Laserfiche WebLink
KEYNOTES - DEMOLITION PLAN <br />PROJECT: <br />r — — — Ef <br />— — — — — — — — — — — — — — — — — — ---- —---------- <br />I ,) <br />I II <br />I 1 <br />—1-------------------------, <br />o07 <br />L— — — — J — — — — — — — — — — — — — — — — — — — — — — - nni <br />II I <br />/_z <br />f"" I I I 001 <br />IF------ <br />1 I II <br />IIF_ —_---_— <br />I I II \ <br />o01 �4 <br />I I II <br />L_� ►I <br />-------- 003 I <br />8.1 <br />DEMOLITION PLAN <br />1 /8" = 1'-0" <br />001 IN GENERAL, REMOVE ALL EXISTING FLOOR, WALL, AND CEILING TILE (GRID TO REMAIN) INCLUDING <br />EXISTING LIGHTING. UNLESS NOTED OTHERWISE. <br />002 REMOVE EXISTING MILLWORK IN IT'S ENTIRETY <br />003 PROVIDE OPENING FOR NEW DOOR <br />004 EXISTING LOCKERS TO BE REMOVED AND DPOSED OF. <br />005 EXISTING MILLWORK, REMOVE EXISTING COUNTERTOPS AND SALVAGE FOR USE AS TEMPLATE FOR <br />NEW COUNTERS. <br />006 EXISTING LIGHTING TO REMAIN. <br />007 REMOVE PORTION OF EXISTING CEILING TILES AND GRID FOR NEW CEILING. <br />GENERAL DEMOLITION NOTES II <br />1. IN ACCORDANCE WITH FEDERAL REGULATIONS PROMULGATED UNDER THE CLEAN AIR ACT, AND COMMONLY <br />REFERRED TO AS ASBESTOS NESHAP, MORE SPECIFICALLY, 40 CFR PART 61, SUBPART M, SECTION 61.145, THE <br />CONTRACTOR SHALL VERIFY THAT AN ASBESTOS SURVEY HAS BEEN CONDUCTED PRIOR TO THE COMMENCEMENT <br />OF DEMOLITION OR RENOVATION WORK WHICH IS PART OF THIS CONTRACT. <br />2. IN ACCORDANCE WITH ABOVE REGULATION REQUIREMENTS, THE CONTRACTOR SHALL FILE WRITTEN <br />NOTIFICATION WITH THE EPA PRIOR TO ANY DEMOLITION WORK BEING PERFORMED REGARDLESS OF THE AMOUNT <br />OF ASBESTOS, INCLUDING ZERO. <br />3. ALL DEMOLITION WORK SHALL BE PERFORMED IN ACCORDANCE WITH FEDERAL, STATE AND LOCAL <br />REGULATIONS. SECURE REQUIRED PERMITS. ARRANGE WITH BUILDING OWNER AND/OR APPROPRIATE UTILITY <br />COMPANIES FOR SERVICE SHUTOFFS BEFORE BEGINNING DEMOLITION OPERATIONS. <br />4. CONSULT WITH OWNER AND FIRE OFFICIALS PRIOR TO MAKING ANY ALTERATIONS TO THE EXISTING FIRE ALARM <br />AND SPRINKLER SYSTEM. <br />5. COORDINATE ALL DEMOLITION OPERATIONS WITH OWNER FOR SHUTDOWN PERIODS AND SEQUENCE OF <br />WORK. PROVIDE TEMPORARY DUST PARTITIONS, BARRICADES, SIGNAGE, AND PROTECTIVE ENCLOSURES REQUIRED <br />TO PROPERLY SECURE, ISOLATE, WATERPROOF, AND PROTECT AREAS OF WORK FROM EXISTING AREAS TO REMAIN <br />IN OPERATION AND TO ASSURE CONTINUING FACILITY OPERATIONS IN GENERAL. IDENTIFY AND PROTECT ANY <br />AREAS WHERE DEMOLITION IS TO TAKE PLACE WHERE THE DEMOLITION CREATES A PHYSICAL SAFETY HAZARD. THE <br />CONTRACTOR SHALL KEEP THE CORRIDORS AND EXITS CLEAR OF DEBRIS, STORED MATERIALS, ETC., AT ALL TIMES TO <br />PROVIDE REQUIRED FIRE EGRESS FROM THE BUILDING. <br />6. MAKE EVERY EFFORT POSSIBLE TO MINIMIZE DISTURBANCES TO BUILDING OCCUPANTS. COORDINATE HOURS OF <br />DISRUPTIVE DEMOLITION WITH BUILDING OWNER PRIOR TO COMMENCEMENT. <br />7. IT IS NOT THE INTENT TO SHOW EVERY PIECE OR ITEM TO BE REMOVED IN DEMOLITION WORK. MECHANICAL, <br />ELECTRICAL AND OTHER WORK RELATED TO A WALL OR AREA SCHEDULED FOR DEMOLITION AND