I <br />UniSpec II - Store Planning <br />SECTION 01255 - REQUEST FOR INFORMATION <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />' A. Section Includes: <br />1. Requests for Information (RFI) procedures. <br />DEFINITION <br />062615 <br />A. Requests for Information: A formal online process used during the construction phase to facilitate communication <br />between the Contractor, the Wal-Mart Construction Manager, and the Professional of Record with regard to re- <br />quests for additional information and clarification of the intent of the Contract Documents (Drawings and Specifi- <br />cations). <br />B. Professional of Record: The Architect of Record (AOR) or the Civil Engineering Consultant (CEC). <br />C. Architect of Record (AOR): The prime consultant in charge of overall design and coordination of the project. The <br />AOR will be the administrator for all construction RFIs classified as "BLDG". <br />D. Civil Engineering Consultant (CEC): The Registered Engineer in responsible charge of the civil design for the <br />project. The CEC will be the administrator for sitework RFIs classified as "SITE". <br />r1.3 REQUEST FOR INFORMATION SUBMITTAL <br />A. Submit requests for information for conditions requiring clarification of the Contract Documents on Wal-Mart <br />Construction RFI website as designated by Wal-Mart. (www.bldgpoi al.com, enter username and password, select <br />Construction RFI). Professional of Record will not respond to requests for information unless this format is uti- <br />lized and all appropriate information is provided. Faxed or e-mailed RFIs will not be reviewed. <br />B. Do not use Request for Information process during bidding phase. For questions during bidding phase, refer to In- <br />vitation to Bid issued by Wal-Mart Contract Administrator. <br />' C. Submit in accordance with procedure as follows: (See Process Flow Chart at the end of this Section) <br />1. Subcontractors, manufacturers, and suppliers shall submit request for additional information and clarifica- <br />tion to Contractor. <br />2. Contractor shall contact Wal-Mart Construction Manager with requests for additional information or clari- <br />fication. Wal-Mart Construction Manager will not accept requests for information or clarification submit- <br />ted directly from subcontractors, manufacturers, or suppliers. <br />3. Wal-Mart Construction Manager will provide response to Contractor or will direct Contractor to submit a <br />' formal Request for Information. <br />a. Submit a formal RFI only if authorized by the Wal-Mart Construction Manager. Submittal to Con- <br />struction RFI website signifies authorization has been given. <br />' b. Generate Requests for Information by one source per project. <br />C. Submit one request for information per website entry. <br />4. Professional of Record will review formal requests from Contractor and provide response within 2 working <br />days. <br />5. Professional of Record's response shall not be considered as a Change Order or Change Directive, nor does <br />it authorize changes in the Contract Sum or Contract Time. <br />D. Submit HVAC, Refrigeration, and EMS requests for information in accordance with procedure as follows: (See <br />HVAC/Refrigeration/EMS Process Flow Chart at the end of this Section). <br />1. Subcontractors, manufacturers, and suppliers shall submit request for additional information and clarifica- <br />tion to Contractor. <br />01255 - 1 <br />0706 - Zephyrhills, Florida - 16592140 February 16, 2017 <br />