Laserfiche WebLink
. SPEGIFIGATIONS <br />1. 1. GONSTRUG. T40-14 <br />AGI 50-02 BUILDIN& COVE i EGUIREMENT5 FOR STRUCTURAL GONGRE-TE <br />AGI 530/A5GE 5/TMG ec*a � 1 a y�l, ' ,0, l/t SO fi/iMS bO2-�Iq <br />F <br />SPEGIFIO .TIOid r A lw. SiTGURES. <br />6476-6II, AND GqO- FO 5PEGIFIGATION5 FOR MASONRY STRIIGTUR 5 <br />t• 1. `1 <br />NATIONAL DE516N 5PEGIFiGATION5 (ND5) FOR WOOD CONSTRUCTION, 2001 EDITION, AND ALL <br />AGGOMPANYIN6 SUPPLEMENTS. <br />FLORIDA BUILDING CODE (FBC).200t ?':TION <br />"MAa1IrW-, Of S1tffL 6-dNSTRU6TION, ALLOWABLE 5T€ E-55 DE516N", BY THE AfItRIGAN <br />IN aTl`II)% STEEL CONSTRUCTION, (AI5G) qTH EDITION. <br />"C`E51ON 5PErGIF1GATION FOR LIC-a�€•lT METAL PLATE CONNECTED WOOD TRU55E5" BY THE <br />TRUSS PLATE INSTITUTE (TPI) Igg5 EDITION. <br />1.2. DESIGN <br />1. 2. 1. <br />AGI 50-02 BUILDING GODS REQUIREMENTS FOR STRUCTURAL GONr-RE E <br />1. 2. 2. <br />AG€ 530/ASGE 5/TM5 402-1q I$ AGI 550, I/ASGE b/TMS 602-qq <br />SPECIFICATIONS FOR MASONRY STRUCTURES. <br />1. 2. 3. <br />ASTM G270q2, a476- U, AND i}&jO-g0 SPP-cIPICATION5 t C)k MA50NiRY 5TRUCTURES <br />1.2.4. <br />NATIONAL M,16W SPECIFICATIONS (ND5) FOR WOOD CONSTfRUG7'ION, 2001 EDITION, AND ALL <br />AG`(-,0MPANYING SUPPLEMENTS. <br />1. 2. 5. <br />PLYWOOD DE516N SPECIFICATIONS (APA) <br />I. 2. 6. <br />FLORIDA BUILDtN& CODE (FEY--), 2001 EDITION <br />I. 5 • SHOP DRAW 1 NG S : <br />THERE SHALL NOT BI; ANY DEVIATIONS FROM THESE: D-515N PLANS 13Y OTHERS <br />DURING THE PREPARATION OF SHOP PRAWING5 WITHOUT WRITTEN APPROVAL FROM <br />THE: EN51WER OF RECORD. <br />ALL.. SHOP DRAin€IN&S ATE TO E3E 5UBMITTE'D TO THE EN&INEEIR OF RECORD PRIOR To, <br />THE COMMENCEMENT OF CONSTRUCTION. <br />t• 3. 3- ALL ROOF AND FLOOR TRU55 SHOP DRAWIN&5 ARE To BE SIGNED AND SEALED BY A <br />FLA. Ri=6. PE. AND SHALL INCLUDE : DRA.WIN65 AND CALCULATIONS, REAGTIONS AND <br />13EARINO POINTS, BRACINe REGtUIREMENT5, AND CONNECTIONS TO <br />5UPPORTIN5 TRU55 MEMBERS. <br />2. DESIGN LOADS <br />2.1. DEAD <br />LOADS <br />2. 1. I. <br />UNIT kNBC-7HT OF SOIL, COMPACTED : <br />120 PGF <br />2. €. 2. <br />UNIT WEI6+4T OF REINFORCED CONCRETE : <br />150 PGF <br />UNIT 1�1&HT OF 5" G.M.U. BLOCK : <br />40 PSF <br />15T FLOOR SUPERIMPOSED LOAD. <br />20 P5F <br />2. 1. 5. <br />UNIT WEIGHT OF 2x4 PARTITION WALLS : <br />II P5F <br />UNIT WEIGHT OF 2xb 5EARIN& HALLS: <br />12 PSF <br />BALCONIES s 51EGK5 : <br />15 P5F <br />2. 1. b, <br />TILE ROOF <br />TOP GOORD : <br />fe FSF <br />E30TTOM CHORD : <br />10 P5F <br />2, I. Li. <br />5HIN6LE ROOF <br />TOP CHORD ; <br />7 Psi" <br />BOTTOM CHORD : <br />10 P5F <br />2. 