T� II. 1
<br />r1'! 1HIF`F �i
<br />{ Z" MIN. BAND OF SAME SIZE
<br />SCREWS AS HANGER STRAP
<br />NOTE:
<br />HANGER STRAP SIZE PER SMACNA.
<br />STRAP
<br />2 Rectangular/Round Duct Hanger Detail
<br />Scale: None
<br />MOUNT CAP LEVEL
<br />ANCHOR W/ CADMII
<br />PLATED SCREWS 1',
<br />O.C.
<br />FLASHING BY ROOF
<br />BIRD SCREEN
<br />CAULKING BEAD OR GASKET FULL
<br />PERIMETER OF CURB BY HVAC.
<br />TREATED WOOD NAILER
<br />13-1/2" PREFABRICATED
<br />CURB FURNISHED BY HVAC
<br />INSTALLED BY GENERAL
<br />CONTRACTOR
<br />ROOF
<br />SUPPORT ANGLES AS
<br />REQUIRED BY GENERAL
<br />CONTRACTOR
<br />112'EXTERNAL
<br />INSULATION
<br />2"
<br />SEAL WATERTIGHT
<br />3 Gravity Roof Vent Detail
<br />Scale: None
<br />710 4'-V MAXIMUM
<br />---- METAL STRAP
<br />M UM SAG 12" PER FOOT -� 1-1/2" MINIMU -
<br />OF SU T SPACING.
<br />FL
<br />DUCT
<br />11
<br />NOTES:
<br />1. DUCT SHOULD EXTE TRAIGHT
<br />SEVERAL INCHES OM A CONNECTI
<br />BEFORE BEN
<br />2. SU SYSTEM MUST NOT DAMAGE DUCT
<br />0 USE OUT OF ROUND SHAPE.
<br />Flex Duct Support Detail
<br />ale: None
<br />NOT USED
<br />SUPPLY DUCT F SPIN -IN FITTING INSULATED D
<br />WITH DAMPER FLEXIBL CT
<br />/ (MAX. LONG)
<br />S TO MATCH
<br />/ IFFUSER NECK.
<br />ROUND METAL DUCT INSULATION
<br />(EXTERNAL INSULATION)
<br />OL
<br />CEILING J CEILING DIFFUSER
<br />iling Diffuser Runout Detail
<br />Scale: None
<br />NOT USED
<br />r1owlif
<br />\�
<br />HVAC SYMBOLS
<br />SYMBOL
<br />DESCRIPTION
<br />NEW DUCT WORK
<br />FLEXIBLE DUCT
<br />B
<br />SUPPLY AIR DUCT WORK UP
<br />THRU PLAN
<br />NO
<br />RETURN AIR OR EXHAUST
<br />DUCT WORK UP THRU PLAN
<br />DUCT WORK TRANSITION
<br />900 ELBOW WITH TURNING
<br />VANES
<br />MANUAL AIR VOLUME
<br />CONTROL DAMPER
<br />® OR ®
<br />SUPPLY AIR DEVICE
<br />zRETURN
<br />AIR DEVICE
<br />®
<br />EXHAUST AIR DEVICE
<br />O
<br />WALL MOUNTED
<br />THERMOSTAT
<br />SD
<br />DUCT SMOKE DETECTOR
<br />DIFFUSER DEVICE TYPE - AIR
<br />QUANTITY
<br />RTU -10
<br />EQUIPMENT DESIGNATION
<br />TAG
<br />----- R------s
<br />REFRIGERATION PIPING
<br />CONDENSATE PIPING
<br />EXISTING 4
<br />TON RTU TO
<br />REMAIN.
<br />r SD 02
<br />I
<br />I I
<br />L OJ
<br />COMPLETE HVAC DISTRIBUTION
<br />INCLUDING DUCTING, SUPPLY
<br />DIFFUSERS, AND RETURN GRILLES
<br />SHALL BE PROVIDED AS PART OF
<br />THE FUTURE TENANT BUILD OUT
<br />Mechanical Floor Plan
<br />Z Scale: //8"=1'-0"
<br />EXISTING 4
<br />TON RTU TO
<br />REMAIN.
