Laserfiche WebLink
E <br />Zz1 f D SAFETY C LAZ I NC IN HAZARDOUS LOCATION'S <br />(RE: FBC, 2405.2.1) <br />2405.1 General. Individual glazed areas including glass mirrors in hazardous locations <br />such as those indicated in 24052 shall pass. the test. requirements of GPaG Ib--GFR, <br />Port 1201 or by comparative test shall be proven to produce or ieast equivalent performances. <br />Exceptions: <br />I. Polished wire glass installed in fire doors, fire windows and view panels in fire resistant <br />walls and hazardous locations in 2405.2.1(3) and 2405.2.1(4) shalt comply with AN51 Z47.1. <br />2. Approved plastic materials used as g€azing in hazardous locations ehall comply with AN51 ZcN.l. <br />:2405.2 Hazardous Locations <br />i2-405.2.1 The following shall be considered specific hazardous locations for the purpose <br />of glazing: <br />1. 61azin in swinging doors and fixed and gilding panels of sliding <br />(patio) door assemblies. <br />2. 6lazin In doors and walls of enclosures for hot tubs, whirlpool5, <br />sauna &team rooms, bathtubs, showers other svch foNrIties <br />where such gqlazingq is located 3b in hes 14 mm) or Tess, <br />measured horizonCally, from a standing or walking Surface within <br />the encio5ure and where the bottom edgcte of the exposed glazing Is <br />less than 60 inches (1524 mm), meo5ured-verticalky, above such <br />standing or walking surface. <br />3. 61azing to an individual fixed or operable panel adjacent to a door <br />where the nearest vertical ed 15 within a 24-ln6h (610 mm% <br />radius of the door in a closed position and whose bottom eaqe 15 <br />less than 60 inches (1524 mm) above the floor or walking sur%ce. <br />Exception: <br />I. &lazing in wails perpendicular to the plane of the door in a closed position In Croup R3 <br />or within dwelling units in Group R2 shall be subject to 2405.2.1(4). <br />4 6lazinq in on individual fixed or operable anel, other than those <br />[ocatlo"ns described In Items 2 and 3 aboV6, that meets oli of the <br />fallowing conditions: <br />4.1 Exposed ar f of on Individual pane greater than G sq. ft. <br />(0.84.m ) <br />4.2 Bottom edge less than lS Inches (457 mm) above the floor. <br />443 Top edge greater than 36 inches (414 mm) above the floor. <br />4.4 One or more walking surfaces within 36 inches (914 mm) <br />horizontally of the plane of the glazing. <br />5. All glazing in rolitn95 regardkess of area or height above a walking <br />surfaces including Structural baluster panels and non structural In- <br />fili5 panels. <br />6. 