1. 10. <br />FLOOR TRUSSES <br />15 <br />2. 2. LIVE LOADS <br />2. 2. 1. <br />SIDEWALK AND DRIVEWAY LOAD : <br />200 P5F <br />2.2.2. <br />0ARA&E LOAD5 : <br />50 PSI= <br />2.2.5. <br />CORRIDORS AND BATHROOMS: <br />80 PSF <br />2.2.4. <br />PARTITIONED ROOMS : <br />40 PSF <br />2.2.5. <br />BALCONY AND DECKS : <br />40 P5F <br />2. 2. 6. <br />STAIRWAYS AND LANDIN65 : <br />40 Psi= <br />2. 2. 7. <br />ROOF: <br />20 P5F <br />2. 2. 8. <br />FLOOR TRU55 <br />TOP CHORD MINIMUM - <br />40 P5F <br />2. 2. a. <br />Poor TRUSS <br />TOP CHORD MINIMUM : <br />20 PSF <br />2. 3_ RAILING LOADS : <br />c• I• <br />ALL RAILING AND GUARD RAIL 5Y5TEM'5 ARE TO BE DESIONED TO WITHSTAND A <br />CONCENTRATED LOAD OF 200 POUNDS APPLIED AT ANY POINT AND IN ANY <br />DIRECTION ON THE RAiLING. <br />2.3.2. <br />ALL RAILING AND GUARD RAIL 5Y5TEM'S ARE TO 13F DESIGNED TO WIT+STAND A <br />HORIZONTAL LOAD OF 50 PLF ON THE GUARDRAIL AND A 5iMULTANE0U5 LOAD <br />OF 100 PLF APPLIED VERTICALLY DOWNWARD AT THE TOP OF THE GUARDRAIL <br />2.3.3. <br />GUARDRAIL 5Y5TEM SHALL BE DE5€ONED TO WITH5TAND 2001b CONGENTRATED <br />HORIZONTAL LOAD APPLIED ON 1 50, FT, AT ANY POINT IN THE SYSTEM. <br />2.3.4. <br />2.3.1., 2.3.2 $ 2.3.3. ARE NOT REQUIRED TO BE APPLIED SIMULTANEOUSLY, BUT EACH <br />SHALL BE APPLIED TO PRODUCE THE MAXIMUM 513z>E55E5 IN THE M- rMBER, COMPONENTS. <br />2. 4. WIND <br />LOADS : <br />2. 4. 1. <br />WIND PI~51GN To BE CONDUCTED IN ACCORDANCE WITH SECT. 160E OF THE <br />FBC, 2001 EDITION, AND CONDUCTED BASED ON A 120 MPH, 3 SECOND GUST, <br />FXPO5UIRE "B" IMPORTANCE FACTOR "I" = 1.0. ENCLOSED BUILDIN5. <br />2.4.2. <br />NET UPLIFT DEAD LOADS - 10 PSF SHINGLE, 15 PSF TILE <br />2.5. DEFLEGTION5 : <br />2. b. 1. FLOOR TRU55E5 5HALL LIMIT DEFLECTION TO 1/360 TIMES THE SPAN FOR LIVE; LOADS <br />AND 1/240 TIMES THE SPAN FOR TOTAL LOAD. <br />STRUCTURAL. NOTES <br />E3. DESIGN METHOD <br />5. I . LOOP EATOR DE51 G N <br />3. I, I. THE LOAD FACTOR DESIGN METHOD WAS USED TO DE%FC,N : <br />CAST -IN -PLACE GONGRETE SLABS AND FOOTIN65 <br />F 5ERVIGE LOAD DESIGN <br />3. 2. 1_ THE SBRV€CF- LOAD DE516N METHOD WAS U5ED TO PE516,N <br />MASONRY WALLS AND LINTFL5 <br />INTERIOR AND EXTERIOR WOOD FRAMING AND 5HE ATH1N6 <br />STAIR5 AND FLOOR FRAMING <br />ROOF FRAMING, 5HEATHIN& AND UPLIFT <br />LOAD COMBINATIONS FOR LFRD DE516NS <br />3. 3. 