Laserfiche WebLink
AT <br />EQ <br />EQUAL <br />MAT. <br />MATERIAL <br />SHEET NUMBER e DRAWING NAME <br />DATE ISSUED REVISION <br />COVER SHEET <br />PROJECT: <br />PINCHASERS <br />ANTHONY PERRONE <br />ZL ANGLE EXI. / EXIST. EXISTING <br />CENTERLINE EXH EXHAUST <br />L CHANNEL EXP. EXPOSED <br />PERPENDICULAR EXT. EXTERIOR <br />> PLATE F.B.C. FURNISHED BY CONTRACTOR <br />ROUND/ DIAMETER ' F.B.O. FURNISHED BY OWNER <br />A.F.F. ABOVE FINISH FLOOR F.C. FIRE CODE <br />MAX. MAXIMUM <br />MECH MECHANICAL <br />MEP -FP MECHANICAL, ELECTRICAL, <br />PLUMBING & FIRE PROTECTION <br />MET, METAL <br />MEZZ. MEZZANINE <br />MFR MANUFACTURER <br />GENERAL CONSTRUCTION NOTES: <br />1. GENERAL CONTRACTOR SHALL INSPECT THE SITE AND SHALL BE FAMILIAR WITH ALL CONDITIONS AND WITH LIMITATION OF THE CONTRACT AND SCOPE OF WORK. <br />2. ALL CONTRACTORS SHALL ENSURE THAT ALL WORK AND MATERIALS SHALL COMPLY WITH ALL FIRE SAFETY, HEALTH, LOCAL AND STATE BUILDING CODES. UNLESS OTHERWISE AGREED TO IN WRITING, CONTRACTOR S SHALL BE <br />RESPONSIBLE TO SECURE ALL PERMITS AND PAY FEES FOR THE SAME AS REQUIRED BY STATE AND LOCAL RULES AND REGULATIONS. <br />CS COVER SHEET <br />GENERAL <br />G1.0 <br />IGENERAL NOTES AND WALL TYPES <br />G1.1 <br />CODE ANALYSIS PLAN <br />DEMOLITION <br />Dl .0 FIRST FLOOR DEMOLITION PLAN <br />A.P. ACCESS PANEL <br />A.T. ASPHALT TILE <br />A/C AIR CONDITIONING <br />A.C.T. ACOUSTICAL CEILING <br />AC. ACRE <br />ADD'N ADDITION <br />ADD. ADDENDUM <br />UST. ADJUSTABLE <br />ADJUST. <br />ALT. ALTERNATE <br />ALUM. ALUMINUM <br />ANCHOR(AGE) <br />ANCH. ANCHOR <br />ANOD. ANODIZED <br />APPROX. APPROXIMATE <br />ARCH. ARCHITECTURAL) <br />ASPH. ASPHHLT <br />B.M. BENCHMARK <br />B.W. BOTH WAYS <br />B.O. BOTTOM OF <br />BD. <br />BD. BOARD <br />BLDG. BUILDING <br />BLKG. BLOCKING <br />BLKT. BLANKET <br />BM. BEAM <br />BRG. BEARING <br />BRK. BRICK <br />F.D. <br />F.E. <br />F.E.C. <br />TILE F.H. <br />F.O. <br />F.P. <br />FDN. <br />FLR. <br />FIN. <br />FIXT. <br />FL. <br />F.O.F. <br />F.O.S. <br />' F.O.W. <br />FR. <br />FRM'G. <br />FT. <br />FTG. <br />FUR, <br />FURN. <br />F.R.P. <br />F.R.P.T. <br />F.R. <br />FLOOR DRAIN <br />FIRE EXTINGUISHER <br />FIRE EXTINGUISHER CABINET <br />FIRE HYDRANT <br />FRAME OPENING <br />FIREPROOFING <br />FOUNDATION <br />FLOOR <br />FINISHED) <br />FIXTURE <br />FLOOR <br />FACE OF FOUNDATION <br />FACE OF STUD <br />FACE OF WALL <br />FRAME <br />FRAMING <br />FEET <br />FOOTING <br />FURRING <br />FURNITURE <br />FIBERGLASS REINFORCED <br />PANEL <br />FIRE RETARDANT PRESSURE <br />TREATED <br />FIRE RATED <br />MIN <br />MISC. <br />MLDG. <br />M.O. <br />M.R. <br />MTL <br />MULL. <br />N.A. <br />N.I.C. <br />NOM <br />N.T.S. <br />NAT. <br />NO. <br />NOM. <br />O.A. <br />O.C. <br />O.D. <br />OPNG. <br />OPH <br />OPP <br />P&M <br />P.M.S. <br />PBD, <br />PERM. <br />P,C. <br />MINIMUM <br />MISCELLANEOUS <br />MOULDING <br />MASONRY OPENING <br />MOISTURE RESISTANT <br />METAL <br />MULLION <br />NOT APPLICABLE <br />A <br />NOT A CONTRACT <br />NOMINAL <br />NOT TO SCALE <br />NATURAL <br />NUMBER <br />NOMINAL <br />OVERALL <br />ON CENTER <br />OUTSIDE DIAMETER <br />OPENING <br />OPPOSITE HAND <br />OPPOSITE <br />PATCH & MATCH <br />PREFORMED METAL SIDING <br />PARTICLE BOARD <br />PERIMETER <br />PRE CAST <br />3. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND ELEVATIONS BEFORE PROCEEDING WITH WORK. <br />4. ANY ERRORS, AMBIGUITIES, DISCREPANCIES, OR OMISSIONS IN DRAWINGS OR NOTES SHALL BE REPORTED TO THE ARCHITECT FOR CORRECTION OR CLARIFICATION BEFORE ANY PART OF THE WORK IS STARTED. <br />5. IN GENERAL, ALL BUILDING SURFACES WITHIN CONSTRUCTION LIMITS SHALL BE CLEANED AT PROJECT COMPLETION, USE CLEANING MATERIALS AS RECOMMENDED BY PRODUCT MANUFACTURERS. EMPLOY EXPERIENCED <br />WORKMEN OR PROFESSIONAL CLEANERS. BEFORE INSPECTION FOR SUBSTANTIAL COMPLETION, COMPLETE ALL NECESSARY CLEANING WITHIN AREA OF WORK, INCLUDING THE FOLLOWING: <br />REMOVE GREASE, DIRT, STAINS, FINGERPRINTS, ETC. FROM EXPOSED TO VIEW FINISHED SURFACES. <br />TOUCH UP MARRED SURFACES AS REQUIRED, <br />REMOVE PROTECTIVE COVERS FROM, CLEAN AND POLISH EXPOSED TO VIEW FIXTURES, WINDOWS, HARDWARE, ETC. <br />6, ALL FINISH MATERIAL SHALL BE STORED SO IT IS CLEAN AND FREE FROM STAIN OR DISCOLORATION. <br />7. THE CONTRACTOR SHALL SUBMIT REQUIRED SHOP DRAWINGS, FINISH AND OR COLOR SAMPLES AND EQUIPMENT CUTS PRIOR TO INSTALLATION TO THE ARCHITECT AND OWNER FOR APPROVAL BEFORE CONSTRUCTION <br />BEGINS. IF NOT SPECIFIED OTHERWISE, COLORS AND FINISHES OF SPECIFIED PRODUCTS WILL BE SELECTED FROM MANUFACTURER'S STANDARD RANGE. SHOP DRAWINGS, PRODUCT DATA, AND OTHER SUBMITTALS (OTHER THAN <br />ACTUAL SAMPLES) SHALL BE SUBMITTED IN ELECTRONIC (PDF) FORMAT WHEREVER POSSIBLE. IF PAPER SUBMITTALS ARE SUBMITTED, PROVIDE ONE (1) COPY FOR REVIEW. <br />8. THE ACCEPTANCE OF THE CONTRACT CARRIES WITH IT A GUARANTEE ON THE PART OF THE CONTRACTOR TO MAKE GOOD ANY DEFECTS IN WORK AND WORKMANSHIP FOR ONE YEAR FROM COMPLETION OF THE ENTIRE <br />9. GENERAL CONTRACTOR SHALL CARRY ALL INSURANCE, SATISFACTORY TO OWNER. <br />10. DO NOT SCALE DRAWINGS TO DETERMINE LOCATIONS AND LAYOUT OF THE WORK. <br />11. BE RESPONSIBLE FOR THE COMPLETE SECURITY OF THE WORK PREMISES WHILE JOB IS IN PROGRESS AND UNTIL JOB IS COMPLETED. <br />6816 GALL BOULEVARD <br />ZEPHYRHILLS, FL 33542 <br />-- <br />- <br />PROJECT NUMBER: 21161 <br />- <br />- - <br />- -- <br />ARCHITECTURAL <br />A1.0 <br />FIRST FLOOR PLAN <br />A]. 