REMOVAL SHALL <br />BE REMOVED WHETHER SPECIFICALLY ITEMIZED OR NOT. TERMINATE, CAP AND REMOVE ALL ABANDONED <br />ELECTRICAL CONDUIT, WIRING BOXES, SWITCHES, ETC; PLUMBING, PIPING, AND PLUMBING FIXTURES, ETC; HVAC <br />DUCTWORK, CONTROLS, PIPING, ETC; AS REQUIRED. <br />8. WHEN WALLS, COLUMNS, OR OTHER SUPPORTING AND/OR BRACING ELEMENTS ARE SCHEDULED FOR <br />DEMOLITION, TEMPORARY STRUCTURAL SUPPORTS AND BRACING FOR THE ADJACENT CONSTRUCTION SHALL BE <br />PROVIDED AND MAINTAINED UNTIL THE PERMANENT SUPPORTING STRUCTURES ARE IN PLACE AND ABLE TO <br />SUPPORT IMPOSED LOADS. ANY STRUCTURAL BRACING DISCOVERED DURING DEMOLITION IS NOT TO BE <br />REMOVED - NOTIFY ARCHITECT OF ANY AND ALL SUCH DISCOVERIES IMMEDIATELY. <br />9. WHERE EXISTING WALL SUBSTRATES REMAIN AS BASE MATERIAL SURFACES FOR INSTALLATION OF NEW FINISHES, <br />REMOVE PROJECTIONS, FILL VOIDS, SECURE OR REMOVE AND REPLACE ANY EXISTING LOOSE OR OTHERWISE <br />UNSUITABLE SUBSTRATE MATERIALS AND ADD BLOCKING OR STRAPPING TO RECEIVE NEW MATERIALS AND FINISHES <br />STRIP EXISTING WALL FINISH MATERIAL TO EXPOSE SUBSTRATE WHERE NEEDED. <br />10. REMOVE ALL FINISH FLOORING MATERIALS INCLUDING WALL BASE FROM EXISTING FLOORS SCHEDULED TO <br />RECEIVE NEW FLOORING. GRIND, SCRAPE, SAND, CLEAN AND OTHERWISE PREPARE SUBSTRATE PRIOR TO <br />INSTALLATION OF NEW FINISH FLOORING. PREPARE SUBSTRATE IN ACCORDANCE WITH FLOORING <br />MANUFACTURER'S WRITTEN SPECIFICATIONS. PROVIDE LEVELING MASTICS AND GROUTS AS REQUIRED TO RENDER <br />SUBSTRATES LEVEL AND TRUE TO 1 /8" IN 10', AND AS REQUIRED TO BLEND ADJACENT DISSIMILAR FLOORING <br />MATERIALS. <br />11. REMOVE EXISTING CEILING FINISH MATERIAL, FRAMING/SUSPENSION SYSTEMS, INCLUDING LIGHT AND CEILING <br />FIXTURES, AS REQUIRED TO ACCOMMODATE NEW WORK. IN ROOMS WHERE CEILINGS ARE TO REMAIN AND <br />SECTIONS OF PARTITIONS ARE TO BE REMOVED/RELOCATED, CEILINGS SHALL BE PATCHED AND REPAIRED TO <br />MATCH EXISTING. <br />12. NEATLY SAWCUT SLAB, AND TRENCH AND EXCAVATE FOR NEW PLUMBING OR ELECTRICAL WORK AS SHOWN OR <br />REQUIRED ON PLUMBING AND ELECTRICAL DRAWINGS. WHERE CUT FOR TRENCHING, BACKFILL, COMPACT FILL <br />REPAIR/INSTALL NEW VAPOR BARRIER TO PROVIDE WATER TIGHT SYSTEM, AND PATCH SLAB TO BLEND <br />INDISTINGUISHABLE WITH ADJACENT SLAB. REPAIR EXISTING VAPOR BARRIER. <br />13. PATCH, REPAIR AND REFINISH ALL SURFACES TO MATCH AND ALIGN WITH EXISTING ADJACENT SURFACES <br />SCHEDULED TO REMAIN, AND PREPARE TO RECEIVE NEW FINISHES SPECIFIED. WORK SHALL INCLUDE ALL LABOR AND <br />MATERIALS ON ALL SURFACES REQUIRED TO RENDER SUBSTRATES ACCEPTABLE TO RECEIVE NEW FINISHES SPECIFIED <br />IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS. <br />14. PROTECT FROM LOSS OR DAMAGE ALL ITEMS INTENDED FOR SALVAGE AND REUSE, OR SCHEDULED TO REMAIN. <br />15. REPLACE IN KIND ANY EXISTING CONSTRUCTION, OR ITEM INTENDED TO REMAIN, OR BE SALVAGED FOR REUSE, <br />BUT DAMAGED OR LOST AS A RESULT OF THE WORK OF THIS CONTRACT. <br />16. REUSE OF SALVAGED MATERIALS NOT SPECIFICALLY SCHEDULED FOR REUSE, WILL BE AT THE SOLE DISCRETION <br />OF THE OWNER. IN