1. THE FOLLOWING LOAD COMBINATIONS WERE P 516NB? FOR <br />TOTAL. DL + FLOOR H + ROOF LL <br />TOTAL DL + FLOOR L_I._ + WL <br />TOTAL DL + WL <br />5.5.2. ALL ROOF AND FLOOR TRUSSES SHALL E3E DE5I67NED TO RESIST THE WORST LOAD <br />COMBINATION RE5ULTIN& IN TIME MAXIMUM 5TRE55E--3 PLACED ON THAT COMPONENT. <br />BOTH PARTIAL, FULL., AND ALTERNATING SPAN LOADING ARE TO BE CONSIDERED. <br />3 4. DE51 N A55UMPTION5 <br />3. 4. 1. ALL FOUNDATIONS ARE CENTERED UNDER 5iUPPORTED COLUMNS AND WALLS UNLESS <br />5140M OTHiwRW15E IN Tt-1E DE516N PLANS. <br />4. MATERIALS <br />4.1. RE I NEORG I NC 5TEEL : <br />4. 1. 1. <br />REINFoRoN6 STEEL. SHALL BE A51-M A615-14 6RADE 40, f'y = 40 K51 <br />4. 1. 2. <br />LAP 5PLICE: SHALL BE A5 FOLLOWS: #5 BAR 25", #4 BAR 20", #3 BAR 15", <br />4. I. 3. <br />ALL DII�IEN51ON5 PERTAININC7 TO THE LOCATION OF RFINFORGIN6 ARE TO THE <br />CENTERLINE OF EACH BAR EXCEPT H-ERE THE COVER DIMENSION 15 5HOWN TO THE <br />FACE OF THE CONCRETE. <br />4. 1. 4. <br />REINFORCiN& DETAIL DIMENSIONS ARE OUT TO OUT OF BARS. <br />REINFORCIN& MECHANICAL COUPLERS AREA TO DEVELOP 125 % OF THE REQUIRED <br />YIIrLD STREwN&TH OF THE BAR AND ARE TO BE: APPROVED BY THE ENGINEER OF <br />RECORD. <br />4. L 6. <br />DE:51ON COVER REQUIREMENTS: <br />6-1-P GONGRETE FORMED AC7AIN5T EARTH : 3, <br />6--1-P GONGRETE EXPOSED TO EXTERIOR : 2" <br />G--I-P CONCRETE NOT EXP05ED : 1 1/2" <br />6ROUT FILLED MASONRY : 3/4" <br />PRESTRESSED STRESSED CONCRETE LINTELS (ADD. REBAR €N) : 1 1/2' <br />PRE CAST GROUT FILLED LINTFL3 (ADD. RE BAR IN) : t 1/2" <br />4. 1. -1. <br />WELDED WiiRE= FABRIC (WWF): A5TM A05-q0o. <br />4.1. 8. <br />DETAIL FzEINFORGEMENT IN ACCORDANCE W€TH AGI 315-LATE5T EDITION. <br />4. 2. CONCRETE : <br />4. 2. I. <br />CONCRETE TYPE: <br />MIN. 2,5 DAY <br />DESION (f'c) <br />MODULES OF <br />ELASTICITY <br />DESION (E) <br />C-I-P GONGRE'TE (NORMAL WEIGHT) <br />2,500 P51 <br />2,b50 K51 <br />G-I-P &ROUT <br />2,500 P51 <br />2,b50 K51 <br />PRE CAST CONGRETE LINTFL5 <br />3,000 P51 <br />3,122 Ksl <br />PPzE 571RE 5ED GONGREM LINTEL5 <br />5,000 Prl <br />4,030 Ksi <br />4.2.2. CONCRETE SHALL CONSIST OF I" MAXIMUM AG6RE&ATE CONCRETE MIX WITH SLUMP <br />DETNEEN b" AND 7" AT TIME OF PLACEMENT. SEE 5PECIFIGATION5 FOR ADDITIONAL <br />CRITERIA. <br />4.2.5. GROUT SHALL 6ON515T OF PEA ROCK (3I8" MAXIMUM AOC7RE&ATE) CONCRETE MIX <br />WITH SLUMP BETHEEN 2D" AND 10" AT TIME OF PLAGEMENT. SEE SPECIFICATIONS FOR <br />ADDITIONAL CRiTER€A. <br />4.2.4. CONSTRUCTION JOINTS WILL BE PERMITTED <br />4. 2. 5. IvETHOD OF CONCRETE FORMING, PLACEMENT AND CURtN& SHALL BE CONDUCTED IN <br />ACCORDANGE WITH THE SPECIFICATIONS A5 5TATED. <br />4. 