1 <br />EQUIPMENT AND FURNITURE PLAN <br />A2.1 <br />REFLECTED CEILING PLAN <br />A7.1 <br />DOOR SCHEDULE <br />A7.2 <br />ROOM SCHEDULE <br />A8.1 <br />INTERIOR ELEVATIONS <br />. <br />A$2 <br />INTERIOR ELEVATIONS AND PLAN DETAILS <br />A8.3 <br />INTERIOR DETAILS <br />�, V) <br />�, <br />J <br />w <br />L <br />p U <br />N � <br />CD U <br />Q w <br />� I- - <br />2 <br />= U <br />Q <br />Q <br />O <br />m <br />PLUMBING <br />P0.1 <br />PLUMBING -LEGENDS &SYMBOLS <br />Pl .0 <br />PLUMBING - NEW WORK PLAN WATER WASTE & VENT <br />P2.0 <br />PLUMBING -SPECIFICATIONS <br />FIRE PROTECTION <br />FPI.I <br />FIRE PROTECTION <br />FP1.2 <br />FIRE PROTECTION <br />MECHANICAL <br />M0.1 <br />MECHANICAL - LEGENDS & SYMBOLS <br />Ml .0 <br />MECHANICAL -NEW WORK PLAN <br />M2.0 <br />MECHANICAL -SCHEDULES <br />M3.0 <br />MECHANICAL -SPECIFICATIONS <br />BVL. <br />BVL <br />CABT. <br />CARP. <br />C.I. <br />C.I.P. <br />C.G. <br />C.J. <br />CL. <br />C.L.L. <br />C.M.P. <br />CLR <br />BASEMENT <br />BEVELED <br />CABINET <br />CARPENTER <br />CAST IRON <br />CAST -IN -PLACE <br />CORNER GUARD <br />CONTROL JOINT <br />CLOSET <br />CONTRACT LIMIT LINE <br />CORRUGATED METAL <br />CEILING <br />CLEAR <br />GA <br />GALV <br />G.C. <br />GL <br />GWB <br />GYP. BD. <br />H. <br />HDWR <br />H.C. <br />PIPE H.M. <br />H/C <br />HBD. <br />GAUGE <br />GALVANIZED <br />GENERAL CONTRACTOR <br />GLASS <br />GYPSUM WALL BOARD <br />GYPSUM BOARD <br />HEIGHT <br />HARDWARE <br />HOLLOW CORE <br />HOLLOW METAL <br />HANDICAPPED <br />HARDBOARD <br />PLWD PLYWOOD <br />PLAM PLASTIC LAMINATE <br />PLAS. PLASTER <br />PLBG. PLUMBING <br />P.T. PRESSURE TREATED <br />PTD PAINTED <br />PLYWD. PLYWOOD <br />PNL. PANEL <br />PR. PAIR <br />PREFAB. PREFABRICATE(D) <br />Q.T. QUARRY TILE <br />QTY. QUANTITY <br />RAD/ R RADIUS <br />12. THE OWNER RESERVES THE RIGHT TO PERFORM ADDITIONAL WORK THAT IS NOT PART OF THE CONTRACT WITH HIS OWN FORCES, UNDER SEPARATE CONTRACTS AND/ OR WITH OTHER CONTRACTORS OR VENDORS. <br />COOPERATE WITH THE OWNER AND THE OTHER CONTRACTORS AND COORDINATE WORK WITH THE OWNER SO THAT WORK BY OTHERS CAN BE INCORPORATED IN A TIMELY MANNER . <br />13. ALL DAMAGES TO THE BUILDING PROPERTY DUE TO CONTRACT OPERATIONS MUST BE REPORTED IMMEDIATELY TO THE OWNER'S REPRESENTATIVE. <br />14. ALL MATERIALS SHALL BE FURNISHED AND INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURERS WRITTEN INSTRUCTIONS AND RECOMMENDATIONS, BY SKILLED WORKMEN UNDER ADEQUATE SUPERVISION. MATERIALS <br />AND METHODS OF INSTALLATION SHALL ALSO CONFORM TO THE APPROPRIATE NATIONAL TRADE HANDBOOKS; I.E. ARCHITECTURAL WOODWORK INSTITUTE's QUALITY STANDARDS, UNITED STATES GYPSUM'S, GYPSUM <br />CONSTRUCTION HANDBOOK, ETC. COPIES OF MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR ALL PRODUCTS SHALL BE AVAILABLE AT JOB SITE. <br />15. ALL MILLWORK, WOODWORK AND WOOD DOORS SHALL BE FABRICATED, FURNISHED, AND INSTALLED IN STRICT ACCORDANCE WITH THE APPROPRIATE SECTIONS OF THE ARCHITECTURAL WOODWORK INSTITUTES, <br />ARCHITECTURAL WOODWORK QUALITY STANDARDS', CUSTOM