<br />r SD 0
<br />1
<br />I I
<br />LA
<br />0(mb
<br />MECHANICAL GENERAL NOTES
<br />1. CONTRACTOR TO VISIT SITE AND VERIFY ALL CLEARANCES BEFORE FABRICATION OF DUCTWORK AND 16. VERIFY VOLTAGE WITH ELECTRICAL CONTRACTOR BEFORE ORDERING EQUIPMENT.
<br />PROVIDE ADDITIONAL OFFSET AND/OR CHANGES IN DUCT SIZES TO MEET FIELD CONDITIONS AND COORDINATE
<br />WITH ELECTRICAL, PLUMBING AND FIRE PROTECTION SUBCONTRACTOR BEFORE ANY CONSTRUCTION WORK. 17. VERIFY EXISTING TRAP IN ALL CONDENSATE PIPING LOCATED AT AIR HANDLING UNITS. SLOPE
<br />CONDENSATE LINES 1/8" PER FOOT. CONDENSATE LINES SHALL BE PVC SCH. 40. ALL CONDENSATE DRAIN
<br />2. SUPPLY, RETURN AND OUTSIDE AIR DUCTWORK SHALL BE EXTERNALLY INSULATED SHEET METAL PIPING SHALL BE PROPERLY SUPPORTED.
<br />CONSTRUCTION IN ACCORDANCE WITH LATEST SMACNA STANDARDS. INSULATION SHALL HAVE VAPOR
<br />BARRIER AND AN INSTALLED MINIMUM THERMAL RESISTANCE (R) VALUE OF 6.0. ALL EXHAUST DUCTWORK 18. ALL MECHANICAL WORK SHALL MEET ALL THE REQUIREMENTS OF THE 2007 FLORIDA BUILDING CODE,
<br />SHALL BE UNINSULATED SHEET METAL CONSTRUCTION IN ACCORDANCE WITH LATEST SMACNA STANDARDS. MECHANICAL AND 2009 SUPPLEMENT.
<br />ALL JOINTS SHALL BE SECURELY TAPED WITH 3" WIDE GLASS FABRIC TAPE WITH FOSTER 30/35 MASTIC OR
<br />EQUAL. 19. GUARANTEE; FOR ONE YEAR AFTER DATE OF ACCEPTANCE BY THE OWNER, ALL EQUIPMENT,
<br />MATERIALS AND WORKMANSHIP TO BE FREE FROM DEFECT.
<br />3. DUCT SHALL BE SECURELY SUPPORTED, HUNG OR SUSPENDED IN ACCORDANCE WITH THE LATEST SMACNA
<br />EDITION AND SECTION 603 OF THE 2007 FLORIDA BUILDING CODE, MECHANICAL WITH 2O09 SUPPLEMENT.
<br />4. ROOFTOP UNIT OUTSIDE AIR INTAKE SHALL MAINTAIN A MINIMUM OF 10'-0" FROM ANY EXHAUST OR
<br />SANITARY VENT THROUGH ROOF PIPING. ALL TRANSFER DUCTWORK LEADING TO REST ROOMS SHALL HAVE A
<br />ZERO LEAKAGE BACK DRAFT DAMPER AS SHOWN ON MECHANICAL DRAWINGS.
<br />5. PROVIDE ALL MECHANICAL EQUIPMENT WITH MANUFACTURER'S RECOMMENDED SERVICE AREA
<br />CLEARANCES.
<br />6. ALL ROOF TOP UNITS SHALL BE REINFORCED TO WITHSTAND LOCAL WIND LOAD DESIGN. SEE STRUCTURAL
<br />DRAWING(S) FOR DETAIL(S) /CONSULT WITH BUILDING STRUCTURAL ENGINEER.