2. b. EARTH SUPPORTED SLABS (EXCLUDING EXTERIOR WALKWAY5 4 DRIVEWAYS) <br />3 €/2" MIN. THICKNE-55 W/ MIN. REINFORCEMENT OF 6.0 x 6.0 H/ 1.4 x 1.4 WWI= <br />MID-DEF-rk OF SLAB. FIBER ME51-1 MAY BE USED I.L.O. KKF g CONTRACTORS DISCRETION. <br />4.2.1. CONCRETE PLACEMENT PRACTICES 5HALL.5E IN ACCORDANCE W/ ALL <br />AGI-- MCP lagq STANDARDS. <br />4. 5. GONCRETE MASONRY . <br />FILLED GELL5 W/ (U #5 13AR SHALL BE; LOCATED @ V-0" O.G. MAX, @ BOTH SIPES <br />OF OPENING b'-O" WIDE OR MORE, 6 THE .Hi&H SIDE OF ALL MASONRY WALL <br />STEPS, t 6 ALL CHANGES IN DIRECTION OF THE MA50NRY WALLS. <br />4.5.2. LOAD BEARINe CONCRETE MASONRY BLOCK SHALL. BE: A5TM 640-qO, TYPE 11 <br />NON -MOISTURE CONTROLLED. <br />ALL GELL�a 4 GAVITIE5 BELOW GRADE WILL BE FILLED W/ CONCRETE IN ALL �. <br />5TEM WALLS. <br />4. 3. 4. THE AGGREGATE STRE=NOTH OF THE: BLOCK AND MORTAR SHALL BE F'm = 1,500 P51 <br />MINIMUM. <br />4.3.5. METHOD OF CONCRETE MASONRY PLACEMENT AND CONSTRUCTION 5HALL BE <br />CONDUCTED IN ACCORDANCE WITH THE^ SPECIFICATIONS AS STATED. <br />4.3.6. MORTAR 5HALL BE TY E "5" FOR ALL MASONRY CONSTRUCTION. <br />4. 3. 7. LINTEL5 5UPPLIED DY APPROVED MANUFACTURER= <br />1) FECP/C AS T-GRETE CORPORATION <br />2) P0I4ER CONCRETE <br />3) ALLIED PRECAST <br />4) LOTT <br />5) MARION MASONRY <br />6) WIEKWA <br />STRUGTURAL. NOTES <br />4. 4. STRUCTURAL LUMBER. <br />4.4. I.E. INTERIOR LOAM BEARING WALLS 5.P.F., fb = 45'15 P51, E = 1200 Ksi <br />ALL EXTERIOR FRAMING 5.P.F., fb = 675 P51, E = 1200 Ksi <br />4. 4. 1.2. ALL. FRAME- WALLS TO BE CoN5TRUCTED U51N6 S.P.F. , <br />STUD QUALITY OR BETTER <br />4.4.2. ALL PLYWOOD USED FOR EXTERIOR APPLICATIONS <br />SHALL BE APA RATED 5HEATHINO EXP I U.N.O. <br />4.4.3. ALL €='LY1,4000 USED FOR INTERIOR APPLICATIONS SUCH AS SUB FLOORING AND <br />SHEAR WALLS SHALL BE APA RATED 5HEATHIN& EXP I U.N.O. <br />4.4.4. 1F 055 HOARD 15 TO BE U5ED IN PLACE OF PLYWOOD 15 TO HAVE 51MILAR OR <br />GREATER 5E6TION PROPERTIES. <br />4. 4. 5. ONLY 5TRUCTURAL L.UMI3ER TO BE USED FOR AN EXTERIOR APPLICATION. WOOD IN <br />CONTACT WITH CONCRETE 15 TO RECEIVE A STANDARD GRADE PPE5s-URE TREATING. <br />4.4.6. K-EN PRE EN&INEERED TRU5SE5 ARE GALLED FOR ON THE PLANS T44E <br />MANUFACTURER IS TO SUBMIT SHOP DRAWINC-6 TO THE ENGINEER OF RECORD. <br />4. 4. 7. DE516N, FABRICATE AND ERECT WOOD TRUSSES IN ACCORDANCE WITH THE "DESIGN <br />SPECIFICATION FOR L16HT METAL PLATE CONNECTED WOOD TRUSSES" BY THE <br />ANSI/TPI I•-Igg5, HIB-Gl AND 05T-88. <br />4. 4, b. UNTREATED WOOD SHALL NOT BE IN DIRECT CONTACT WiTH CONCRETE. SEAT PLATES <br />SHALL BE PROVIDED AT SEARING LOCATIONS WITHOUT WOODEN TOE' PLATES. <br />4. 