EXTEND NEW 1-1/4" GAS PIPING TO EXISTING PIPING. J
<br />CONTRACTOR SHALL ENSURE THAT POINT OF i l
<br />CONNECTION IS AT LOCATION IN PIPE THAT WILL ACCEPT
<br />AN ADDITIONAL 160 MBH LOAD. AFTER VERIFYING
<br />EXISTING CAPACITY, IF EXISTING SYSTEM WILL NOT
<br />ACCOMMODATE NEW LOAD, CONTRACTOR MUST
<br />COORDINATE WITH LOCAL UTILITY FOR INCREASED
<br />SERVICE CAPACITY.
<br />ROUTE GAS PIPING
<br />ON FACE OF WALL
<br />WHEN ALLOWED
<br />BY AHJ
<br />DIRT LEG
<br />GAS COCK
<br />1-1/4" MECHANICAL
<br />SOLENOID VALVE
<br />BELOW CEILING
<br />1-1/4" 160 MBH
<br />INSTALL QUIK
<br />DISCONNECT
<br />TO FRYER
<br />GAS COCK
<br />(TYPICAL) -
<br />GAS RISER PLAN N.T.S. I E
<br />CONNECT TOBER
<br />EXISTING PLUM��w
<br />VERIFY LOCATI
<br />I XIST.
<br />I 1 /2"CW
<br />1/2"CW I EXIST.
<br />1/2"HW I 11/2"HW
<br />I I
<br />NEW HAND SINK
<br />W/FOOT PEDAL
<br />NEW HAND SINK
<br />W/FOOT PEDAL
<br />WATER RISER PLAN N.T.S.
<br />I
<br />EXIST.
<br />1 1/2"
<br />I VENT
<br />NEW
<br />I NEW
<br />NEW
<br />HAND
<br />SINK
<br />I HAND
<br />-IjSINK
<br />1 1/2"
<br />SAN.
<br />P.O.C.
<br />EXIST.
<br />54FIN.
<br />1 1/2"
<br />EXIST.
<br />FLR. SAN.
<br />2"SAN.
<br />N EW`_-
<br />3
<br />THE EQUIPMENT ROUGH -IN ITEMS AND THEIR DIMENSIONED LOCATIONS
<br />FOR ALL CONNECTIONS ARE ACCURATE TO THE BEST OF OUR KNOWLEDGE
<br />AND SHALL BE VERIFIED WITH THE EQUIPMENT SUPPLIER, OWNER AND/OR
<br />THE EQUIPMENT ROUGH -IN DRAWINGS. IN SOME INSTANCES, THE OWNER
<br />OR SUPPLIER MAY MAKE SUBSTITUTIONS OR THE EQUIPMENT ITEM MAY
<br />VARY FROM WHAT IS SHOWN ON THE PLAN. THEREFORE, THE
<br />ARCHITECT/ENGINEER SHALL BE IMMEDIATELY NOTIFIED, PRIOR TO
<br />CONSTRUCTION OF ANY DEVIATIONS FROM WHAT IS SHOWN OR IMPLIED
<br />ON THESE DRAWINGS. FAILURE OF THE APPROPRIATE CONTRACTOR TO
<br />VERIFY ROUGH -INS OR THEIR LOCATIONS SHALL PACE THE
<br />RESPONSIBILITY FOR ANY SUBSEQUENT RELOCATION AND/OR ADDITIONAL
<br />ROUGH -INS DIRECTLY UPON THE CONTRACTOR.
<br />A. ALL WORK SHALL BE IN ACCORDANCE WITH THE RULES AND
<br />REGULATIONS OF CITY, AND/OR STATE.
<br />B. ALL AUTHORITIES HAVING JURISDICTION SHALL BE NOTIFIED AT LEAST
<br />THREE WORKING DAYS PRIOR TO COMMENCEMENT OF WORK.