<br />7. DUCT SMOKE DETECTORS SHALL BE FURNISHED BY THE FIRE ALARM CONTRACTOR, INSTALLED IN DUCT BY
<br />THE MECHANICAL CONTRACTOR AND WIRED BY THE FIRE ALARM CONTRACTOR. SMOKE DETECTORS SHALL BE
<br />INSTALLED IN ACCORDANCE WITH NFPA 72, NATIONAL FIRE ALARM CODE; NFPA 90A, STANDARD FOR
<br />INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS, 2007 FLORIDA BUILDING CODE, MECHANICAL
<br />WITH 2O09 SUPPLEMENT AND THE MANUFACTURER'S INSTALLATION IN STRUCTIONS. COORDINATE LOCATION
<br />OF SMOKE DETECTORS WITH FIRE ALARM CONTRACTOR. PROVIDE A VISIBLE/AUDIBLE NOTIFICATION PANEL.
<br />MAKE: SYSTEM SENSOR SSK451 OR EQUAL, COMPATIBLE WITH BUILDING FIRE ALARM SYSTEM.
<br />8. IN GENERAL, PLANS AND DIAGRAMS ARE SCHEMATIC ONLY AND SHOULD NOT BE SCALED.
<br />9. HVAC CONTRACTOR IS RESPONSIBLE FOR ANY ADDED ELECTRICAL COSTS WHICH MAY RESULT FROM
<br />SUBSTITUTED EQUIPMENT.
<br />10. DUCTWORK INSULATION SHALL BE FOIL FACED FIBERGLASS DUCT WRAP WITH A MINIMUM THERMAL
<br />RESISTANCE (R) OF 6.0. INSULATION SHALL HAVE VAPOR BARRIER. INSTALL F ER MFR. REQUIREMENTS.
<br />11. COORDINATE AIR DEVICE LOCATIONS WITH LIGHTING FIXTURES.
<br />12. TURNING VANES SHALL BE PROVIDED IN ALL SUPPLY DUCT RECTANGULAR ELBOWS WITH ANGLES
<br />BETWEEN 15 DEGREES AND LESS THAN 90 DEGREES PER FIG. 2-5 OF THE SMACNA MANUAL.
<br />13. DUCT DIMENSIONS SHOWN ON DRAWINGS ARE CLEAR INSIDE DIMENSIONS. DUCTWORK, DIFFUSERS,
<br />REGISTERS, GRILLES, AND OTHER ITEMS OF THE AIR HANDLING SYSTEM SHALL NOT BE SUPPORTED BY THE
<br />CEILING OR CEILING SUSPENSION SYSTEM.
<br />14. UNLESS OTHERWISE NOTED, INSTALL DUCTWORK AS HIGH AS POSSIBLE, TIGHT TO BOTTOM OF
<br />STRUCTURE. COORDINATE DUCT ELEVATION WITH STORM LEADERS, WATER PIPING, SANITARY DRAINS AND
<br />MAJOR ELECTRICAL CONDUITS.
<br />15. CONTRACTOR TO PROVIDE ALL SUPPLEMENTARY STEEL REQUIRED TO SUSPEND MECHANICAL EQUIPMENT
<br />& MATERIALS. INSTALLATION OF EQUIPMENT SHALL COMPLY WITH MANUFACTURER'S SPECIFICATIONS AND
<br />CLEARANCE REQUIREMENTS FOR SERVICING OF EQUIPMENT.
<br />20. DO NOT CUT STRUCTURAL MEMBERS WITHOUT PRIOR WRITTEN APPROVAL OF THE STRUCTURAL
<br />ENGINEER OR ARCHITECT. ARRANGE FOR REPAIRS REQUIRED TO RESTORE OTHER WORK, BECAUSE OF
<br />DAMAGE CAUSED AS A RESULT OF MECHANICAL INSTALLATIONS.