4. q, ALL EXTERIOR FRAME WALLS SHALL HAVE 7/&" 5TUGG0 FIN15H PER ASTM C. q26. <br />APPLY 3 LAYERS THICKNESS OF 7/8" OVER METAL LATH. FIRST 2 LAYERS 3/b" THICK. <br />EACH, AND 3RD LAYER 1/b" THICK. <br />4.5. FASTENERS AND TIE DONNS : <br />4. 5. 1. <br />FASTENERS AND TiE: DOWN5 5HAH CONSIST OF BUT ARE NOT LIMITED TO <br />SHAPES, ANOLE5, CHANNEI-5 : A5TM A36-36M q4 Fy = 36 Ksi <br />ROUND METAL PIPE : A5TM A53-C14, GRADE B Fy = 35 K5T <br />5QUARE METAL TUBING : A5TM A500•--q4, GRADE B F� = 461<51 <br />HIC-H 5TRENOTH BOLTS : A5TM A325-q4 <br />MACHINE E30LT5 : 6ALVANI7FD A5TM A307-q4 <br />4.5.2. <br />SHEET METAL ACCESSORIES SHALL CONFORM TO : 33K3iWITH &010 <br />&ALVANIZED COhTiN& IN ACCORDANCE: WITH A5TM A5 25-87. <br />4.5.3. <br />NAILS SHALL CONSIST OF : COMMON WIRE NAILS WITH MINIMUM DIAMETER A5 <br />FO€10W5 : Sd = 0.115", IOd = 0.126>", €2d = 0.12&", 16d = 0.135". <br />4.5.4. <br />ALL FASTENERS AND TIE DOWN5 EMBEDDED IN CONGfR.ETE OR USED IN AN EXTERIOR <br />APPLIGATION ARE TO RECEIVES AN ANTI-GORRO51VE GOATING t3Y MANUFACTURE'. <br />PRIOR TO INSTALLATION. <br />4. 5.5. <br />ALL FASTENERS AND TIE DOWN5 ARE TO PROVIDE THE UPLIFT CAPACITY GALLED <br />FOR IN THE PLANS ARE A MINIMUM. <br />4.5.6. <br />ALL FASTENER TIE DOWNS, BEAM HANC7ErR5, JOIST HANC-:>ERS, AND FLOOR TRU55 <br />STRAPPING ARE TO BE 1145TA:L.LED IN ACCORDANCE WITH THE PLANS AND <br />SPECIFICATIONS. <br />`T• 5. 7• <br />CONGRE l EMBEDDED 1.11 BOLTS USED FOR UPLIFT ARE TO BE NET SET PRIOR TO <br />INITIAL SET OF THE CONCRETE, SPACING AND ALiC7NMENT ARE TO BE IN ACCORDANCE <br />WITH THE DE510N PLANS, U.N.O. ALTERNATES TO "J" 5OLT5 ARE NOTED ON PI_AN5. <br />4. 5. b. <br />CONCRETE EMBEDDED TIE DOWN5 USED FOR TRU55 AND WALL UPLIFT ARE To BE <br />PLACED AROUND EMBEDDED REINFORGIN& PRIOR TO PLAGINO GROUT. <br />4. 6. MICRO <br />-LAM LUMBER: <br />4. b. 1. M€GRO-LAM STRESS GRADE 5 SHALL PROVIDE THE FOLLOWING MINIMUM PROPERTIES- <br />STRUGTURAL NOTES <br />4. 8. SOiL: <br />4. b. 1. MINIMUM SOiL BEARING PRESSURE CAPACITY OF 2000 P5F. <br />4. 8. 2. ALL SOIL 15 TO BE GLEAN I POISONED FOR .TE-fRMiTES PER i=BG 2001 5ECTiON5 <br />104.2.6, 104.23, 1403.i.b, 1503AA 1816, Ig167.5, 2303.1.4, $ 2304. <br />TERMITE PROTECTION - <br />PLANS MUST SPECIFY TYPE OE TERMITE TREATMENT <br />• 5o11 Chemical Barrier Method <br />• Other treatment - Must specify proposed method and submit documentation, which <br />substantiates the proposed method, is on approved termite protection system or method. <br />IF CHEMIGAL SOIL TERMITE TREATMENT 