GRADE, UNLESS OTHERWISE NOTED. PROVIDE ARCHITECTURAL WOODWORK INSTITUTE QUALITY CERTIFICATION PROGRAM LABELS OR CERTIFICATES INDICATING <br />THAT THE WOODWORK, INCLUDING INSTALLATION, COMPLIES WITH REQUIREMENTS OF GRADES SPECIFIED. <br />O <br />u <br />T <br />1 <br />.......ILI��� <br />ZCLG <br />o <br />.o <br />CD �O <br />p <br />N � <br />w Lo <br />H-Lo <br />N pp <br />p <br />w V) <br />w � <br />(- <br />MD1.0 <br />MECHANICAL - DEMOLITION <br />ELECTRICAL <br />E0.1 <br />ELECTRICAL -LEGENDS &SYMBOLS <br />E1.0 <br />ELECTRICAL - LIGHTING PLAN <br />E1.1 <br />ELECTRICAL - POWER PLAN <br />El .2 <br />ELECTRICAL - LIFE SAFETY PLAN <br />E2.0 <br />ELECTRICAL - SCHEDULES <br />E3.0 <br />ELECTRICAL - DETAILS <br />E4.0 <br />ELECTRICAL -SPECIFICATIONS <br />ED1.0 <br />ELECTRICAL - DEMOLITION <br />COMB. <br />COMP. <br />CMU <br />COL <br />CONC <br />CONT <br />COMBINATION HDWD. <br />COMPOSITE HDWR. <br />CONCRETE MASONRY UNIT HD <br />COLUMN HORIZ. <br />CONCRETE HR. <br />CONTINUOUS HVAC <br />HARDWOOD <br />HARDWARE <br />HIGH POINT <br />HORIZONTAL <br />HOUR <br />HEATING, VENTILATION, <br />REINF. <br />REF. <br />REF. <br />RET. <br />R.D. <br />RO <br />REINFORCING <br />REFERENCE <br />REQUIRED <br />RETURN <br />ROOF DRAIN <br />ROUGH OPENING <br />16. ANY SUBSTITUTIONS FOR MATERIALS/MANUFACTURERS SYSTEMS SPECIFIED MUST BE PREAPPROVED BY THE ARCHITECT. SUBMIT SUBSTITUTION REQUEST IN WRITING, ALONG WITH APPROPRIATE SHOP DRAWINGS, PROPOSED <br />MANUFACTURER'S PRODUCT DATA, AND SAMPLE(S) OF PRODUCT(S) IN COLOR <br />COLORS)/FINISH(ES) PROPOSED. NOTE THE REASON FOR THE SUBSTITUTION AND ANY COST SAVINGS TO BE CREDITED TO THE OWNER FOR USE OF <br />SUBSTITUTED PRODUCT OR SYSTEM. EVALUATION OF CONTRACTOR -PROPOSED SUBSTITUTIONS BY THE ARCHITECT MAY REQUIRE ADDITIONAL SERVICES IN THE FORM OF RESEARCH OR REDESIGN. THE OWNER AND/OR <br />CONTRACTOR WILL BE NOTIFIED OF THE NEED FOR ADDITIONAL SERVICES PRIOR TO REVIEW OF A PROPOSED SUBSTITUTION. THE OWNER MUST AUTHORIZE ADDITIONAL SERVICES PRIOR TO THE ARCHITECT CONDUCTING A <br />REVIEW OF THE PROPOSED SUBSTITUTION IN QUESTION. <br />r <br />W <br />I Q <br />� <br />I N <br />N <br />z v. <br />w N <br />U ao <br />DRAWING LIST <br />CPT. <br />C.T. <br />D. <br />CARPET <br />CERAMIC TILE <br />DEPTH <br />I.B.C. <br />LB.O. <br />AIR CONDITIONING <br />INSTALLED BY CONTRACTOR <br />INSTALLED BY OWNER <br />REV. <br />RM. <br />SIM <br />REVISED/ REVISION <br />ROOM <br />SIMILAR <br />17. SUBSTITUTIONS: WHEN PROVIDING A PRODUCT OR MATERIAL WHICH IS A SUBSTITUTE FROM WHAT THE DRAWINGS SHOW AS THE "BASE SPECIFICATION", THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR <br />COORDINATION OF ANY VARIATIONS FROM THE ORIGINALLY SPECIFIED PRODUCT, INCLUDING BUT NOT LIMITED TO DIMENSIONAL VARIATIONS, UTILITY REQUIREMENTS, OR STRUCTURAL SUPPORT. <br />I <br />CN O <br />M <br />'- <br />o- <br />D.F. <br />D.H. <br />D.O. <br />DEFL. <br />DIA <br />DIAG. <br />DIMEN. <br />DRINKING FOUNTAIN <br />DOUBLE HUNG <br />DOOR OPENING <br />DEFLECTION <br />DIAMETER <br />DIAGONAL <br />DIMENSION <br />I.C.S. <br />I.D. <br />IMPREG. <br />INCL. <br />INSUL <br />INT. <br />INV. <br />INSULATED COMPOSITE SIDING <br />INSIDE DIAMETER <br />IMPREGNATED <br />INCLUDE(D) (-ING) <br />INSULATE(D) (-[ON) (-ING) <br />INTERIOR <br />INVERT <br />SP <br />SQ <br />S.C. <br />S.S. <br />STL <br />STD <br />TEMP <br />SPACES <br />SQUARE <br />SOLID CORE <br />STAINLESS STEEL <br />STEEL <br />STANDARD <br />TEMPERED <br />18. ARRANGE AND PAY FOR ANY REQUIRED TEMPORARY UTILITIES AND FACILITIES. PROVIDE TEMPORARY HEAT AND WEATHER PROTECTION AS REQUIRED. <br />19. LOCATE ALL EXISTING UTILITIES WHETHER SHOWN HEREIN OR NOT AND PROTECT THEM FROM DAMAGE. BEAR ALL EXPENSE OR REPAIR OR REPLACEMENT OF UTILITIES OR OTHER PROPERTY DAMAGED BY OPERATIONS IN <br />CONJUNCTION WITH PERFORMANCE OF THE WORK. <br />20. LOCATIONS FOR CONSTRUCTION DUMPSTERS OR OTHER TEMPORARY FACILITIES AND STAGING AREAS OUTSIDE OF THE WORK AREA MUST BE REVIEWED BY THE OWNER'S REPRESENTATIVE. <br />(1) LAYER OF 5/8" GYP. BD. ON <br />EACH SIDE <br />3 5/8" 25 GA. STEEL STUDS @ <br />� 16" O.C. <br />� <br />DL <br />DN. <br />DN. <br />DWG <br />DR <br />D.S. <br />EA <br />EJ <br />EP <br />EIFS <br />ELEC. <br />ELEV <br />E <br />ESTITIM. <br />DEAD LOAD <br />DOWN <br />DETAIL <br />DRAWING <br />DOOR <br />DOWNSPOUT <br />EACH <br />EXPANSION JOINT <br />ELECTRIC PANEL <br />EXTERIOR INSULATION <br />FINISH SYSTEM <br />ELECTRICAL <br />ELEVATION <br />ENCLOSURE <br />ESTIMATE <br />J.C. <br />JT <br />L. <br />LAM. <br />LAV. <br />LF <br />LG. <br />LG. <br />LT -GA. <br />LTL. <br />LVR. <br />LL <br />L.P. <br />MACH. <br />JANITOR CLOSET <br />JOINT <br />LENGTH <br />LAMINATED <br />LAVATORY <br />LINEAR FEET <br />LONG <br />LOCATE(D) (-ION) <br />LIGHT GAUGE <br />LINTEL <br />LOUVER <br />LIVE LOAD <br />LOW POINT <br />MACHINE <br />T&G <br />T <br />T.O.S.. <br />U.N.O. <br />VERT. <br />VEST. <br />VCT <br />WD. <br />W.C. <br />W.R. <br />W.P. <br />W/O <br />W/ <br />WDW. <br />TONGUE & GROOVE <br />TOP OF STEEL <br />TYPICAL <br />UNLESS NOTED OTHERWISE <br />VERTICAL <br />VESTIBULE <br />VINYL COMPOSITION TILE <br />WIDTH <br />WOOD <br />WATER CLOSET <br />WATER RESISTANT <br />WATERPROOF <br />WITHOUT <br />WITH <br />WINDOW <br />21 •NEW GYPSUM WALLBOARD SUBSTRATES APPLIED OVER NEW STEEL STUDS OR NEW WOOD STUDS SHALL BE SECURED WITH APPROPRIATE SCREW FASTENERS. INSTALLATION SHALL BE IN ACCORDANCE WITH "GYPSUM <br />CONSTRUCTION HANDBOOK" BY USG. ALL JOINTS SHALL BE TAPED AND FINISHED AND APPROPRIATE METAL TRIM PROVIDED WHERE REQUIRED. <br />22. PROVIDE BACK -BLOCKING AS REQUIRED TO ACHIEVE FIRM ATTACHMENT OF ALL