My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7631 Gall Blvd (36)
Zephyrhills
>
Building Department
>
Building Plans
>
7631 Gall Blvd (36)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2025 12:05:23 PM
Creation date
2/18/2025 4:18:07 PM
Metadata
Fields
Template:
Building Plans
Street #
7631
Location
Gall Blvd
Building Plans - Permit #
18385
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
512
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Contractor shall contact Wal-Mart Mechanical Services Construction Manager with requests for additional <br />information or clarification. Wal-Mart Mechanical Services Construction Manager will not accept requests <br />for information or clarification submitted directly from subcontractors, manufacturers, or suppliers. <br />3. Wal-Mart Mechanical Services Construction Manager will provide response to Contractor or will direct <br />Contractor to submit a formal Request for Information. ' <br />a. Submit a formal RFI only if authorized by the Wal-Mart Mechanical Services Construction Manag- <br />er. Submittal to Construction RFI website signifies authorization has been given. <br />b. Generate Requests for Information by one source per project. <br />C. Submit one request for information per website entry. ' <br />4. Professional of Record will review formal requests from Contractor and provide response within 2 working <br />days. <br />5. Professional of Record's response shall not be considered as a Change Order or Change Directive, nor does <br />it authorize changes in the Contract Sum or Contract Time. <br />E. Scheduling, Costing, and Owner Provided Equipment Coordination: Direct to the Owner's Construction Manager. <br />1.4 PENALTY FOR FAILURE TO FOLLOW PROCEDURE <br />' <br />A. A $250 administrative cost will be assessed to the Contractor for each Request for Information submitted which <br />does not follow the procedure specified above. <br />' <br />1.5 REIMBURSEMENT FOR ARCHITECTURAL AND ENGINEERING FEES <br />A. The Contractor shall be charged administrative costs and professional fees incurred by Wal-Mart for additional <br />' <br />Architectural and Engineering services associated with the correction of completed Work which is not in accord- <br />ance with the Contract Documents. Refer to Paragraph 8.7 of the Construction Contract between Wal-Mart and <br />Contractor for provisions relating to correction of Work. <br />PART2-PRODUCTS <br />Not Used. <br />' <br />PART 3 - EXECUTION <br />Not Used. <br />END OF SECTION <br />1 <br />J <br />1 <br />11 <br />01255 - 2 1 <br />0706 - Zephyrhills, Florida - 16592140 February 16, 2017 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.