Laserfiche WebLink
1X4 1I2" DRYWALL <br />DOOR JAMB (REFER 1 X 4 1!2" DRYWALL <br />DOOR JAMB REFER 1 X 4 DRYWALL <br />( <br />UNACCEPTABLE INSTALLTION <br />DOOR JAMB (REFER <br />TO SHT. SDW2-K1 P.T. <br />TO SHT. SDW2-K1 <br />TO SHT. SDW2-K1 <br />FOR CONN. DETAILS <br />MAX. 8" DO NOT DO THIS <br />PROPER INSTALLATION <br />2"x BOT. PLATE W/ (2) 10d @ 6" O.C. <br />FOR CONN. DETAILS <br />1 X 4 <br />FOR CONN. DETAILS ., <br />1 X 4 <br />3/16"0 X 3" LONG FURRING <br />71/2" <br />1 X 4 <br />FURRING <br />3/16"0 X 3-1/2" LONG '' "' <br />#5 REBAR (TYP,) <br />#5 REBAR (TYP,) <br />3J4" PLYWOOD DECKING GLUED <br />AND NAILED W18d COMMON @ , <br />3-1/4" LONG X 3/16"0 FURRING <br />TAPCONS <br />6" O.C. EDGES AND 12" O.C. FIELD <br />TAPCON. INTO <br />STAGGERED @ 16" <br />TAPCONS STAGGERED 2X8 <br />ATTACHED WALL SHEATHING TO <br />BLOCK@ SPACING ,� <br />1 DETAIL <br />1X8 P.T. <br />O.C. 2-ROWS INTO <br />STAGGERED @ 16" O.C. 1X8 <br />2-ROWS INTO <br />2X BOTTOM PLATE W/ 8d @ 4" O.C., 2 <br />ROWS STAGGERED <br />PER MANUFACTURE <br />MASONRY THROUGH „ <br />—1 /2 DETAIL <br />MASONRY THROUGH 311 DETAIL <br />D. 90° HOOK (TYP.) <br />STD. 90" HOOK (TYP.) <br />1x4 P.T. & 1x8 P.T. <br />1x8 P.T. & 2x8 P.T. <br />FILL SOLID <br />BOTH CELLS <br />2x BAND JOIST <br />METAL SEAT PLATE 10d @ TOP & BTTM CHORD / FACE IL <br />NOTE: AND (8) FACE NAILS 10d @ <br />3/16" x 3 -1/2" <br />TAPCON @ 16" <br />O.C. & 4" FROM <br />1X4 P.T. <br />3/16" x 3 -1/2" <br />DOOR JAMB (REFER 1 X 4 1/2" DRYWALL <br />Ll <br />LAP SHEATHING TO <br />BOTTOM OF BAND TRUSS VERT. WEB <br />DOOR JAMB (REFER EACH END W/ MIN. <br />DOOR JAMB (REFER TAPCON <br />TO SHT. SDW2-K1 FOR <br />I <br />JOIST TYPICAL <br />TO SHT. SDW2-K1 2" EDGE DIST. <br />TO SHT. SDW2-K1 <br />CONN. DETAILS <br />FOR CONN. DETAILS <br />" <br />FOR CONN. DETAILS �=j �': <br />10d @ 12"' O.C. 1 X 4 <br />FURRING <br />- <br />2X8 P.T. WITH 3/161 X 3" <br />+2�� NOTC @ FIRST COURSE <br />USP HGAM10 @ 12" O.C. w/4-SDS 1/4x1 1/2" <br />LONG TAPCONS <br />SCREWS INTO BAND JOIST & (4) 3/16"x1-3/4" <br />2x P.T. AS REQ'D <br />2X8 P.T. <br />2X8 <br />STAGGERED @ 16" O.C. <br />WEDGE BOLTS INTO K.O. BLOCK <br />2x DETAIL <br />2 1/4" DETAIL <br />2-ROWS INTO MASONRY 3-1/4" DETAIL <br />NOTCH WEB AT THE FIRST 2 COURSES <br />+5" <br />FILLED CELL PER FOUNDATION PLAN <br />rH'�' <br />BUILDOUT @OVER SIZE DOOR -WINDOW ROUGH OPENINGS CC <br />FILLED CELL INSTALLATION <br />RETROFIT FOR MISSING EMBEDDED STRAP <br />SCALE: N.T.S. SS <br />SCALE: N.T.S. �+ <br />SS <br />SEE TYP. 2-STORY WALL SECTION FOR ADDL. INFO SCALE: N.T.S. <br />2x8 P.T. BUCK -CONNECT TO BLOCK SECTION <br />UPLIFT CAPACITY = 945 # FOR 1 STRAP <br />W/ 1/4" x 31/4" TAPCON ( 1 1/4" MIN. A -A <br />= 1890 #FOR 2 STRAPS <br />:� ' , FILL 1st4 COURSES <br />EMBEDMENT INTO BILK.) 1/4" MAX <br />�. SOLID W/GROUT <br />•:• <br />2'-0" 8' , <br />1-PLY PRE-ENGINEERED TRUSS <br />' x <br />1 X 4 FURRING SOLID BLKG. AT TOP BTWN. 1/4" x 31/4" TAPCONS <br />ARCH BLKG. &BUCK <br />1 1 <br />s % USP RT16M W/ (8) NA11 NAILS & (6) x 24' <br />BLOCK HEADER <br />4" <br />TAPCONS <br />1/2" DRYWALL * <br />_ (IF TRUSS IS 2 PLY INSTALL USP HTWM16 W! (6) <br />10d NAILS x 11" NAILS AND <br />8d NAILS AT 8„ O.C. AT BUCK <br />2 x 8 45^ DIAGONAL LEAVE A CUTOUT IN O.S.B. ON THE <br />(4) 4" X 1 41' WEDGE BOLTS [ (1) STRAP = 1225 # ; <br />(4)10d NAILS INTO <br />BRACE(S) 2 x 8 BRACE/ BLKG. INSIDE TO ALLOW FOR INSULATION <br />(2) STRAPS 2450#]) <br />•.' <br />7/16" OSB TO BE INSTALLED <br />BOND BEAM OR CAST <br />FOR OVERHANGS BETWEEN OVER 1 1/2" <br />BUILT UP PLWD. BUCK ARCH PANEL CUT HOLE IN O.S.B. FOR <br />POLY -CELL IN THIS AREA 2 x 8 45 DIAGONAL BRACE AT EA. <br />IN PACE BEAM <br />CONTACT ENGINEER OF RECORD FOR <br />FURTHER INSTRUCTIONS. ' °• . �'••a '; '• ' .. <br />SCRIBE (NOTCH) * FACE OF ARCH W/ (3) 10d NAILS <br />• <br />BACKSIDE TO FIT ARCH (4) 10d NAILS INTO 2 x 8 AT EA. END <br />RETROFIT TRUSS DETAIL <br />OVERRAN :�' .�••:.�•�• ;,: <br />:�• .. <br />CONNECT W/ 8d NAILS BRACE/ BLKG. <br />N.T.S. <br />INSTALL WDW. SCREW ANCHOR4 2 x 4 SOLID BLKG. (FULL WIDTH OF WALL) BTWN. OSB <br />ARCH FACES W (4) 10d NAILS THRU OSB INTO 2 x 8 PROVIDE TAPCON WITHIN <br />RETROFIT WALL OVERHANG DETAIL (NTS) <br />INTO ARCH BLKG. PER <br />4 MIN. OF BRACE <br />A <br />2 X 4 #2 SYP SCAB TO SIDE OF <br />INSTALLATION DETAILS -A PROVIDE TAPCON PER WDW. INSTALLATION DETAILS OR THRU <br />TRUSS AS SHOWN FOR O.H. UP TO 2'-6" <br />FOR OVERHANGS BETWEEN 3/8" TO 1 1/2" <br />1-1/2" THK. OR MORE BUCK WITHIN 6" MIN. OF START OF ARCH <br />START OF ARC <br />2X6 SYP #2 CONT. (MATCH TRUSS DEPTH <br />IF TRUSSES USED) W/ (3) #6 X 4%" WOOD <br />/ * DOUBLE 2x4 SCAB FOR 2'-6" TO 4'-0" O.H. <br />NOTE: FOR OVERHANGS LESS THAN 3/8"- NO REPAIR REQ'D. <br />/ <br />X 10d NAILS @ 8" O.C. <br />4' MAX. RAD. <br />SCREWS @ 16" O.C. MAX. OR IF MASONRY <br />� <br />0TO TRUSS TOP CHORD <br />FRygN T <br />ARCH DETAIL <br />WALL USE (3) 1/4" X 31/2" TAPCONS AT 16" <br />/ <br />SCALE: N.T.S. SS <br />O.C. 12 <br />tFl�GT <br />+ + PLYWOOD SHEATHING <br />H <br />1 r-On 5r-On <br />JACK TRUSS PROVIDED BY <br />+ <br />TRUSS COMPANY OR PAN <br />2x6 #2 SYP @ 24" O.C. - <br />+ + <br />+ + <br />"INISH FLO <br />2 <br />x 8 BUCK - CONNECT TO BLOCK SECTION <br />+ + BLOCKING AS <br />° <br />WITH <br />1/4" x 31/4" TAPCON (1 1/4" MIN. B B <br />ROOF SHEATHING ATTACHED <br />+ REQUIRED <br />D <br />1/4" MAX EMBEDMENT INTO K.) <br />PER NAILING SCHEDULE <br />ALL <br />+ TO SUPPORT <br />TRUSS SOFFIT <br />° . ° D Q . o <br />#5 BAR <br />'� <br />2-0.. 8 <br />+ <br />pD 10 Q . o D ° <br />BLOCK HEADER <br />SOLID BLKG. AT TOP BTWN. ARCH <br />(5) -12d NAILS <br />+ <br />+ <br />CENTERED W/D <br />° <br />9T H <br />1 X 4 FURRING <br />BLKG. &BUCK <br />2X6 TO 2X4 USP RT3A <br />2X4 SYP ®®� <br />o ° °� IN TOP <br />KNOCKOUT / � <br />EACH TRUSS <br />o <br />8d NAILS @ 8" O.C. AT BUCK <br />-- ° CHAIR BLOCK <br />PROVIDE 2 x 8 DIAG. BRACE B <br />2 x 8 VERT. W/ (2) 10d <br />NAILS AT EA. END <br />PROVIDE (2) MIN. <br />PROVIDE 2x - <br />. - <br />CONT. W/ (3) <br />CONNECTOR <br />- i> <br />- - <br />MONO FOOTING - : p ° <br />° <br />VERT. BRACES WHEN HGT. OF <br />BRACE EXCEEDS 24" <br />TAPCON AT EA. SIDE1-7 <br />BUCK - (1) WITHIN 4;' <br />12d NAILS <br />TRUSS PROVIDED BY <br />SEE LINTEL <br />SIZE AND REINF. PER PLAN --- D� <br />AND SECTION DETAILSJACK <br />LEAVE A CUT OUT IN O.S.B. ON T <br />MIN. OF START OF <br />TRUSS COMPANY OR 2x4 <br />SCHED. <br />CLEAN FILL <br />2 x 8 VERT. BRACES) <br />INSIDE TO ALLOW FOR INSULATION <br />ARCH <br />#2 SYP @ 24" O.C. <br />ENTER SO IT <br />DIRT z <br />TO BE INSTALLED <br />BUILT UP PLWD. BUCK - <br />PRECAST LINTEL <br />°. STANDARD o <br />4'-0" MAX SEE PLAN <br />SCRIBE (NOTCH) BACKSIDE <br />7/16" OSB ARCH PANEL <br />2X4 SYP #2 CONT. (MATCH TRUSS DEPTH <br />SEE ELEVATION <br />� D 90 HOOK N <br />#5 BAR IN <br />TO FIT ARCH CONNECT W/ <br />IF TRUSSES USED) W/ (2) #6 X 4%i' WOOD <br />FOR OVER HANG <br />FILLED CELL <br />8d NAILS <br />2 x 4 SOLID BLKG. (FULL WIDTH OF WALLS) <br />START OF ARC <br />SCREWS @ 16" O.C. MAX. OR IF MASONRY <br />(MAX. 4'-0") <br />� ' � �' � " � � ` <br />BTWN. OSB ARCH FACES W/ (4) 10d NAILS