ITEMS Of ARCHITECTURAL WOODWORK, AND ALL OTHER WALL AND/OR CEILING MOUNTED FINISHES, EQUIPEMNT, AND ACCESSORIES, <br />FIXTURES, ETC. <br />23. PROVIDE A BEAD OF SANITARY, MILDEW RESISTANT SILICONE SEALANT AT THE FOLLOWING LOCATIONS: <br />METAL DOOR FRAME AND WALL CONSTRUCTION. <br />CONDUIT AND PIPE PENETRATIONS AT WALLS AND CEILINGS. <br />JUNCTION OF MILLWORK AND SURROUNDING SURFACES. <br />TOILET ACCESSORIES. <br />BASEBOARD TO WALL. <br />WINDOW FRAMES AND MISC.TRIMWORK JOINTS WITH WALLS, <br />ELSEWHERE AS SHOWN ON DRAWINGS OR WHERE REQUIRED BY THE ARCHITECT, OR LOCAL AUTHORITIES. PROVIDE PAINTABLE SEALANTS AT LOCATIONS SCHEDULED TO RECEIVE PAINTED OR STAINED FINISHES. <br />24. DESIGNATE DELIVERY DATES OF OWNER FURNISHED ITEMS IN THE CONSTRUCTION SCHEDULE, RECEIVE, UNLOAD, AND HANDLE OWNER FURNISHED ITEMS TO BE INSTALLED BY THE CONTRACTOR AT THE SITE. STORE MATERIALS <br />DELIVERED TO THE SITE OFF GROUND, UNDER COVER, IN DRY WELL VENTILATED LOCATIONS SECURE FROM VANDALISM AND THEFT. IN FULL CONFORMANCE WITH MANUFACTURER'S RECOMMENDATIONS. CAREFULLY PROTECT <br />3 1/2" SOUND ATTENUATION <br />BATTS <br />NOTE: <br />EXTEND STUDS TO UNDERSIDE OF <br />DECK/STRUCTURE, EXTEND GYP. BD. AND <br />INSULATION TO b" ABOVE CEILING. <br />A NON -RATED WALL <br />3 1/2" SOUND ATTENUATION <br />BATTS <br />ABBREVIATIONS <br />STORED MATERIALS FROM DAMAGE, DAMPNESS, AND EXTREMES OF TEMPERATURES. PROVIDE SEPARATIONS BETWEEN FINISHED MATERIALS WHICH ARE STORED IN STACKED OR LEANING POSITIONS. <br />25. CLOSE-OUT SUBMITTALS REQUIRED AT FINAL COMPLETION SHALL INCLUDE: <br />OPERATING AND MAINTENANCE MANUALS. INSTRUCTION OF OWNER AND/OR BUILDING OWNER PERSONNEL IN MAINTENANCE AND OPERATION OF SYSTEMS. <br />3 5/8" 25 GA. STEEL <br />16" O.C. <br />STUDS @ <br />4 A8.1 2 <br />MATCHLINE <br />INTERIOR ELEVATION KEY. INDICATED <br />NUMBERS USED FOR VIEW IDENTIFICATION <br />I <br />Mom <br />NEW STUD WALL <br />NEW CMU WALL <br />SUBMISSION OF CERTIFICATIONS, TEST REPORTS, ETC. PROVISION OF SPARE PARTS AND MAINTENANCE MATERIALS, NEATLY WRAPPED OR PACKAGED IN STANDARD SIZES, AND CLEARLY LABELED. THIS INCLUDES EXTRA <br />STOCK OF CARPET, VINYL TILE, AND PAINT OF EACH COLOR AND SHEEN SPECIFIED. <br />CERTIFICATE OF INSURANCE FOR PRODUCTS AND COMPLETED OPERATIONS. TYPED LIST OF MAJOR SUB -CONTRACTORS AND SUPPLIERS WITH ADDRESSES AND TELEPHONE NUMBERS. <br />26. PLAN AND SCHEDULE WORK AND PURCHASING IN ORDER TO MINIMIZE ON -SITE CONSTRUCTION TIME AND DISRUPTION OF EXISTING BUILDING OCCUPANTS AND OPERATIONS. <br />(1) LAYER OF 5/8" GYP. BD. ON <br />EACH SIDE <br />NOTE: <br />EXTEND STUDS TO UNDERSIDE OF <br />DECK/STRUCTURE. EXTEND GYP. BD. AND <br />27. THE OWNER MAY AUTHORIZE THE CONTRACTOR TO COMMENCE WORK BASED ON THE CONTRACTOR'S AGREEMENT TO ADHERE TO CERTAIN RULES AND REGULATIONS. THE CONTRACTOR SHALL AGREE TO ANY SUCH RULES <br />INSULATION