<br />21. FLEXIBLE AND RIGID ROUND DUCT TAKE -OFFS FOR DIFFUSERS SHALL BE THE SAME SIZE AS DIFFUSER
<br />NECK. MAXIMUM FLEXIBLE DUCT LENGTH SHALL BE 8'-0". FLEXIBLE DUCT SHALL BE THERMAFLEX TYPE M-KC
<br />OR EQUAL.FLEXABLE DUCT SHALL BE INSULATED FIBERGLASS, R-6, CLASS 1, UL181 LISTED AND COMPLY
<br />WITH NFPA 90A AND NFPA 90B.
<br />22. ALL WALL MOUNTED THERMOSTATS SHALL BE INSTALLED AT AN ELEVATION OF 54" ABOVE FINISHED
<br />FLOOR TO THE TOP UNLESS OTHERWISE NOTED ON DRAWINGS. LOCATION OF THE WALL MOUNTED
<br />THERMOSTAT SHALL BE COORDINATED WITH OTHER TRADES FOR A NEAT APPEARANCE. FINAL LOCATION
<br />OF THERMOSTAT SHALL BE SUBJECT TO THE APPROVAL OF THE ENGINEER OR HIS REPRESENTATIVE IN THE
<br />FIELD.
<br />23. ALL UNITS SHALL BE BALANCED TO WITHIN 10 PERCENT OF THE DESIGN AIR QUANTITY. BALANCE
<br />DIFFUSERS AND REGISTERS TO WITHIN 10 PERCENT OF QUANTITIES SHOWN ON DRAWINGS.
<br />24. PROVIDE FLEXIBLE NEOPRENE DUCT CONNECTORS ON THE DISCHARGE AND ENTERING SIDES OF ALL
<br />VIBRATING EQUIPMENT TO WHICH DUCTWORK IS ATTACHED.
<br />25. CONTRACTOR SHALL PROVIDE 3 COPIES OF A TEST AND BALANCE REPORT. AIR BALANCING SHALL BE
<br />PERFORMED BY AN INDEPENDENT TESTING AND BALANCING CONTRACTOR WHICH SHALL BE QUALIFIED AND
<br />CERTIFIED BY EITHER ASSOCIATED AIR BALANCE COUNCIL (AABC) OR NATIONAL ENVIRONMENTAL
<br />BALANCING BUREAU (NEBB). THIS REPORT MUST BE REVIEWED AND APPROVED BY THE ENGINEER PRIOR
<br />TO THE FINAL INSPECTION.
<br />26. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL TRADES' INSTALLATION SCHEDULES.
<br />COORDINATE WORK SCHEDULE WITH GENERAL CONTRACTOR.
<br />27. WHEN THE INTENT OF THE DRAWINGS AND SPECIFICATIONS IS NOT CLEAR, OR IS CAPABLE OF MORE
<br />THAN ONE INTERPRETATION, SUCH MATTERS WILL BE BROUGHT TO THE ATTENTION OF THE
<br />ARCHITECT/ENGINEER IN WRITING BEFORE THE SUBMISSION OF BIDS. THE ARCHITECT/ENGINEER SHALL
<br />MAKE CORRECTION OR EXPLANATION IN WRITING.
<br />28. PLANS AND SPECIFICATIONS ARE INTENDED AS A GENERAL DESCRIPTION OF THE WORK TO BE
<br />PERFORMED. ALL ITEMS NOT SPECIFICALLY MENTIONED OR SHOWN, BUT NECESSARY FOR THE
<br />COMPLETION OF THE INSTALLATION, SHALL BE FURNISHED AND INSTALLED BY THIS CONTRACTOR. THIS
<br />CONTRACTOR SHALL THOROUGHLY ACQUAINT HIMSELF WITH THE MECHANICAL, ARCHITECTURAL,
<br />STRUCTURAL AND ELECTRICAL PLANS BEFORE SUBMITTING HIS FINAL BID. NO ADDITIONAL COMPENSATION
<br />WILL BE ALLOWED DUE TO THE CONTRACTOR'S FAILURE TO FAMILIARIZE HIMSELF/ HERSELF WITH THE
<br />PLANS.
<br />FAN SCHEDULE
<br />EXT. STATIC
<br />MARK
<br />SERVICE
<br />CFM
<br />PRESSURE (IN.
