR LESS AND A'SHGC' OF 0.25 OR LESS. (UTILIZING <br />THE PRESCRIPTIVE METHOD FOR EXISTING STRUCTURES) <br />EGRESS NOTE: <br />EACH BEDROOM MUST HAVE ONE WINDOW THAT <br />COMPLIES WITH EGRESS CODES, IF THERE IS NO ACCESS <br />TO EXTERIOR THROUGH A DOOR. THE WINDOW MUST <br />HAVE A MAXIMUM SILL HEIGHT OF 44" ABOVE FINISH <br />FLOOR LINE OF THAT PARTICULAR ROOM <br />SHINGLE / UNDERLAYMENT NOTE: <br />ASPHALT SHINGLES ARE IN ACCORDANCE WITH TABLE <br />R905.2.6.1, FBC 7TH EDITION (2020) - RESIDENTIAL <br />SHINGLE UNDERLAYMENT SHALL COMPLY WITH SECTION <br />905.1.1, FBC 7TH EDITION (2020) - RESIDENTIAL <br />GENERAL FINISH NOTES: <br />APPLICATION OF STUCCO (EXTERIOR PLASTER) <br />MUST BE IN ACCORDANCE WITH FBC R703.7, <br />ASTM C926 AND C1063 <br />ALL LATH AND LATH ATTACHMENTS TO BE OUT OF <br />CORROSION -RESISTANT MATERIAL. (REFER TO SHEET SN1 <br />FOR THE ENGINEERED METHOD FOR LATH ATTACHMENT) <br />OCT 2 8 2022 <br />\/RA <br />c. <br />Plans Review completed and ap r <br />for compliance with the 2020 FBC Edition <br />GENERAL NOTES: <br />* G.C. VERIFY ROOF PITCH <br />ROOF PITCH VARIES PER SUBDIVISIONS (5/12 PR 5.9/12) <br />IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY ROOF <br />SLOPE REQUIREMENTS WITH TRUSS MANUFACTURER. <br />ROOF CRITERIA <br />- 12" OVERHANG U.N.O. <br />- PLUMB CUT FASCIA <br />- ROOF PI fCH PER ELEVATION <br />- WINDLOAD CALC. PER ASCE 7-98 (VARIES BY LOCATION) <br />- SHINGLE LOADING <br />ROOF VENT CALCULATIONS: <br />NOTE: VERIFY WITH GENERAL CONTRACTOR ALL ROOF VENT <br />LOCATIONS, QUANTITIES, AND SIZES. ROOF VENTS SHALL BE <br />INSTALLED FOR A MIN. OF VENTED AREA AS LISTED BELOW OR <br />EQUIVALENT SYSTEM PER 7TH EDITION (2020) FBC SECTION R806 <br />FORMULA = S.F. / 150 (1/150) * 144 (TO CONVERT TO SQ. INCHES) _ <br />NET SQ. INCH REQUIREMENT <br />ATTIC AREA = 1697 SQ FT <br />VENTILATION REQUIRED = 815 SQ IN <br />VENTILATION PROVIDED AT RIDGE = 407 SQ IN <br />VENTILATION PROVIDED AT SOFFIT = 1218 SQ IN <br />ATTIC VENTILATION <br />ATTIC VENTILATION TO BE IN COMPLIANCE WITH THE FLORIDA <br />BUILDING CODE 7TH EDITION 2020 RESIDENTIAL R806. <br />THE MINIMUM NET FREE VENTILATING AREA SHALL BE 1/150 OF THE <br />AREA OF THE VENTED SPACE. THE VENTILATED AREA MAY BE <br />REDUCED TO 1/300 PROVIDED THAT AT LEAST 40% BUT NO MORE <br />THAN 50% OF THE REQUIRED VENTILATION IS PROVIDED IN THE <br />UPPER PORTION OF THE SPACE TO BE VENTILATED. UPPER <br />VENTILATORS SHALL BE LOCATED NO MORE THAN 3 FEET MEASURE <br />VERTICALL BELOW THE RIDGE OR HIGHEST POINT OF THE SPACE, <br />WITH THE B LANCE OF THE REQUIRED VENTILATION PROVIDED BY <br />EAVE OR CORNICE VENTS. <br />CALCULATIONS BASED ON THE FOLLOWING