TO 6" ABOVE CEILING. <br />NEW BRICK WALL <br />AND REGULATIONS TO THE SATISFACTION OF THE OWNER PRIOR TO START OF WORK. A COPY OF CURRENT RULES, IF AVAILABLE SHALL BE PROVIDED BY THE OWNER AT CONTRACTOR'S REQUEST. <br />A5.1 <br />EXTERIOR ELEVATION KEY. NUMBERS <br />USED FOR VIEW IDENTIFICATION <br />EXISTING WALL TO BE REMOVED <br />28. THE OWNER RESERVES THE RIGHT TO INSTALL EQUIPMENT IN COMPLETED AREAS OF THE BUILDING, PRIOR TO SUBSTANTIAL COMPLETION PROVIDED THAT SUCH OCCUPANCY DOES NOT INTERFERE WITH COMPLETION OF THE <br />WORK. <br />NON - RATED WALL <br />B <br />29. MAINTAIN MEANS OF EGRESS DURING CONSTRUCTION AS REQUIRED BY NFPA 101, LIFE SAFETY CODE, CURRENT EDITION AND LOCAL AUTHORITIES. <br />1 <br />REVISION TAG <br />EXISTING WALL TO REMAIN <br />30. WORKMEN SHALL CONDUCT THEMSELVES IN A REASONABLE MANNER (I.E. SHALL NOT USE PROFANITY, CREATE A NUISANCE TO SURROUNDING BUILDING OCCUPANTS, LOITER IN SURROUNDING BUILDINGS, ETC.). <br />31. IN THE EVENT THAT ANY PORTION OF THE WORK WILL DISTURB AND/OR DISRUPT ANY OTHER OPERATIONS IN THE BUILDING, MAKE ARRANGEMENTS WITH THE OWNER TO CONDUCT THE WORK AT A TIME AGREED UPON BY <br />THE AFFECTED OPERATIONS AND/OR PARTIES. ANY AND ALL SUCH WORK AND RELATED CIRCUMSTANCES SUCH AS POWER SHUT DOWNS, PIPING, CABLING, FIRE ALARM, ETC., WILL BE COORDINATED WITH ALL AFFECTED <br />WALLS LEGEND <br />OWINDOW <br />AA <br />TAG <br />OPERATIONS, OWNER AND AUTHORITIES HAVING JURISDICTION OVER THE AFFECTED WORK. <br />cl <br />WALL TYPE; SEE WALL TYPES ON DWG. <br />G 1.0 <br />- <br />SPOT ELEVATION - CEILING HEIGHT <br />EARTH <br />STAMP: <br />DEMOLITION KEYNOTE <br />❑p <br />DRAWING KEYNOTE <br />- .- °a .� _ �a <br />GRAVEL <br />e OF -FL O,Q� <br />4bP 9 <br />' • I � � if "' '�i I • <br />1 SIM <br />A6.1 <br />1 SIM <br />1 SIM <br />DETAIL VIEW KEY <br />° a <br />CONCRETE <br />CMU <br />A 444 I <br />,' �� ' <br />BRED ARCS <br />PARTITION TYPES <br />SCALE: 1 1/2" = 1'-0" <br />A6.1 <br />A6.1 <br />FULL BUILDING SECTION KEY <br />ALL DIMENSIONS SHOWN ARE SHOWN AS FOLLOWS: <br />FRAMED CONSTRUCTION <br />1 SIM <br />WALL AND PARTIAL SECTION KEY <br />BRICK <br />WALLS: FACE OF STUD TO FACE OF STUD <br />DOORS / WINDOWS: CENTERLINE OF UNIT <br />ALL ANGLE'S ARE 45 ^ OR 90 ^ UNLESS NOTED OTHERWISE <br />ISSUE: <br />DATE: <br />ISSUED FOR PERMIT <br />Ol .25.2023 <br />A6.1 <br />MASONRY/ CONCRETE CONSTRUCTION <br />ROOM NAME <br />101 <br />ROOM TAG <br />BATT INSULATION <br />1. PROVIDE CEMENT BACKER BOARD IN LIEU OF GYP. BOARD AT ALL LOCATIONS SCHEDULED TO <br />WALLS: FACE OF MASONRY TO FACE OF MASONRY <br />DOORS / WINDOWS: MASONRY OPENING <br />RECEIVE CERAMIC TILE. SEE INTERIOR ELEVATIONS AND ROOM FINISH SCHEDULE. <br />FINISHED DIMENSIONS SHALL BE NOTED AS EITHER FINISHED OR CLEAR ON <br />DIMENSION STRING. <br />101A <br />DOOR TAG; SEE DOOR SCHEDULE <br />RIGID