<br />C. ALL PIPING SHALL BE ROUTED IN THE SUSPENDED CEILING SPACE
<br />UNLESS OTHERWISE INDICATED. ALL PIPING EXPOSED TO VIEW SHALL
<br />BE ROUTED AS HIGH AS POSSIBLE AND TIGHT TO THE UNDERSIDE OF
<br />THE STRUCTURAL STEEL.
<br />D. EXPOSED PIPING IN FINISHED AREAS SHALL BE CHROME PLATED WITH
<br />CHROME PLATED ESCUTCHEON AT PIPE ENTRY TO FINISHED AREA.
<br />E. SLEEVE OR CORE -DRILL FLOOR SLABS, WALLS, ETC. AS REQUIRED FOR
<br />PIPING AND FIRE -STOP OPENING AROUND PIPE VERIFY LOCATION OF
<br />STRUCTURAL BEAMS, JOISTS, ETC. BEFORE DRILLING.
<br />F. ALL OPENINGS IN DRAINAGE AND/OR VENT SYSTEMS AS A RESULT OF
<br />INSTALLATION ROUGH -IN SHALL BE PROTECTED WITH A TEST PLUG THAT
<br />IS SECURELY LOCKED IN PLACE UNTIL FINAL FINISHED CONNECTIONS
<br />ARE INSTALLED.
<br />G. ALL PIPING SHALL BE CONCEALED IN WALLS AND BEHIND FIXED
<br />FURNISHINGS UNLESS OTHERWISE INDICATED.
<br />H. WHEREVER FOUNDATION WALLS, OUTSIDE WALLS, ROOF, ETC. ARE
<br />PENETRATED FOR INSTALLATION OF SYSTEMS, THEY SHALL BE PATCHED
<br />TO MATCH EXISTING CONSTRUCTION AND SEALED WEATHER TIGHT.
<br />WORK SHALL BE PERFORMED BY CRAFTSMEN SKILLED IN THEIR
<br />RESPECTIVE TRADES.
<br />F I. ALL PIPING SHALL BE RUN PARALLEL TO BUILDING LINES AND
<br />SUPPORTED AND ANCHORED AS REQUIRED TO FACILITATE EXPANSION
<br />AND CONTRACTION. ALL PIPING SHALL BE CONCEALED EXCEPT IN
<br />UNFINISHED SPACES. INSTALL AS REQUIRED TO MEET ALL
<br />CONSTRUCTION CONDITIONS AND TO ALLOW FOR INSTALLATION OF
<br />OTHER WORK INCLUDING DUCTS AND ELECTRICAL CONDUIT. AT ALL
<br />CONNECTIONS BETWEEN FERROUS PIPING AND NONFERROUS PIPING,
<br />PROVIDE AN ISOLATING DIELECTRIC UNION.
<br />J. PROVIDE ALL FITTINGS, ACCESSORIES, OFFSETS, AND MATERIALS
<br />NECESSARY TO FACILITATE THE PLUMBING SYSTEM'S FUNCTIONING AS
<br />INDICATED BY THE DESIGN AND THE EQUIPMENT INDICATED.
<br />K. ALL DRAINAGE PIPING SHALL BE UNIFORMLY PITCHED, 1/4" PER FOOT
<br />UNLESS OTHERWISE REQUIRED BY EXISTING CONDITIONS.
<br />L. PROVIDE A COMPLETE SYSTEM OF COPPER, STEEL OR PLASTIC VENT
<br />RISERS ABOVE FLOOR. ALL VENTS SHALL BE CARRIED THROUGH THE
<br />ROOF WITH FLASHING. PLASTIC IS PREFERRED BY OWNER IF ALLOWED
<br />BY AUTHORITIES. PLASTIC PIPING, IF PERMITTED, SHALL NOT BE FOAM
<br />CORE P.V.C.