EQUAL EQUAL <br />4' MAX. RAD. <br />WALL USE (2) 1/4" X 3 1/2" TAPCONS AT 16" <br />° ' <br />INSTALL WDW, SCREW <br />THRU OSB INTO 2 x 8 <br />O.C. <br />ANCHOR INTO ARCH BLKG. <br />STEMWALL FOOTING <br />SIZE AND <br />PER INSTALLATION DETAILS <br />B_g <br />ARCH DETAIL K <br />SECTION @ ENTRY L <br />SECTION @ROOF EXTENSION M <br />REINF. PERLAN AND <br />STEMWALL <br />MONO TO STEMWALL FOOTING <br />SCALE: N.T.S. SS <br />SCALE: 3/4" 1'-0" SS <br />SCALE: 3/4" V-0'" SS <br />SECTION DETAILS <br />SCALE: 3/4" = 1'-0" <br />GLASS BLOCK INSTALLATION PERFORMED IN ACCORDANCE WITH FRC /FBC <br />NOTE: IF RETROFIT FILLED CELL CONDITIONS <br />A) COVER SILL AREA WITH A HEAVY COAT OF ASPHALT EMULSION. ALLOW EMULSION TO DRY <br />EXCEED (3) PER PROJECT, CONTACT ENGINEER OF RECORD <br />AT LEAST 2 HOURS BEFORE PLACING MORTAR. <br />B) ADHERE EXPANSION STRIPS TO JAMBS AND HEAD. MAKE CERTAIN EXPANSION STRIP <br />FOR ADDITIONAL INSTRUCTION. <br />EXTENDS TO SILL. <br />C) SET A FULL MORTAR BED JOINT, APPLIED TO SILL. <br />MASONRY WALL. SEE PLAN FOR <br />EXISTING BOND BEAM. <br />D) SET LOWER COURSE OF BLOCK. MAINTAIN A UNIFORM JOINT WIDTH OF 3/8" PLUS OR MINUS <br />REINFORCING. PROVIDE LOWER <br />HOOKED DOWEL <br />1/8". ALL MORTAR JOINTS MUST BE FULL AND NOT FURROWED. ALL MORTAR SHALL BE <br />SEE SHEET D2 AND <br />DRILL 3/4"X6"MIN. HOLE <br />TYPE ""S" OR "N". STEEL TOOLS MUST NOT BE USED TO TAP BLOCKS INTO POSITION. (PACE EXPANSION STRIP <br />FLOOR PLAN FOR <br />A RUBBER CRUTCH TIP ON END OF TROWEL TO TAP BLOCK INTO POSITION.) DO NOT 20 ga. PANEL <br />MORE INFO <br />SET BAR IN EPDXY <br />REALIGN, TAP, OR OTHERWISE MOVE BLOCK AFTER INITIAL PLACEMENT, FOR SOLID GLASS <br />ANCHOR <br />HTT16 W/ (18) - 16d NAILS TO <br />CAP TO PREVENT LEAKAGE <br />BLOCK IT MAY BE NECESSARY TO USE WEDGES IN THE MORTAR JOINTS OF THE LOWER <br />W.W.AT PERIMETER <br />COURSES TO PREVENT THE MORTAR FROM BEING SQUEEZED OUT. 1/4 EXPANSION BOLT (2 <br />WHERE THIS CONDITION <br />STUDS &1 5/1 DIA. ALLM. <br />() <br />#5X6 EMBEDDED INTO <br />E) INSTALL PANEL REINFORCING IN EVERY OTHER MORTAR BED HORIZONTALLY AND IN JOINTS 9 ga. PANEL PER ANCHOR) <br />(1) #5 BARS CONT. OCCURS <br />TOP WITH MIN. 3" <br />THREAD ROD EPDXIED W/ <br />SIMPSON "SET" EPDXY MIN. <br />} <br />Z EXISTING BOND BEAM <br />IMMEDIATELY ABOVE AND BELOW ALL OPENINGS WITHIN PANELS. THE SAME SPACING <br />( REINFORCING <br />COVER 6'-0" <br />5" EMBEDMENT & 3" MIN. <br />O <br />CD <br />SHALL APPLY TO PANEL ANCHORS WHEN USED AT JAMBS AND HEADS IN LIEU OF CHANNEL (EVERY OTHER <br />F•F• <br />Q FILL CELL FULL HEIGHT WI <br />OR CHASE SURROUNDS.) RUN REINFORCING CONTINUOUSLY FROM END TO END OF PANELS. COURSE) EXPANSION STRIP <br />EDGE DISTANCE <br />w NON SHRINK GROUT. <br />LAP REINFORCING NOT LESS THAN 6 INCHES WHENEVER IT IS NECESSARY TO USE MORE <br />U_ LU <br />THAN ONE LENGTH. DO NOT BRIDGE EXPANSION JOINTS WITH REINFORCING. INSTALL <br />D <br />p P a <br />w d A <br />REINFORCING AS FOLLOWS: <br />a 1 <br />* SEALANT <br />PLACE LOWER HALF OF MORTAR IN BED JOINT. DO NOT FURROW. <br />o II-III-III-III-III=III; <br />I III <br />�- Q <br />* PRESS PANEL REINFORCING INTO PLACE. <br />—III=III—III—III <br />k _ " <br />I=III=III—I I <br />, <br />0 z #5X6 EMBEDDED INTO <br />6" MIN. LAP SPLICE W/ <br />° - -I (- <br />EXISTING FOOTING 2-#5X6' IN CONG. <br />* COVER PANEL REINFORCING WITH UPPER HALF OF MORTAR BED AND TROWEL REINFORCING PANEL <br />I=1 I=1 I= <br />Q - <br />N FILLED CELL <br />SMOOTH. DO NO FURROW. <br />p .D III=III= <br />DRILL 3/4"X6" MIN. HOLE <br />F) PACE FULL MORTAR BED FOR JOINTS NOT REQUIRING PANEL REINFORCING - DO NOT <br />III=I I GRADE P. t> — _ <br />� <br />SET BAR IN EPDXY <br />FURROW. MAINTAIN UNIFORM JOINT WIDTH. " <br />6 MIN. LAP <br />� <br />D' <br />o <br />G) SET SUCCEEDING COURSE OF BLOCKS. SPACE AT HEAD OF PANEL AND JAMBS MUST SPLICE <br />N <br />REMAIN FREE OF MORTAR. NOTE: <br />co z <br />H) STRIKE JOINTS SMOOTH WHILE MORTAR IS STILL PLASTIC AND BEFORE FINAL SET. AT THIS SEE GLASS BLOCK INSTALLATION NOTES. <br />N ' <br />r • o <br />TIME RAKE OUT ALL SPACES REQUIRING SEALANT TO A DEPTH EQUAL TO THE WIDTH OF THE SEALANT <br />D <br />I ;4" SAW CUT <br />SPACES. REMOVE SURPLUS MORTAR FROM FACES OF GLASS BLOCKS AND WIPE DRY. GLASS BLOCK DETAIL <br />\ (2) #5 REBAR. MIN. 3" <br />TOOL JOINTS SMOOTH AND CONCAVE, BEFORE MORTAR TAKES FINAL SET. (REMOVE <br />WEDGES FROM LOWER COURSES OF SOLID BLOCKS AND POINT THE VOIDS WITH MORTAR.) *(110 mph FASTEST WIND = 130 mph, 3 SEC. GUST. FRC TABLE R301.2.1.3) <br />16" MIN. COVER EA. WAY <br />A SECTION <br />1) AFTER FINAL MORTAR SET (APPROX. 