Laserfiche WebLink
Plan Review 5.5.4.2.3 Envelope <br />In buildings > 2,500 ft2, any enclosed spaces <br />directly under a roof with ceiling heights > 15 ft. <br />and used as an office, lobby, atrium, concourse, <br />corridor, storage (including nonrefrigerated <br />warehouse), gymnasium, fitness/exercise area, <br />playing area, gymnasium seating area, <br />convention exhibit/event space, courtroom, <br />automotive service, fire station engine room, <br />manufacturing corridor/transition and bay areas, <br />retail, library reading and stack areas, <br />distribution/sorting area, transportation baggage <br />and seating areas, or workshop, the following <br />requirements apply: The daylight zone under <br />skylights is >= half the floor area and (a) the <br />skylight area to daylight zone is — 3 percent with <br />a skylight VT — 0.40 or (b) the minimum skylight <br />effective aperture >= 1 percent. The skylights <br />have a measured haze value > 90 percent. <br />Plan Review 5.5.4.2.3 Envelope <br />In buildings > 2,500 ft2, any enclosed spaces <br />❑ 0 0 <br />directly under a roof with ceiling heights > 15 ft. <br />and used as an office, lobby, atrium, concourse, <br />corridor, storage (including nonrefrigerated <br />warehouse), gymnasium, fitness/exercise area, <br />playing area, gymnasium seating area, <br />convention exhibit/event space, courtroom, <br />automotive service, fire station engine room, <br />manufacturing corridor/transition and bay areas, <br />retail, library reading and stack areas, <br />distribution/sorting area, transportation baggage <br />and seating areas, or workshop, the following <br />requirements apply: The daylight zone under <br />skylights is >= half the floor area and (a) the <br />skylight area to daylight zone is >= 3 percent with <br />a skylight VT — 0.40 or (b) the minimum skylight <br />effective aperture — 1 percent. The skylights <br />have a measured haze value > 90 percent. <br />Plan Review 5.5.4.2.3 Envelope <br />In buildings > 2,500 ft2, any enclosed spaces <br />013 ❑ <br />directly under a roof with ceiling heights > 15 ft. <br />and used as an office, lobby, atrium, concourse, <br />corridor, storage (including nonrefrigerated <br />warehouse), gymnasium, fitness/exercise area, <br />playing area, gymnasium seating area, <br />convention exhibit/event space, courtroom, <br />automotive service, fire station engine room, <br />manufacturing corridor/transition and bay areas, <br />retail, library reading and stack areas, <br />distribution/sorting area, transportation baggage <br />and seating areas, or workshop, the following <br />requirements apply: The daylight zone under <br />skylights is >= half the floor area and (a) the <br />skylight area to daylight zone is >= 3 percent with <br />a skylight VT — 0.40 or (b) the minimum skylight <br />effective aperture — 1 percent. The skylights <br />have a measured haze value > 90 percent. <br />Plan Review 5.5.4.2.3 Envelope <br />In buildings > 2,500 ft2, any enclosed spaces <br />❑ ❑ <br />directly under a roof with ceiling heights > 15 ft. <br />and used as an office, lobby, atrium, concourse, <br />corridor, storage (including nonrefrigerated <br />warehouse), gymnasium, fitness/exercise area, <br />playing area, gymnasium seating area, <br />convention exhibit/event space, courtroom, <br />automotive service, fire station engine room, <br />manufacturing corridor/transition and bay areas, <br />retail, library reading and stack areas, <br />distribution/sorting area, transportation baggage <br />and seating areas, or workshop, the following <br />requirements apply: The daylight zone under <br />skylights is >= half the floor area and (a) the <br />skylight area to daylight zone is — 3 percent with <br />a skylight VT >= 0.40 or (b) the minimum skylight <br />effective aperture — 1 percent. The skylights <br />have a measured haze value > 90 percent. <br />EnergyGauge Summit® Fla/Com-2020. Effective Date: Dec 31, 2020 <br />Florida Building Code, Seventh Edition (2020) - Energy Conservation C402.1.1: ASHRAE Energy Cost Budget Option <br />5/19/2022 Page 11 of 24 <br />