<br />M. CONDENSATE AND INDIRECT DRAIN PIPING SHALL BE COPPER OR
<br />PLASTIC TUBING. PLASTIC IS PREFERRED BY OWNER IF ALLOWED BY
<br />AUTHORITIES. PLASTIC PIPING, IF PERMITTED, SHALL NOT BE FOAM
<br />CORE P.V.C.
<br />N. PROVIDE CLEAN -OUTS AT THE END OF EACH HORIZONTAL RUN, AND AT
<br />THE BASE OF ALL VERTICAL WASTE AND DRAIN PIPES. CLEAN -OUTS
<br />SHALL BE OF THE SAME SIZE AS THE PIPES THEY SERVE.
<br />SANITARY RISER PLAN N.T.S. I G
<br />17 � N
<br />NEW
<br />1-1 /4"GAS ,
<br />I €
<br />E
<br />14 4 5 ..`s,
<br />11
<br />I
<br />I
<br />I
<br />1
<br />I
<br />I
<br />I
<br />1
<br />O. HOT AND COLD WATER PIPING SHALL BE TYPE "L" COPPER PIPE ABOVE
<br />GRADE AND TYPE "K" COPPER PIPE BELOW GRADE, FITTINGS AS
<br />REQUIRED BY LOCAL AUTHORITIES. PROVIDE WATER HAMMER
<br />ARRESTORS WADE "SHOKSTOP" MODEL NO. W-5 THROUGH W-100, SIZE
<br />AS INDICATED BY MANUFACTURER, WHERE SHOWN ON THE DRAWINGS.
<br />INSTALL STOP VALVE IN AN ACCESSIBLE LOCATION IN EACH WATER
<br />SUPPLY TO EACH FIXTURE.
<br />P. INSULATE ALL HOT AND COLD WATER PIPING BOTH VERTICALLY AND
<br />HORIZONTALLY, IN CEILING AND CONCEALED IN WALLS COMPLETELY.
<br />PROVIDE 1" PREFORMED FIBERGLASS ASJ-VB, FLAME SPREAD 25,
<br />SMOKE DEVELOPED 50, ASTM C-547.
<br />Q. PIPING ROUTED IN EXTERIOR WALLS SHALL BE ROUTED ON THE
<br />WINTER -WARM -SIDE OF THE BUILDING WALL INSULATION.
<br />R. ACCESS PANELS SHALL BE PROVIDED WHERE CONCEALED CONTROL
<br />DEVICES, VALVES, ETC. ARE CONCEALED WITHIN WALLS. WHERE
<br />ACCESS FOR ADJUSTMENT AND MAINTENANCE IS POSSIBLE THROUGH
<br />LAY -IN SUSPENDED CEILINGS, ACCESS PANELS ARE NOT REQUIRED.
<br />�S. PROVIDE A COMPLETE NATURAL GAS PIPING SYSTEM AS NOTED ON THE
<br />DRAWINGS. PIPE AND FITTINGS SHALL BE AS REQUIRED BY LOCAL
<br />AUTHORITIES. PROV
<br />IDE ALL UNIONS SHUT-OFF VALVES AND DIRT LEGS
<br />REQUIRED BY NFPA-54 AND GOVERNING LOCAL CODES. PROVIDE ALL
<br />TEST, METERS, INSPECTIONS, HANGERS AND EQUIPMENT CONNECTION
<br />REQUIRED FOR A COMPLETE AND OPERATING SYSTEM. PAINT PIPING ON
<br />ROOF WITH TWO COATS OF RUST RESISTANT OUTDOOR PAINT,
<br />T. DRAINAGE PIPING UNDERGROUND SHALL BE CAST IRON OR PLASTIC
<br />PIPE AND FITTINGS. PLASTIC IS PREFERRED BY OWNER IF ALLOWED BY
<br />AUTHORITIES. PLASTIC PIPING IF PERMITTED, SHALL NOT BE FOAM CORE
<br />P.V.C.