61azing in walls and fences enclosing indoor and outdoor swimming pools and <br />spas where the bottom exposed edge of the glazing Is: (1) 1e55 than r00 Inches <br />(1525 mm) above the walking surface on the pool side of the gglazing, and (2) <br />the glazing is within 60 inches (1525 mm) horizontally of the woter's edge of o <br />swimming pool or spa. This 5hail apply to single glazing and all panes in <br />multiple glazing. <br />COMPONENT >$ GL,ADDINO DE51 N PRE55URE <br />(120 MPH, 3 5EC. &U5T, 2.1/12 TO 6.11/12 WITCH, EXPO54)RE B, IMPORTANCE FACTOR=1) <br />TRIBUrAI2Y AREA <br />ROOF <br />WALL <br />CI"TZ) <br />'F14A <br />10 <br />-50.1 <br />25A -34: i <br />20 <br />13.6 -45A <br />24.1 -32.4 <br />50 <br />I J A <br />23.2 -2<1.3 <br />100 <br />10.5 -34.7 <br />22.0 -265A <br />125 <br />105 -343 <br />213 -262 <br />NOTT5: I FOR. EFFEr_TNIE AREAS OR WIND 5PEEo5 BETWEEN TH05E GIVEN ABOVE, THE <br />LOAD MAY BE INTERPOLATED, OTI-iERN15E U5E THE LOAF A550C1ATE2 NrrH <br />THE LONER EFFECTIVE AREA. <br />2 TABLE VALUES SHALL BE AD,iU5TE2 FOR HEIGHT AND EXPo5i1RE BY <br />MULTIpLYINCy BY ADJUSTMENT GOEFFIGIENT5 IN TABLE 160b.2D OF THE i=LORVA <br />BUILDING GORE 2001. <br />3 PLU5 AND MINUS 510N5 51GN1FY PRr-55URE5 ACTING TokARD AND AWAY FROM <br />THE BUILDING 5URf=AGE5_ <br />. PRECAST 1_._ I NTEL. <br />SAFE GRAVITY LOAD TABLE <br />LEN67TH <br />SAFE LOAD -- POUNDS PER LINEAR FOOT <br />UNFILLED <br />FILLED <br />2'-10" (34") PRECAST <br />2302 <br />6,861 <br />3'-6" (42") PRECAST <br />2302 <br />6,039 <br />4'70" (48") PRECAST <br />2,029 <br />4,657 <br />4--6" (54") PRECAST <br />1,624 <br />31662 <br />V-4" (64") PRECAST <br />1,184 <br />3,241 <br />5-10"(64") PRECAST <br />972 <br />2,718 <br />6'-6" (78") PRECAST <br />937 <br />2,332 <br />7'--6" (90") PRECAST <br />767 <br />2,040 <br />9'-4" (112") PRECAST <br />573 <br />1,529 <br />10'-6" 126") PRECAST <br />456 <br />1,392 <br />11'-4" (136") PRECAST <br />445 <br />1,234 <br />12'-0" (144") PRECAST <br />414 <br />1,140 <br />13'-4" (160") PRECAST <br />362 <br />1,073 <br />14'-0" (168") PRECAST <br />338 <br />1,003 <br />14'-8" (176") PRE STRESSED <br />N.R. <br />1,370 <br />15'-4" 184" PRE STRESSED <br />N.R. <br />1,203 <br />17'-4" (206") PRE STRESSED <br />N.R. <br />950 <br />19'-4" (232") PRE STRESSED <br />N.R. <br />750 <br />21'-4" 252" PRE STRESSED <br />N.R. <br />610 <br />22'w-0" (264") PRE STRESSED <br />N.R. <br />570 <br />24'-O" (288") PRE STRESSED <br />N.R. <br />470 <br />- SAFE LOAD VALUES ARE BASED ON MANUFACTURER'S CALCULATIONS. <br />- PRECAST LINTELS MAY BE SUPPLIED ONLY BY APPROVED <br />PRECAST MANUFACTURERS. (SEE SECT 4.3) <br />- FILLED LOAD VALUES ASSUME A MINIMUM 8" CONCRETE FILLED KNOCK -OUT BLOCK ABOVE <br />THE PRECAST LINTEL AND ONE #5 BAR IN THE LINTEL. <br />GLASS BLOCK INSTALLATION PERFORMED IN ACCORDANCE WITH FBC <br />A) COVER SILL AREA WITH A HEAVY COAT OF ASPHALT EMULSION. ALLOW EMULSION TO DRY <br />AT LEAST 2 HOURS BEFORE PLACING MORTAR. <br />B) ADHERE EXPANSION STRIPS TO JAMBS AND HEAD. MAKE CERTAIN EXPANSION STRIP <br />EXTENDS TO SILL. <br />C) SET A FULL MORTAR BED JOINT, APPLIED TO SILL. <br />D) SET LOWER COURSE OF BLOCK. MAINTAIN A UNIFORM JOINT WIDTH