<br />FAN TYPE
<br />DRIVE
<br />SONES
<br />WATTS
<br />RPM
<br />V/0
<br />MANUFACTURER
<br />MODEL
<br />NOTES
<br />WATER)
<br />EF-1
<br />EXHAUST
<br />100
<br />0.375
<br />CEILING
<br />DIRECT
<br />3.2
<br />98
<br />1100
<br />120/1
<br />COOK
<br />GC-144
<br />1,2
<br />NOTES
<br />1. WITH PLUG-IN DISCONNECT.
<br />2. PROVIDE CONTROL BY MANUAL LIGHT WITH OCCUPANCY SENSOR. COORDINATE WITH ELECTRICAL DRAWINGS FOR LOCATION OF SWITCH.
<br />MECHANICAL KEY
<br />PLAN NOTES:
<br />1Q UNDERCUT DOOR 1" TO ALLOW FOR TRANSFER OF AIR TO
<br />BATHROOM.
<br />O2 VERIFY THAT THERE IS AN EXISTING SMOKE DUCT
<br />DETECTOR IN THE SUPPLY DUCT. IF THE SMOKE
<br />DETECTOR IS NOT INSTALLED, REFER TO MECHANICAL
<br />GENERAL NOTE # 7. THE GC SHALL BE RESPONSIBLE FOR
<br />COORDINATING THE EXACT SCOPE OF WORK REQUIRED
<br />BETWEEN THE MECHANICAL SUB AND THE ELECTRICAL
<br />SUB PRIOR TO BIDDING. NO CHANGE ORDERS WILL BE
<br />APPROVED FOR FAILURE TO VERIFY EXISTING
<br />CONDITIONS OR COORDINATE BETWEEN SUBS.
<br />03 CEILING MOUNTED BATHROOM EXHAUST FAN.
<br />COORDINATE EXACT LOCATION OF PENETRATION WITH
<br />ARCHITECTURAL PLAN. INSTALL GALVANIZED DUCT
<br />WORK DOWN FROM GRAVITY ROOF VENT. SIZE OF DUCT
<br />TO MATCH SIZE OF GRAVITY ROOF VENT OPENING. RUN
<br />DUCT IN CEILING / JOIST SPACE AND CONNECT TO
<br />CEILING MOUNTED EXHAUST FAN PER MANUFACTURER'S
<br />RECOMMENDATIONS.
<br />® RELOCATE EXISTING THERMOSTAT SUPPLIED IN SHELL
<br />PROJECT TO LOCATION SHOWN.
<br />OUTSIDE AIR CALCULATION
<br />AREA
<br />PEOPLE / 1,000
<br />CFM /
<br />CFM /SQFT
<br />CFM
<br />CFM
<br />AREA SERVED
<br />(SQFT)
<br />(SQFT) (1)
<br /># PEOPLE
<br />PERSON (1)
<br />(1)
<br />CALCULATED
<br />SUPPLIED
<br />B1B2
<br />2,866
<br />-
<br />-
<br />-
<br />0.3
<br />1 860
<br />1 RE: NOTE (2)
<br />(1) PER TABLE 403.3 - FLORIDA BUILDING CODE - MECHANICAL 2007
<br />(2) THE OUTSIDE AIR OF THE EXISTING RTU'S SHALL BE BALANCED AS REQUIRED AS PART OF THE FUTURE TENANT BUILD OUT.
<br />GRAVITY ROOF VENT SCHEDULE
<br />THROAT
<br />TYPE
<br />CFM
<br />SERVICE
<br />MANUFACTURER
<br />MODEL
<br />NOTES
<br />SIZE
<br />GRVA
<br />200
<br />EXHAUST
<br />0.852
<br />COOK
<br />PR 12
<br />1,2
<br />NOTES:
<br />1. PROVIDE
<br />MANUFACTURER'S ROOF CURB. COORDINATE WITH ROOF TYPE.
<br />2. PROVIDE INSECT SCREEN.
