My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 Gall Blvd (134)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 Gall Blvd (134)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2025 10:27:49 AM
Creation date
2/18/2025 3:58:38 PM
Metadata
Fields
Template:
Building Plans
Street #
7050
Location
Gall Blvd
Contractor
Berglund Construction Co
Building Plans - Permit #
2206
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H. Damages to existing structures, utilities and other items which are caused by Contractor's <br />operations shall be repaired or replaced to their original conditions. <br />1.3 USE OF PREMISES <br />A. Use of site: Limit use and operation at site to "Limits of Construction," indicated and required to <br />perform Work. Portions of site beyond area of required Work shall not be disturbed without <br />written approval of Owner. <br />1. Obtain written approval from Owner at least seven (7) working days in advance when <br />scheduling Work outside limits of construction. Provide Owner an estimate of time needed <br />to perform Work outside limits of construction. <br />2. Cutting, capping, and reconnecting utility systems outside limits of construction shall be <br />performed by Contractor, unless otherwise noted. <br />3. Conform to all laws, ordinances, permits and regulations affecting Work on site. <br />4. Existing roads, streets, drives, parking lots, entrances and required fire exitways shall be <br />kept clear and available at all times for their intended use. Do not use these areas for <br />parking, staging or storage without Owner's written approval. Coordinate with Owner, and <br />provide alternate routes for public and Owner access if normal routes are affected. <br />5. Do not unreasonably encumber site with equipment, materials or vehicles. <br />6. Return all improvements on or about site and adjacent property which are not shown to be <br />altered, removed or otherwise changed; to conditions which existed previous to starting <br />performance under Contract. <br />B. Use of facilities: <br />1. Limit use and operation within existing facilities to areas indicated for construction Work <br />and as required to perform Work. Other areas within facility shall not be disturbed or <br />disrupted. <br />2. Perform Work so as not to interfere or inconvenience public, staff and Owner's operation. <br />3. Maintain and keep clear all required fire exitways throughout facility within and in vicinity <br />of construction areas. Coordinate alternate temporary egress routes with Owner and local <br />fire authority. <br />4. Do not load structure with weights that will endanger structure. <br />5. Smoking is prohibited within facilities or on Owner's property. <br />6. Audio devices and radios are prohibited, except two-way radios needed for Contractor's <br />operations. Use of two-way radios within occupied facilities shall be limited, so not to <br />disrupt occupants. <br />7. Use of toilet facilities, washrooms, and telephones within existing facility or occupied areas <br />is not allowed without Owner's consent. <br />8. Elevators in existing facility or within occupied areas of addition may not be used by <br />construction personnel without Owner's consent and such use shall meet following <br />conditions: <br />a. Protect and maintain entire system during temporary use. <br />b. Repair or replace any damaged components of system. <br />c. Clean all finishes. <br />9. Cafeteria and dining areas may not be used by construction personnel without Owner's <br />consent. <br />10. T-shirts or other clothing with derogatory depictions, language, and/or slogans regarding <br />alcohol, drugs, race or sexual in nature, shall not be worn on premises. <br />11. Coordinate construction operations to assure that operations are carried out with <br />consideration given to conservation of energy, water, and materials. <br />12. Maintain existing building in a weathertight condition throughout construction period. <br />Repair damage and leaks caused by construction operations. Take all precautions necessary <br />to protect building and its occupants during construction period. <br />13. Make every effort to keep noise to a minimum in construction operation. Jack hammer will <br />not be permitted to use within the existing building without Owner's consent. <br />14. Derogatory language regarding race, sexual or religious in nature, shall not be used on <br />premises. <br />042.21-177.01 AdventHealth - Zephyrhills: Operating Room #5 - Cystoseopy 3/17/2021 <br />COORDINATION WITH OCCUPANTS <br />01 14 16 - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.