OF 3/8" PLUS OR MINUS <br />1/8". ALL MORTAR JOINTS MUST BE FULL AND NOT FURROWED. ALL MORTAR SHALL BE <br />TYPE "S" OR "N". STEEL TOOLS MUST NOT BE USED TO TAP BLOCKS INTO POSITION. (PLACE <br />A RUBBER CRUTCH TIP ON END OF TROWEL TO TAP BLOCK INTO POSITION.) DO NOT <br />REALIGN, TAP, OR OTHERWISE MOVE BLOCK AFTER INITIAL PLACEMENT. FOR SOLID GLASS <br />BLOCK IT MAY BE NECESSARY TO USE WEDGES IN THE MORTAR JOINTS OF THE LOWER <br />COURSES TO PREVENT THE MORTAR FROM BEING "SQUEEZED" OUT. <br />E) INSTALL PANEL REINFORCING IN EVERY OTHER MORTAR BED HORIZONTALLY AND IN JOINTS <br />IMMEDIATELY ABOVE AND BELOW ALL OPENINGS WITHIN PANELS. (THE SAME SPACING <br />SHALL APPLY TO PANEL ANCHORS WHEN USED AT JAMBS AND HEADS IN LIEU OF CHANNEL <br />OR CHASE SURROUNDS.) RUN REINFORCING CONTINUOUSLY FROM END TO END OF PANELS. <br />LAP REINFORCING NOT LESS THAN 6 INCHES WHENEVER IT IS NECESSARY TO USE MORE <br />THAN ONE LENGTH. DO NOT BRIDGE EXPANSION JOINTS WITH REINFORCING. INSTALL <br />REINFORCING AS FOLLOWS' <br />* PLACE LOWER HALF OF MORTAR IN BED JOINT. DO NOT FURROW. <br />PRESS PANEL REINFORCING INTO PLACE. <br />* COVER PANEL REINFORCING WITH UPPER HALF OF MORTAR BED AND TROWEL <br />SMOOTH. DO NO FURROW. <br />F) PLACE FULL MORTAR BED FOR JOINTS NOT REQUIRING PANEL REINFORCING - DO NOT <br />FURROW, MAINTAIN UNIFORM JOINT WIDTH. <br />G) SET SUCCEEDING COURSE OF BLOCKS. SPACE AT HEAD OF PANEL AND JAMBS MUST <br />REMAIN FREE OF MORTAR. <br />H) STRIKE JOINTS SMOOTH WHILE MORTAR IS STILL PLASTIC AND BEFORE FINAL SET. AT THiS <br />TIME RAKE OUT ALL SPACES REQUIRING SEALANT TO A DEPTH EQUAL TO THE WIDTH OF THE <br />SPACES. REMOVE SURPLUS MORTAR FROM FACES OF GLASS BLOCKS AND WIPE DRY. <br />TOOL JOINTS SMOOTH AND CONCAVE, BEFORE MORTAR TAKES FINAL SET. (REMOVE <br />WEDGES FROM LOWER COURSES OF SOLID BLOCKS AND POINT THE VOiDS WITH MORTAR.) <br />E <br />1) AFTER FINAL MORTAR SET (APPROX. 24 HOURS), INSTALL PACKING TIGHTLY BETWEEN <br />GLASS BLOCK PANEL AND JAMB AND HEAD CONSTRUCTION. LEAVE SPACE FOR SEALING. <br />J) APPLY SEALANT EVENLY TO TIME FULL DEPTH OF RECESSES IN ACCORDANCE WITH THE <br />MANUFACTURER'S APPLICATION MANUAL AND INSTRUCTIONS. <br />K) A MAXIMUM OF 60 SQUARE FEET OF GLASS BLOCK MAY BE INSTALLED IN ANY OPENING. <br />FOR WIND SPEEDS UP TO 110 MPH*, PER PITTSBURG CORNING RECOMMENDATIONS FOR <br />INSTALLATION OF GLASS BLOCK. <br />NA MIRPANEL <br />9 gga. PANEL <br />REINF13RCING <br />(EVERY OTHER <br />COURSE) <br />1/4' , EXPANSION <br />BOLT(2 PER <br />ANCHOR) <br />�. 