VALUES, SEE ROOF PLAN. <br />VALUES TO BE VERIFIED WITH MANUFACTURER SPECIFICATIONS) <br />RIDGE VENTS - 18 SQ. IN. OF NET FREE AREA / LINEAR FT. <br />* OFF -RIDGE VENTS - 138 SQ. IN. OF NET FREE AREA / UNIT <br />* SOFFIT VENTS - 7 SQ. IN. OF THE NET FREE AREA / SQ. FT. <br />IF NOT ENOUGH VENTED SOFFIT IS PROVIDED DUE TO FIRE <br />PROTECTION, THE CONTRACTOR SHALL USE DECK -AIR OF OTHER <br />APPROVED MATERIAL TO PROVIDE SUFFICIENT IN -TAKE VENTILATION <br />• LOMANCO DECK -AIR - 9 SQ. IN. OF NET FREE AREA / FT. FOR SHINGLE <br />36 SQ. IN. OF NET FREE AREA / FT. FOR TILE <br />NOTE: <br />EXTERIOR WINDOWS, SLIDING DOORS AND EXTERIOR SIDE -HINGE <br />DOORS SHALL BE TESTED AND LABELED WITH A PERMANENT LABEL <br />PROVIDING TRACE ABILITY TO MANUFACTURER AND PRODUCT <br />N <br />N <br />O <br />N <br />N <br />1 <br />P�} • �. <br />L0 <br />O <br />00 <br />0, r <br />. <br />b <br />It. 'K ' Cl ' z <br />O <br />w <br />0 <br />z <br />Q <br />E <br />W L.'ice-... O C? U <br />�c� <br />U)U <br />co <br />°` avi n <br />- o <br />u o <br />-2-9 <br />Q <br />4) a <br />i U <br />•^N^`` <br />iD <br />U W C)_N C <br />TW <br />v <br />tr O� E <br />c. 'a <br />W <br />V <br />� LLI vi W 0 <br />�Q w ;. Wgyz� Z <br />�(Q <br />H H <br />Qax -WOW OZLLO0011-0 <br />Q 0 ZLLLL-Z� J�HQQ <br />oW(r9oZoi200M9 <br />o <br />00 <br />cnWaWmwWW55xW<D <br />WO <br />W0 <br />� <br />Q <br />F__ <br />ZOZQ <br />OQ =0 Q� <br />Q <br />Q�2 <br />LL O LL <br />O <br />O <br />Z N <br />OW <br />F- <br />> (n O <br />�U)cMl` <br />J <br />ULL <br />ti <br />F-- W M <br />QO <br />Z U F- <br />WW_� <br />O <br />CD <br />O <br />o <br />0 <br />0 <br />0 <br />M <br />N <br />N <br />0 <br />N <br />N <br />N <br />w <br />C) <br />a) <br />O <br />N <br />c) <br />N <br />O <br />z <br />0 <br />0 <br />0 <br />o <br />I <br />' <br />O <br />NnW <br />, <br />V/ <br />> <br />o <br />0 <br />N <br />0 <br />C'7 <br />0 <br />-i <br />o <br />L6 <br />I <br />1 <br />I <br />i <br />zZ <br />W <br />Qz <br />w <br />000 <br />0) <br />O <br />V <br />U V <br />F- <br />z)z> <br />OF-0 <br />EEL of Ca <br />Q <br />�--I <br />F- <br />It w a <br />_ <br />(9y <br />F-F-W <br />2 <br />/ <br />( V <br />I� <br />O <br />zoo <br />■ <br />Q_ <br />M <br />W <br />CWC <br />G <br />O <br />WWw <br />O <br />Z <br />U <br />: <br />a-ZLL <br />�z <br />Z <br />F- <br />pU <br />ow <br />W <br />z <br />Z <br />z <br />W <br />W <br />J <br />N <br />0 <br />O <br />LAST PLOT DATE <br />O <br />• <br />July 21, 2022 <br />ZO <br />EXTERIOR <br />J <br />ELEVATIONS & ROOF <br />PLAN A <br />P, , <br />
The URL can be used to link to this page
Your browser does not support the video tag.