24 HOURS), INSTALL PACKING TIGHTLY BETWEEN *(110 mph FASTEST WIND = 130 mph, 3 SEC. GUST. FBC TABLE 1606.1.6.1) <br />EXISTING FOOTING <br />GLASS BLOCK PANEL AND JAMB AND HEAD CONSTRUCTION. LEAVE SPACE FOR SEALING. <br />SCALE: N.T.S. <br />J) APPLY SEALANT EVENLY TO THE FULL DEPTH OF RECESSES IN ACCORDANCE WITH THE <br />SECTION AT DEEP MONO FOUNDATION <br />RETROFIT FOR MISSING MSTAM STRAP <br />MANUFACTURER'S APPLICATION MANUAL AND INSTRUCTIONS. <br />RETROFIT FILLED CELL DETAIL <br />- K) A MAXIMUM OF 60 SQUARE FEET OF GLASS BLOCK MAY BE INSTALLED IN ANY OPENING. <br />SCALE: 3/4" = 1'-0" <br />SCALE: 3/4" = V-0" <br />FOR WIND SPEEDS UP TO 110 MPH*, PER PITTSBURG CORNING RECOMMENDATIONS FOR <br />SCALE: N.T.S. <br />INSTALLATION OF GLASS BLOCK. <br />o <br />� <br />N <br />m <br />N <br />Mo o <br />or, <br />00 <br />O <br />cNn <br />_ <br />®M ® O <br />m fd U <br />"0 <br />�a <br />N <br />cZ LL r) m <br />Rs "= <br />t. <br />0 2 <br />d M <br />N O <br />U <br />d <br />3 0.0 <br />0 CO <br />a� <br />C6 <br />LO <br />o <br />rn <br />O <br />A <br />� <br />NC B DC <br />wG <br />P <br />B <br />D® <br />a2 <br />zji400d ,r <br />o <br />z <br />re <br />� <br />a ¢ rn <br />Z) 0 <br />Z <br />anq�d°a� <br />_ <br />^kTt-O <br />J U <br />Ins <br />To the best of the engineer's knowledge and <br />understanding, the structural plans and <br />specifications comply with the 2007 Florida <br />Building Code, Residential with 2009 revisions <br />signed and sealed for the structural portion of this <br />drawing. <br />O <br />r_4 M <br />Z CU cl <br />ko <br />N CD® <br />_j <br />N M o <br />a 'i fu <br />Fa- fu N <br />Ce S L N <br />n <br />Z�.�%%.. <br />Z <br />LU <br />Uj <br />to N <br />Ln U <br />a <br />z <br />LLJ <br />W LE o <br />I <br />LLJ <br />m Z Z 4 a <br />00 <br />Lu <br />Ul-2:(n0O <br />F-arz¢U <br />zrQ82:¢ <br />=R:EZZ <br />22gW�o_j <br />U'% <br />040 <br />v = O =) w N <br />T-� <br />I—aoz0 <br />O <br />cawJ <br />J <br />T <br />to <br />Q <br />J <br />J <br />tO <br />t-1 <br />r—I <br />> <br />Ln <br />uj W � <br />¢zU0 <br />LU Lo <br />FV)mCLL) <br />°oaFw��o`F <br />z¢zz <br />LU <br />8�w <br />00 <br />u_10 W9o_ <br />0 u_ z <br />W <br />p <br />w Q <br />QQFon <br />//1� <br />L/ <br />0 d� � n <br />Q <br />O <br />r-i <br />1 <br />J O z <br />asUj LU <br />© <br />4 F <br />" <br />z <br />LU <br />U0 <br />z <br />z <br />O <br />SCALE <br />AS NOTED <br />PLOT DATE : 03 / 31 / 2011 <br />VERSION NO. <br />isoo <br />JOB NO: 11-0441-0444 <br />SHEET NO. <br />SS <br />tttttttttr�tttt�wes�r�r�n��rn�m�mn�ermm�n�at ttw�tt�® <br />