15 USED <br />I. FBG 104.2.E - "A permanent sign which identifies the termite treatment provider <br />and need for re -inspection and treatment contract renewal shall be provided. <br />The sign shall be posted near the water heater or electric panel" <br />2. FBC 1505-4.4 - Condensate and roof downspouts shall discharge at least <br />€`-O" away from the building side walls. <br />3. F5G 1505.4.4 - Irrigation/sprinkler systems including all risers and <br />spray heads shall not be installed within I'-0" of the building side wall. <br />4. F56 1403.1.6 -- To provide, for Inspection for termite infestation, between <br />wat€ covering and final earth grade shall not be less than 6 inches. <br />Exception: Paint or decorative cementitious finish leer, than 5/b" <br />thick adhered directly to the foundation wail. <br />5. f; 3G Ibl6.l.l M- Initial treatment shall be done after all excavation <br />and backfill 15 complete. <br />b. FUG Ibl6.i.2 - Solt disturbed after the Initial treatment shall be retreated <br />Including spaces boxed or formed. <br />"7. FBG 016.15 - Boxed areas In concrete floors for 5ub5egvent installation of traps, <br />etc., shall be made with permanent metal or plastic forms. Permanent forms must be <br />of a size and depth that w111 eliminate the dlsturbance of soil after the initial treatment. <br />8. F ,- 1516.1.4 - Minimum b mil vapor retarder must be- installed to protect against <br />rainfall dilution. If rainfall occurs before vapor retarder placement, <br />retreatment 1s rogwred. <br />q. FBG I816.1.5 - Concrete overpour and mortar along the foundation perimeter <br />must be, removed before exterior Soil treatment. <br />10. FBC IM65.1.6 - Soil treatment must be applied under all exterior concrete <br />or grade within 1'-0" of the structure 5idewa0s. <br />it. FBG 1816.1 b - An exterior vertical chemical barrier must be installed after <br />construction is complete, including landscaping and irrigation. Any soil disturbed <br />after the vertical barrier is applied, shall be retreated, <br />12. FBG 1816J.T - All buildings are required to have pre -construction treatment. <br />13. FBG Iblb.l.1 - A certificate of compliance must be issued to the building department <br />a licensed pest control company before a certificate of occupancy wlli be Issued. <br />e certificate of compliance shalt State: "The building has received a complete <br />treatment for the prevention of subterranean termites. The treatment 15 in <br />accordance with the rules and laws of the Florida Department of Agriculture <br />and Consumer Services". <br />14. FBG 2305.1.3 - After all work 15 completed, loose wood and fill must be removed <br />from below and within 1'-0" of the building. This includep ail grade Stakes, <br />tub trop boxes, forms, shoring or other cellulose containing material. <br />15. FBG 2505.1.4 - No wood, vegetation, stumps, cardboard, trash, etc., <br />Shall be, buried within 15'-0" of any WTIding or proposed building. <br />4. b. 3. 501L 15 TO BE GOMPAGTED TO q5% MODIFIED PROCTOR AS I3FFINFD E3Y <br />A5TM D 155'7-Q <br />E = 2,000,000 P51 <br />Fb = 2,c150 P51 <br />I=t = 1050 P51 <br />500 P51 (PERPENDICULAR) <br />ATTENTION: CHEMICAL CHANGES IN FRESSURZ TRE,�TED WOODS <br />Fc = 2,100 (PARALLEL) <br />Fv = 205 P51 <br />S OF DECEM5ER 31ST, 2003, CHROMATrED COi�'ER ARSFN,4TE (CCA -C) <br />,WILL <br />4. 7. STEEL: <br />NO LONGER 15E PRODUCED FOR RESIDENTIAL OR GENERAL <br />4.1, 1. INSTALLATION OF ALL STEEL. TO BE PERFORMED BY AN EXPER1ETiGi<D, QUALIFIET? <br />CONSUM'fEfR USE. SEVERAL NEW PRESSURE TREATED WOOD ALTERNATIVES <br />STEEL ERECTOR. <br />HAVE SEEN CREATED TO REPLACE CCA-C. MANY OF THE NEW P ESSURE <br />4.7.2. FABRICATE AND ERECT ALL 5TRUGTURAL STEEL IN ACCORDANCE_ WITH A.1.5.G. <br />T ATE WOODS USE CHEMiCALS TWAT ,ARE CORROSI Yam, TO ST ,{,,.. IT 1 <br />"SPECIFICATION FOR THE DE516N, FABRICATION, AND ERECTION OF 5TRUGTURAL <br />STEEL FOR E3€iILDIN05". <br />THE CONTRAOTOR'$ RESPONSBILITY TO VERIFY THE TYPE OFWoOD <br />4. -T. 3. <br />TREATMENT AND TO SELECT APPROPRIATE CONNECTORS THAT RESIST <br />STRUCTURAL STEEL: ASTM A36-3bM q4. <br />CORROSION. POP, EXAMPLE, ACc�-C, ACC2-D,l iBA"A, OR CA-e REQUIRE <br />4.7.4. STEEL TIli31NC: ASTM A50o-q4, cRA1 B_ <br />HOT-DiFIPED GALVANIZED OR STAINLESS STEEL FASTENERS. DOT SODIUM <br />4.7.5. WELDED CONNECTIONS. EiOXX ELECTRODES, MINIMUM 51ZE FILLET WELDS 3/Ib", AW5 <br />WEL.DER5. CERTIFICATION I APER5 TO BED SUBMITTED UPON REGUE=ST, <br />�O�tT� �rJ��� DOES NOT. <br />4. 7. 6. 14HE RE 5TIEL 13EAM5 ARE GONTINUOU5 OVER COLUMNS, PROVIDE WEB STIFFENER <br />PLATES ON EACH 51DE OF THE WEB, OF A THICKNE55 EaUA. TO BEAM FLANGE <br />THIGKNE S5, LOCATED AT THE CENTER LINE OF THE TUBE COLUMN. <br />THE STEEL FRAME: 15 "NON -SELF SUPPORTING". ADEQUATE TEMPORARY SUPPORT <br />SHALL BE PROVIDED BY THE CONTRACTOR UNTIL REQUIRED CONNECTIONS OR <br />ELEMENTS ARE IN PLACE. <br />1� REVISED 08-15-03 <br />DO CREATED 01-02-02 <br />120 MPH <br />3 SEC. GUST <br />s : » •, ;, r� s•» r . it ... � - � �� <br />3` s ,t is ZO001EDITIONX <br />DATE IT 16 810W AND» <br />DRAU04 ONLY. <br />