<br />U. DRAINAGE PIPING INSIDE THE BUILDING SHALL BE CAST IRON OR
<br />PLASTIC PIPE AND FITTINGS. PLASTIC IS PREFERRED BY OWNER IF
<br />ALLOWED BY AUTHORITIES. PLASTIC PIPING, IF PERMITTED, SHALL NOT
<br />BE FOAM CORE P.V.C.
<br />V. EXISTING CONDITIONS ARE BASED ON "AS -BUILT" DRAWINGS PROVIDED
<br />BY THE OWNER AND LIMITED FIELD VERIFICATION. CONTRACTOR SHALL
<br />ADJUST TO ACTUAL FIELD CONDITIONS AT NO ADDITIONAL EXPENSE TO
<br />THE OWNER.
<br />W. CONTRACTOR SHALL VERIFY ALL SIZES, LOCATIONS, AND DEPTHS OF
<br />EXISTING PLUMBING PRIOR TO CONSTRUCTION.
<br />X. PVC SHALL BE USED FOR DRAIN, WASTE & VENT SYSTEMS WHENEVER
<br />ALLOWED BY THE AUTHORITIES HAVING JURISDICTION (AHJ).
<br />Y. PROVIDE AIR CHAMBERS WHEN WATER HAMMER ARRESTORS ARE NOT
<br />ALLOWED (CHICAGO AREA).
<br />Z. PROVIDE NEW CONDENSATE LINE FROM EVAPORATOR COIL IN COOLER/
<br />FREEZER TO APPROVED RECEPTACLE. INSTALL APPROVED
<br />RECEPTACLE WHEN REQUIRED BY CODE.
<br />,mim� GAS PIPING SHALL BE SCHEDULE 40 BLACK IRON STEEL. CONTRACTOR
<br />SHALL PAINT GAS PIPING TO MATCH COLOR OF EXPOSED SURFACES.
<br />BB. "OPTIONAL VEGGIE SINK": INSTALL AERO VEGGIE SINK WHEN REQUIRED
<br />BY LOCAL AUTHORITIES HAVING JURISDICTION. INSTALL MODEL: N-909
<br />FOR APPLICATIONS WHERE DRAINBOARD IS LOCATED ON THE RIGHT.
<br />INSTALL N-910 WHERE DRAINBOARD IS NEEDED ON LEFT SIDE.
<br />GENERAL NOTES I D I
<br />I
<br />7
<br />6 9 10
<br />O
<br />TI- ...5
<br />I
<br />I I €
<br />F
<br />t
<br />51
<br />11
<br />i
<br />c
<br />Q EXISTING GAS PIPING FROM EXISTING GAS METER. CONTRACTOR SHALL VERIFY IF
<br />EXISTING GAS METER CAN HANDLE AN INCREASE OF 240.0 MBH.
<br />O 1-1/4" GAS PIPING DOWN TO FRYER BELOW. DROP DOWN TO 12" AFF BEFORE
<br />HORIZONTAL TRANSITION,
<br />1" QUIK DISCONNECT FOR NEW FRYER AT 160.0 MBH TOTAL. REFER TO GAS RISER E/P1.0
<br />DETAIL D/P2.0 FOR INFORMATION.
<br />® PROVIDE AND INSTALL NEW "HANDS FREE" KIT AT SITE OF EXISTING HANDSINK.
<br />CONNECT TO EXISTING WATER SUPPLY LINES. REFER TO PLUMBING NOTES #4, #5, AND
<br />DETAIL B/P2.0 FOR ADDITIONAL INFORMATION.
<br />(aDEXISTING 3" HUB DRAIN SHOWN FOR REFERENCE. FIELD VERIFY EXACT LOCATION.