NO CASE SHALL SALVAGED MATERIAL BE INCORPORATED IN THE WORK THAT DOES NOT MEET <br />MINIMUM REQUIREMENTS OF STATE AND LOCAL CODES AND REGULATIONS. <br />17. SCHEDULES OF ADDITIONAL ITEMS TO BE SALVAGED (IF ANY) ARE TO BE PROVIDED BY THE OWNER UPON <br />REQUEST OF THE CONTRACTOR. <br />18. ITEMS TO BE SALVAGED BUT NOT SO SCHEDULED ON THE DEMOLITION PLAN SHALL BE CONFIRMED BY THE <br />CONTRACTOR WITH THE OWNER. ALL ITEMS TO BE TURNED OVER TO THE OWNER, SHALL BE PROTECTED DURING <br />DEMOLITION AND REMOVAL AND SHALL BE DELIVERED IN AN UNDAMAGED CONDITION. <br />19. REMOVE ALL DEMOLISHED MATERIALS NOT SCHEDULED FOR SALVAGE AND REUSE, OR THOSE TO BECOME <br />PROPERTY OF THE OWNER, FROM THE SITE AND DISPOSE OF IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL <br />REGULATIONS. <br />20. TAKE CARE TO DISCONNECT ALL ELECTRICAL POWER TO PARTITIONS AND OTHER ITEMS, AREAS, ELEMENTS <br />INVOLVED IN THE DEMOLITION PRIOR TO DEMOLITION. <br />21. CONFINE TOOLS AND EQUIPMENT, STORAGE OF MATERIALS AND OPERATIONS TO LIMITS DESIGNATED BY THE <br />BUILDING OWNER. THE PREMISES SHALL BE MAINTAINED IN SAFE, ORDERLY CONDITION AT ALL TIMES. REMOVE <br />DEBRIS DAILY. COVER DUMPSTERS WITH FIRE RESISTANT TARPS SECURELY FASTENED TO PREVENT VANDALISM. <br />22. IN THE EVENT THAT SUSPECTED HAZARDOUS MATERIALS ARE DISCOVERED DURING THE COURSE OF <br />DEMOLITION, CEASE WORK IMMEDIATELY AND NOTIFY THE BUILDING OWNER OF ANY SUCH DISCOVERIES. <br />23. FOR ADDITIONAL DEMOLITION NOTES, REFER TO STRUCTURAL, MECHANICAL AND ELECTRICAL DEMOLITION <br />DRAWINGS, IF ANY. <br />24. DEMOLITION PLANS SHALL BE USED IN CONJUNCTION WITH DRAWINGS FOR NEW CONSTRUCTION (INTERIOR <br />ELEVATIONS, DETAILS, ETC.) SO THAT EXACT LIMIT AND BOUNDARIES OF SPECIFIC DEMOLITION MAY BE <br />DETERMINED. <br />25. ENSURE THAT ALL ELECTRICAL, MECHANICAL, FIRE PROTECTION, VOICE/DATA WIRING, AND PLUMBING SYSTEMS <br />SERVING OTHER TENANTS AND BASE BUILDING SYSTEMS WILL REMAIN OPERATIONAL DURING THE COURSE OF <br />DEMOLITION. SURVEY THE SITE BEFORE STARTING WORK TO IDENTIFY LOCATIONS OF THESE SYSTEMS, <br />DEMOLITION FLOOR PLAN SYMBOLS <br />EXISTING DOOR TO REMAIN <br />R <br />EXISTING DOOR TO BE DEMOLISHED <br />I a <br />EXISTING WALL TO REMAIN <br />EXISTING WALL TO BE DEMOLISHED <br />PINCHASERS <br />ANTHONY PERRONE <br />6816 GALL BOULEVARD <br />ZEPHYRHILLS, FL 33542 <br />PROJECT NUMBER: 21161 <br />('') O <br />Mon0 U <br />N <br />O u <br />JI I­W <Lu <br />= <br />U <br />�Q <br />� W o� <br />m <br />O X <br />oLL <br />(D <br />10 <br />lq- <br />w <br />r f�Lo <br />�•/ ) ~ <br />00 <br />z w O <br />u F- LL <br />z N <br />N N <br />LLJ N <br />H <br />Z <br />Q w N <br />U ' <br />N O <br />M Lo <br />r <br />CL <br />STAMP: <br />09 M COL;V, 9 <br />A 449� <br />7� <br />ISSUE: <br />ISSUED FOR PERMIT <br />DRAWING SCALE: <br />DRAWN BY: <br />DATE: <br />01.25.2023 <br />As indicated <br />CHECKED BY: Checker <br />DRAWING TITLE: <br />FIRST FLOOR DEMOLITION PLAN <br />SHEET NUMBER: <br />DI <br />0 <br />• <br />- <br />I - I. . 1, di.- , � • j iLOW. Jtia <br />