6' MIN. <br />LAP SPLICE <br />W/ REINFORCING <br />6' MIN PANEL <br />000000 LAP SPLICE <br />SEALANT NOTEi <br />SEE GLASS BLOCK <br />INSTALLATION NOTES, <br />GLA65 SLCCK DETAIL <br />* (110mph FASTEST WIND= 13OMPH, 3 SEC. GUST. FBC TABLE 1606.1.6.1) <br />RCCE DIAPHRAGM NAILING SCHEDULE <br />RITIGF I INF <br />+ + <br />-1 <br />+ + + + + + + + +� <br />+ + + + + + + + O <br />+ + + + + + + + + + + + + + <br />+ + + + + + + + + + + + + + <br />+ <br />+ + <br />+ + <br />+ <br />+ + + + + + + + +«I <br />+ + + + + + + + <br />+ + + + + + + + + + + + + + <br />+ + + + + + + + + + + + + + <br />+ <br />+ + <br />+ <br />+ <br />+ + <br />+ + <br />+ + <br />i <br />+ + <br />+ <br />+ + <br />+ <br />+ <br />+ <br />+ <br />+ + <br />+ <br />+ + <br />+ + <br />+ + <br />+ <br />+ <br />+ + <br />+ + + + <br />+ + 7+,+++++++++ + + <br />+ C+ <br />+ <br />+ <br />+ + + + + + <br />+ + + + + + ++ + + <br />++ <br />++ ++ <br />+ + <br />+ <br />+ <br />+ ++ <br />+ +I <br />+ <br />+ + <br />+ + + + <br />+ <br />+ + <br />+ <br />120 MPH 3 SECON <br />`-ItIUUL UNL <br />EXPOSURE "B" WIND ZONE 1120 MPH 3 SECOND GUST EXPOSURE V WIND ZONE <br />8d COMMON NAILS @ 6" O.C. & <br />+ + 4» O.C. @ GABLE END WALL OR GABLE TRUSS <br />+ .131OX2 1/2" LONG GUNNAIL @ 4" O.C. <br />.120OX3" LONG GUNNAIL @ 4" O.C. <br />.11302" LONG GUNNAIL @ 3" O.C. <br />.099OX2 1/4" LONG GUNNAIL 0 3" O.C. <br />8d COMMON NAILS 0 6" O.C. EDGES & <br />8d COMMON NAILS 0 12" O.C. INTERMEDIATE <br />.131OX2 1/2" LONG GUNNAIL ® 4" O.C. <br />EDGES & 8" O.C. INTERMEDIATE <br />.120OX3" LONG GUNNAIL @ e O.C. <br />EDGES & 8" O.C. INTERMEDIATE <br />A1302" LONG GUNNAIL 0 3" O.C. EDGES <br />(STAGGERED) & 8" O.C. INTERMEDIATE <br />NOTE: 1) SEE STRUCTURAL NOTES FOR SHEATHING SPECIFICATIONS AND WIND SPEED. .09902 1/4" LONG GUNNAIL @ 3" O.C. <br />21 END JOINTS tw THE ROOF SHEATHING SHALL EDGES & 6" O.C. INTERMEDIATE <br />BE STAGGERED AND OCCUR OVER FRAMING MEMBER. <br />3) SCHEDULE ASSUMES SHEATHING IS FASTENED DIRECTLY TO SOUTHERN YELLOW PINE OR DOUGLAS <br />FIR OR BETTER. IF ROOF FRAMING CONSISTS OF A LESSER GRADE OF LUMBER, CONTRACTOR MUST <br />CONTACT DANSCO ENGINEERING, P.A. FOR ALTERNATE FOR NAILING PATTERN. <br />❑ IRWIN J. 5EN60N, FE, #4 -156 <br />ALI A55A5 HAKI 'I, FE, (la(, <br />TO T4-E 5E5T OF Toe ENC-.iNE5R'5 KNO LEDGE AND 5ELiFF, T E <br />STRUCTUR41L PLANS AND 9PECfl=ICATIGN6 COMPLY WIT4 TWE <br />FLMDA 15UILDIWS WD)E., SECTION 1606 FoR I20 MPW 3 5ECON2 <br />CiIJST, EXPOSUkE 154 WIND ZONE (2001 EDITION). <br />THIS DRAUUINra AND DE516;N IS VALID FOR 12 MONTHS AFTER TPE <br />DATE IT 16 SI6"ED AND SEALED. <br />SICKED AND SEALED FOR TqE STRUCTURAL POIRTION OF TWIS <br />DRAWWz ONLY. <br />SEAL LENNAR HOB <br />NOTE T IS THE BEGINS. DANSCOACTORS ENGINEER NG P.A.BISITY TO REVIEW ALL RESPONSIBLE FOR THEWINGS STRUCTURA BEFORE <br />INTEGRIT(CONSTRUCTION <br />THIS DATE 1/2/02 TAMPA I r 1 N: /BLOCKS/STv �G01 <br />PROJECT ONLY. ANY DISCREPANCY BETWEEN FIELD CONDITIONS, OTHER DESIGN PROFESSIONALS' <br />SHOP DRAWINGS, CONTRACTORS' BUILDING METHODS, AND THESE SIGNED AND SEALED DRAWINGS MUST BE BROUGHT TO THE ATTENTION OF DANSCO ENGINEERING P.A. PRIOR TO ��* <br />+UL <br />THE COMMENCEMENT OF CONSTRUCTION. <br />DE JOB IBC,. FIM - 5021 1 <br />