<br />© NEW BEVERAGE DISPENSER TO REPLACE EXISTING BEVERAGE DISPENSER IN DINING
<br />AREA. LOCATE AS SHOWN AFTER COMPLETION OF NEW DINING ROOM CONSTRUCTION
<br />BY PEPSI SUPPLIER. PROVIDE NEW INDIRECT WASTE PIPING AND ROUTE TO EXISTING 3"
<br />HUB DRAIN WITH CODE REQUIRED AIR GAP.
<br />O NEW ICE MACHINE TO BE LOCATED ABOVE NEW BEVERAGE DISPENSER IN DINING AREA
<br />AS SHOWN AFTER COMPLETION OF NEW DINING ROOM CONSTRUCTION. PROVIDE NEW
<br />INDIRECT WASTE PIPING AND ROUTE TO EXISTING 3" HUB DRAIN WITH CODE REQUIRED
<br />AIR GAP. PROVIDE NEW 1/2" FILTERED C.W. PIPING FROM SYRUP BUNDLE CONNECT TO
<br />EXISTING FILTERED WATER LINE FOR ICE MACHINE. FIELD VERIFYLOCATION.
<br />Q EXISTING BAG-N-BOX SHOWN FOR REFERENCE.
<br />O NEW CARBONATOR TO BE LOCATED AS SHOWN AT DRINK DISPENSER. CONNECT TO
<br />EXISTING FILTERED WATER PIPING FROM EXISTING SYRUP BUNDLE AS REQUIRED.
<br />BACKFLOW PREVENTOR SHALL BE INSTALLED AT CARBONATOR WITH PIPING
<br />DOWNSTREAM THEREFROM SHALL NOT BE AFFECTED BY CARBON DIOXIDE GAS. FIELD
<br />VERIFY EXACT SIZE AND LOCATION.
<br />10 CONTRACTOR SHALL PROVIDE AND INSTALL A DOUBLE CHECK VALVE BACKFLOW
<br />PREVENTOR WITH ATMOSPHERIC VENT (WATTS SD-3 OR EQUAL) INSTALL UPSTREAM OF
<br />CARBONATOR AS PER SECTION 608.16.1 OF THE 2004 FLORIDA PLUMBING CODE.
<br />11 EXISTING GREASE INTERCEPTOR SHOWN FOR REFERENCE. FIELD VERIFY LOCATION.
<br />12 EXISTING ICE MACHINE TO BE REMOVED. FIELD VERIFY EXACT LOCATION. DISPOSE OF
<br />AS PER YUM CONSTRUCTION MANAGER'S DIRECTION. CAP EXISTING FILTERED WATER
<br />LINES ABOVE CEILING OR AT WALL.
<br />13 EXISTING 3" HUB DRAIN AT DEMO-6 ICE MACHINE. IF HUB DRAIN ONLY RECEIVES
<br />INDIRECT WASTE FROM ICE MACHINE, CONTRACTOR SHALL REMOVE AND DISPOSE OF
<br />AS YUM CONSTRUCTION MANAGER'S DIRECTION. REMOVE EXISTING WASTE PIPING BACK
<br />TO POINT OF CONNECTION AND CAP. PATCH FLOOR BACK TO LIKE -NEW CONDITION.
<br />VERIFY IN FIELD.
<br />CD NEW "HANDS FREE" HANDSINK TO REPLACE EXISTING HANDSINK. CONNECT TO EXISTING
<br />WATER SUPPLY, SANITARY AND VENT LINES. REFER TO PLUMBING NOTES #4, #5, AND
<br />DETAIL B/P2.0 FOR ADDITIONAL INFORMATION.
<br />15 NEW "HANDS FREE" HANDSINK. REFER TO PLUMBING NOTES #4, #5, AND DETAIL B/P2.0
<br />FOR ADDITIONAL INFORMATION.
<br />(aD PROVIDE NEW 1/2" HOT & COLD WATER PIPING SUPPLY FOR NEW HAND SINK AND
<br />CONNECT TO EXISTING. REFER TO WATER RISER F/P1.0 FOR INFORMATION.