INSULATION <br />2. PROVIDE MOISTURE RESISTANT GYP. BOARD IN LIEU OF REGULAR GYP. BOARD AT ALL WET WALL <br />AREAS (RESTROOMS, KITCHENS, SERVICE AREAS, ETC.) SEE INTERIOR ELEVATIONS AND ROOM FINISH <br />DIMENSIONING NOTES <br />ON DWG. A7.?? <br />SCHEDULE. <br />N <br />3, ALL JOINTS OF GYPSUM BOARD/CEMENT BACKER BOARD SHALL BE TAPED AND FINISHED PER <br />MANUFACTURER'S WRITTEN SPECIFICATIONS. PROVIDE ALL APPROPRIATE TRIM AND ACCESSORIES FOR <br />NORTH ARROW <br />STEEL <br />A COMPLETE INSTALLATION. <br />4. PRIME PAINT AND OTHERWISE PREPARE WALL SUBSTRATES IN ACCORDANCE WITH MANUFACTURER'S <br />(NOTES ARE NOT KEYED ON DRAWINGS) <br />G.1 ALL CONSTRUCTION IS TO COMPLY WITH ANY AND ALL APPLICABLE LOCAL <br />DRAWING SCALE: As <br />indicated <br />SPECIFICATIONS, AND AS REQUIRED TO RECEIVE FINISHES SPECIFIED. <br />AND STATE BUILDING CODES. <br />A <br />O <br />SIM <br />A4.1 <br />FINISH TAG; SEE FINISH SCHEDULE ON <br />DWG. g7.22 <br />ENLARGED PLAN OR DETAIL <br />CALLOUT <br />ROUGH LUMBER <br />5. INSTALL GYPSUM BOARD FINISH ON UNRATED WALLS TO 6" ABOVE CEILING, TYP., UNLESS NOTED <br />OTHERWISE ON WALL TYPES. <br />REVIEW ALL DRAWINGS FOR FINISHES, MILLWORK, FIXTURES AND EQUIPMENT ITEMS THAT WILL <br />REQUIRE BACK -BLOCKING IN WALLS TO PROPERLY ATTACH SAME. COORDINATE WORK SO THAT ALL <br />BACK -BLOCKING IS PROVIDED PRIOR TO INSTALLATION OF SUBSTRATES ON PARTITIONS. <br />G.2 EACH PRIME SUBCONTRACTOR IS RESPONSIBLE FOR OBTAINING AND <br />PAYING FOR REQUIRED PERMITS AND SCHEDULING REQUIRED INSPECTIONS UNLESS <br />DIRECTED OTHERWISE BY OWNER. <br />G.3 GENERAL CONTRACTOR SHALL ERECT TEMPORARY BARRIERS, WARNING <br />SIGNS, CONSTRUCTION FENCING ETC. TO MAINTAIN A SAFE WORKING <br />ENVIRONMENT. <br />DRAWN BY: <br />CHECKED <br />BY: Checker <br />DRAWING TITLE:6. <br />GENERAL NOTES AND WALL TYPES <br />PLYWOOD <br />7. METAL STUD FRAMING AT INTERIOR DOOR JAMBS AND WINDOW SHALL BE 20 GA., TYP. <br />GA CONSTRUCTION DEBRIS AND DEMOLISHED MATERIALS SHALL BE DISPOSED <br />ALIGN SURFACES <br />FINISHED WOOD <br />8. ISOLATE FRAMING SYSTEM FROM STRUCTURAL LOADING BOTH HORIZONTALLY AND VERTICALLY. <br />9. PROVIDE SLIP OR CUSHIONED JOINTS AT TOP OF WALLS WHERE THEY MEET STRUCTURAL BEAMS OR <br />DECK ABOVE. MAINTAIN LATERAL STABILITY. <br />OF IN A LAWFUL AND TIMELY MANOR. <br />G.5 CONTRACTOR SHALL PROTECT ALL REQUIRED MEANS OF EGRESS <br />THROUGHOUT ENTIRE CONSTRUCTION PERIOD. <br />SHEET NUMBER: <br />10. DEPTH: 3-5/8" STUDS UNLESS OTHERWISE NOTED, OR REQUIRED TO MEET SPAN AND DEFLECTION <br />CONSTRAINTS. <br />G.6 CONTRACTOR SHALL BE RESPONSIBLE FOR THE BRACING AND SHORING OF <br />THE STRUCTURE THROUGH OUT THE ENTIRE CONSTRUCTION PERIOD. <br />ARCHITECTURAL PLAN SYMBOLS <br />MATERIALS LEGEND <br />GENERAL CONSTRUCTION NOTES <br />GENE11 RAL INTERIOR WALL NOTES <br />PERMITTING & LOCAL REQUIRMENTS <br />• <br />