<br />AIR DEVICE SCHEDULE Z-10or
<br />TAG
<br />G./CAT. #
<br />TYPE
<br />NECK
<br />FRAME
<br />FINISH oO
<br />NOTES
<br />0-125CFM = 6'RND
<br />12x12
<br />130 -150 CFM = 6" RND
<br />A
<br />TITUS - TMS-
<br />CD
<br />160 - 275 CFM = 8" RND
<br />B T. ENAMEL
<br />1,2,3,4,5
<br />280 - 390 CFM =10" RND
<br />24 x 24
<br />400 - 600 CFM =12" RND
<br />B
<br />I TITUS - 50F
<br />RAR
<br />22 x 22 (MAX 1280 CFM)
<br />2 4
<br />BAK. WHT. ENAMEL
<br />1,2,4,E
<br />DEVICE TYPE LEGEND:
<br />CD = CEILING DIFFUSER
<br />RAR = RETURN AIR REGISTER
<br />EAR = EXHAUST AIR REGISTER
<br />SAG = SUPPLY AIR GRILLE
<br />NOTES:
<br />1. PROVIDE CEILING DEVICES WITH PR R FRAME STYLE TO MA CEILING TYPE AS CALLED FOR BY
<br />ARCHITECT.
<br />2. DEVICES SHALL BE PROVIDED FACTORY FINISH.
<br />3. CEILING DIFFUSERS SHAL 4-WAY THROW UNLESS NOTED OTHERWISE SHOWN ON PLANS WITH
<br />DIRECTIONAL ARROW
<br />4. IF NECESSARY, PR E TOP HAT FOR GRILLES REGISTERS AND DIFFUSERS.
<br />5. PROVIDE EQU G GRID (TITUS MODEL EG). FOR DIFFUSERS TAPPED DIRECTLY BOTTOM
<br />OF DUCT, P IDE OPPOSED BLADE DAMPER (TITUS MODEL D-57).
<br />6. PROVID POSED BLADE DAMPER FOR REGISTERS.
<br />NOT USED
<br />TYPICAL SEQUENCE OF OPERATION
<br />THE A/C UNIT SHALL BE STARTED AND STOPPED FROM A ROOM THERMOSTAT. ON A CALL FOR
<br />COOLING, THE THERMOSTAT SHALL ENERGIZE THE COMPRESSOR(S) TO MAINTAIN SET POINT. ON A
<br />CALL FOR HEATING, THE THERMOSTAT SHALL ENERGIZE THE ELECTRIC HEAT IN STAGE(S) TO
<br />MAINTAIN SET POINT. SUPPLY FAN SHALL RUN CONTINUOUSLY DURING OCCUPIED HOURS.
<br />DRAWING INDEX
<br />SHEET NUMBER
<br />TITLE
<br />M101
<br />Mechanical General In meflon A
<br />Floor Plan
<br />L
<br />C.)
<br />i
<br />6
<br />C
<br />0
<br />Q
<br />O
<br />L.
<br />Lu
<br />cc Z Co
<br />UQ°
<br />.PVC+)
<br />W UL
<br />w EmQ
<br />N2
<br />w •+MH
<br />J
<br />U
<br />0)
<br />a
<br />O
<br />E
<br />E
<br />O
<br />U
<br />L
<br />N 00
<br />�o
<br />(U J
<br />N m
<br />m
<br />�a
<br />m
<br />Um
<br />CIR
<br />U) 0 _j
<br />J
<br />w CU
<br />� 04
<br />a� LO
<br />I��N
<br />a
<br />Cu
<br />E
<br />0
<br />c
<br />9
<br />O
<br />Cu
<br />Cu
<br />J `/
<br />W
<br />w
<br />w
<br />x
<br />Cn
<br />1=
<br />P'
<br />rn
<br />W
<br />o
<br />N
<br />J
<br />z
<br />CD
<br />N
<br />w CNui
<br />U
<br />a
<br />O
<br />o
<br />U
<br />m 10 1
<br />
|