<br />17 PROVIDE 1-1/2" SANITARY FOR NEW HAND SINK AND CONNECT TO EXISTING. FIELD
<br />VERIFY SIZE, LOCATION, AND DIRECTION OF FLOW. REFER TO SANITARY RISER G/P1.0
<br />FOR INFORMATION.
<br />KEY NOTES I C
<br />LEGEND
<br />EX/ST/NG
<br />NEW WORK
<br />® NEW TO £X/S77NG CONNEC77ON
<br />PLUMBING PLAN 1/4"=V-0"
<br />CONNECT 1-1/4" GAS PIPING TO EXISTING GAS METER SUPPLYING AN ADDITIONAL 160 MBH
<br />AT 8" WATER COLUMN WITH AN ALLOWABLE PRESSURE DROP OF 0.5" W.C. NEW GAS
<br />METER BY LOCAL UTILITY COMPANY IF REQUIRED. CONTRACTOR SHALL VERIFY WITH
<br />LOCAL GAS UTILITY COMPANY THAT THE GAS GAS METER AND SERVICE LINE IS CAPABLE
<br />OF HANDLING THE ADDITIONAL LOAD. ONLY IN SEISMIC AREAS: INSTALL AN APPROVED
<br />SEISMIC SHUT-OFF VALVE ON SERVICE IF EXISTING VALVE IS NOT PRESENT.
<br />�2 EXISTING ELECTRICAL EQUIPMENT. NO PIPING SHALL CROSS THIS SPACE.
<br />INSTALL 1-1/4" MECHANICAL SOLENOID VALVE SUPPLIED BY OWNER DROP GAS PIPING
<br />THROUGH CEILING. LOCATE SOLENOID VALVE AND GAS COCK ADJACENT TO NEW GAS
<br />HOOD. ROUTE GAS PIPING UP IN CEILING SPACE, THEN DOWN IN WALL. INSTALL QUICK
<br />DISCONNECT AT FRYER.
<br />® (REUSE EXISTING MIXING VALVE IF ONE IS PRESENT) PROVIDE THERMOSTATIC MIXING
<br />VALVE, LEONARD MODEL: 210 MOUNTED BELOW FIXTURE. SET TEMPERATURE AS
<br />REQUIRED BY AHJ. PIPE WATER FROM MIXING VALVE TO FOOT CONTROL (PROVIDED BY
<br />OWNER) THEN BACK TO HANDSINK. FOLLOW MANUFACTURER'S INSTALLATION
<br />INSTRUCTIONS. INSTALL NEW MIXING VALVE IF REQUIRED BY LOCAL AUTHORITIES.
<br />50 INSTALL HAND FREE MODEL: FOOT CONTROL PEDALS (SUPPLIED BY OWNER). CONNECT
<br />NEW 1/2 HOT AND COLD WATER TO EXISTTNG. VERIFY SIZES AND LOCATIONS OF EXISTING
<br />PLUMBING PRIOR TO INSTALLATION. PROVIDE FLEXIBLE STAINLESS STEEL -BRAIDED
<br />SUPPLY LINE TO FOOT CONTROL. SEE FOOT CONTROL DETAIL ON SHEET P-2. PROVIDE 0.5
<br />GPM FLOW CONTROL IN OUTLET OF FAUCET. REPLACE PLUMBING FOUND IN POOR
<br />CONDITION. INSTALL PER MANUFACTURER'S REQUIREMENTS.
<br />PLUMBING NOTES: I B
<br />CONTRACT DATE: 03.21.08
<br />BUILDING TYPE: ?WM.
<br />STORE NUMBER: 95343
<br />ARCV NUMBER: 080406
<br />6548 GALL BLVD.
<br />ZEPHYRHILLS, FL 33542
<br />PLUMBING
<br />PLAN
<br />Pi so
<br />PLOT DATE:
<br />02.19.08
<br />
|